TI/SPC/PSI/2x25/FC&SR/0100(/10)
Effective from:
..Sep.10
Page 1 of 34
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
TECHNICAL SPECIFICATION
FOR
SHUNT CAPACITOR & SERIES REACTOR EQUIPMENT TO BE USED OVER 2 X 25 KV TRACTION
SUBSTATIONS
September 2010
ISSUED BY
Specification No.
TI/SPC/PSI/2x25/FC&SR/0100(/10)
Page 2 of 34
Effective from:
..Sep.10
SPECIFICATION FOR: SHUNT CAPACITOR & SERIES REACTOR EQUIPMENT TO BE USED OVER 2 X 25 KV
TRACTION SUBSTATIONS
SPECIFICATION No
Amendment
Number
0
: TI/SPC/PSI/2x25/FC&SR/0100(/10)
Amendment / Revision
Total pages
Re-affirmed Specification
..
SIGNATURE
DATE
DESIGNATION
Date of Issue
PREPARED BY
CHECKED BY
APPROVED BY
SE/TI
DIR./TI-P&S
ED/TI
Specification No.
TI/SPC/PSI/2x25/FC&SR/0100(/10)
Effective from:
..Sep.10
Page 3 of 34
SPECIFICATION
FOR
SHUNT CAPACITOR & SERIES REACTOR EQUIPMENT TO BE USED OVER 2 X 25 KV TRACTION
SUBSTATIONS
SPECIFICATION NO. TI/SPC/PSI/2 x25/FC&SR/0100(./10)
1.
SCOPE
1.1.
This specification covers design, manufacture, supply, testing and commissioning of shunt
capacitor equipment intended for outdoor installation on the 2 X 25 kV side of ac traction
system on Indian Railways, for the purpose of improvement of power factor and reduction of
maximum demand. It supersedes specification No. ETI/PSI/126(8/89).
1.2.
This specification is technically similar to RDSO specification for Fixed capacitor and series
reactor No. TI/SPC/PSI/FC&SR/0100.
1.3
The capacitor equipment shall be complete with control gear, protective relays, series reactors
and accessories necessary for its efficient operation.
1.4
All such items and accessories shall be deemed to be within the scope of this specification
whether specifically mentioned herein or not. The equipment shall be erected by the successful
tenderer, therefore, the offer shall include deputing of engineers and supervisors by the supplier
of equipment for adequate handling, installation, testing and commissioning to the satisfaction
of Railways engineers at site.
1.5
All civil engineering works connected with foundations of the capacitor banks, circuit breaker,
isolator, series reactor, current & potential transformers, supporting steel structures for the
equipment etc shall also be done by the contractor.
1.6
All associated items of HT shunt capacitor bank assembly like Series reactor, CT, PT, LA, CB,
isolators, protection relays & panels etc. should be procured from RDSO/CORE approved
vendors.
2.
GOVERNING SPECIFICATIONS
2.1
The shunt capacitor and associated items shall, unless otherwise specified herein, conform to
the latest revision of RDSO specification, Indian Standard specifications/IEC, Recommendations
as indicated below and the Indian Electricity Rules, wherever applicable.
1.
2.
IS:513
IS:800
3.
IS:1554 (Pt.II)
4.
5.
6.
7.
8.
9.
10.
IS:2099
IS:13925 (1998)
IS:3070 (Pt.-I)
IS:3231
IS:5553 (Pt-3)
IS:5553 (Pt.-5)
IS:11298 (Pt.-3/Sec.1)
Specification No.
TI/SPC/PSI/2x25/FC&SR/0100(/10)
12.
IS:12672
13.
14.
RDSO Specn.
No.ETI/OHE/13(4/84)
RDSO specn. No.
ETI/OHE/18(4/84)
RDSO specn. No.
TI/SPC/PSI/PROTCT/6070
RDSO specn.
No.TI/SPC/PSI/MOGTLA/0
100(07/10)
RDSO Code
NO.ETI/PSI/120(2/91)
15.
16.
17.
19.
2.1.1
2.2
Effective from:
..Sep.10
Page 4 of 34
In addition to above, the following RDSO specifications are presently used for various equipment
being provided over 2 x 25 kV AT feeding system. Some of the specifications mentioned below
are under revision therefore purchaser shall provide the latest specifications for below items
which shall have to be adhered to by the tenderer for execution of the work
1
ETI/PSI/122(3/89)
ETI/PSI/123(9/93)
ETI/PSI/124(7/95)
ETI/PSI/125(7/97)
5
6
7
8
9
10
ETI/PSI/126(8/89)
ETI/PSI/127(8/89)
ETI/PSI/128(8/89)
ETI/PSI/129(8/89)
ETI/PSI/130(8/89)
ETI/PSI/132(8/89)
11
12
ETI/PSI/133(8/89)
ETI/PSI/135(8/89)
13
14
ETI/PSI/138(8/89)
ETI/PSI/139 (12/89)
15
ETI/PSI/141 (10/90)
16
ETI/PSI/145(3/92)
17
ETI/PSI/147(3/92)
Any deviation from this specification, proposed by the tenderer for improving the performance,
utility and efficiency of the equipment, will be given due consideration provided full particulars
Specification No.
TI/SPC/PSI/2x25/FC&SR/0100(/10)
Effective from:
..Sep.10
Page 5 of 34
of the deviation with justification are furnished. In such case, the tenderer shall quote according
to this specification and the deviations, if any, proposed by him shall be quoted as
alternate/alternatives.
2.3
In case of any conflict between the contents of the above IS and this specification, the
stipulation of this specification shall prevail.
3.
