KULIAH PENGANTAR REKAYASA DISAIN

KEGIATAN
EKSPLORASI, EKSPLOITASI DAN
PENGEMBANGAN LAPANGAN PANASBUMI

D IIr. N
Dr.
Nenny Mi
Miryanii Saptadji
S t dji
FIKTM - ITB

STAGES IN GEOTHERMAL EXPLORATION


AND DEVELOPMENT

Nenny Saptadji/TM-ITB

Geothermal Law

(can be extended
Up to 20 years)

To be completed 2
years fter exploration

Can be extended
for two years and
then for one year

Nenny Saptadji/TM-ITB

The developers submit Work Program (Plan of


Development) and Budget to the Government.
Exploitation by the developer of the work area to proceed
if the feasibility study determines that a power
development at the work area will be economically
feasible.
Feasibility study is undertaken by the developers to analyze
the feasibility of the working area to be developed for
electricity generation, both technically and economically.
Detailed explorations, including exploration drillings,
are undertaken by the developers who has been
granted a geothermal mining business licenses (an
IUP).
Before
B f
exploration
l ti iis conducted,
d t d d
developers
l
h
have tto
submit Work Program and Budget.
Monitoring will be conducted by government
(national, regional and/or local).
Conducted by Government, regional or local
authorities.
Working area (WKP) is determined based on these
surveys.
The Government
G
(national,
(
regional and/or
/ local)) will
tender working areas to registered developers. The
winner of the bidders will be granted a geothermal
mining business licenses (an IUP).

TAHAP 1

EKSPLORASI PENDAHULUAN
(RECONNAISSANCE SURVEY)

EKSPLORASI PENDAHULUAN
(RECONNAISSANCE SURVEY)
1. STUDI LITERATUR
2. SURVEY LAPANGAN
3. ANALISA DATA
4 MENENTUKAN DAERAH PROSPEK
4.
5. SPEKULASI BESAR SUMBERDAYA
6. MENENTUKAN JENIS SURVEY YAD
7 MEMBUAT LAPORAN
7.

STUDI LITERATUR
Regional Geology ?
Lokasi Daerah Manifestasi Panasbumi?
Volcanic phenomena?
Geologi & Hidrologi di daerah tersebut?
Tempat-tempat yang akan disurvey?

STUDI LITERATUR

Ada Photo udara?


Ada Landsat Images?
Lokasi Daerah Manifestasi Panasbumi?

Ada laporan hasil kajian sebelumnya?

2.

SURVEY LAPANGAN

Geologi dan Hidrologi


di Daerah tersebut ?

Nama Manifestasi?
Lokasi?
Karakteristik?
Pemetaan Lokasi Manifestasi Permukaan

Nama & Jenis

Manifestasi Panasbumi
di Permukaan ?

ANALISA DAN INTERPRETASI DATA


Geologist dan Geochemist

Analisa Kimia ?
Pemetaan

Data Geokimia

ANALISA DAN INTERPRETASI DATA


Geologist dan Geochemist

Analisa Kimia ?
Pemetaan

Interpretasi Data
Jenis Reservoir ?
Temp Reservoir ?
Temp.
Sumber Air ?
Jenis Batuan Res ?
Daerah Prospek ?

JENIS RESERVOIR?

JENIS RESERVOIR?

JENIS RESERVOIR?

JENIS RESERVOIR?

JENIS RESERVOIR?

Umi Jigaku - Japan

Champagne Pool NZ

EKSPLORASI PENDAHULUAN
(RECONNAISSANCE SURVEY)
1. STUDI LITERATUR
2. SURVEY LAPANGAN
3. ANALISA DATA
4 MENENTUKAN DAERAH PROSPEK
4.
6. MENENTUKAN JENIS SURVEY YAD
7 MEMBUAT LAPORAN
7.

EKSPLORASI PENDAHULUAN
(RECONNAISSANCE SURVEY)
1. STUDI LITERATUR
2. SURVEY LAPANGAN
3. ANALISA DATA
4 MENENTUKAN DAERAH PROSPEK
4.
5. SPEKULASI BESAR SUMBERDAYA
6. MENENTUKAN JENIS SURVEY YAD
7 MEMBUAT LAPORAN
7.

EKSPLORASI PENDAHULUAN
(RECONNAISSANCE SURVEY)
1. STUDI LITERATUR
2. SURVEY LAPANGAN
3. ANALISA DATA
4 MENENTUKAN DAERAH PROSPEK
4.
5. SPEKULASI BESAR SUMBERDAYA
6. MENENTUKAN JENIS SURVEY YAD
7 MEMBUAT LAPORAN
7.

