RAB Penawaran IPAL
RAB Penawaran IPAL
TENAGA AHLI
S-1
- 1 Th
- 2 Th
- 3 Th
- 4 Th
- 5 Th
- 6 Th
- 7 Th
- 8 Th
S-2
- 1 Th
- 2 Th
- 3 Th
- 4 Th
- 5 Th
- 6 Th
- 7 Th
- 8 Th
TENAGA PENDUKUNG
Asisten Muda :
- S2/S3
1 Th
2 Th
- S1
1 Th
2 Th
3 Th
4 Th
Teknisi :
- S1/D3
1 Th
2 Th
3 Th
4 Th
5 Th
6 Th
7 Th
- SMK/D1
3 Th
4 Th
8 Th
9 Th
10 Th
11 Th
Sekretaris
Surveyor
Juru Gambar/Drafter
Pilot
Kameramen
Programer
Operator Plotter
Asisten Surveyor
KEPBUP
NO. 915/Kep.367-Pemb/2007
Tgl. 11 Desember 2007
Harga Satuan
Owner Estimate
(OE) - 90 %
Harga Satuan
Owner Estimate
(OE) - 100 %
6,250,000.00
6,500,000.00
6,750,000.00
7,000,000.00
7,250,000.00
7,500,000.00
7,750,000.00
8,000,000.00
5,613,000.00
5,863,000.00
6,113,000.00
6,363,000.00
6,613,000.00
6,863,000.00
7,113,000.00
7,272,000.00
6,250,000.00
6,500,000.00
6,750,000.00
7,000,000.00
7,250,000.00
7,500,000.00
7,750,000.00
8,000,000.00
7,250,000.00
7,500,000.00
7,750,000.00
8,000,000.00
8,250,000.00
8,500,000.00
8,750,000.00
9,000,000.00
6,522,000.00
6,772,000.00
7,022,000.00
7,272,000.00
7,522,000.00
7,772,000.00
8,022,000.00
8,181,000.00
7,250,000.00
7,500,000.00
7,750,000.00
8,000,000.00
8,250,000.00
8,500,000.00
8,750,000.00
9,000,000.00
3,000,000.00
3,200,000.00
2,727,000.00
2,909,000.00
3,000,000.00
3,200,000.00
2,200,000.00
2,400,000.00
2,600,000.00
2,800,000.00
###
2,400,000.00
2,600,000.00
2,800,000.00
2,200,000.00
2,400,000.00
2,600,000.00
2,800,000.00
1,800,000.00
2,000,000.00
2,200,000.00
2,400,000.00
2,600,000.00
2,800,000.00
3,000,000.00
1,800,000.00
2,000,000.00
2,200,000.00
2,400,000.00
2,600,000.00
2,800,000.00
3,000,000.00
1,800,000.00
2,000,000.00
2,200,000.00
2,400,000.00
2,600,000.00
2,800,000.00
3,000,000.00
1,260,000.00
1,500,000.00
1,740,000.00
1,980,000.00
2,220,000.00
2,700,000.00
1,500,000.00
2,750,000.00
2,000,000.00
5,000,000.00
2,750,000.00
2,750,000.00
1,500,000.00
2,000,000.00
1,260,000.00
1,500,000.00
1,740,000.00
1,980,000.00
2,220,000.00
2,700,000.00
1,500,000.00
2,750,000.00
2,000,000.00
5,000,000.00
2,750,000.00
2,750,000.00
1,500,000.00
2,000,000.00
1,260,000.00
1,500,000.00
1,740,000.00
1,980,000.00
2,220,000.00
2,700,000.00
1,500,000.00
2,750,000.00
2,000,000.00
5,000,000.00
2,750,000.00
2,750,000.00
1,500,000.00
2,000,000.00
TENAGA PENDUKUNG
1 Asisten Arsitektur
2 Surveyor
3 Administrasi/Sekretaris
JUMLAH
ORANG
WAKTU
ORANG
BULAN
HARGA
SATUAN
1
1
1
1
1
3.00
1.50
1.00
1.00
1.00
3.00
1.50
1.00
1.00
1.00
7,500,000.00
7,000,000.00
6,000,000.00
6,000,000.00
6,000,000.00
22,500,000.00
10,500,000.00
6,000,000.00
6,000,000.00
6,000,000.00
51,000,000.00
1
2
1
1.50
1.00
3.00
1.50
2.00
3.00
2,000,000.00
2,000,000.00
1,000,000.00
3,000,000.00
4,000,000.00
3,000,000.00
10,000,000.00
61,000,000.00
Sub Total B
TOTAL I
JUMLAH
HARGA
B
1
2
3
4
5
C
URAIAN KEGIATAN
BIAYA PROSES
1 Diskusi / Pembahasan
2 Penggandaan materi untuk pembahasan
- Laporan Pendahuluan
