You are on page 1of 30

COMMUNITY CENTRE

COMPILED BY
AISVARYA SINGH DEO
A51204011039
BACHELOR OF ARCHITECTURE
7TH SEMESTER
ARCHITECTURAL DESIGN

LOCATION
MAP

LOCATION - CHANDRASHEKHARPUR,BHUBA
Chandrashekharpur
Chandrashekharpur is a well developed
residential,commercial,educational hub
in Bhubaneswar,Odisha. Lying north of National Highway 5 it
was developed by Bhubaneswar Development Authorityto
Neighbour
house
the growing population.
The neighbouring areas are Raghunathpur,Nayapalli,
Jayadev Vihar, Sailashree Vihar,Patia

BHUBANESWAR PL

POPULATION AND ECONOMIC STATUS

BHUBANESWAR POPULATION 2011


As per provisional reports of Census India, population of Bhubaneswar in 201
of which male and female are 445,233 and 392,504 respectively. Although Bh
has population of 837,737; its urban / metropolitan population is 881,988 of w
are males and 413,686 are females.
BHUBANESWAR LITERACY

Bhubaneswar'sliteracy rateis
93.15 per centsignificantly higher
than the national average of 74.04per
cent. . In education section, total
literates in Bhubaneswar city are
Bhubaneswar population growth cha
710,243 of which 388,164 are males
while 322,079 are females. Average
literacy rate of Bhubaneswar city is 93.15 percent of which male and female
95.69 and 90.26 percent.

SITE ANALYSIS
SITE
It is a commercial cum
residential hub located in
Chandrashekharpur,Bhubanesw
ar
Dense residential area around
the site.
Access roads on two sides of
the site.
The surroundings to the site is
mostly residential,some of
commercial,recreational and
The
site isareas
well
public
connected with roads
which makes it easily
accessible
The roads on two sides
of the
site are of sufficient

Its primary location in th


residential area makes
it a focal point

LAND USE MAP OF


BHUBANESWAR

CLIMATE ANALYSIS
Bhubaneswar is located on the coastal
plains of
Odisha (Orissa), south-west of the River
Mahanadi
. It experiences typical tropical weather
The
summer months from March to May are hot
conditions
andto
temperatures
,and
andhumid,
succumbs
the heat andoften
cold shoot past 40 C
in May.
waves
that
sweep in from north India.
The south west monsoon lashes Odisha
(Orissa) in June, bringing relief to the
parched environs of Bhubaneswar.

Pleasant weather conditions prevail during


November in Bhubaneswar,
but December and January face the chilly
winds from the North North-east at average
speeds of 7 miles/hour. Temperatures drop
to approximately 15 C during these months.
WIND
The wind direction to the site is North-West

Site Specifications
Site Area
- 4 hectares, 40,000 sqm
F.A.R
- 1.25
Ground coverage - 25%
Height
- Not Restricted
Proximity
- Airport 9.7kms , Railway Station 11kms
Vegetation
- Tropical trees and shrub cover
Topography
- No contours
Climate
- Warm and humid

Distance of Site from Railwat Stn.

Distance

Area Calculation

Site Dimensions 210 M * 191 M


= 40110 SQ.M
= 4 hectares

191000

F.A.R = Built Up Area


Total Area
Built Up Area = F.A.R x Total Area
= 1.25 x 40,000 SQ.M
= 50,000 SQ.M
Total Ground Coverage = 25%
= 25 x 40,000 = 10,000 SQ.M
Permissible no. of floors = 50,000 = 5 nos.
210000
10,000
Set Backs :
Front = 15 M Rear = 9 M Side 1 = 9M Side 2 = 9M

SITE

Parking Standards 100 msq for 3 ECS


Total built up area = 50,000 sqm
Total Ground Coverage = 10,000 sqm
= 3 x 50,000 = 1500 ECS
100