ENVIRONMENTAL CONDITIONS.
3.1
The shunt capacitor installation shall be suitable for outdoor use in moist tropical climate and in
areas subject to heavy rainfall, pollution due to industry and marine atmosphere and severe
lightning. The limiting weather conditions which the shunt capacitor and associated items have
to withstand in service are indicated below:
1
Atmospheric temperature
i.
ii.
iii.
iv.
2
3
4
Coastal area
9
10
5
6
3.2
100%
Ranging from 1750 to 6250mm
120 days
85 days
35 days
Extremely dusty and desert terrain in certain areas.
The dust concentration in air may reach a high value
of 1.6 mg/m. In many iron ore and coalmine areas,
the dust concentration is very high affecting the filter
and air ventilation system.
The equipments shall be designed to work in coastal
areas in humid and salt laden atmosphere with
maximum. pH value of 8.5, sulphate of 7mg per liter,
max. concentration of chlorine 6 mg per liter and
maximum conductivity of 130 micro siemens/cm.
200kg/sq.m.
Up to 1000 m above mean sea level
VIBRATIONS
The shunt capacitor installation would also be subjected to vibrations on account of trains
running on nearby railway tracks. The amplitude of these vibrations which occur with rapidly
varying time periods in the range of 15 to 70 ms lies in the range of 30 to 150 microns at present
with the instantaneous peak going up to 350 microns.
4.
4.1
General Scheme :
The electric power for railway traction is supplied in ac 50 Hz. single phase through 2x25 kV AT
feeding system, which has a feeding voltage from the substation two times as high (2x25 kV) as
Specification No.
TI/SPC/PSI/2x25/FC&SR/0100(/10)
Effective from:
..Sep.10
Page 6 of 34
catenary voltage (25kV). This high voltage power supplied from the traction substation through
catenary wire and feeder wire is stepped down to the catenary voltage by use of
autotransformers installed about every 13 to 17 km along the track, and then fed to the
locomotives, In other words, both the catenary voltage and feeder voltage are 25kV against the
rail, although the substation feeding voltage between catenary and feeder is 50 kV. Therefore,
the catenary voltage is the same as that of the conventional 25 kV system.
4.1.1
Since the power is supplied in two times higher voltage, the 2x25 kV AT feeding system is
suitable for a large power supply, and it has the following advantages, compared with
conventional feeding systems.
(a) Less voltage drop in feeder circuit.
(b) Large spacing of traction substation.
(c) Less telecommunication interference by use of AT installed with adequate spacing.
4.1.1
4.1.2 The power is obtained from 220/2x25 kV Scott- connected or V- connected traction
transformer or 132/2x25 kV single phase transformers. The primary windings of the single phase
transformers are connected to two or three phases of 132 kV, three-phase effectively earthed
transmission net-work of the Electricity Board, in case of a single phase transformer or in case of
two single phase transformers connected in V, respectively. On the other hand, the primary
windings of the Scott-connected transformers are connected to the three phases of 220 kV
three-phase, effectively earthed transmission net-work of the Electricity Board. The Scottconnected transformer and V-connected single phase transformers are effective in reducing
voltage imbalance on the transmission net-work of the Electricity Board . The spacing between
adjacent substations is normally between 70 to100 kms. A power supply diagram No.
ETI/PSI/SK/3 & a sketch showing the general arrangement at a traction sub-station is at
Appendix-I & II
4.1.3
One outer side terminal of the secondary windings of traction transformer is connected to the
catenary, the other outer side terminal being connected to the feeder. Two inner side terminals
are, via series capacitors or directly, connected to each other, and their joint is solidly earthed
and connected to the traction rails.
4.1.4
The load current from the substation flows through the catenary and returns to the substation
flows through the feeder. Between two adjacent ATs, the load current fed from the catenary to
the locomotive flows in the rail and is boosted up to the feeder through the neutral tap of ATs at
left and right sides of the locomotive.
4.1.5
At the points of substation and sectioning post, a dead zone known as neutral section is
provided in OHE to avoid a wrong phase coupling. The power to the catenary and feeder on one
side of the substation is fed by one feeder circuit breaker, even if there exist two breakers for
one side, and each track is controlled by an interrupter. The two breakers are used as a stand-by
for each other. For maintenance work and keeping the voltage drop within limits, one or more
sub-sectioning and paralleling posts (known as SSP) are introduced between traction substation
and a sectioning and paralleling post (known as SP). A SSP on a double track section normally
has four sectioning interrupters and one paralleling interrupter. In case of fault, the feeder
circuit breaker of the substation isolates it.
4.1.6
A figure showing the principle of AT feeding system and a typical power supply diagram showing
the general feeding arrangement at a traction substation and sections of the OHE are given in
the sketch at the Appendix-V.
Specification No.
TI/SPC/PSI/2x25/FC&SR/0100(/10)
Effective from:
..Sep.10
4.2
PROTECTION SYSTEM
4.2.1
The following relays are provided for the protection of traction transformers:
a)
b)
c)
d)
e)
4.2.2
Differential protection.
IDMT over current protection, (on HT& LT side)
Restricted earth fault protection, (on HT & LT side)
Instantaneous over current element on HT side
Phase-failure relay (to detect a malfunction of a feeder circuit breaker)
4.3
Page 7 of 34
4.3.1
Traction transformer
The percentage impedance of a 2x25 MVA, 220/2x25 kV Scott- connect or V- connected
transformer and a 20 MVA, 132/2x25 kV single-phase transformer are 12% ( at 27 MVA base)
and 12% (at 21.6 MVA base), respectively.
