Professional Documents
Culture Documents
SprinkCALC III Report3
SprinkCALC III Report3
Project Location:
Drawing No. :
City:
Design Areas
Design Area
Name
Tercer piso p2
Calc. Mode
(Model)
Demand (HW)
Occupancy
Area of
Total Water Pressure @
Application
Source
Min.
Density
Min.
Pressure
Min.
Flow
Calculated
Heads
Hose
Streams
Margin To
Source
(ft)
(gpm)
(psi)
(gpm/ft)
(psi)
(gpm)
(gpm)
(psi)
2000
325,5
165,4
0,09
10,3
36
100
32,5
Page 1
HYDRAULIC CALCULATIONS
for
Job Information
Project Name : Job Name
Contract No. :
City:
Project Location:
Date: 26/09/2014
Contractor Information
Name of Contractor:
Address:
City:
Phone Number:
E-mail:
Name of Designer:
Authority Having Jurisdiction:
Design
Remote Area Name
Tercer piso p2
HTMC
Occupancy Classification
Density (gpm/ft)
0,09
2000
400
Special Heads
Hose Streams (gpm)
100
325,5
128,4
Type of System
Wet
147,7 gal
26/09/2014
Location
HTMC
Source
W2
Notes
Page 2
Node Labels:
Pipe Labels:
Off
Off
Page 3
Demand
Hazen-Williams
Water @ 60F (15.6C)
N/A for Hazen-Williams calculation.
N/A for Hazen-Williams calculation.
Supply 1 : W2
Pressure (psi)
170
150
Hoses
Inside Hose Flow / Standpipe Demand (gpm)
Outside Hose Flow (gpm)
Additional Outside Hose Flow (gpm)
100
100
Sprinklers
Ovehead Sprinkler Flow (gpm)
225,5
225,5
W2 - Pressure (psi)
128,4
W2 - Flow (gpm)
225,5
N/A
Other
Page 4
Page 5
Values
Description
S1
S2
D1
Elevation Pressure
D2
D3
Flow (gpm)
Pressure (psi)
170
500
150
4,3
System Demand
225,5
128,4
325,5
128,4
Curve Name
Supply
Safety Margin
Pressure (psi)
Flow (gpm)
Pressure (psi)
@ Flow (gpm)
164,1
258,6
32,5
325,5
Open Heads
Head Ref.
Head Type
Required
Coverage
Calculated
K-Factor
Density
Flow
Pressure
Density
Flow
Pressure
(ft)
(gpm/psi)
(gpm/ft)
(gpm)
(psi)
(gpm/ft)
(gpm)
(psi)
S62
Overhead
Sprinkler
400
11,2
0,09
36
10,3
0,129
51,7
21,3
S63
Overhead
Sprinkler
400
11,2
0,09
36
10,3
0,136
54,6
23,7
S64
Overhead
Sprinkler
400
11,2
0,09
36
10,3
0,092
36,8
10,8
S65
Overhead
Sprinkler
400
11,2
0,09
36
10,3
0,116
46,5
17,2
S66
Overhead
Sprinkler
400
11,2
0,09
36
10,3
0,09
36
10,3
Page 6
Node Data
Node#
Elev
Type
Hgroup
K-Fact.
Discharge
Coverage Tot. Pres.
Req. Pres.
