RATE ANALYSIS FOR REINFORCED CEMENT CONCRETE


DOWNLOADED FROM THECONSTRUCTOR.ORG
RCC

:1

:2

Analysis for

Wet Volume

1.00

Dry Volume

1.54

MATERIAL
CEMENT BAGS

Qty.
11.10

SAND

0.39

Aggregate
Reinforcement

0.77
157.00

LABOUR With
Mechanical Mixer & Vibrartor
MASON
LABOUR
WATER CARRIER
BAR BENDER
MIXER OPERTOR

Days
0.37
3.50
1.39
1.57
0.071

MIXER VIBRATOR

0.071
0.00

PRIME COST (Rs.):


Water Charges 1.5%
Sundries (including mixer machine, transportation etc) 7.5 %
Contractor's Profit

14

Total Cost per m3 of RCC =

Cost of RCC for Given

ENT CONCRETE
Steel % by volume of

NSTRUCTOR.ORG

Concrete

2
m

Units
bags

Rs. / Unit
300

SLAB

1.00%

BEAM

2.00%

COULMN

2.50%

Road

0.60%

AMOUNT
(Rs.)
3329

m3

900

347

m
Kg

700
60

539
9420

SUBTOTAL
(Rs.)

13634.03

300
200
200
200
200

111.00
700.00
278.00
314.00
14.28

200

14.28
15066
226
1130

2109

otal Cost per m3 of RCC =

18531

Cost of RCC for Given Data = Rs.

18531

1431.56