4.3.2
Clearance at Substations:
Normally a minimum clearance of 500 mm is provided between any live part at 25 kV and earth.
4.4
4.4.1
OHE is subjected to frequent earth faults caused by failure of insulation, snapping of OHE and
touching the rail or earth, or loose wires carried by birds coming in contact with OHE below
over-line structures, miscreant activities etc. These faults are cleared by the feeder circuit
breaker which operates on any one or both of the following relays depending on the proximity
of the fault.
1. Distance relay
2. Delta I type fault selective relay
3. Instantaneous over current relay
4.4.2
Inadvertent coupling of two phases between adjacent substations at the neutral section or at
intermediate switching stations in case of extended feed, causes short circuit. This is cleared by
tripping of one of the feeder breakers at the two ends through Wrong phase coupling relays
Specification No.
TI/SPC/PSI/2x25/FC&SR/0100(/10)
4.5
Effective from:
..Sep.10
Page 8 of 34
4.6
4.6.1
Traction load is of frequent and rapidly varying nature and may fluctuate between no-load and
overloads. The system is also subject to frequent short circuits due to earth faults. It is difficult,
therefore, to forecast precisely the load cycle of traction service because of the non-uniform
pattern of traffic, which is different on different days.
4.6.2
The conventional AC electric locomotives are fitted for conversion of ac to dc, with single phase
bridge-connected silicon rectifiers with smoothing reactor for feeding the dc traction motors.
The ripple current is in the region of 25 to 40%, which introduces harmonics in the 25kV power
supply. There are some locomotives based on thyristor control, which are having higher
harmonics generation. The typical percentages of harmonics present in the traction current with
diode rectifier and the Thyristor locomotives are as follows :
Current harmonics (%) with
Rectifier
Thyristor
rd
3 harmonics (150 Hz)
15%
23%
5th harmonics (250 Hz)
6%
14%
7th harmonics (150 Hz)
4%
10%
These are the typical values and measurements have indicated that these can be higher at lower
loads and lower at higher loads.
4.6.3
The average power factor of electric traction and multiple unit trains generally varies between
0.7 and 0.8 lagging without compensation.
4.6.4
In big yards and loco sheds, a number of locomotives stand idle with only the load of their
auxiliaries drawing higher reactive power. The load power factor is, therefore, rather low.
4.6.5
In addition to above IR is having locomotives and EMUs fitted with 3-phase drives having
regenerative braking capabilities.
5.
TECHNICAL SPECIFICATION
5.1
Specification No.
TI/SPC/PSI/2x25/FC&SR/0100(/10)
vi)
vii)
viii)
5.1.1
Page 9 of 34
The complete HT capacitor bank (with 13% series reactor) shall have to be designed in two
exactly similar parts. One bank shall be between traction wire and rail (earth) while other bank
shall be connected between Feeder wire and the rail. As minimum standard capacitor bank
rating with 5, 220 kVAR and 8 kV capacitor units comes to 1100 kVAR @ 40 kV, minimum rating
of a HT capacitor bank shall be 2200 kVAR (@ 40kV) and in multiples of it thereof. Refer to
Appendix -III for constitutional of shunt capacitor equipment.
Capacity of
bank in kVAr
at 40 kV
In the multiple
of 220 kVAr
2200
4400
6600
8800
NOTE:
5.2
Effective from:
..Sep.10
Xc()
XL()
Xc()
KV2 x 1000
kVAr
0.13 x Xc
0.87 x Xc
Capacity of
bank in kVAr
at 25 kV
KV2 x 1000
Xc
I at 25 kV (in
Amps)
KVAr at 25 kV
25
727.27
94.55
632.73
988
39.51
363.64
47.27
316.36
1976
79.02
242.42
31.52
210.91
2963
118.53
181.82
23.64
158.18
3951
158.05
Note: Losses of the reactor shall be guaranteed at the rated current
Rated current
of reactor (in
Amps)
I at 25 kV x 1.3
51
103
154
205
To cater for manufacturing tolerances of both capacitance and inductance, the maximum and
minimum frequencies shall be taken as 53 Hz and 47 Hz respectively.
Resonant condition and inrush current :
The rating of the capacitor bank shall be such that it does not resonate with source impedance
including transformer impedance and series reactor (parallel resonance). It shall also not
resonate with the series reactor (series resonance) at any of the harmonic frequencies. It shall
also be ensured that the inrush current of the capacitor bank does not exceed the maximum
guaranteed value. Calculations shall be furnished with the tender in respect of the inrush
current, surge voltage and series/parallel resonant frequencies.
5.3
Capacitor Unit :
5.3.1
Rating of the capacitor unit of the bank shall be 220 kVAr, 8 kV. The individual capacitor units of
the bank shall be of All polypropylene (APP) self-contained, outdoor type provided with double
bushing protected by internal element fuses. Each capacitor unit shall be built up of number of
elements having a dielectric of plastic film (polypropylene) between the aluminium foils as
electrode. The bushings shall be of porcelain and shall be jointed to the case by welding or other
approved technique (except soldering). The minimum value of creepage distance for bushings
shall be 25mm per kV of appropriate class. The bushing shall be in accordance with IS-2099-
Specification No.
TI/SPC/PSI/2x25/FC&SR/0100(/10)
Effective from:
..Sep.10
Page 10 of 34
1986 & IS- 5621-1980 and shall be got routine & type tested from a reputed laboratory like CPRI,
ERDA or another for which approval of RDSO may be obtained. The bushing shall also withstand
a torsional effort at the terminal stud, not less than 20 Nm.
