Course Contents
control
Purpose
SA0 SA1 SA2 SA3 SA0 SA1 SA2 SA3 SA0 SA1 SA2 SA3
MS adopts the new
power level and TA
In the 26 multi-frames,
frame 12 sends
SACCH.
MS obtains SACCH
block
Measurement
report preprocessing
Yes
Power control algorithm
selection
HW I power control
HW II power control
algorithm
algorithm
HWII algorithm
control be processed.
If
Course Contents
HW I Power Control
HW
I power control
MR pre-processing
HW I Power Control
Process
of HW I power control
Measurement report
pre-processing
Aim achieved ?
N
Power control calculation and
adjustment
HW I Power Control
Original
Uplink MR
BTS
Downlink
measurement
report
Network
HW I Power Control
Measurement report
Uplink
measurement
report
Downlink
measurement
report
HW I Power Control
Measurement
are
discontinuous,
this
indicates
that
some
MR
Measurement report
serial number n
MR
MR
MR
MR
Measurement report
serial number n+4
HW I Power Control
Measurement
MR
MR
MR
MR
MR
Filter
MR
HW I Power Control
HW
introduction
[BTS power control table]
HW I Power Control
[BTS power control table]
HW I Power Control
[MS power control data table]
HW I Power Control
HW I Power Control
HW
HW I Power Control
Power
Both level and quality equal to the setting values (HW I power
control), or level and quality are within threshold band(HW II
power control)
HW I Power Control
HW
1800M:
0
10
11
12
13
14
15
16
17
18
19
10
11
12
13
14
15
16
17
18
19
Level
Error tolerance
900M
Level
Error tolerance
HW I Power Control
Comparison
Similarity:
1. To avoid frequently changes of signal level, the PC interval time
between the two consecutive uplink and downlink power control are
limited.
2. To reduce the influence caused by abnormal reports, all
measurement reports should be filtered.
3. Both uplink and downlink power controls include level-specific
and quality-specific power controls.
4. Both uplink and downlink power controls have maximum power
control step size limit and compensating factor.
HW I Power Control
Comparison
Differentia:
1. Including power control for the stable status, MS also has power
control when MS access the network, thus to reduce transmitting
power of MS as soon as possible.
2. For uplink, precautions are ready for increase MS transmitting
power in case HO fails.
3. For downlink, there are maximum and minimum transmitting
power limits in power control data configuration.
HW I Power Control
HW
Exercise
HW
Exercise
HW
Exercise
Course Contents
HW I I Power Control
HW
I I power control
HW I I Power Control
Power
HW I I Power Control
HW I I Power Control
Power
HW I I Power Control
General
HW I I Power Control
HW
I I power control
HW II Power Control
HW
HW II Power Control
Measurement
report compensation
Implementation steps:
1. Put the current receiving measurement report into the measurement
report compensation queue.
2. Record the changed information of the transmitting power according
to the MS and BTS power levels in the measurement report.
3.After finish the measurement report compensation, system will
compensate the receiving level of the history measurement report
according to the power change information. The compensated
measurement reports will be the original data in the filter process.
4. Filter the compensated measurement reports.
HW II Power Control
Measurement
report compensation
50
40
30
20
10
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Y axis
70
X axis
The
Theexpected
expectedreceiving
receivingsignal
signallevel:
level:30
30
The
Thepower
powercontrol
controlwill
willbe
bemore
moreeffective
effectivewith
withmeasurement
measurementreport
report
compensation.
compensation.
HW II Power Control
Measurement
report prediction
Purpose
to avoid power control later than needed, the delay is dangerous in
case of poor level or bad quality
Implementation procedure
1. Analyze the tendency of MR by the historical measurement
reports after interpolation.
2. Guide by the tendency, to predict the values of measurement
report to be received. There are 0~3 measurement reports
prediction, which are configured on OMC.
3. Filter the interpolated, compensated and predicted measurement
reports, and implement power control judgment.
HW II Power Control
Measurement
report prediction
Diagram of power control effect comparison between prediction filter and mean filter
50
45
No power control
35
30
25
20
15
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Y axis
40
X axis
The
Theexpected
expectedreceiving
receivingsignal
signallevel:
level:30
30
The
Thepower
powercontrol
controlwith
withprediction
predictionfilter
filterwill
willbe
bemore
moreeffective
effective than
thanthat
thatwith
with
mean
filter
mean filter
HW II Power Control
Adaptive
power control:
HW II Power Control
Power
HW II Power Control
Simple
parameter configuration
HW II Power Control
[HW II power control table] main parameters 1:
HW II Power Control
[HW II power control table] main parameters 2:
HW II Power Control
[HW II power control table] main parameters--3
HW II Power Control
[HW II power control table] main parameters--4
Exercise
Exercises
Given conditions:
The uplink receiving level is -85dBm, the quality is level 4. Power
control algorithm is HW II.
Data configuration is as follows: Uplink signal level upper threshold:
-60dBm, uplink signal level lower threshold: - 80dBm. Uplink signal
upper quality threshold: level 0. Uplink signal lower quality
threshold: level 2. The adjustable step size of quality band 0 is
16dB, of quality band 1 is 8dB, and of quality 2 is 4 dB. The
adjustable step size for power control by quality is 4dB.
Exercise
Exercises
Answer.
First, transmitting power to be added according to receiving level =
(uplink signal level upper threshold + uplink signal level lower
threshold)/2-actual receiving level (-60 + (-80))/2-(-85) (-70)(-85) 15dB. As the receiving quality is level 4, only adjustable
step size of quality band 2 can be used -- increase 4dB.
Second, the transmitting power to be increased according to
receiving quality = as power control adjustment step size by
quality is 4dB, thus increase 4dB, the same as adjustment by
signal level.
Therefore, according to the general judgement on power control,
4dB should be increased for adjustment either by level or by quality.
Exercise
Exercises
Answer .
After the implementation of step 1 power control, the receiving level
becomes: -85dBm + 4dB=-81dBm, Suppose the quality reach
already in level 2 here, it still fails within the expected band
-80dBm~-60dBm. Therefore, it needs to be adjusted.
First: adjust by level -- repeat the previous step: adjustment by level
= (-70) (-81) = 11db, i.e. to increase 11dB. If the receiving quality
has been improved to level 2, and the adjustable step size with
quality band 1 is 8dB. Then, the result of adjustment by level is to
increase 8dB.
Second: adjustment by quality--as the receiving quality value is
between 0 and 2, Neednt adjust.
Therefore, the uplink stable receiving level = (-81) + 8 = -73dBm.