Professional Documents
Culture Documents
Vehicle Scheduling (T
SCM612
Transportation Relevance..................................................................................................................................16
Options for Creating Shipments........................................................................................................................17
Functions in Shipment Processing - Scenarios.................................................................................................18
Shipment Stages................................................................................................................................................19
Deadlines in the Shipment Document...............................................................................................................20
Status Information in the Shipment Document.................................................................................................21
Shipment Costing: Topic Objectives.................................................................................................................22
Shipment Cost Processing in Detail..................................................................................................................23
Requirements for Shipment Cost Calculation...................................................................................................24
Creating a Shipment Cost Document................................................................................................................25
Structure of the Shipment Cost Document........................................................................................................26
Items of the Shipment Cost Document.............................................................................................................27
Overview of Shipment Cost Calculation...........................................................................................................28
Condition Records for Shipment Costs.............................................................................................................29
Shipment Cost Settlement with Direct Transfer...............................................................................................30
Steps During Settlement....................................................................................................................................31
Settings Necessary for Integration: Topic Objectives......................................................................................32
R/3 Customizing and Master Data Activities....................................................................................................33
Transportation Relevance..................................................................................................................................34
Shipment Document Number Ranges...............................................................................................................35
Shipment Type Required Settings.....................................................................................................................36
Transportation Planning Point...........................................................................................................................37
Packaging Materials Needed for APO Mapping...............................................................................................38
Material Master Data Field Checks...................................................................................................................39
R/3 Transportation Processing Overview: Unit Summary................................................................................40
R/3 Transportation Processing Overview Exercises.........................................................................................41
R/3 Transportation Processing Overview Solutions.........................................................................................51
APO Overview........................................................................................................................................................1
APO Overview: Unit Objectives.........................................................................................................................2
APO Overview: Business Scenario.....................................................................................................................3
The Supply Chain: From Supplier to Consumer.................................................................................................4
Key Supply Chain Problems...............................................................................................................................5
SAP's Total Supply Chain Solution....................................................................................................................6
Levels of Supply Chain Management.................................................................................................................7
APO Planning Components................................................................................................................................9
Network Design.................................................................................................................................................10
APO Planning Sequence with R/3 Integration..................................................................................................11
Functions of Demand Planning.........................................................................................................................13
Collaborative Planning in APO.........................................................................................................................14
Supply Network Planning (SNP)......................................................................................................................15
Supply Network Planning Scenario..................................................................................................................16
Comparison of Mid- and Short-Term Planning................................................................................................17
Location Types....................................................................................................................................................6
Location Type: Plant...........................................................................................................................................7
Additional Data in APO Location.......................................................................................................................8
Location Type: Distribution Center....................................................................................................................9
Location Type: Customer..................................................................................................................................10
Location Type: Vendor/Carrier/Service Provider.............................................................................................11
External Procurement Relationship...................................................................................................................12
Master Data: Overview (2)................................................................................................................................13
Product Master in APO.....................................................................................................................................14
Product Master Data..........................................................................................................................................15
General Data......................................................................................................................................................16
Maintaining Additional Product Master Fields in APO....................................................................................17
Resources..........................................................................................................................................................18
Transportation Planning Resources...................................................................................................................19
Single Resource Example..................................................................................................................................20
Vehicle Resource Example)..............................................................................................................................21
Transport Method..............................................................................................................................................22
Transportation Lane..........................................................................................................................................23
Transportation Lanes.........................................................................................................................................24
Transportation Lanes.........................................................................................................................................25
TP/VS Supply Chain Modeling - Hierarchies...................................................................................................26
Distance/Duration Calculation..........................................................................................................................27
Transportation Zone (Location) Hierarchy.......................................................................................................28
Carrier Structure Hierarchy...............................................................................................................................29
Hierarchy: Example 1........................................................................................................................................30
Hierarchy: Example 2........................................................................................................................................31
Example: Roundtrip outbound from one location.............................................................................................32
Example: Round trip inbound into one location...............................................................................................33
Example: Mixed round trip to and from one location......................................................................................34
Example: Multi stop - no return........................................................................................................................35
Example: Scheduled vehicles............................................................................................................................36
Note: More complex problems ...can be solved by decomposing the transport network.................................37
APO TP/VS Master Data: Unit Summary.........................................................................................................38
APO TP/VS Master Data Exercises..................................................................................................................39
APO TP/VS Master Data Solutions..................................................................................................................43
Models and Planning Versions................................................................................................................................1
Models and Planning Versions: Unit Objectives................................................................................................2
Models and Planning Versions: Business Scenario............................................................................................3
Models and Planning Versions............................................................................................................................4
Models and Planning Versions for Locations and Products...............................................................................5
Models and Planning Versions for Resources.....................................................................................................6
Supply Chain Engineer (SCE) as the Modeling Tool for Models.......................................................................7
Geocoding...........................................................................................................................................................7
TP/VS Number Ranges.......................................................................................................................................8
Transportation Mode, Transportation Method, Resources..................................................................................9
Transportation Groups.......................................................................................................................................10
Freight Units......................................................................................................................................................11
Determine Shipment Type................................................................................................................................12
Transportation Matrix, Used for Deadheads.....................................................................................................13
How to maintain a Transportation Matrix.........................................................................................................14
Vehicle Scheduling (VS): Basic Settings: Unit Summary................................................................................15
Vehicle Scheduling (VS): Basic Settings Exercises.........................................................................................16
Vehicle Scheduling (VS): Basic Settings Solutions..........................................................................................23
Vehicle Scheduling (VS).........................................................................................................................................1
Vehicle Scheduling (VS): Unit Objectives.........................................................................................................2
Vehicle Scheduling (VS): Business Scenario.....................................................................................................3
Vehicle Scheduling Process Flow (1).................................................................................................................4
Transactional Exchange relevant for Vehicle Scheduling..................................................................................5
VS Optimizer: How does it work?......................................................................................................................6
VS Optimizer Process.........................................................................................................................................7
Results of an optimization run............................................................................................................................8
Constraints...........................................................................................................................................................9
Costs in Optimization........................................................................................................................................10
Location-Related Costs.....................................................................................................................................11
Penalty Costs: Delayed Delivery and Non-Delivery Costs...............................................................................12
Shipment-Related Costs....................................................................................................................................13
Dimension-Related Costs..................................................................................................................................14
Stopovers, used in Cost Profile.........................................................................................................................15
Costs for Transportation Lane...........................................................................................................................16
Vehicle Scheduling Alert Profile......................................................................................................................17
Optimization Profile (1)....................................................................................................................................18
Planning Horizon...............................................................................................................................................19
Optimization Profile (2)....................................................................................................................................20
Demand Horizon...............................................................................................................................................21
Demand Categories...........................................................................................................................................22
Optimization Profile (3)....................................................................................................................................23
Optimization Profile (4)....................................................................................................................................24
Vehicle Scheduling Consistency Check............................................................................................................25
Interactive Planning (1).....................................................................................................................................26
Interactive Planning (2).....................................................................................................................................27
Create a shipment manually..............................................................................................................................28
Create Shipments Manually..............................................................................................................................29
VS Optimization Run........................................................................................................................................30
Optimization Logfile.........................................................................................................................................31
0
SCM612 APO Transportation Planning and Vehicle
Scheduling (TP/VS)
SCM612
APO Transportation
Planning / Vehicle
Scheduling (TP/VS)
SAP AG 2002
0.2
Copyright
SAP AG 2002
Trademarks:
Some software products marketed by SAP AG and its distributors contain proprietary software
components of other software vendors.
