Rab Kemanggisan Utama Rev2
Rab Kemanggisan Utama Rev2
KETERANGAN
VOLUME
SATUAN
NO
8 KAMAR DAN 9 K.MANDI
KEBERSIHAN
PARTISI GYPSUM 12 mm
PARTISI GRC 4 mm K. MANDI
LIST PROFIL
KERAMIK 30 X 30 EX ROMAN
KERAMIK PLAN
KUSEN ALUMMUNIUM
PINTU PANEL / JENDELA ALUMUNIUM
KUNCI PINTU / ENGSEL
PINTU PVC KAMAR MANDI
CLOSED DUDUK
LANTAI KMAR MANDI
WASTAFEL
SHOWER
FLOOR DRAIN
KRAN AIR
INSTALASI LISTRIK
LAMPU DOWN LIGHT
SAKLAR 1 TTK / STOP KONTAK 2 TTK
PENGECATAN DULUX ICI
PIPA AIR BERSIH
PIPA AIR KOTOR PVC 4"
PEMASANGAN AC PANASONIC 1/2 PK
INSTALASI LISTRIK AC
BONGKAR PINTU DAN PASANG HEBEL
BOBOK DINDING DAN PERAPIHAN
1.00
127.50
33.60
159.60
151.20
160.00
9.00
9.00
9.00
9.00
9.00
17.64
9.00
9.00
9.00
18.00
24.00
25.00
27.00
472.00
20.00
20.00
4.00
4.00
3.74
3.74
LS
M2
M2
M1
M2
M1
UNIT
UNIT
UNIT
UNIT
UNIT
M2
UNIT
UNIT
UNIT
UNIT
TITIK
UNIT
TITIK
M2
M1
M1
UNIT
TITIK
M2
M2
HORMAT,KAMI
buatan kamar
HARGA
SATUAN
2,500,000.00
350,000.00
200,000.00
35,000.00
250,000.00
80,000.00
1,500,000.00
3,000,000.00
400,000.00
650,000.00
1,800,000.00
200,000.00
600,000.00
250,000.00
200,000.00
80,000.00
250,000.00
100,000.00
75,000.00
45,000.00
85,000.00
100,000.00
3,500,000.00
250,000.00
500,000.00
150,000.00
FEE PEMBORONG10%
JUMLAH
2,500,000.00
44,625,000.00
6,720,000.00
5,586,000.00
37,800,000.00
12,800,000.00
13,500,000.00
27,000,000.00
3,600,000.00
5,850,000.00
16,200,000.00
3,528,000.00
5,400,000.00
2,250,000.00
1,800,000.00
1,440,000.00
6,000,000.00
2,500,000.00
2,025,000.00
21,240,000.00
1,700,000.00
2,000,000.00
14,000,000.00
1,000,000.00
1,870,000.00
561,000.00
243,495,000.00
24,349,500.00
LANTAI 1
TOTAL
PEMBULATAN
267,844,500.00
268,000,000.00
BAHAN
GYPSUM
PVC
LUAS / m2
348.5564
246.6
2.88
2.88
JUMLAH