EKSPLORASI LANJUT
(EKSPLORASI RINCI)
SURVEY GEOLOGI
SURVEY GEOKIMIA
SURVEY GEOFISIKA
SURVEY GEOGRAFI

Survey Geologi

Mendapatkan informasi yang lebih baik mengenai


geologi permukaan dan bawah permukaan

Survey Geokimia

SURVEY
GEOFISIKA

ANALISIS DAN
INTERPRETASI DATA
Memperkirakan
p
daerah yang
y g "diduga"
g
mengandung sumberdaya panasbumi

Struktur batuan ?
Penyebaran batuan ?
Jenis reservoir?
Temperatur reservoir?
Sumber panas ?
P t
Potensi
i sumberdaya
b d
?

SURVEY GEOGRAFI
Status Lahan

Hutan Lindung ?
Tanah Penduduk ?
Hutan Sekunder ?
Perkebunan ?

Distribusi kemiringan
g
lereng

Luas Area ?
Sering Longsor ?

Jarak ? Waktu Tempuh ?

SURVEY GEOGRAFI

Curah Hujan ?
Dari Kota Terdekat ?
Dari Pemukiman
Penduduk Terdekat ?

Peresapan Air ?
Sering Banjir ?
Fasilitas ?

Air ? Listrik ? Pasar ? Komunikasi ?

Prasarana Jalan ?

Perlu Pelebaran Jalan ?


Perlu Pengerasan ?
Perlu Perbaikan Jembatan ?

SURVEY GEOGRAFI

Penduduk ?

Jumlah dan kepadatan ?


Mata Pencharian Pokok ?
Tenaga Kerja Potensial ?
Pendidikan ?
Kelembagaan ?

PEMBORAN SUMUR EKSPLORASI

Geologists

Engineers

Analisa
Cutting

Membor
Sumur

Mengontrol lumpur/
pemboran
fluida p
Memasang casing
Cementing
Coring
Loss of circulation ?
Pengukuran P dan T
Evaluasi Data

SUMUR Eksplorasi di
Kamojang (Sumur KMJ-3)

PENGUKURAN &
PENG
PENGUJIAN
N SUMUR

Water loss test


Gross permeability test
Heating measurements
Discharge/output test
Transient test

Lahendong

SETELAH PENGUJIAN
SUMUR ?

SETELAH PENGUJIAN SUMUR

Jenis dan sifat fluida


produksi ?
Kedalaman reservoir ?
Jenis reservoir ?
Temperatur reservoir ?
Sifat batuan reservoir ?
Laju aliran massa &
enthalpy fluida dari sumur
produksi ?
Kapasitas produksi dalam
MW ?

Apakah lapangan tersebut secara teknis dan


ekonomis menarik untuk

dikembangkan ?

EVA LUA SI
D a t a G eolog i
d rolog i
D a t a H id
D a t a G eok im ia
D a t a F isik a
D a t a S um ur
O
O
O
O

B U A T M O D E L S I S T I M P A N A SB U M I
((C O N CE
E PT U A L M O D E L )
P O T E N S I S U M B ER D A YA PA N A SB U M I ?
J U M L A H E N E RG I YA N G DA PA T
D I M A N F A A T KA N ?
P O T E N S I S U M U R -S U M U R Y A N G
M E N G H A S IL K A N F L U I D A P A N A S BU M I ?

BILA POTENSI SUMUR TINGGI

Ada permintaan energi ?


Ya

Tidak
Untuk sementara
waktu
ditinggalkan

Untuk apa ?

Listrik ?

Berapa
b
banyak
k?

Non
Li t ik ?
Listrik

Apakah secara teknis


mungkin
dikembangkan

H 2S
CO 2
Korosif ?

Tidak

Ya

scaling ?

BILA SECARA TEKNIS MUNGKIN


DIKEMBANGKAN DAN ADA
KEBUTUHAN LISTRIK

Uap kering ?
Uap basah ?
Geologists

Uap - air

JENIS
FLUIDA
PRODUKSI ?

KAPASITAS LISTRIK TERPASANG


YANG DIUSULKAN ?
ALTERNATIF PENGEMBANGAN ?
DIAGRAM ALIR FLUIDA ?
Lokasi
sumur ?

Membor sumur
lagi ?

BANYAKNYA UAP
YANG DIBUTUHKAN ?
JUMLAH SUMUR PRODUKSI
YANG DIBUTUHKAN ?
JUMLAH SUMUR INJEKSI
YANG DIBUTUHKAN ?

Engineers

ANALISA
KEEKONOMIAN
ALTERNATIF PENGEMBANGAN ?
Alternatif
1
Skala kecil

Alternatif 2

Alternatif 3

Alternatif 4

Skala besar

Skala kecil

Lainnya ?