Microsoft, WINDOWS, NT, EXCEL, Word, PowerPoint, and SQL Server are registered
trademarks of Microsoft Corporation.
IBM, DB2, OS/2, DB2/6000, Parallel Sysplex, MVS/ESA, RS/6000, AIX, S/390,
AS/400, OS/390, and OS/400 are registered trademarks of IBM Corporation.
ORACLE is a registered trademark of ORACLE Corporation.
INFORMIX-OnLine for SAP and INFORMIX Dynamic ServerTM are registered trademarks of
Informix Software Incorporated.
UNIX, X/Open, OSF/1, and Motif are registered trademarks of the Open Group.
HTML, DHTML, XML, XHTML are trademarks or registered trademarks of W3C, World Wide
Web Consortium, Massachusetts Institute of Technology.
JAVA is a registered trademark of Sun Microsystems, Inc.
JAVASCRIPT is a registered trademark of Sun Microsystems, Inc., used under license for
technology invented and implemented by Netscape.
SAP, SAP Logo, R/2, RIVA, R/3, ABAP, SAP ArchiveLink, SAP Business Workflow, WebFlow,
SAP EarlyWatch, BAPI, SAPPHIRE, Management Cockpit, mySAP.com Logo, and mySAP.com
are trademarks or registered trademarks of SAP AG in Germany and in several other countries all
over the world. All other products mentioned are trademarks or registered trademarks of their
respective companies.
0.3
Course Prerequisites
Required Prerequisites:
LO611 Transportation
Recommended:
SAP AG 2002
0.4
Target Audience
Participants
Duration: 3 days
SAP AG 2002
User notes:
These training materials are not a teach-yourself program. They complement the explanations
provided by your course instructor. Space is provided on each page for you to note down additional
information.
There may not be sufficient time during the course to complete all the exercises. The exercises
provide additional examples that are covered during the course. You can also work through these
examples in your own time to increase your understanding of the topics.
1
Course Overview
Contents:
Course Goal s
Course Objective s
Course Content
Main Busine ss Scenario
SAP AG 2002
(C) SAP AG
SCM612
1.2
Course Goal
SAP AG 2002
(C) SAP AG
SCM612
1.3
Course Objectives
TP/VS
SAP AG 2002
(C) SAP AG
SCM612
1.4
Course Content
Unit 1 Course Overview
Unit 2 Transportation
Processes Overview
Unit 3 R/3 Transportation
Processing Overview
Unit 15 Conclusion
SAP AG 2002
(C) SAP AG
SCM612
1.5
Main Business Scenario
SAP AG 2002
(C) SAP AG
SCM612
2
Transportation Processes Overview
Contents:
The Transportation Management System (TMS)
R/3 System Logistics processe s
Transportation planning and execution with the R/3 System
Transportation planning with TP/VS
SAP AG 2002
(C) SAP AG
SCM612
2.2
Transportation Processes: Unit Objectives
SAP AG 2002
(C) SAP AG
SCM612
2.3
Transportation Processes : Business Scenario
SAP AG 2002
(C) SAP AG
SCM612
2.4
Logistics Execution and the Supply Chain
Vendor
Customer
Warehouse
Border
Production warehouse
Distribut ion center
Production facilities
SAP AG 2002
The Logistics Execution (LE) component models the logistics processes of a company. It covers
the entire process chain from the vendor through the warehouses, production facilities, and
distribution centers to the customer.
These processes include:
The goods receipt process: Goods pickup from the vendor and putaway
The goods issue process: Picking and outbound delivery of the goods to the customer
Internal warehouse processes such as posting changes, stock transfers, and inventory
The transportation process: Inbound and outbound shipments and shipment cost calculation
and settlement
(C) SAP AG
SCM612
2.5
Transportation Management System (TMS)
APO-TP/VS
BW, SCEM
(Planning)
LES
(Execution)
(Monitoring)
SAP AG 2002
(C) SAP AG
SCM612
(C) SAP AG
SCM612
2.6
Shipments in R/3 Logistics Execution
MM ordering
SD order processing
PO
processing
Inbound
delivery
Vendor
Inbound
shipment
Sales order
processing
LE Logistics Execution
Goods
receipt
Goods
issue
Invoice
verification
Outbound
delivery
Outbound
shipment
Customer
Billing
SAP AG 2002
Inbound shipments are an integral part of the process chain in Procurement (MM Purchasing)
and are processed based on inbound deliveries. They are required for transportation planning.
The basis of the procurement process is the purchase order. The subsequent document is the
inbound delivery that is used by the vendor to confirm the delivery. The inbound delivery is an
R/3 document and is created with reference to the purchase order.
The inbound delivery is the basis for creating the inbound shipment (the shipment of the ordered
goods from the vendor to the company's plant).
Goods receipt is then posted. Invoice verification completes the purchasing process.
The basis of the Sales and Distribution (SD) process is the sales order. The subsequent document
is the outbound delivery, which documents the shipping of the goods.
Outbound shipments are part of the SD process and are processed based on outbound deliveries.
The outbound delivery is the basis for creating the outbound shipment (the shipment of the goods
from the company's plant to the customer).
Goods issue is then posted and the invoice is created.
Shipment documents can also be created for stock transfers between plants.
(C) SAP AG
SCM612
2.7
R/3 Transportation and Shipment Cost Processing
Transportation processing
Create shipment
document
Process shipment:
planning & completion
Monitor shipment:
lists & shipment info
R/3 transportation and shipment cost processing includes transportation processing, shipment
cost calculation, and shipment cost settlement.
A shipment document is created based on the inbound or outbound deliveries.
Other shipment processing activities include shipment planning and completion. The tasks are
associated with both planning and executing.
Tools are available to support shipment monitoring during planning and execution. They include
lists, graphical transportation information, and the transportation information system (TIS).
Shipment cost processing begins with the creation of the shipment cost document.
The shipment costs are automatically calculated in this document.
The costs are transferred so that accruals can be posted and assignments made in Controlling (CO).
Settlement is completed with the service agents through the payment of the invoice or creation of a
credit memo.
You can copy the costs resulting from the shipment and calculated in the shipment cost document
into customer billing documents, and thus include the costs of transportation in the customer.
(C) SAP AG
SCM612
2.8
R/3 and APO Integration Architecture
Materials
Management
C a r r i e r
B us ines s
W a re h o u se
S e t t le
m e n
t
P u r c h a s e
O r d e r s
S t o c k
T r a n s p o r t
O r d
I m p o r t
FI / CO
L
E
S
F r e i g h t
D a
I
O
o c u m e
n t a
t i o n
F r e i g h t
Transportation
C o Processing
s t s
Ac c o u n t
D e t e r m i n a t i o n
F r e i g h t
C o s t s
G o o d s
C o s t s
D e l i v e r ie s
a n d
S h i p m e n t s
A PO
TP /V S
I s s u e
Warehouse
Management
n b o u n d
u t b o u n d
S a l e s
C u s t o m
e r
r d e r s
T r ac kin
g
Supply
Chain
Se
r
ve
r
Event M anager
Sales and
Distribution
SAP AG 2002
e r s
Foreign
t aTrade
S e t t le
m e n t
Integrating APO TP/VS and R/3 provides the ability to perform short to intermediate term
transportation planning that optimizes the inbound and outbound transportation demand.