The capacitor elements shall be assembled in a stack closely fitted into the container in order to
reduce the amount of free impregnation fluid. The container shall accommodate changes in
fluid volume due to variation in the temperature. Each individual unit shall consist of a number
of elements connected in series parallel arrangement. Each element shall be protected by
means of an internal fuse connected in series. The capacitor unit shall be capable of
withstanding transient over currents of high frequency and amplitude occurring at the time of
their switching in the circuit.
Each capacitor unit of 220 kVAr shall have at least 15 Parallel elements in each series group so
that failure of 40% of elements in a series group shall not give rise to more than 10% over
voltage on healthy parallel units.
Each capacitor unit shall satisfactorily operate continuously at rated voltage and shall withstand
30% over current (rms value) due to over-voltages and harmonics. The unit shall also
satisfactorily operate with traction harmonic currents as indicated in clause 4.7.2. Depending
upon the actual capacitance value, which may be maximum of the 1.15 time the rated
capacitance Cn, the maximum current may reach 1.5 times the rated current.
5.3.2
The Polypropylene film conforming to IS: 11298 shall be checked for proper thickness,
roughness, breakdown voltage besides its physical appearance.
5.3.3
5.3.4
The aluminium foil used shall be of very high purity and free from materials like rolling oil and
such other defects. The thickness of aluminium foil used shall not be less than 5 microns.
5.3.5
The container of each capacitor unit shall be leak and moisture-proof. The capacitor containers
shall be made of CRCA steel sheets of drawing quality generally as per IS: 513. The nominal
thickness of steel shall be 1.6 mm. The inside surface of the container in contact with the
impregnating fluid shall not be painted and shall only be degreased and made rust-free. The
steel surfaces exposed to weather shall be given a primer coat of zinc-chromate and two coats
of light grey enamel paint as per shade 631 of IS: 5.
5.3.6
Internal element fuse for capacitor units shall comprise very high-grade quality special alloy
wire. The raw material for fuse shall comprise fuse wire, pressboard and insulating paper. These
fuse wire shall be checked for tolerance in dimension and uniformity in finish and also for
compatibility with the impregnating fluids. The element fuse shall be current limiting type,
which shall operate in a very short duration to isolate the faulty elements.
5.3.6.1 The fuse shall be capable of carrying both nominal current continuously and inrush current. It
shall operate safely at the minimum available energy and should not explode while discharging
maximum available energy.
5.3.6.2 The construction of the internal fuse shall be such that the residue of fuse operations shall not
contaminate the impregnating liquid.
Specification No.
TI/SPC/PSI/2x25/FC&SR/0100(/10)
Effective from:
..Sep.10
Page 11 of 34
5.3.6.3 The internal fuse shall be so designed that fuse operation under the worst conditions will not
cause a fire inside the unit. The internal fuse shall be designed and tested as per IS: 12672 and
test results furnished with each capacitor unit.
5.3.7
Each capacitor unit shall be provided with a directly connected internal discharge device to drain
the residual voltage from the crest value of the rated voltage to 50 volts or less within ten
minutes of disconnection of the capacitor from the source of supply.
This device shall be made from carbon resistors without lacquer coating.
5.4
5.4.1
The successful tenderer shall provide complete system details of series reactor and HT capacitor
bank e.g. KVAr, XL, XC, Current, Voltage etc. to the manufacturer of series reactor (OEM).
5.4.2
Reactors should be designed to facilitate easy lifting and provided with lifting eyes or similar
provisions to allow safe & rapid installation.
5.4.3
Lifting and handling instructions shall be furnished by the reactor manufacturer. In case of heavy
reactors, special crating and transport precautions shall be taken by the reactor manufacturer to
keep stresses in the reactor within safe levels.
5.5
5.6
Protection :
5.6.1
The offer shall include design and supply of a comprehensive protection scheme for the
equipment offered by the tenderer. Full details including relay characteristics of the protection
scheme offered for the capacitor bank, series reactor, circuit breaker shall be fully explained in
the offer giving necessary calculations and diagrams.
Specification No.
TI/SPC/PSI/2x25/FC&SR/0100(/10)
Effective from:
..Sep.10
Page 12 of 34
5.6.2
The protective relays offered shall be properly coordinated with the existing scheme of
protection indicated in sketch attached at Appendix-IV
5.6.3
The protection system for shunt capacitor bank shall include protection against over current,
overload, over voltage, under voltage and unbalance current protection.
i)
Over current relay with inverse definite minimum time (IDMT) element with suitable settings.
ii)
Over voltage relay over voltage protection against system over voltages shall be provided
with an inverse time characteristics with suitable settings. The over voltage relay shall be
energized from a potential transformer connected to the main bus bar on the incoming side of
the circuit breaker controlling the capacitor bank. If required an interposing voltage
transformer (IVT) of suitable ratio shall be used for matching the capacitor over voltage
withstand characteristics.
iii)
Under voltage relay In conjunction with the timer to enable the capacitors to discharge
before reclosure. The relay provided for this purpose shall be connected to the bus potential
transformer and have high resetting ratio. Also a time delay relay shall be included with
adjustable setting of 0 to 10 minutes to provide a time lag before the breaker can be reclosed.
However, this relay would not be required if a timer is included in the closing circuit of its
associated breaker to prevent its reclosing within 10 minutes.
iv)
The capacitor bank shall be protected by means of unbalance current protection. The capacitor
bank shall be connected as a bridge and an unbalance sensing current transformer provided.