Skala besar
Biaya ?

Biaya ?

Biaya ?

Biaya ?

Waktu ?

Waktu ?

Waktu ?

Waktu ?

Ek l
Eksplorasi
i?
Eksploitasi ?
PLTP ?
L i - lain
Lain
l i ?
Harga listrik
alternatif 1 ?

Harga listrik
alternatif 2 ?

Harga listrik
alternatif 3 ?

ALTERNATIF YANG PALING MENARIK ?

Harga listrik
alternatif 4 ?

HULU
(UPSTREAM)

HILIR
((DOWN STREAM))

Rencana
pengembangan ?

Steam Field
PLTP

Rencana Pengembangan:

Kapasitas Pembangkit?
Kapan akan dioperasikan?
Jenis Pembangkit?
Lokasi PLTP ?

Hatcobaru

RENCANA PENGEMBANGAN
LAPANGAN UAP (STEAM FIELD):
FIELD)
Jumlah sumur yang harus dibor?
Sumur produksi?
Sumur injeksi?
Jumlah sumur make up?

Krafla

Separator di well site atau terpusat?

Kawerau

Route Pipa?
Diameter Pipa ?

Condensate traps?
Insulator?
Support?
I l d
Iceland

INFRASTRUKTUR ?

Sembaloran

STATUS LAHAN?

Bacon Manito

Perlu pembebasan lahan?


Perlu sewa?
Dampak pengembangan
terhadap
p lingkungan
g
g ?

Darajat

PROJECT DEVELOPMENT
Typical
T
i l IInvestment & P
Production
d
i
Cost
C
of a Geothermal Power Plant
((Investment cost p
per MW))
Major challenges for Investors to
Develop Geothermal Power Plants in
Indonesia from legal, financial &
technical aspect.

Nenny Saptadji/TM-ITB

INVESTMENT & PRODUCTION COST


STEAM FIELD
(UPSTREAM)

Nenny Saptadji/TM-ITB

POWER PLANT
(DOWNSTREAM)

COST FOR STEAM FIELD DEVELOPMENT

Production Facility Costs

Exploration Cost

Well Costs

Land, Road & Support Facilities


Nenny Saptadji/TM-ITB

Operation & Maintenance

Turbin &
Generator

Cooling
Tower

Re-injection
Well

Well costs dependant on:


Reservoir/Well depth
Well productivities
Type of reservoir
(Production Fluids)

Steam &
Water

Water or
Mixture of water & steam

Surface Facilities dependant on:


Type of Fluids
Pressure
P
& Temperature
T
t

Number of separators
Length of pipelines
Nenny Saptadji/TM-ITB

Number of production wells


Number of make-up wells
Number
N
b off injection
i j ti
wells
ll

TOTAL Well Costs


dependant on:

Well Type

Well potential

Well size

Success Ratio

Well depth

Standard Well
Nenny Saptadji/TM-ITB

Big hole

Estimation of well costs


Assumptions:

Well potentials : 5 MW/well


Well size
: standard well
S
Success
R
Ratio
ti
: 80%
Time
: 25 years

Estimation of number of wells should be drilled:


Capacity of
Power Plant
(MW)

Minimum
Number of
production wells

Number of
Wells Should be
Available

Make
up
Wells

Total
Production
wels

Wells
should be
Drilled

30

25

32

40

55

11

12

25

37

46

60

12

13

25

38

48

110

22

23

25

48

60

200

40

41

25

66

83

220

44

45

25

70

88

330

66

67

25

92

115

Nenny Saptadji/TM-ITB

Make-up Wells

Potensi Sumur 5 MWe

Laju Alir Ma
L
asa Uap (ton/jam)

1100

Laju Alir Masa Uap


Uap yang harus tersedia

1050
1000
950
900
850
800
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Tahun

Nenny Saptadji/TM-ITB

COST FOR POWER PLANT DEVELOPMENT

,
Pl
Plant
facilities
f ili i costs
++ Costs:
Land
Road
detailed engineering
construction and installation
civil work
Nenny Saptadji/TM-ITB

Geothermal Law

PRODUKSI UAP
UAP, LISTRIK
MONITORING DAN EKSPANSI

Nenny Saptadji/TM-ITB

PRODUKSI UAP DAN LISTRIK


OPERASI DAN MONITORING
PERAWATAN

P, T, FLOWRATES
DAN KWALITAS UAP

SCALING

CORROSION

PRODUCTION
MONITORING
GEOCHEMISTRY

SUBSIDENCE

SCALING

CORROSION

PL P
PLTP
KINERJA

LAINNYA