In this scenario, TP/VS is used to perform the transportation planning and R/3 is used for
transportation execution.
Additional functions, such as Event Manager and Business Warehouse reporting, can be provided
in the R/3 and APO architecture.
(C) SAP AG
SCM612
2.9
Transportation Management
Shipper
Shipper /C arrier
Carrier
Creat e Orders
Vehicle Scheduling
Creat e Planned
Shipments Including
Planned
Deliveries
Exchange
Transportation
Requirements
Carrie
CarrierrSelection/
Selection/
Tendering
Tendering
Routing/Scheduling
Collaborate on
Exceptions
Vehicle
VehicleScheduling/
Scheduling/
Transfer
TransferDat
Dataato
to R/3
R/3
Execute Shipment
SAP AG 2002
The target of the transportation planning process is to optimize the inbound or outbound
transportation demand between a plant/DC and different other locations, such as suppliers and
customers. The optimization covers the companys own fleet as well as carrier vehicles. Carrier
selection can be executed to select carriers based on least cost, business share, or priority.
The Transportation Management scenario comprises the following main processes:
Document entry
Consolidation of transportation demand
Interactive Vehicle Scheduling
Carrier Selection
Collaborative Transportation Planning
Transfer Deliveries and Shipments to R/3
Execute Shipment in R/3 by picking and packing deliveries, goods issue posting, set status
shipment end, and archive shipments
(C) SAP AG
SCM612
10
2.10
Create Orders in R/3 System
Shipper
Shipper /C arrier
Carrier
Creat e Orders
Vehicle Scheduling
Creat e Planned
Shipments incl. Planned
Deliveries
Exchange
Transportation
Requirements
Carrier
Carrie rSelection/
Selection/
Tendering
Tendering
Routing/Scheduling
Collaborate on
Exceptions
Vehicle
VehicleScheduling/
Scheduling/
Transfer
TransferDat
Dataato
to R/3
R/3
Routing/Scheduling
Execute Shipment
SAP AG 2002
Different types of orders are first created in the R/3 system. These orders (sales orders, purchase
orders, stock transfer orders, and so on) build the transportation demand for APO TP/VS.
Delivery and Shipment documents created in the R/3 system can also be used to build the
transportation demand.
The transportation demand can be transferred from R/3 via integration model (CIF) into APO or is
generated directly in the APO system (for example, as a result of the TLB run). The ATP check is
performed out of the R/3 into APO for sales orders. Additional data is brought over from R/3 to
APO and stored in database tables. This additional information can then be used in the TMSprocess for special handling, instructions, compatibilities, and so on.
(C) SAP AG
SCM612
11
2.11
Transportation Planning: Outbound Process
Create
Demands at Locations
Plan material
and source
Add. Data
- Selection
- Consolidation,
scheduling, and building
planned shipments
Checks
Deliveries
Add. Data
Checks
Shipment
with
Deliveries
- Rescheduling of orders
Create
- Carrier Selection
Update
Create
Update
Orders
Planned Shipments
including
Planned Deliveries resp.
Planned Delivery Items
SAP AG 2002
Sales orders, outbound deliveries, and shipments can be used to create transportation demand in
TP/VS.
Using sales order data, TP/VS planning process creates planned delivery and shipment documents
in the R/3 system.
The TP/VS planning process does not make any changes to the sales documents in the R/3 system.
Generally, transportation-related changes made to an R/3 document are updated in the
corresponding TP/VS document.
(C) SAP AG
SCM612
12
2.12
Transportation Planning: Inbound Process
Create
Demands
Add. Data
Production planning
and sourcing
Checks
Purchase Orders
Add. Data
Create
Update
Checks
Deliveries
Create
Update
Planned Shipments
including
Planned Deliveries
Add. Data
Create
Checks
Shipment
with
Deliveries
Purchase
Requisiton
Update
SAP AG 2002
Purchase Orders, Stock Transport Orders, Inbound Deliveries, and Shipment documents are used to
plan inbound transportation demand.
When Purchase Orders/Stock Transport Orders are provided to TP/VS for planning, TP/VS will
create the Inbound Delivery and Inbound Shipment document data for the R/3 System.
Transportation demands from Supply Network Planning (SNP) are also created in TP/VS for
planning.
Transportation-relevant changes made to an R/3 document are updated in the corresponding TP/VS
document.
(C) SAP AG
SCM612
13
2.13
Transportation Planning: Change Process
Orders
Update
Demands
Manual
changes
Deliveries
Update
Planned Deliveries
Update
Manual
changes
Shipment
with
Deliveries
Update
Planned Shipments
and
Planned Deliveries
Update
SAP AG 2002
Transportation planning-relevant changes made to any R/3 document that has a corresponding
TP/VS document are made to those documents.
A shipment in the APO system changes its status if you change documents in the R/3 System that
are contained in a planned shipment in the APO System.
Note: You can find a process list with the expected behavior of the APO System when changing
the planning objects in the OLTP system in note 362445.
(C) SAP AG
SCM612
14
2.14
Vehicle Scheduling (VS)
Shipper
Shipper /C arrier
Carrier
Consolidation of transportation
demand in APO TP/VS
Creat e Orders
Vehicle Scheduling
Creat e Planned
Shipments including
Planned
Deliveries
Exchange
Transportation
Requirements
Carrie
CarrierrSelection/
Selection/
Tendering
Tendering
Routing/Scheduling
Collaborate on
Exceptions
Vehicle
VehicleScheduling/
Scheduling/
Transfer
TransferDat
Dataato
to R/3
R/3
Routing/Scheduling
Execute Shipment
SAP AG 2002
The
next step is the consolidation of transportation demand in APO. In the unassigned freight units
view in the vehicle scheduling planning board the transportation demand (sales orders, purchase
orders, and stock transfer orders) is visible. The orders in this area are not assigned to a resource and
have to be planned now.
There are two ways to assign the transportation demand to the resources, manually and by using the
optimizer. To assign a transportation demand manually to a vehicle resource you have to select the
relevant resource first and then choose the unassigned orders which you want to plan on this
resource.
The optimizer takes all unassigned orders and unreleased shipments into consideration. The
following criteria is taken into account:
Departure from and return to depot
Loading and unloading time
Order consolidation
Cost minimization of shipment time
Cost minimization of distance
Costs for earliness/delay
Costs for non-delivery
Shipment fixed costs
The resources are planned now and the orders are changed into planned shipments.
(C) SAP AG
SCM612
15
2.15
Carrier Selection
Shipper
Shipper /C arrier
Carrier
Creat e Orders
Vehicle Scheduling
Creat e Planned
Shipments incl. Planned
Deliveries
Exchange
Transportation
Requirements
Carrie r Selection/
Tendering
Routing/Scheduling
Collaborate on
Exceptions
Vehicle
VehicleScheduling/
Scheduling/
Transfer
TransferDat
Dataato
to R/3
R/3
Routing/Scheduling
Execute Shipment
SAP AG 2002
After the planning is settled, the planned shipments are assigned to certain carriers. The carrier
selection is executed manually for each carrier or automatically via a selection profile containing
several carriers.