REQUIREMENT
S

OFFICE- 59.4%
HOTEL- 10%
RETAIL SHOPS- 30%
AUDITORIUM- 0.6% (300 SEATS)
OPEN AIR THEATRE- 300 SEATS

CALCULATION- BUILT UP AREA


OFFICE-59.4% OF BUILT UP AREA
HOTEL- 10% OF BUILT UP AREA
= 59.4*50,000/100
=10*50,000/100
= 29,700 SQ.M
= 5000 SQ.M

10

RETAIL SHOPS- 30% OF BUILT UP AUDITORIUM- 0.6% OF BUILT UP


AREA
AREA
= 30*50,000/100
= 0.6*50,000/100
=1500 SQ.M
= 300 SQ.M

OCCUPANT LOAD

OFFICE- CATEGORY-BUSINESS
OCCUPANT LOAD PER 100 SQ.M OF COVERED
AREA- 10 PEOPLE
BUILT UP AREA- 29,700 SQ.M
OCCUPANT LOAD- 10*29,700/100= 2970
OCCUPANTS
HOTEL- CATEGORY-RESIDENTIAL
OCCUPANT LOAD PER 100 SQ.M OF COVERED
AREA- 8 PEOPLE
BUILT UP AREA- 5000 SQ.M
OCCUPANT LOAD- 8*5000/100= 400
RETAIL
SHOPS- CATEGORY- MERCANTILE
OCCUPANTS
OCCUPANT LOAD PER 100 SQ.M OF COVERED AREA- 50
BUILT UP AREA- 15,000 SQ.M
OCCUPANT LOAD- 50*15,000/100= 7500 OCCUPANTS
11

AUDITORIUM AND OPEN AIR THEATRE- OCCUPANT LOAD- 300 OCCUPA

WATER CALCULATION
OFFICE- CONSUMPTION PER HEAD PER DAY- 45LT.
OCCUPANT LOAD- 2970
WATER CONSUMPTION PER DAY- 2970*45=
133650 LT.
STANDARD

CALCULATI VOLU
ON
ME

UNIT NO.
OF
TANK
S

WATE 1CUM/1000
133650/100 133.65 CUM 2
R
LT.
0
TANK
STANDAR CALCULATIO VOLUME UNIT
D
N
FIRE
TANK

0.2%*
WATER
TANK

0.2*133.6

26.73

CUM

VOLUM
E(PER
TANK)

SIZE
OF
TANK

66.8

6*4*2.
8

NO. OF
TANKS

SIZE
OF
TANK

2.5*4*2
.7
12

HOTEL- CONSUMPTION PER BED PER DAY- 180 LT.


OCCUPANT LOAD- 400
WATER CONSUMPTION PER BED PER DAY400*180 = 72000 LT.
STANDARD

WATE 1CUM/1000
R
LT.
TANK

FIRE
TANK

CALCULAT
ION

VOLU
ME

72000/1000 72

UNI NO.
VOLUME
T
OF
(PER
TANKS TANK)

SIZE
OF
TANK

CU
M

4*3*3

36

STANDARD

CALCULATI
ON

VOLUM
E

UNIT NO.
SIZE
OF
OF
TANKS TANK

0.2*WATER
TANK

0.2*72

14.4

CUM

2.4*2.4*
3

13

RETAIL SHOPS- CONSUMPTION PER HEAD PER DAY- 45LT.


OCCUPANT LOAD- 7500
WATER CONSUMPTION PER DAY- 7500*45= 337

STANDARD

WATER 1CUM/1000
TANK
LT.

FIRE
TANK

CALCULAT VOLU
ION
ME

UNIT

NO.
OF
TANK
S

VOLU
ME
(PER
TANK)

SIZE
OF
TANK

337500/10
00

CUM

56.25

5.6*5*
2

337.5

STANDAR CALCULATI
D
ON

VOLUM UNIT NO.


E
OF
TANK
S

VOLUM
E (PER
TANK)

SIE
OF
TAN
K

0.2*WATE
R TANK

67.5

33.75

4.2*4
*2

0.2*337.5

CUM

14

AUDITORIUM- CONSUMPTION PER SEAT PER DAY- 15 LT.


OCCUPANT LOAD- 300
WATER CONSUMPTION PER DAY- 300*15= 4500LT.

WATER
TANK

FIRE
TANK

STANDA
RD

CALCULATI
ON

1CUM/10
00 LT.

4500/1000

VOLUM UNI NO.


E
T
OF
TANK
S
4.5

CU
M

STANDAR
D

CALCULATI
ON

VOLUM
E

0.2*WATER
TANK

0.2*4.5

0.9

VOLUME SIZE
(PER
OF
TANK)
TANK

4.5

2*2.5*1

UNIT NO. OF
TANK

SIZE OF
TANK

CUM

0.9*1*1

15

SANITATION CALCULATION
OFFICEOCCUPANT LOAD- 2970
RATIO OF MALE AND FEMALE- 1:1
THUS, MALE- 1485, FEMALE- 1485

16

S.NO SANITARY UNIT STANDAR


.
D (MALE)

QUANTITY STANDAR
(MALE)
D
(FEMALE)

QUANTITY
(FEMALE)

1.

WATER CLOSET

1 FOR 25
PERSONS

59

1 FOR 15
PERSONS

99

2.

