Energy used Methods and Machine

Process/Methods

*fuel
consumpti
*fuel
Equipment ons of the
to be
to be used equipment,
used
(Liter or in
kg)

Sand
Dredging/Bund
filling

CutterHead
Dredger
55.2L/hr
(86t)

Dies
2
el

45.5
MJ/Kg

8760hr
36,610,689
s

OnHighway
26.25L/hr
Dump truck
(>17t)

Dies
15
el

45.5
MJ/Kg

8760hr 1,305,748,8
s
08

46.46L/hr

Dies
5
el

45.5
MJ/Kg

17.7L/hr

Dies
5
el

45.5
MJ/Kg

17.7L/hr

Dies
5
el

45.5
MJ/Kg

Compactor 35.8L/hr

Dies
4
el

45.5
MJ/Kg

Geotextile
filling/laying

Flat boat
crane

Dies
1
el

45.5
MJ/Kg

Rock/Aggregate
filling

On26.25L/hr
Highway
Dump truck
(>17t)

Dies 15
el

45.5
MJ/Kg

Sand
Preloading/Surchar Excavator
(21t)
ging

Bulldozer

Bulldozer
Dynamic
Compaction/Roller
Compaction

49.39

*quanti
ty or
how
many
trucks
etc

*calori
fic
value,
show
units

Usage/
Duratio
n,
total MJ
(hours
or
days)

8760hr
s
77,034,991

8760hr
s
29,348,242

8760hr
s
29,348,242

8760hr
s
47,487,777

8760hr
s
19,685,866

8760hr 1,305,748,8
s
08

Excavator( 46.46L/hr
21t)
Delivery of
concrete
pavements

Crane
truck
Construction of
Platforms

Bulldozer

45.5
MJ/Kg

8760hr
s
77,034,991

Dies
el
20

45.5
MJ/Kg

8760hr
s
286,518,43
5

13.29L/hr

Dies
el
2

45.5
MJ/Kg

8760hr
s
17,627,622

13.29L/hr

Dies
el
2

45.5
MJ/Kg

8760hr
s
17,627,622

Dies
5
el

45.5
MJ/Kg

8760hr
29,348,242
s

Mixer(>14t
)
43.2L/hr

Crane
Setting up of Rails truck

Dies
5
el

17.7L/hr

3,366,220,
TOTAL 298 MJ