Carrier selection
Checks availability and compatibilities
Processes:
Cost-based: Rules of freight cost engine will be taken from LES or you can maintain costs
in the APO system on the transportation lane
Business share: Balancing of business share to fulfill contracts
Priorities: Carrier with high priority will be chosen
User can choose the sequence of processes
After the carrier selection is done the shipments are ready to be released or published. Publication
allows the planning result to be accepted as final and the shipment is prepared for transfer to the
OLTP system. Released shipments will not be deleted when doing a new optimization run.
(C) SAP AG
SCM612
16
2.16
Transfer of Data to R/3
Shipper
Shipper /C arrier
Carrier
Creat e Orders
Vehicle Scheduling
Creat e Planned
Shipments incl. Planned
Deliveries
Exchange
Transportation
Requirements
Carrie r Selection/
Tendering
Routing/Scheduling
Collaborate on
Exceptions
Vehicle Scheduling/
Transfer Dat a to R/3
Routing/Scheduling
Execute Shipment
SAP AG 2002
After releasing the shipments, the OLTP transfer of deliveries and shipments is enabled. Now the
transfer of the planned shipments to the R/3 System can be triggered from the interactive vehicle
scheduling board.
(C) SAP AG
SCM612
17
2.17
Transportation Processes : Unit Summary
SAP AG 2002
(C) SAP AG
SCM612
18
2.18Exercises
Unit: Transportation Processes Overview
Select the process(es) that are not part of the Logistics Execution (LE) component
of R/3:
a) Transportation process
b) Internal warehouse process
c) Material Requirements Planning (MRP)
d) Goods issue process
e) Goods receipt process
f) Production Planning process
1-2
1-3
1-4
True or False. Delivery documents must be created before shipment documents can
be created.
1-5
(C) SAP AG
SCM612
19
1-6
1-7
True or False. The goal of the transportation planning process is to optimize the
inbound and outbound transportation demand between the plant/DC and other
locations such as customers, suppliers and other plants/DCs.
1-8
Which of the following criteria does the TP/VS Optimizer take into account during
transportation planning:
a) Shipment fixed costs
b) Cost minimization of distance
c) Order consolidation
d) Loading and unloading time
e) Cost minimization of distance
f) Goods issue date
g) Costs for non-delivery
h) Distance in the delivery route code
1-9
During Carrier Selection, TP/VS can select carriers based on the following:
a) Vehicle capacities (weight, volume, number of pallets, and so on)
b) Availability and compatibility of products
c) Contract terms
d) Priority of carrier
e) Business share
f) Carrier quality / service performance rating
g) Costs
1-10
True or False. Sales order and Purchase order demand must be used for APO
TP/VS planning of outbound and inbound shipments, respectively.
1-11
(C) SAP AG
SCM612
20
2.19Solutions
Unit: Transportation Processes Overview
1-1
Select the process(es) that are not part of the Logistics Execution (LE) component
of R/3:
Material Requirements Planning and the Production Planning process are not part
of the LE component.
1-2
Inbound shipments are an integral part of the process chain in Procurement and are
created from Inbound Delivery documents.
1-3
Outbound shipments are created from Outbound delivery documents that are
generated from sales orders.
1-4
1-5
1-6
1-7
(C) SAP AG
True. The goal of the transportation planning process is to optimize the inbound
and outbound transportation demand between the plant/DC and other locations such
as customers, suppliers, and other plants/DCs.
SCM612
21
1-8
Which of the following criteria does the TP/VS Optimizer take into account during
transportation planning:
a) Shipment fixed costs
b) Cost minimization of distance
c) Order consolidation
d)Loading and unloading time
e) Cost minimization of distance
g) Costs for non-delivery
1-9
During Carrier Selection, TP/VS can select carriers based on the following:
a) Vehicle capacities (weight, volume, number of pallets, and so on)
b) Availability and compatibility of products
d) Priority of carrier
e) Business share
g) Costs
1-10
False. Sales order and Purchase order demand does not have to be used for APO
TP/VS planning of outbound and inbound shipments, respectively.
1-11
The transfer of planned deliveries and shipments are triggered by the GOTO
function.
(C) SAP AG
SCM612
22
3
R/3 Transportation Overview
Contents:
Organizational Units in Transportation
Shipment document structure and control
Shipment costing
Ba sic R/3 to APO TP/VS interface settings
SAP AG 2002
(C) SAP AG
SCM612
3.2
R/3 Transportation Processing Overview: Unit
Objectives
At the conclusion of thi s uni t, you will be able to:
Explain the organizational units related to R/3
System transportation
De scribe the structure of the shipment
document and its functions
Identify and locate important information in the
shipment document
De scribe the processe s related to R/3 System
freight costing
Explain the purpose, structure and processe s
related to the shipment cost document
Make the basic customizing and master data
settings to interface an R/3 System with an
APO TP/VS System
SAP AG 2002
(C) SAP AG
SCM612
3.3
R/3 Transportation Processing Overview: Business
Scenario
(C) SAP AG
SCM612
3.4
Organizational Units in Transportation : Topic
Objectives
SAP AG 2002
(C) SAP AG
SCM612
(C) SAP AG
SCM612
3.5
The Transportation Planning Point
Transportation
planning points
Company code
Planning and
processing
shipments
1010
Hamburg
International
shipment by
sea
1011
Hamburg
Rail
shipments
1200
Dresden
Truck
Shipments
SAP AG 2002
The transportation planning point is the central point within the company that plans, processes,
and monitors shipments. It can be a location or a group of people responsible for processing.
Each shipment is created and processed by a single transportation planning point.
You can freely define the transportation planning points to meet your corporate requirements (for
example, in terms of the location or the mode of transport).
The transportation planning point is defined for a specific company code in Customizing. This
assignment of the planning point to the company code is important for shipment cost calculation and
settlement.
(C) SAP AG
SCM612
3.6
Route Definition
Cologne
Frankfurt
Trade
Trade center
center
Praha
Prague
Route
Route
Stage
Stage
Nuremberg
Border
Strabourg
Strasbourg
Vienna
Munich
SAP AG 2002
A route is the journey to be covered between a departure point and a destination and is represented
by the route code.
A route can be defined in great detail and consist of one or more individual stages, but it can also be
a general description or even simply a destination area.
Like a shipment stage, a stage can be a leg, a load transfer point, or a border crossing point.
For example, the above route consists of five stages: three legs, one load transfer point, and one
border crossing point.
The route code is determined for each line item in a sales order and is copied into the header of the
outbound delivery document(s) created from the sales order.
Inbound delivery documents do not require a route code, but one may be entered manually.
The route code is not used by APO TP/VS because TP/VS determines the route stages based on the
planning criteria associated with transportation lanes. Routes in the R/3 System are only required to
identify the transportation documents as relevant for shipment.
Multimode APO transports or APO transports with transshipment points are created with several
shipment stages in the R/3 System. In the R/3 System they are identified as generated manually.
A transfer of the routes from the R/3 System to the APO System does not occur. Currently a report
or something similar is not available.