The current transformer ratio shall be chosen so that even one capacitor element failure can be
detected. The relay used shall be a harmonic insensitive over current relay with fixed time
delay characteristic. The time delay shall be set at approximate 0.1 sec. Calculations shall be
furnished to establish that unbalance protection shall operate before the over voltage limits as
given in Clause No. 5.3.1 are exceeded.
v)
Each capacitor element shall be protected by means of internal fuse. The fuse shall be
connected in series with each capacitor element inside the capacitor unit to limit the effects of
dielectric failures. If a puncture of dielectric occurs, only one element shall be disconnected and
the capacitor unit continues to operate. While selecting the fuse rating, it would be necessary
to choose proper time-current characteristics which in turn significantly depends upon the
cross section and circumference e of the fuse. Fuses chosen shall have adequate thermal
capability and comply with relevant IS: 12672.
5.6.4. The tenderer may propose any other protection which they consider in their experience to be
superior for the installation and shall give full justification for the same.
6.
6.1
The capacitor bank shall be of outdoor type, mounted on steel rakes for connection to the 25kV
bus through single pole isolator and circuit breaker. The capacitor bank shall consist of groups of
individual capacitor units, connected in series-parallel combination to deliver the rated output,
at normal rated system voltage, rated frequency and other system conditions detailed
elsewhere. The number of parallel units in each series group shall be selected so as to satisfy the
conditions in clause No. 5.3.1. the capacitor bank shall be supplied complete with mounting
steel rack assembly, interconnectors between units, insulators, suitable earthing lugs including
Specification No.
TI/SPC/PSI/2x25/FC&SR/0100(/10)
Effective from:
..Sep.10
Page 13 of 34
terminal connectors (but without connecting jumper to 25kV bus) and other material required
to make the bank complete in all respects for its satisfactory operation.
6.2
Mounting arrangement
6.2.1
The capacitor bank and the series reactor shall be suitable for mounting on steel racs which in
turn shall be mounted on a concrete plinth with suitable base frames. The racks shall be
complete with rack insulators and other hardware.
6.2.2
The tenderer is free to suggest any other arrangement for mounting the capacitor bank and
reactor which is considered economical without sacrificing the safety of the personnel working
in traction substation. Full details of such arrangements shall be furnished with the tender.
7.
Control panel
The control panel having the relays for the capacitor bank shall be supplied and installed by the
tenderer in the control room of unattended remote control traction substation as per RDSO
specification No. TI/SPC/PSI/PROTCT/6070 or latest.
8.
9.
10.
Earthing:
Earthing arrangements shall be provided for capacitor bank installation in accordance with RDSO
Code No. ETI/PSI/120(2/91) Code practice for Earthing of power supply installation for 25kV, ac,
50 Hz, single phase traction system.
11.
Painting:
All steel structures exposed to weather shall be given primer coat of zinc chromate and two
coats of light grey enamel paint to shads No.631 of IS: 5. One additional coat of paint shall be
given at site by the manufacturer.
12.
Fasteners:
All fasteners of 12 mm diameter and less exposed to atmosphere shall be of stainless steel and
those above 12 mm dia shall be preferably of stainless steel or mild steel hot dip galvanized to
RDSOs specification No. ETI/OHE/18(4/84). The material of the stainless steel fasteners shall
conform to IS: 1570 (Pt.V) Grade 04 Cr 17Ni 12 Mo 2.
Specification No.
TI/SPC/PSI/2x25/FC&SR/0100(/10)
13.
Effective from:
..Sep.10
Page 14 of 34
13.1 General:
13.1.1 Once a purchase order is placed for supply of capacitor equipment the designs and drawings
shall be furnished to the purchaser/Director General (Traction Installation) Research Designs
and Standards Organisation , Lucknow, as the case may be within the period stipulated in the
order. Only after all the designs and drawings have been approved for prototype tests and a
written advice given to that effect, the successful tenderer/manufacturer take up manufacture
of the prototype of the shunt capacitor equipment. It is to be clearly understood that any
change or modification required by the above authorities is to be done in the prototype shall be
done expeditiously, not withstanding approval having already being given for the designs and
drawings. Such change or modification shall be incorporated in the drawing as indicated in
clause 15.6.
13.1.2 Prior to giving a call to the Purchaser/Director General (Traction Installation) Research Designs
and Standards Organisation, Lucknow, hereafter written as DGTI-RDSO for inspection and
testing of the prototype the successful tenderer/manufacturer shall submit a detail test
schedule consisting of schematic circuit diagrams for each of the test and the number of days
required to complete all the tests at one stretch. Once the schedule is approved, the tests shall
invariably be done accordingly. However during the process of type testing or even later, the
purchaser reserves the right to conduct any additional test(s), besides those specified herein, on
any equipment/item so as to test the equipment/item to his satisfaction or for gaining
additional information and knowledge. In case any dispute or disagreement arises between the
successful tenderer/manufacturer and representative of the Purchaser/ DGTI-RDSO, during the
process of testing as regards the procedure for type tests and/or the interpretation and
acceptability of the results of type tests, it shall be brought to the notice of the purchaser/ DGTIRDSO, as the case may be, whose decision shall be final and binding. Only after the prototype
shunt capacitor is complete and ready in each and every respect, shall the successful
tenderer/manufacturer give the actual call for the inspection and testing with at least fifteen
days notice for the purpose.
13.1.3 In the event of the test not being carried through to completion at one stretch for any reason
attributable to the successful tenderer/manufacturer and it is required for the representative of
the Purchaser/ DGTI-RDSO, to go again or more number of times to the works of the successful
tenderer/manufacturer or other place(s) for continuing and/on completing the tests on the
prototypes of the equipment, the successful tenderer/manufacturer shall reimburse to the
purchaser/ DGTI-RDSO, shall be paid through a demand draft to the concerned account officer
of the purchaser/ DGTI-RDSO, as shall be advised to the successful tenderer/manufacturer.