- Laporan Draft Akhir/ Laporan Konsep
3 Sewa Infocus
Sub Total C
TOTAL II
SATUAN
HARGA
SATUAN
VOLUME
Rim
Rim
Tube
11
6
4
Unit-Bulan
Unit-Bulan
Unit-Bulan
2
1
1
Bulan
Bulan
JUMLAH
HARGA
35,500.00
47,000.00
250,000.00
390,500.00
282,000.00
1,000,000.00
350,000.00
250,000.00
275,000.00
2,100,000.00
750,000.00
412,500.00
3
3
500,000.00
300,000.00
1,500,000.00
900,000.00
Hari
Hari
Ls
20
22
1
300,000.00
75,000.00
1,000,000.00
6,000,000.00
1,650,000.00
1,000,000.00
15,985,000.00
Buku
Buku
Buku
Buku
Buku
5
5
10
10
10
50,000.00
75,000.00
100,000.00
100,000.00
50,000.00
250,000.00
375,000.00
1,000,000.00
1,000,000.00
500,000.00
3,125,000.00
LS
2,000,000.00
4,000,000.00
buku
buku
Kali
5
10
2
18,000.00
25,000.00
50,000.00
90,000.00
250,000.00
100,000.00
4,440,000.00
23,550,000.00
3
3
2
R E K A P I T UL A S I
RENCANA ANGGARAN BIAYA
Penyusunan Masterplan dan Detail Engineering Design (DED) RTH Gunung Malang
URAIAN KOMPONEN
II
JUMLAH HARGA
Rp.
51,000,000.00
B. TENAGA PENDUKUNG
Rp.
10,000,000.00
Rp.
15,985,000.00
Rp.
3,125,000.00
Rp.
4,440,000.00
T OTAL
PPN 10 %
J U M LAH T OTAL
PEMBULATAN
TERBILANG : ===SEMBILAN PULUH TIGA JUTA RUPIAH====
Rp.
Rp.
Rp.
Rp.
84,550,000.00
8,455,000.00
93,005,000.00
93,000,000.00
JUMLAH WAKTUORANG
ORANG
BULAN
HARGA
SATUAN
1
1
1
1
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
###
###
###
###
7,500,000.00
7,000,000.00
6,000,000.00
6,000,000.00
26,500,000.00
1
2
1
1.50
1.00
3.00
1.50
2.00
3.00
###
###
###
3,000,000.00
4,000,000.00
3,000,000.00
10,000,000.00
36,500,000.00
Sub Total A
B
1
2
3
TENAGA PENDUKUNG
Asisten Arsitektur
Surveyor
Administrasi/Sekretaris
Sub Total B
TOTAL I
JUMLAH
HARGA
URAIAN KEGIATAN
BIAYA PROSES
1 Diskusi / Pembahasan
2 Penggandaan materi untuk pembahasan
- Laporan Pendahuluan
- Laporan Draft Akhir/ Laporan Konsep
3 Sewa Infocus
Sub Total C
TOTAL II
SATUAN
VOLUME
Rim
Rim
Tube
11
6
4
Unit-Bulan
Unit-Bulan
Unit-Bulan
2
1
1
Bulan
Bulan
HARGA
SATUAN
JUMLAH
HARGA
35,000.00
45,000.00
250,000.00
385,000.00
270,000.00
1,000,000.00
350,000.00
250,000.00
275,000.00
2,100,000.00
750,000.00
550,000.00
3
3
500,000.00
300,000.00
1,500,000.00
900,000.00
Hari
Hari
Ls
18
20
1
300,000.00
75,000.00
###
Buku
Buku
Buku
Buku
Buku
5
5
10
10
10
50,000.00
75,000.00
100,000.00
100,000.00
50,000.00
LS
buku
buku
Kali
5
10
2
3
3
2
5,400,000.00
1,500,000.00
1,000,000.00
15,355,000.00
250,000.00
375,000.00
1,000,000.00
1,000,000.00
500,000.00
3,125,000.00
###
20,000.00
25,000.00
50,000.00
4,000,000.00
100,000.00
250,000.00
100,000.00
4,450,000.00
22,930,000.00
61.42
R E K A P I T UL A S I
RENCANA ANGGARAN BIAYA
Penyusunan Masterplan dan Detail Engineering Design (DED) RTH Gunung Malang
URAIAN
I
II
JUMLAH HARGA
Rp.
Rp.
26,500,000.00
10,000,000.00
Rp.
Rp.
Rp.
15,355,000.00
3,125,000.00
4,450,000.00
Rp.
Rp.
Rp.
59,430,000.00
5,943,000.00
65,373,000.00
Terbilang: "Sembilan Puluh Dua Juta Tiga Ratus Dua Puluh Tiga Ribu Rupiah"
70.29
27,627,000.00