(C) SAP AG
SCM612
3.7
Information in the Route
De scription
Di stance
Service agent
Route
Transportation
relevance
Factory
calendar
Transit time
Shipping type
Transportation
planning
lead time
Travel duration
SAP AG 2002
(C) SAP AG
SCM612
3.8
Shipment Document: Topic Objectives
document
Explain the ways a shipment document can be
created
SAP AG 2002
(C) SAP AG
SCM612
3.9
The Shipment Document and its Functions
Grouping of inbound or
outbound deliveries in
shipments
Create output
(EDI / documents)
rrtt
poo SSeer
nnssp
rvvi
a
a
r
iccee
ff tt r
aagg
ee oo
eenn
d
d
o
o
tt
M
M
Record shipment
characteristics
Shipment document
functions
Record planned and
actual dates/status
information
Plan
Act.
Packing/loading
B
04.06.
12.06.
SAP AG 2002
The shipment document is the central document that is used to model shipments in the R/3 System.
It contains all information necessary for organizing and carrying out a shipment.
The shipment document provides the following functions:
Combining inbound deliveries to form inbound shipments
Combining outbound deliveries to form outbound shipments
Assigning service agents, modes of transport, shipment types, and so on
Planning and monitoring deadlines
Specifying shipment stages
Cross-delivery packing and creation of shipping units
Creating output and shipping papers
Recording shipment-relevant texts
Recording partner information
Using TP/VS, shipments are created by combining deliveries within APO. Carriers and
transportation methods are also assigned to the shipments. They are then transferred to the R/3
System. In the R/3 System, they contain the data maintained in APO.
(C) SAP AG
SCM612
10
3.10
Structure of the Shipment Document
0000001234
Nords peed
ShPt
1000
Shipment
header:
Wt/kg
18,586 0
0080004903
1200
8,386
0080004879
1000
3,200
0080004905
1000
Items:
Inbound or
outbound
7,000
deliveries in the
shipment
SAP AG 2002
The shipment document contains general data that applies to the whole document, such as shipment
type, transportation planning point, route, deadlines, and status information. This information is
displayed in the shipment header.
Since the shipment is a collection of inbound or outbound deliveries that are shipped together, the
items of the shipment correspond exactly to the inbound deliveries in the case of inbound shipments,
and to the outbound deliveries in the case of outbound shipments.
(C) SAP AG
SCM612
11
3.11
Shipment Type
Completion type
Number assignment
Leg indicator
Texts
Shipment
Shipment type
type
Output
Shipping type
Copying rule
Planning Profile
Split profile
SAP AG 2002
The shipment type controls elements in the shipment document and represents a particular
processing type for a shipment.
Shipment type settings include:
The leg determination type (automatic leg determination, for example)
The completion type (loaded outbound shipment and inbound shipment, for example)
The processing control (collective shipment using one mode of transport, for example)
The service level (general cargo and grouped load, for example)
The shipping type (truck, train, and mail, for example)
The leg indicator (preliminary leg, subsequent leg, direct leg, for example)
Copying data from preceding documents (unique forwarding agent and route, for example)
Output determination and text determination procedure
Default values for the shipment document (weight and volume unit and planning profile, for
example)
You can define your own shipment types to suit your own shipment requirements.
Shipment types created for APO TP/VS use must not have leg determination enabled.
(C) SAP AG
SCM612
12
3.12
Individual Shipment
SHIPMENT
Hamburg
DELIVERY 1
From : Hamburg
Delivery 1,2
To: Frankfurt
BA
Load : A
DELIVERY 2
Frankfurt
From : Hamburg
To: Frankfurt
Load : B
SAP AG 2002
(C) SAP AG
SCM612
13
3.13
Collective Shipment
SHIPMENT
Hamburg
DELIVERY 1
BA
From : Hamburg
Delivery 1.2
To: Stuttgart
Load : A
Frankfurt
DELIVERY 2
From : Hamburg
Delivery 1
To: Frankfurt
Stuttgart
Load : B
SAP AG 2002
(C) SAP AG
SCM612
14
3.14
Transportation Chain
Dresden
Hamburg
Rotterdam
Boston
Philadelphia
Shipment 1
Delivery 1.2
Shipment 2
Delivery 3-6
Preliminary
legs
Main leg
Shipment 3
Subsequent legs
Shipment 4
Delivery 1-6
Delivery 1.2
Shipment 5
Delivery 3
Shipment 6
Delivery 4-6
SAP AG 2002
A transportation chain supports the shipment of inbound or outbound deliveries for which several
modes of transport are to be used. This means that the deliveries are involved in various subsequent
shipments.
A transportation chain has the following characteristics:
One or more deliveries are involved in several shipments.
There are one or more points of departure and one or more destinations.
Various modes of transport can be used.
Several shipment documents are created: preliminary legs, main legs, and subsequent legs. Special
shipment types are available for this in the system.
Example of a transportation chain:
The computer manufacturer ships deliveries from Dresden and Hamburg to Boston and
Philadelphia
The deliveries from Dresden and Hamburg are shipped separately by truck or rail to Rotterdam:
Leg indicator one = Preliminary leg
In Rotterdam, the deliveries are loaded together and shipped to New York: Leg indicator two =
Main leg
In New York, the deliveries are again shipped separately by truck to Boston and by rail to
Philadelphia: Leg indicator three = Subsequent leg
APO TP/VS does not support the creation of transportation chains; however, various multi-modal
shipment scenarios can be modeled by TP/VS.
(C) SAP AG
SCM612
15
3.15
Transportation Relevance
Delivery item
category
Delivery type
Out. delivery LF
Cash sale
BV
Out. delivery EL
Route of
the delivery
Route HH - F
Text item
Route HH - M
TATX
Northern route
Out. delivery LF
Route HH - F
Transportation
planning status = A
SAP AG 2002
The transportation relevance of the delivery type, the delivery item category, and the route in
the delivery controls whether or not a shipment can be created.
The delivery type must be set as relevant for transportation so that a shipment can be created.
Similarly, at least one delivery item category in the delivery must be relevant for transportation.
The outbound delivery must contain a route code that is relevant for transportation (does not apply
to inbound deliveries). A route is defined as the connection between a point of departure and a
destination point, with several possible points in between.
If all three (or two in the case of inbound deliveries) conditions are met, the delivery has
transportation planning status A, which means that the delivery document is relevant for
transportation.
You set transportation relevance in Customizing for Transportation.
(C) SAP AG
SCM612
16
3.16
Options for Creating Shipments
Creating shipments
Manually using
Create
Shipment
Without
planning
proposal
With
planning
proposal
Automatically
in collective
proce ssing
using the
worklist
Using a
transportation
planning system
TP/VS
Online
B/ground
R/3
SAP AG 2002
(C) SAP AG
SCM612
17
3.17
Functions in Shipment Processing - Scenarios
Scheduling
deadlines
Determ ining
the stages
Determ ining the
means of transport
Entering
texts / comments
Checking in the
means of transport
Printing documents/
generating output
SAP AG 2002
Depending on the type of shipment, you may need to process the created shipment documents
further. Using shipment processing in the R/3 System, you can perform these activities and record
related information in the shipment document.
Most of the activities are optional. Depending on your requirements, you may actually use onlysome
of them.
Part of the information in shipment processing can be determined based on the shipment type (for
example, means of transport) or is adopted from the deliveries (for example, shipping units, service
agent, route, and route stages). You can usually change this information manually.
Determine other data in the shipment document (for example, deadlines, notes, texts, and so on).