13.1.4 The following type tests shall be carried out on the prototype shunt capacitor equipment at the
works of the successful tenderer/manufacturer in the presence of the representative of the
purchaser/ DGTI-RDSO and the tests for which facility does not exist at firms premises shall be
conducted at a reputed testing laboratory in accordance with the relevant specifications and
reports shall be submitted to RDSO.
13.2
13.2.1 The following type tests shall be carried out on the prototype capacitor unit as per IS: 13925
(part-I): 1998 and shall be carried out in the sequence given below:
1.
2.
Specification No.
TI/SPC/PSI/2x25/FC&SR/0100(/10)
3.
4.
5.
6.
7.
8.
9.
10.
Effective from:
..Sep.10
Page 15 of 34
Specification No.
TI/SPC/PSI/2x25/FC&SR/0100(/10)
1.
2.
3.
4.
5.
6.
7.
Effective from:
..Sep.10
Page 16 of 34
The following type tests shall be carried out on the prototype units as per IS: 5553 (parts 3 &
5) and shall be carried out in the sequence given below:
1.
2.
3.
4.
5.
6.
7.
8.
Note: Above tests shall be repeated at the time of renewal of vendor registration with RDSO.
13.6.2 Routine tests on series reactor :
The following routine test shall be carried out on each unit of series reactor as per IS:5553 (parts
3 & 5)
1.
Measurement of winding resistance,
2.
Measurement of insulation resistance,
3.
Measurement of impedance at continuous current,
4.
Measurement of loss,
5.
Separate source voltage withstand test,
6.
Induced over-voltage withstand test or lightning impulse test and
7.
Measurement of Q-factor.
13.6.3 The Short time current test and measurement of impedance at short time current shall only be
carried out as a type test on the first prototype reactor unit in accordance with the procedure
laid down in IS: 5553 (parts 3 & 5) and repeated if any changes will be made in design.
13.7 Test on control panel :
Following checks and tests shall be carried out on the control panel:
i)
Visual checks:
General check of control board in respect of construction, wiring, provision of various
equipments and relays.
Specification No.
TI/SPC/PSI/2x25/FC&SR/0100(/10)
ii)
iii)
iv)
Effective from:
..Sep.10
Page 17 of 34
Operation tests:
Operation tests on all the equipments, switches and tests to prove correctness of wiring
of various circuits including indications, alarms, operation of relays and annunciation.
Power frequency high voltage withstand test:
Voltage test on the panel with all equipments and wiring for a withstand voltage of
2000V (rms) to earth for one minute.
Insulation resistance tests:
Measurement of insulation resistance of the complete panel wiring, circuit by circuit, by
using 1000V megger.
13.8 Following tests shall be jointly conducted at site alongwith representative of Railways/purchaser
to verify the performance of the complete capacitor bank installation:
i)
ii)
iii)
iv)
Capitalization of losses:
In evaluating the offer, the price of capacitors and series reactor with higher watt losses/KVAr
shall be compared by increasing the prices by capitalization of additional losses by the formula
given in Appendix-VII. The tenderer shall for this purpose clearly indicate the losses in watts per
kVAr rating of the capacitor bank and separately for the series reactor at rated voltage.
14.1
The losses of the capacitor bank shall be made up of the losses per capacitor unit (including
fuses and discharge device) multiplied by the number of units in the bank. The overall losses of a
capacitor unit shall be as low as possible and shall not be more than 0.2 watt/KVAr.
15.0
15.1
The tenderer shall furnish guaranteed performance data, technical and other particulars for the
equipments offered in the proforma at Annexure-A. Technical details of the protection
Specification No.
TI/SPC/PSI/2x25/FC&SR/0100(/10)
Effective from:
..Sep.10
Page 18 of 34
employment together with detailed calculation or the ratings of the equipment shall also be
furnished with the tender.
15.2
The information furnished in Schedule of guaranteed technical performance, data and other
particulars shall be completed in all respects. If there is any entry like shall be furnished later
or blanks are left against any item, the tender is not likely to be considered as such omissions
cause delays in finalizing the tender.
15.3
The tenderer shall specifically indicate in a statement attached with his offer, his compliance
with each clause and sub clause of this specification. If any vague remarks on any clause or subclause of this specification is given by the tenderer, then the tender submitted by him is not
likely to be considered. A separate deviation statement shall be furnished with the offer drawing
attention to the clause(s) where the tenderer seeks deviation giving detailed
remarks/justification thereof. If there are no deviations, a NIL statement shall be furnished.
15.4
The tenderer shall furnish the following calculations with their offer:
a)
b)
c)
d)
15.5
Detailed calculations for rating of capacitor bank, series reactor, inrush current,
transient over voltage, parallel and series resonant frequencies.
Calculations for protection scheme offered.
Calculations to establish that unbalance protection shall operate before the over voltage
limits as given in Clause 5.3.1 are exceeded.
Calculations for design of supporting frame, fixing arrangement and foundation.
The successful tenderer shall be required to submit for approval the following detailed
dimensioned drawings as per Indian Railways Standard in sizes of 210mmx297mm or any
integral multiples thereof:
a. Outline general arrangement drawing of the capacitor bank installation indicating overall
dimensions, clearance and location of equipments/fittings (all the 3 views) name and rating
plate with diagram of connections (one in English and the other in Hindi)
b. Outline general arrangement of series reactor including cross-sectional views in both plan
and elevation; rating and diagram plate and core lifting arrangement.
c. Schematic and wiring diagram.
d. Supporting frame with details of fixing arrangement and foundations along with calculation
for their designs.
e. Arrangement of capacitor bank showing series reactor, circuit breaker, isolator, lightning
arrestor, current/ potential transformers.
f. Details of capacitor bank showing series parallel arrangement of capacitor units.
g. Arrangement of core winding and magnetic path of series reactor.
h. General arrangement of circuit breaker showing mounting arrangement and overall
dimensions.