Open/Closed Overdischarge Density Elev. Pres. Req. Discharge
gpm
gpm
gpm/psi
ft
ft
gpm/ft
psi
psi
psi
gpm
S62
50
51,7
15,7
400
0,129
21,3
-4,3
10,3
36
S63
50
54,6
18,6
400
0,136
23,7
-4,3
10,3
36
S64
50
36,8
0,8
400
0,092
10,8
-4,3
10,3
36
S65
50
46,5
10,5
400
0,116
17,2
-4,3
10,3
36
S66
50
36
0
400
0,09
10,3
-4,3
10,3
36
001
50
Node
NODE
14,2
-4,3
002
50
Node
NODE
20,6
-4,3
005
49
Node
NODE
27,6
-3,9
039
49
Node
NODE
124,1
-3,9
264
49
Node
NODE
27,2
-3,9
265
49
Node
NODE
27,1
-3,9
W2
40
Supply
SUPPLY
-225,5
128,4
0
Page 7
Sheet number:___________________
PIPE INFORMATION
Node 1
Node 2
Elev 1
Elev 2
(ft)
S66
001
50
50
001
002
(gpm/psi)
(gpm)
11,2
(in)
(ft)
L
F
T
(ft)
(psi)
(psi)
36
36
1 1x(us.Tee-Br)=5
1,049
5,07
5
10,07
120
0,3851
10,3
0
3,9
50
50
36,8
72,8
1.25 1x(us.Tee-Br)=6
1,38
11,22
6
17,22
120
0,3736
14,2
0
6,4
002
005
50
49
46,5
119,3
1.25 1x(us.Tee-Br)=6
1,38
1
6
7
120
0,9317
20,6
0,4
6,5
005
039
49
49
106,2
225,5
2.5 3x(us.90)=18
2,469
523,47
18
541,47
120
0,1783
27,6
0
96,5
039
W2
49
40
0
225,5
4 1x(us.90)=10
4,026
13,39
10
23,39
120
0,0165
124,1
3,9
0,4
S64
001
50
50
11,2
36,8
36,8
1 1x(us.Tee-Br)=5
1,049
3,42
5
8,42
120
0,402
10,8
0
3,4
S65
002
50
50
11,2
46,5
46,5
1.25 1x(us.Tee-Br)=6
1,38
15,13
6
21,13
120
0,1625
17,2
0
3,4
S62
265
50
49
11,2
51,7
51,7
1.25 2x(us.Tee-Br)=12
1,38
15,23
12
27,23
120
0,1979
21,3
0,4
5,4
265
264
49
49
0
51,7
2.5
2,469
9,84
0
9,84
120
0,0116
27,1
0
0,1
264
005
49
49
54,6
106,2
2.5
2,469
8,33
0
8,33
120
0,0442
27,2
0
0,4
S63
264
50
49
5,09
9
14,09
120
0,2187
23,7
0,4
3,1
11,2
54,6
54,6
1.25 1x(us.Tee-Br)=6
1,38 1x(us.90)=3
NOTES
Page 8
Hydraulic Calculations
PIPE INFORMATION
Node 1
Node 2
Elev 1
Elev 2
(ft)
(gpm/psi)
(gpm)
(in)
(ft)
L
F
T
(ft)
(psi)
NOTES
(psi)
Path No: 1
S66
001
50
50
001
002
11,2
36
36
1 1x(us.Tee-Br)=5
1,049
5,07
5
10,07
120
0,3851
10,3
0
3,9
50
50
36,8
72,8
1.25 1x(us.Tee-Br)=6
1,38
11,22
6
17,22
120
0,3736
14,2
0
6,4
002
005
50
49
46,5
119,3
1.25 1x(us.Tee-Br)=6
1,38
1
6
7
120
0,9317
20,6
0,4
6,5
005
039
49
49
106,2
225,5
2.5 3x(us.90)=18
2,469
523,47
18
541,47
120
0,1783
27,6
0
96,5
039
W2
49
40
0
225,5
4 1x(us.90)=10
4,026
13,39
10
23,39
120
0,0165
124,1
3,9
0,4
W2
128,4
Path No: 2
S64
001
50
50
11,2
36,8
36,8
1 1x(us.Tee-Br)=5
1,049
3,42
5
8,42
120
0,402
001
10,8
0
3,4
14,2
Path No: 3
S65
002
50
50
11,2
46,5
46,5
1.25 1x(us.Tee-Br)=6
1,38
15,13
6
21,13
120
0,1625
002
17,2
0
3,4
20,6
Path No: 4
11,2
S62
265
50
49
51,7
51,7
265
264
49
49
0
51,7
264
005
49
49
54,6
106,2
1.25 2x(us.Tee-Br)=12
1,38
15,23
12
27,23
120
0,1979
21,3
0,4
5,4
2.5
2,469
9,84
0
9,84
120
0,0116
27,1
0
0,1
2.5
2,469
8,33
0
8,33
120
0,0442
27,2
0
0,4
005
27,6
Path No: 5
S63
264
50
49
11,2
54,6
54,6
1.25 1x(us.Tee-Br)=6
1,38 1x(us.90)=3
5,09
9
14,09
264
120
0,2187
23,7
0,4
3,1
27,2
Page 9
Hydraulic Calculations
PIPE INFORMATION
Node 1
Node 2
Elev 1
Elev 2
(ft)
(gpm/psi)
(gpm)
(in)
(ft)
L
F
T
(ft)
Pressures are balanced to a high degree of accuracy. Values may vary by 0.1 psi due to display rounding.
NOTES
(psi)
(005-002)
Page 10
Device Graphs
Page 11