(C) SAP AG
SCM612
18
3.18
Shipment Stages
Leg
Rotterdam
New York
New York
Rotterdam
Stop
Cus to ms
SAP AG 2002
(C) SAP AG
SCM612
19
3.19
Deadlines in the Shipment Document
MO
1
8
15
21
28
TU
2
9
16
22
29
WE TH
3 4
10 11
17 18
23 24
30 31
FR
5
12
19
25
SA
6
13
20
26
SU
7
14
21
27
Deadlines in
shipment header
Deadlines in shipment
Deadlines per
stage
Planned/actual
deadlines:
Planned/actual
deadlines:
Planned
Check-in
Loading start
Loading end
Shipment
completion
Shipment start
Shipment end
Stage start
Stage end
11
10
9
8
12
7 6 5
2
3
4
Other deadlines
(header level)
Operation
Planned
deadlines
Actual
deadline
Reason for
deviation
Locations and
so on
SAP AG 2002
You can record the times and deadlines for planning and executing the transportation activities in
the shipment document.
For standard activities, such as planning, check-in, loading, processing, shipment start and shipment
end, you can record planned and actual deadlines in the shipment document at header level. You
can also specify exact times for the deadlines.
You can also define planned and actual start and end dates for each shipment stage.
Similar to Shipping, you can specify additional individual deadlines that are used for further
controlling shipment processes. Besides planned and actual deadlines and times, you can also enter
operation types, reasons for deviations and locations (points).
You can define a deadline procedure (network profile) for your individual deadlines for each
shipment document type.
(C) SAP AG
SCM612
20
3.20
Status Information in the Shipment Document
Processing
status of
shipment
Check-in
Completed
Completed
Loading start
Not completed
Loading end
Not completed
Shipment completion
Not completed
Shipment start
Not completed
Shipment end
Not completed
SAP AG 2002
When transportation activities such as planning, checking in, loading, and so on, are finished, you
can set a status. As soon as the status is set, the activity is considered completed. You always know
the current processing status of a shipment and can quickly provide information.
You can set the status by:
Choosing the corresponding pushbutton; the current date is adopted as the actual date.
Entering the actual date; the status is then set by the system.
A traffic light symbol displays the overall status of the shipment.
Red: Planned status is set.
Yellow: Check-in/Loading Start/Loading End status is set
Green: Shipment completion/Shipment Start/Shipment End status is set
Note: For shipment cost calculation, the status Planned must be set as a minimum.
Note: The planned status is automatically set if you transfer shipments from TP/VS to R/3.
(C) SAP AG
SCM612
21
3.21
Shipment Costing: Topic Objectives
calculation
Explain the structure of the shipment cost
document
Understand the shipment costing settlement
proce ss
SAP AG 2002
(C) SAP AG
SCM612
22
3.22
Shipment Cost Processing in Detail
Shipment
XX
B
XX
SAP AG 2002
Shipment cost calculation and shipment cost settlement are available for both outbound and
inbound shipments.
The shipment costs are recorded in a new system document called the shipment cost document.
You perform the following functions from within this document:
Calculate the shipment costs
Account assignment: Assign the costs in Financial Accounting and Controlling
Transfer the costs to FI and CO
Settle the costs with the service agent
(C) SAP AG
SCM612
23
3.23
Requirements for Shipment Cost Calculation
Shipment
ShpmntCostsRel.
Status
Planned
Completed
SAP AG 2002
A shipment must be relevant for shipment costs (at header and/or stage level) in order to create a
shipment cost document for a shipment. The shipment must also have the required overall status set
in the definition of the shipment cost type. As a minimum, it must have Planned status.
Execute the following in Customizing:
Define number ranges for the shipment costs.
Define and assign shipment cost types and item categories.
For each shipment type, you must set shipment cost relevance for the following shipment elements:
header, leg, border crossing point, and load transfer point.
(C) SAP AG
SCM612
24
3.24
Creating a Shipment Cost Document
Shipment
document
Shipment cost
document
1:1
SAP AG 2002
You can create shipment cost documents individually in dialog mode or using collective
processing.
If you create an individual shipment cost document, always directly refer to a shipment document.
Create exactly one shipment cost document for each shipment document. As a result, there is a 1:1
relationship between the two documents.
Depending on your settings, the system automatically calculates the shipment costs, assigns them
to an account, and transfers them to Financial Accounting when you create the shipment cost
document.
(C) SAP AG
SCM612
25
3.25
Structure of the Shipment Cost Document
Shipment cost docum ent
Overall status
Reference data
Adm inistrative data
Header
Item status
Pricing procedure
Determ ined pricing date
Tax data
Settlement data
Service procurement
Item 1
Sub-item 1
Item 2
Sub-item 1
Result of shipment
cost calculation
Sub-item 2
SAP AG 2002
(C) SAP AG
SCM612
26
3.26
Items of the Shipment Cost Document
Shipment
Shipment costs
Header
1. Item
Insurance
ABC Insur ance
Stage 1
2. Item
Hamburg - Frankfurt
Nordspeed for ward ing
agent
Stage 2
3. Item
Frankfurt - Stuttgart
Schmal enbach
forward ing agent
SAP AG 2002
The shipment cost items either refer to the shipment header or to a shipment stage.
For example, an item that refers to the header can include insurance charges for shipment insurance.
An item that refers to a shipment stage can include load transfer costs.
The function of the items is controlled through the item category.
The items can be automatically generated or manually created depending on the Customizing
settings.
(C) SAP AG
SCM612
27
3.27
Overview of Shipment Cost Calculation
Pricing procedure
1. Basic freight
FB00
2. Discount 1
FD00
3. Discount 2
FD10
Shipment costs
From NY to WA
Conditions
10 t
Scale
1300 USD 1 t or more
1100 USD 10 t or more
1000 USD 20 t or more
SAP AG 2002
In this example, 10 tons of a material are shipped by a forwarding agent from New York to
Washington. The system determines the shipment costs automatically.
The system first determines the corresponding pricing procedure. This contains every possible
condition type within shipment pricing in a particular sequence.
The system reads the first condition type in the pricing procedure. The condition type identifies the
characteristics of a condition.
For this condition type, the system determines the assigned access sequence.
The system reads the access sequence. In the sequence, the condition tables are accessed at least
once. The sequence of the condition tables constitutes the search strategy to determine the
corresponding condition record.
The system searches for valid condition records for the condition tables (accesses). A condition
record contains the actual shipment rates. If no valid condition record exists for the first condition
table, the system searches for condition records for the second table.
When the system finds a valid condition record for a condition table, the condition record is read
and the corresponding value is copied into the shipment cost document.
The system repeats all of these steps for each condition type until the entire pricing procedure is
processed.
(C) SAP AG
SCM612
28
3.28
Condition Records for Shipment Costs
Level at which
the condition
is defined
Condition type :
Service agent:
1120
DE20
Validity period
07/01/1999 - 12/31/2002
Scale:
to
1000 lb
10000 lb
20000 lb
SAP AG 2002
Pricing determines prices and surcharges/discounts (= conditions) for a business transaction and
allows the user to specifically influence these conditions manually.
Prices, surcharges, and discounts are stored in condition records.
You can define conditions at any level. A level corresponds to the fields in the condition table in
which a condition record is stored. The level also represents the key fields for access to a condition.
Common levels at which price agreements are made are predefined in the standard system.