15.6
After approval of designs and drawings by Director General (TI), RDSO, Lucknow the tenderer
shall manufacture an acceptable prototype of shunt capacitor equipment as per approval
drawings. The prototype inspection shall be carried out by the representative of RDSO. The bulk
manufacturing shall be taken up only after approval of prototype by Director General (TI), RDSO,
Lucknow.
15.7
Routine inspection shall be carried out by the representatives of Indian Railways at the
manufacturers works.
Specification No.
TI/SPC/PSI/2x25/FC&SR/0100(/10)
Effective from:
..Sep.10
Page 19 of 34
15.8
After approval, six copies of approved drawings along with two sets of reproducible prints shall
be supplied to each consignee(s). Besides, two copies of drawings along with one set of
reproducible prints and a soft copy in Auto-cad shall be supplied to Director General (Traction
Installation), Research Designs and Standards Organisation. Lucknow (India).
15.9
The successful tenderer shall supply 10 copies of Instruction/Maintenance Manual for the
capacitor bank and series reactor installation and its fittings and accessories, to each
consignee(s) and 2 copies to Director General (Traction Installation), Research Designs and
Standards Organisation, Lucknow (India)
16.
Additional Particulars:
The tenderer shall visit the traction sub-station location, if necessary, and collect any additional
data/details required for the design of the capacitor bank and the series reactor/surge
suppression equipment. It would be the responsibility of the tenderer to visualize the problems
and understand the system conditions before evolving a suitable design.
17.
17.1
The successful tenderer shall carry out the installation and commissioning of H T capacitor
bank and series reactor under the supervision of competent engineers of the Original
equipment Manufacturers (OEM) of HT capacitor bank as well as series reactor, which shall
be subjected to the specified pre-commissioning tests at site in the presence of the Railway
engineer. Necessary arrangement/ coordination in this regard shall be done by successful
tenderer. For this purpose prior intimation regarding the date and location of the tests shall
be given by the purchaser to the successful tenderer.
17.2
Proper packaging, handling & storage of the capacitor bank and reactor shall be ensured by the
successful tenderer and manufacturer to avoid any damage to equipment during transportation,
storage and installation at site. The successful tenderer shall fully adhere to handling
instructions issued by manufacturer of capacitor/reactor and suitable capacity machinery shall
be used for this purpose if required.
18.
Spares:
The tenderer shall furnish along with his offer a list of spares, with cost, recommended by him
for maintenance of capacitor bank installation for a period of 2 years.
19.
20.
Warranty:
Each HT capacitor bank including reactor and all equipment supplied against a purchase
order/contract, in which this specification is quoted, irrespective of origin (imported or
indigenous) shall be guaranteed for trouble free and satisfactory performance for a period of 42
Specification No.
TI/SPC/PSI/2x25/FC&SR/0100(/10)
Effective from:
..Sep.10
Page 20 of 34
months from the date of supply or 36 months from the date of commissioning at the substation
on Indian Railways, whichever period is shorter. Details of warranty/guaranty clause, the extent
of responsibility on other relevant aspects shall be included in purchase order or contract. The
tenderer shall furnish detailed terms and conditions in this regard in his offer.
21.
The supplier shall supply Digital, portable battery operated capacitance meter with range of 200
p.f. to 2000 F accuracy class 0.1% of full scale reading. Guaranteed for satisfactory operation
for 18 months from the date of commissioning of the capacitor bank. One such unit shall be
supplied for one capacitor bank location. The display shall be 0.5 LCD type 3-1/2 digit with
minimum capability of one digital place reading space in decimal point for each range.
************
Specification No.
TI/SPC/PSI/2x25/FC&SR/0100(/10)
Effective from:
..Sep.10
Page 21 of 34
Description
01.
02
03
04
05
06
07
Makers name
Country of manufacture
Manufacturers type designation
Location of capacitor bank (outdoor/indoor)
System voltage
Rated voltage of unit as per IS: 13925
Maximum voltage (rms), which the capacitor unit can withstand
continuously.
Rated frequency
No. of phases
Upper limit of temperature category
Capacity of individual unit at rated voltage of unit.
Capacity of capacitor bank at 25 kV
i)
Rated continuous current
ii)
Maximum continuous current including harmonics
iii)
Maximum inrush current at the instant of switching in.
Basic insulation level of unit
a) Power frequency voltage withstand
b) 1.2/50 microsecond impulse withstand voltage
Basic insulation level of complete capacitor bank
a) Power insulation voltage withstand
b) 1.2/50 microsecond impulse withstand voltage
Transient current withstand capacity.
Constructional details of capacitor unit.
i)
Dielectric material and its thickness
a) Tensile strength
b) Percentage elongation
c) Shrinkage
d) Dielectric break down voltage
ii)
Foil material and thickness
iii)
Impregnating liquid used and its properties.
a) Tan Delta
b) Break down voltage
c) Flash point
d) Acidity
e) Volume resistivity.
iv)
Discharge resistors.
v)
Internal fuses
Total max. losses per kVAr/unit at rated 25 kV voltage and rated 50
Hz frequency (In accordance with clause 14.2)
Capacitor Unit
i)
No. of elements in series
ii)
No. of elements in parallel
08
09
10
11
12
13
14.
