Unplanned Cutter Head Intervention

You might also like

You are on page 1of 3
ce GEOCONSULT ASIA SINGAPORE Pte Utd, coc Sm ‘Nos alan lang Boat Tol: 65) 62940098 ‘ots Pera Cente Fac: 5) 6294 3263 Singapore 158048 ‘cma ofeapeoconl.comap nse ‘ALPINE Bau GmbH 18 March 2013 (0917/0918 Project Ofice 1A, Fourth Avenue, #0101 ure, s4az21-0970 Stogapore 258671 Yourret: — ‘tn: Mr Frank Brodoack : Tan Kah Is F Downtown Line Stage 2 ‘Subject: Unplanned Cutter Head Intervention at CH 464735 to CH 46+734 for TKK to [BTN Expo Bound TBM Drive Dearsir, Reference is made tothe above subject. ‘ter breakng trough he rock face at TKK station and excavating about 1m ino the GUI rock, 2 Unplanned eater heed inerention proposed to be cared out at CH 46+735 to CH 48+734, in ‘order to check on the TEM cuter head for tool wearléamage or potentl Hockage ater cuting ‘through the incined rock ace Location: — The bored tunnel depth is about 173m, measured from round surface fo tunnel ads, = The ground conditions at thie locaton are wall defined fram the sot investigaon and station ‘excavation experince. ~The TBM has just enlra into th rock fom the rock slope within TKK station excavation and is locate in fl face GUGII rock mater, which is overlain by GMI, GV, F2, , and Fil material sbove, = The cument cuter heed location is stl wall within the zone of prong and rack grouing, which was carrie out bears TBM faunching fortes Result = The latest readings from water standpipe GWS2004 indicate thatthe ground water level is stable ‘and unaffected by the TEM launch, Analysis of Face Stability: = Immediately before the stoppage, the TBM was tunneling at about 100 KPa (1 bar) shury pressure, = Analysis of face stabilty has been caried out considering both drained es well as undrained ‘condone Geotechnical parameters used in face stability analysis areas presented in C918 GIBR. — Face stably analysis had been cared out and was presented in design document ref: DocrsterTUNDEsiat0: ~ Face stability analysis has been carried out based onthe approach presented in G. Anagostou, K Kovar: “Face Stabilty Ir Slury and EPS Shield Tunneling’; Tunne's & Tunneling; December ‘986. ~The safety factor adopted for face stably analysis is 1.2 and face stability analysis using the ‘above approach and ccnservalively considering lll rock in the face indicates that no face pressure is required fr face stabil t this location ~ For information, the 52 KPa indicated as calculated face pressure in the face pressure tables, isin {oct related to notional ccmpensating of ay occurring Groundwater seepage pressure. Recommendations: — Gonsiering the fact thatthe current face is ently in good rock and thatthe TBM was actualy launched through a rock face which was standing in free air for several months before ‘commencement of tunneling the intervention can be cari out in fre air — However, compressed a equipmant and respective personnel shal be kept on standby, ~ During the actual intervention process, ground surface setlement shall be measured at very close intervals according to the scheme, wich was shown an the monitoring drawing for unplanned cutter head intervention, Monitoring frequency shall be one reading every 4 hours = At the beginning ofthe intervention the face shall be thoroughly inspected for potential face instablty and water ingress. = If areno signs of face instability, additonal round settlements are less than 10mm and the water Ingress is less than 100 tremin andthe readings from groundwater stand pipe GWS2004 do not inicate significant change, the intention can be continued in free ac. fring the intervention unstable pockets are identified inthe face or the water ingress is larger ‘than 100 lire/min, 100 kPa compressod air pressure shall be applied. If the air supply required for keeping thi pressure ie exceeding 20 m® per hour (mostly likely due to leaking trough the launching sea), the intervention shall be abandoned, Saige Geoconsut Asia Singapore Pe ~ Moritoring control values for the cutter head intervention points (LG) shall be as follows: ‘Work Suspension Level (WS) ~ 29mm ‘© Alert Level (AL) ~ 18mm — Moritring control values forthe groundwater stand pipe GWS2004 shall be a¢ flows: + Aert Level (AL) ~2m drop = Exceeding the sbove alert levels (AL), shal trigger reconsideration of the above recommendations. ‘Although we are confident thatthe above is justified and adequate, itis subjec to approval by QP(S) and LTA In case you require adciticnal clarification or explanation, please do not hesiate to contact the undersigned. Yours fatal, OSKAR SIGL ‘3720 Sere Dx Oskar Sig (QP(0) for C918 tunne! works) Sa

You might also like