ABLUTION TAPS

1 FOR
EACH W.C.

59

1 FOR
EACH W.C.

99

3.

URINALS

OVER 200
PERSONS
ADD AT
THE RATE
OF 2.5%

60

4.

WASH BASINS

1 FOR 25
PERSONS

59

1 FOR 25
PERSONS

59

5.

DRINKING
WATER
FOUNTAINS

1 FOR 100
PERSONS
(MIN. 1 ON
EACH
FLOOR)

15

7.

CLEANERS SINK

1 PER
FLOOR

15

17

HOTELOCCUPANT LOAD- 400


RATIO OF MALE AND FEMALE- 1:1
THUS, MALE- 200, FEMALE- 200

18

S.NO SANITARY UNIT STANDAR


.
D (MALE)

QUANTITY STANDAR
(MALE)
D
(FEMALE)

QUANTITY
(FEMALE)

1.

WATER CLOSET

1 FOR 25
PERSONS

1 FOR 15
PERSONS

13

2.

ABLUTION TAPS

1 FOR
EACH W.C.

1 FOR
EACH W.C.

13

3.

URINALS

FOR 101200
PERSONS
ADD AT
THE RATE
OF 3%

4.

WASH BASINS

1 FOR 25
PERSONS

1 FOR 25
PERSONS

5.

DRINKING
WATER
FOUNTAINS

1 FOR 100
PERSONS
(MIN. 1 ON
EACH
FLOOR)

19

RETAIL SHOPSOCCUPANT LOAD- 7500


RATIO OF MALE AND FEMALE- 1:1
THUS, MALE- 3750, FEMALE- 3750

20

S.NO SANITARY UNIT


.

STANDAR
D (MALE)

1.

WATER CLOSET

1 FOR 25
PERSONS

150

1 FOR 15
PERSONS

250

2.

ABLUTION TAPS

1 FOR
EACH W.C.

150

1 FOR
EACH W.C.

250

3.

URINALS

OVER 200
PERSONS
ADD AT
THE RATE
OF 2.5%

154

4.

WASH BASINS

1 FOR 25
PERSONS

150

1 FOR 25
PERSONS

150

5.

DRINKING WATER 1 FOR 100


FOUNTAINS
PERSONS
(MIN. 1 ON
EACH
FLOOR)

38

7.

CLEANERS SINK

1 PER
FLOOR

QUANTITY STANDAR
(MALE)
D
(FEMALE)

QUANTITY
(FEMALE)

-21

AUDITORIUMOCCUPANT LOAD- 300


RATIO OF MALE AND FEMALE- 1:1
THUS, MALE- 150, FEMALE- 150

22

S.NO SANITARY UNIT STANDAR


.
D (MALE)

QUANTITY STANDAR
(MALE)
D
(FEMALE)

QUANTITY
(FEMALE)

1.

WATER CLOSET

1 FOR 25
PERSONS

1 FOR 15
PERSONS

10

2.

ABLUTION TAPS

1 FOR
EACH W.C.

1 FOR
EACH W.C.

10

3.

URINALS

FOR 101200
PERSONS
ADD AT
THE RATE
OF 3%

4.

WASH BASINS

1 FOR 25
PERSONS

1 FOR 25
PERSONS

5.

DRINKING
WATER
FOUNTAINS

1 FOR 100
PERSONS
(MIN. 1 ON
EACH
FLOOR)

23

CONCEPT OF DESIGN
Office building 10 floors

Retail shops 3 floors

Hotel 5 floors

Concept of Offices, Shops and Hotel with a multi level garden


The concept is to disintegrate the mall into an arrangement of commercial b
areas below and office and other spaces on the upper floors
24

Conceptual View

Segregation of activities
through levels, define
uninterrupted user specific
moment.
Spaces like amphitheaters,
food courts are in open
spaces

25

UNDERGROUND PARKING
GRID : 8.5M *6M

26

6M

CAR SPACE 5 M* 2.5 M

7.5M

2.5M

COLUMN SIZE 1M * 1M

8.5M

GRID : 8.5 M * 6 M

5M

UNDERGROUND PARKING CALCULATIONS


AREA FOR UNDERGROUND PARKING : 168 * 144.5 = 24276 SQ.M
FOR UNDERGROUND PARKING
IT IS 32 SQ.M FOR 1 ECS
FOR 24276 SQ.M ECS = 24276/32 = 758 ECS

27

FLOOR PLATES2
S1

S3

S4
S5

RETAIL COMPLEX
S6
28

FLOOR PLATE

HOTEL COMPLEX
29

THANK YOU