You can add any levels that you need. You can make conditions dependent on any fields of a
business document.
By specifying a validity period, you can restrict a condition to a specific period.
You can maintain the values within a condition record (price, surcharge, and discount) depending
on a scale (weight-based, volume-based, or value-based scale). You can also use multi-dimensional
scales. There is no limit to the number of scale levels.
For each condition record, you can define a lower and an upper limit that allows you to manually
change a pricing element within the limits specified.
(C) SAP AG
SCM612
29
3.29
Shipment Cost Settlement with DirectTransfer
Shipment costs
Item 1
576
Financial Accounting
Transfer
Requirements
Accruals in FI
Assignment in CO
A
XX
B
XX
Entr y/acceptance of
services performed
Settlement with
service agent
1058
XX
Invoice /
credit
memo
SAP AG 2002
Shipment costs are settled with the service agent by shipment cost item.
Settlement includes:
Assigning and transferring shipment costs to Financial Accounting, the formation of accruals,
and the assignment of costs to a CO object.
Settlement of costs with the service agent: Posting payables by cancelling the accruals.
You need to enter and accept the services provided before you can transfer costs to Financial
Accounting. The system automatically creates the service entry sheet based on a purchase order for
external services.
Before you can settle costs with the service agent, you need to create an invoice using manual
invoice verification or create a credit memo using the credit memo procedure.
(C) SAP AG
SCM612
30
3.30
Steps During Settlement
1. Account assignment
G/L account determination
Assignment for Controlling
3. Invoice creation
Credit memo procedure (ERS procedure)
Manual Invoice Verification
SAP AG 2002
During account assignment the system determines the correct G/L account in Financial Accounting
for each shipment cost item and the assignment for Controlling. Account assignment can be carried
out at different levels, depending on how detailed you want to track costs.
Transfer to Financial Accounting to establish accruals requires the entry of services performed.
However, each service entry sheet is based on a purchase order. You must initially create this
purchase order for the service agent in Purchasing. During the posting process, services performed
are accepted; to establish accruals, the system generates an accounting document in Financial
Accounting. The system creates additional subsequent documents in Financial Accounting.
Using the credit memo procedure, also referred to as the ERS (Evaluated Receipt Settlement)
procedure, you can settle the shipment costs with the service agents without receiving invoices from
them. You can choose from different settlement periods. Transfer the calculated shipment costs to
Financial Accounting. The invoices are verified by the service agent. If the service agent discovers
variances, you can post these as subsequent debits/credits. If you receive invoices from the service
agent, you can also verify the invoices manually and create the invoices manually.
(C) SAP AG
SCM612
31
3.31
Settings Necessary for Integration: Topic
Objectives
SAP AG 2002
(C) SAP AG
SCM612
32
3.32
R/3 Customizing and Master Data Activities
Customizing A ctivities
Transportation relevance of orders and deliveries
Definition of Shipment Document Number Ranges
Definition of Shipment Types
Transportation Planning Point Determination
SAP AG 2002
(C) SAP AG
SCM612
33
3.33
Transportation Relevance
R/3: Transportation relevance of deliveries
Route
Delivery
Type
Item
Category
SAP AG 2002
(C) SAP AG
SCM612
34
3.34
Shipment Document Number Ranges
R/3 and APO: Definition of Number Ranges
R/3 IMG:
APO IMG:
R/3
APO
SAP AG 2002
(C) SAP AG
SCM612
35
3.35
Shipment Type Required Settings
SAP AG 2002
(C) SAP AG
SCM612
36
3.36
Transportation Planning Point
R/3 : Transportation Planning Point Determination:
IMG:
IMG:
SAP AG 2002
Update the Transportation Planning Point determination table so that TP/VS can determine the
Transportation Planning point to be assigned to the shipment documents created in TP/VS planning.
A default transportation planning point should also be maintained.
The Shipping Point and Shipping Type can be used in the table to determine the Transportation
Planning Point.
(C) SAP AG
SCM612
37
3.37
Packaging Materials Needed for APO Mapping
R/3 : Packaging Materials needed for APO Mapping Table for Vehicle s:
SAP-Menu: Logistics Materials
APO
SAP AG 2002
Create materials of material type VERP (naming should be the same as that used in the APO
Transport Methods).
Note: In material master view Sales: General/Plant Data a packaging material type means of
transport (For example, Trucks) has to be maintained. See Packaging Material Types in R/3 IMG:
Logistics GeneralHandling Unit ManagementBasicsDefine Packaging Material Types
(C) SAP AG
SCM612
38
3.38
Material Master Data Field Checks
SAP AG 2002
Material
(C) SAP AG
SCM612
39
3.39
R/3 Transportation Processing Overview: Unit
Summary
(C) SAP AG
SCM612
40
3.40Exercises
Unit: R/3 Transportation Processing Overview
Topic: Transportation Planning Point
At the conclusion of this exercise, you will be able to:
True or false?
1-1-1 A company code is an independent accounting unit.
1-1-2 Each plant has exactly one shipping point.
1-1-3 Shipments are processed at a transportation planning point.
1-1-4 Each transportation planning point must be assigned to a plant.
1-1-5 Each transportation planning point must be assigned to a warehouse
number.
(C) SAP AG
SCM612
41
1-2
Which transportation planning points are defined for company code 1000?
____________________________________________________________
Go to the address screen for transportation planning point 1000.
On which street is it located?
______________________________________________________
1-3
Create a new Transportation Planning Point to be used for shipments created from
the APO TP/VS component. Identify the Transportation Planning Point as AP##.
Assign it to Company Code 1000.
Description: TP/VS Group ##
In the Edit Address fields:
Name:
APO TP/VS GR ##
1-4
(C) SAP AG
Country:
DE
Language:
English
When shipment documents are created from the APO TP/VS system, the
Transportation Planning Point must be determined for each shipment document. In
this step you will update the interface table that is used to determine the
Transportation Planning Point. Shipments will be planned for Shipping Point X0##
Dresden. Create the following entries in the Determination of Transportation
Planning Point table.
Shipping Point
Shipping Type
X0##
Blank
X0##
01
TrspPlanPt
AP##
AP##
SCM612
42
Exercises
Unit: R/3 Transportation Processing Overview
Topic: Shipment Document Type
At the conclusion of this exercise, you will be able to:
Create shipment document types used for APO planning.
2-1 An outbound shipment for your group has been created in the system as an example.
Display the outbound shipment.
Search for the document using the F4 Help. Use the External ID 1 field as a search
term.
External ID 1:
GR##-1. (Note: This search is case-sensitive; enter the External
Identification EXACTLY as shown.)
2-1-1 Which outbound deliveries does this shipment contain?
_____________________________________________________
(C) SAP AG
SCM612
43
Data
02
Adopt Route
Determine Legs
Weight Unit
KG (Kilograms)
Volume Unit
M3 (Cubic Meters)
Copy Routine
11 (Route/Deadlines)
(C) SAP AG
SCM612
44
2-3
Data
02
Adopt Route
Determine Legs
Weight Unit
KG (Kilograms)
Volume Unit
M3 (Cubic Meters)
Copy Routine
11 (Route/Deadlines)
(C) SAP AG
SCM612
45
Exercises
Unit: R/3 Transportation Processing Overview
Topic: Basics of Shipment Cost Processing
At the conclusion of this exercise, you will be able to:
3-1 First, answer the following questions about shipment cost processing:
3-1-1 What steps are involved in shipment cost processing?
