contents
Sees
Peeters
rorya oe
Pesan ees
one Renee ates
ere nares
cs
Project Team Introduces
Acid Tunneling in Europe
$s aa
Bs success in sestoring production from
rnon-procicing well in Venezuela with the
patented StniTunnel proces paved the way
forBle eran to ntroce
‘cd tunneling off the const of Spain in May
The StimiTunnel proces involves high impact
ieting tool deployed on coiled
pumped theowgh the oo] ceae Lateral
neers in the N
‘Acids
‘rainage oles, which connect existing micro
fractures in carbonate formations 1 est07e
natural flowing production
From Maracaibo to the Mediterranean
BJ engineets in Emmen, Netherlands, proposed
the StinsTunneltechniqse for plugged off
procacing well nthe Casablanca felt about
miles (50k
0
‘offthe coast of Tarragona inthe
Mediterranean Ses, Injctivity testing became
impossible in the well ta sale deposition
tnd plogging in production tubs. A suspect
formation collapse ina tansition zone
between shale and carbonate sections added to
the challenge, Acid tusneling was lected to
‘open new drainage channels between the well
nd reservoir fractures (sing 15.perent
Inydrochlovie ai)
A By coiled thing crew from Emmen began
the project by cleaning cae deposits rom the
Aubuls with the Roto-Ke® 6
ile bing
EVV! Ie
a
a
Cane
Cis
pene ben?
Cee mentee
ene
peo
Project Bagineer Manvel Nataro then joined
forces with BJ Venemuela West District Coiled
Tubing Enginer Jose Diaz oIead the acid tunnel
‘ng proces the firs ever commercial application
‘outside of Venezuc’s Maracaibo district.
"The procs created more than 130 ft (40m)
‘of tunnel agjacent to the formation ealapse,
which opened the path fr uid injection and
testing, The testment helped increme production
te more than double pr-cllapse volumes. Along
ith Navarro and Diaz, projet contributors
include B Venezuela Country Manager Pal Mos,
‘ences District Manager Jllo Gomez andthe
Emme projec team of Theo Katerberg. Martin
‘laau, Harald Schréder, Johan Welt and
Business Development Manage for The
Netherlands Aso ter Vld
Darren Stuit (Senior Oper
Operator and José Dias (CT Di
‘Anno Arends (Opera
Than Wei (Ser
EVV
Ee
Se
ne
eee
oo
Lis Alonso (Operator Production Bngineer
ar), Harald SchrBider (CT Superssor,
lay Services won a contrat from Houston-based Enventae Global Technology in February to provide
liners. Bs Mumba district ill make-up
Tubular Services" ®
casing male-up services fore Sold Expandable Tula (SET®
Strengthens Robe sco: inventuses open-bote Ser systems for aboot 50 wolls nd rigs in the Mumbai Highfield ofshore
ir Inia to suport the cen thee year mault-milion dolar contrat witha mor lian operator Depths
in Expandable
lange fos 800-1200 (2
Casing Market —spndeddovaile this enables monobocciling and foes casing ch
De estamos)
4 m), Unique chemical and physical specifications allo: SET systems 0
ages instead of wing proges
sively smaller pipe asa wells died deeper BI previously provided expandable tubular make-up services for
Enventure SET systems in the Mumbai High South field in ada and in Blikpapay Indonesia
»SeDiaregitered ralemar of Enventure Global Tecogy L1G