Diketahui : Suatu peledakan direncanakan dengan :

Bahan peledak ANFO


Berat jenis ANFO
Density batuan
Jumlah lubang
Diameter lubang
Stiffnes ratio
Primer < 10 %
1 batang dodol
No. delay

=
=
=
=
=
=
=
=

0,8
2,5
100 (4 row)
5 inch
3
2%
400 gr
0, 1, 2, 3, 4

Penyelesaian :
Barden (B)

= 3,15 . D
= 3,15 . 5

SGe
SGr
0,8
2,5

= 15,75 (0,6839)
= 10,8 ft
= 3,6 m
Spacing (S)

= ( 1,1 1,8) B
= 1,4 x 3,6
= 5 m

Stemming (T)

= ( 0,7 1 ) B
= 0,9 x 3,6
= 3,24 m

Sub drilling (J)

= ( 0,2 0,4 ) B
= 0,3 x 3,6
= 1 m

Stiffnes ratio

L
B

L
= 3
B

L = 3.B
= 3 . 3,6
= 10,8 m
Jadi kedalaman lubang = 10,8 m
Tinggi jenjang (H) = L + J

= 10,8 + 1
= 11,8 m
PC

= H - T
= 11,8 3,24
= 8,56 m

5 inch

= 127,5 mm
= 0,1275 m

Luas lingkaran
= R2
0,1275

= 3,14 x 0,0058
= 0,0183 m2
= 0,0183 m2

Volume

= 0,8 gr/cc
= 0,8 ton/m3
w = 0,0183 x 0,8
= 0,0146 ton
= 14,64 kg/m
Isian bahan peledak
= PC x Loading density
= 10,76 m x 14,64 kg/m
= 157,5 kg
= 157,5 x 40 lubang
= 6300 kg (ANFO)
Primer

= 2 % x 6300
= 126 kg

Jumlah dodol

= 126 kg
=

126000 gr
200 gr

= 630
= 630 batang
Total handak

= 6300 kg + 126 kg
= 6426 kg

Jumlah dodol tiap lubang


=

630
40

= 8 dodol/lubang
AN : FO

= 94,5 % : 5,5 %
= 0,945 x 15752,6
= 14886,2 kg

FO

= 15752,6 14886,2
= 886,4 kg

Volume batuan yang terbongkar


V

= ( B x R) ( 50 x S ) L
= ( 4,3 x 2 ) ( 50 x 6,8 ) 12,9
= 8,6 x 340 x 12,9
= 37719,6 m3

Berat batuan yang terbongkar


Berat
Volume

Density

Berat

= Volume x Density batuan


= 37719,6 m3 x 2,5 ton/ m3
= 94299 ton (loose)]

Powder factor

=
=

Handak
Beratbatuan
Volume