foreign component cost = 13,227,187,216.

26
local component cost = 101,334,202.31
total abc cost = 609,258,191.49
contract amount : 8,500,066,055.73 (loan)
local currency portion ---- php 78,932,912.72
total in peso = 411,561,000.00
feb 2013 --- 1,077.47 Korean won to US dollars (average rate calculation)
researh monthly average x-rates.com: 1 KRW = 0.000919 KRW
based on contract: 1 KRW = 0.000928 usd
derivation of exchange rate...
contract price consists of:
EDCF loan component - foreign cost component denominated in korean won
GOP counterpart - local cost component
all taxes duties and levies on goods in the phil. shall be part of contract cost
local currency portion
ELECTRICAL:
plans needed that should be to-scale
from small scale submitted
aeronautical ground lighting layout
single line diagram
electrical main equipment arrangement
power house, power layout
power house grounding layout
als center line barrette foundation
runway edge lights installation detail-inset type
runway edge lights and taxiway edge lights installation detail
runway threshold lights foundation