15.
16.
17.
18.
19.
Unit of
Measurement
KV
KV
KV
Hz
No.
Deg.C
KVAr
KVAr
Amps
Amps
Amps
KV(rms)
KV(peak)
KV(rms)
KV(peak)
KA
V/micron
Watts
No.
No.
Specification No.
TI/SPC/PSI/2x25/FC&SR/0100(/10)
20.
21.
22
23
24.
25
26.
Effective from:
..Sep.10
Capacitor bank
i)
Capacitance of bank
ii)
No. of series groups
iii)
No. of parallel units in each group
Internal fuse
i)
Type of internal fuse elements of capacitor unit
ii)
Length of fuse element
iii)
Cross section of fuse element
iv)
Circumference of fuse element
v)
I 2t characteristics.
vi)
Time factor (t) of internal fuse element
Discharge device.
i) Type
ii) Location
iii) Time interval between de-energisation and re-energisation.
iv) Residual voltage after an interval of 10 minutes of deenergisation
Bushings:
i)
Makers name
ii)
Governing specification
iii)
Wet-1 minute power frequency voltage withstand.
iv)
Impulse voltage withstand 1.2/50 micro-second full wave.
v)
Creepage distance in air
vi)
No. of bushings in each unit
Overall dimensions
i)
Capacitor Unit
ii)
Complete capacitor bank
Weight per unit
Weight of the complete bank.
Page 22 of 34
Micro Farad
No.
No.
mm
sq.mm
mm
Sec.(under
max. energy
condition)
Sec. (under
Min. energy
condition)
Minutes.
Volts.
KV(rms)
KV(peak)
Mm
No.
Kg.
Kg.
Specification No.
TI/SPC/PSI/2x25/FC&SR/0100(/10)
Page 23 of 34
Effective from:
..Sep.10
3.
i)
ii)
4.
5.
Annunciations provided.
6.
7.
8.
mm
mm
mm
kg
Specification No.
TI/SPC/PSI/2x25/FC&SR/0100(/10)
Effective from:
..Sep.10
Page 24 of 34
Over-current protection
i)
Type and make of relays offered.
ii)
Setting range of current available.
b)
Over-voltage protection
i)
Type and make of relay offered.
ii)
Setting range available.
c)
Unbalance Protection
i)
ii)
iii)
iv)
d)
NOTE : This tenderer should be complete with three sets (one with each copy) of technical
literature and pamphlets of the relay used.
Specification No.
TI/SPC/PSI/2x25/FC&SR/0100(/10)
Page 25 of 34
Effective from:
..Sep.10
D Series Reactor
S.N.
Description
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
17.
18.
19.
20.
Class of insulation
Maximum temperature rise: i)
At continuous current
ii)
At 130% loading
Basic insulation level: i)
Power frequency voltage withstand
ii)
1.2/50 microsecond impulse withstand voltage
Value of the peak surge voltage generated at the time of switching in of
shunt capacitor (calculations shall be appended)
Rated inrush current
Short time current and specified duration
Designed Q-factor at a specified frequency.
Overall dimensions of the series reactor
21.
15.
16.
Unit
of
Measurement
KV
KV
A
A
KVAr
Hz
mH
Ohms
Hz (Parallel)
Hz(Series)
Degree C
Degree C
KV(rms)
KV(Peak)
KV
A
KA
mm x mm x
mm
Kg.
Specification No.
TI/SPC/PSI/2x25/FC&SR/0100(/10)
Effective from:
..Sep.10
Page 26 of 34
E Instrument Transformers
(a)
CURRENT TRANSFORMER:
S.N.
Description
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
Unit
of
measurement
Specification No.
TI/SPC/PSI/2x25/FC&SR/0100(/10)
b)
1.
2.
3.
4.
5.
6.
7.
POTENTIAL TRANSFORMER
14.
15.
16.
8.
9.
10.
11.
12.
13.
Page 27 of 34
Effective from:
..Sep.10
KV
VA
VA
KV/volt
KV
KVp
Degree C
Degree C
KV
mm
Kg
mm
mm
mm
Kg
Yes/No.
Yes/No
Specification No.
TI/SPC/PSI/2x25/FC&SR/0100(/10)
Effective from:
..Sep.10
Page 28 of 34
APPENDIX-I
Specification No.
TI/SPC/PSI/2x25/FC&SR/0100(/10)
Effective from:
..Sep.10
Page 29 of 34
APPENDIX-II
General Arrangement Drawing of Traction Substation for 2 x 25 kV AT Feeding system
Specification No.
TI/SPC/PSI/2x25/FC&SR/0100(/10)
Effective from:
..Sep.10
Page 30 of 34
APPENDIX-III
Specification No.
TI/SPC/PSI/2x25/FC&SR/0100(/10)
Effective from:
..Sep.10
Page 31 of 34
APPENDIX- IV
Schematic Diagram of Shunt capacitor Bank
Specification No.
TI/SPC/PSI/2x25/FC&SR/0100(/10)
Effective from:
..Sep.10
Page 32 of 34
APPENDIX-V
Specification No.
TI/SPC/PSI/2x25/FC&SR/0100(/10)
Effective from:
..Sep.10
Page 33 of 34
APPENDIX-VI
Specification No.
TI/SPC/PSI/2x25/FC&SR/0100(/10)
Effective from:
..Sep.10
Page 34 of 34
APPENDIX-VII
TO
SPECIFICATION NO.: TI/SPC/PSI/2X 25/FC&SR/0100(/10)
(Referred to Clause 14)
Formula:
K
PL
Power losses
thus
*****