__________________________________________
__________________________________________
__________________________________________
__________________________________________
3-1-2 Describe the structure of the shipment cost document:
__________________________________________
__________________________________________
__________________________________________
3-1-3 True or false?
You can combine several shipment documents to form one shipment cost
document.
The shipment must have at least Shipment completed status before a
shipment cost document can be created.
(C) SAP AG
SCM612
46
Exercises
Unit: R/3 Transportation Processing Overview
Topic: Shipment Costing and TP/VS-Related
Customizing
At the conclusion of this exercise, you will be able to:
Make the customizing settings necessary to assign your
APO shipment types to a shipment cost type.
Make the relevant customizing settings necessary to
perform shipment costing for shipments planned in APO
TP/VS and provide the ability to perform carrier selection
in TP/VS using freight rates established in the R/3 System.
Set up Pricing Procedure determination in Shipment
Costing.
The ability to perform shipment costing for both inbound and
outbound shipments and to provide the ability to influence carrier
selection based on actual freight rates are significant benefits of
using the R/3 Transportation application combined with the APO
TP/VS component. As a member of the TP/VS project team you
will need to make the required customizing settings in the R/3
System to facilitate these functions.
4-1
Assign your two new Shipment Types AI## and AO## to Shipment Cost Type 0001
in R/3 Customizing.
4-1-1 Set the Shipment Header, Leg, Load Transfer Point and Border Crossing
Cost Types as Relevant for shipment costs for each assignment.
4-2
Because you will be using tariff zone codes in your freight rates for shipment
costing, you must update the tariff zone determination table to include your new
Transportation Planning Point for each of your carriers. You have three carriers that
have rates established for shipment costing and carrier determination in TP/VS:
1058, 1925 and 1930. These carriers are also used for shipments created for
Transportation Planning Point 1000, so you can copy as the existing entries to your
Transportation Planning Point AP##. You should also copy all subitems in the
entry.
4-3
Update the shipment costing pricing procedure determination table to reflect your
new Transportation Planning Point. Use Transportation Planning Point 1000 as a
reference for the copy as process.
4-4
Make the required setting in the Purchasing Data determination table for your new
Transportation Planning Point, AP##. Use the same purchasing organizational data
as TransportationPlanning Point 1000.
(C) SAP AG
SCM612
47
4-5
To satisfy a requirement for TP/VS Carrier Selection when external costs are used
as a criteria for selection, make an entry in the LES Shipping Point Determination
table for your plants and their corresponding shipping points. The table entries are
as follows:
Shipping Condition
(C) SAP AG
Loading Group
SCM612
Plant
Shipping Point
10##
Z0##
12##
X0##
48
Exercises
Unit: R/3 Transportation Processing Overview
Topic: Stock Transport-Related Customizing
At the conclusion of this exercise, you will be able to:
Make the required, basic customizing settings required for
stock transport processing.
When a new plants are established in the R/3 System, there are
some fundamental settings required to facilitate the processing of
stock transports both inter and intra-company. These settings are
independent of TP/VS. You must make these settings before
stock transport orders are created in the R/3 System.
5-1
DlvTy: NLCC C: B
NL
RP
5-1-5 Check and make any required assignments in the Purchasing document type
table in the Stock Transport customizing area. The table must include the
following combinations of allowed stock transports and corresponding
Purchase Order Document Types:
10## to 12## UB No one-step processing
12## to 22## NB No one-step processing
5-1-6 Verify and make any necessary changes to the Transportation Relevancy
tables. In this step you will make sure that delivery document types NL and
NLCC are set as relevant for transportation processing. In addition, you
must verify that all relevant item categories for these document types are set
as relevant for transportation processing. Unless these objects are set set as
relevant for transportation processing you will not get shipment documents
created when TP/VS planned shipments are published.
(C) SAP AG
SCM612
49
Exercises
Unit: R/3 Transportation Processing Overview
Topic: Settings Necessary for Integration
At the conclusion of this exercise, you will be able to:
Create the Packaging Materials needed for APO TP/VS
planning and integration with the R/3 System.
When APO TP/VS creates shipment documents and they are
subsequently transferred to the R/3 System for execution, the
Transportation Methods codes from TP/VS are translated into
corresponding R/3 System packaging materials in the shipment
document. These packaging materials must exist in the R/3
System Material Master.
6-1
Create two Material Master records, FTL-## and LTL-## by creating with
reference from TRUCK-04 and TRUCK-05, respectively. These materials should
have Material Type of VERP and Industry Sector of Mechanical Engineering. The
following views should be created: Basic Data1, Sales: Sales Org. Data 1, Sales:
Sales Org. Data 2, Sales: General/Plant Data and Accounting 1. In the
Organizational Data enter only your Plant 12## but copy from Plant 1200 of the
reference material.
Description for FTL-##: FTL Group ##
Description for LTL-##: LTL Group ##
All other data fields should remain the same as the reference material.
(C) SAP AG
SCM612
50
3.41Solutions
Unit: R/3 Transportation Processing Overview
Topic: Transportation Planning Point
1-1
True or false?
1-1-1 True
1-1-2 False A plant can have more than one shipping point.
1-1-3 True
1-1-4 False A transportation planning point is only defined for a particular
company code and is not linked to other organizational units.
1-1-5 False A transportation planning point is only defined for a particular
company code and is not linked to other organizational units.
1-2
1-3
1-4
Update the interface table used to determine the Transportation Planning Point in
the APO system.
R/3 IMG: Logistics Execution Transportation Interfaces Transportation
Planning Point Determination
Select New entries.
Make the entries as shown in the Exercise.
Choose Save.
(C) SAP AG
SCM612
51
Solutions
Unit: R/3 Transportation Processing Overview
Topic: Shipment Document Type
2-1
_________________________________
Ship-to address: Shipments and deliveries overview screen:
Recipient address field: _________________________________
Shipping point: Shipments and deliveries overview screen:
Shipping point field: __________________________________
Shipment weight: Shipments and deliveries overview screen
Total weight field: __________________________________
(C) SAP AG
SCM612
52
2-3
(C) SAP AG
SCM612
53
Solutions
Unit: R/3 Transportation Processing Overview
Topic: Basics of Shipment Cost processing
3-1
(C) SAP AG
SCM612
54
Solutions
Unit: R/3 Transportation Processing Overview
Topic: Shipment Costing and TP/VS-Related
Customizing
4-1
Assign your Shipment Types AI## and AO## to ShipmentCost Type 0001:
R/3 IMG: Logistics ExecutionTransportationShipment CostsShipment
Cost Document Shipment Cost Relevance and Default for Shipment Cost Type
Enter Shipment cost type 0001 for your Shipment types.
Choose Save.
4-1-1 Under Dialog Structure, select: Define shipment cost relevance for
shipment type
For your shipment types, select the Header, Leg, Load Transfer Point, and
Border Crossing boxes.
Choose Save.
4-2
(C) SAP AG
SCM612
55
4-3
4-4
Make the required entry in the Purchasing Data determination table for your
Transportation Planning Point:
R/3 IMG: Logistics Execution Transportation Shipment Costs
Settlement Assign Purchasing Data
Use the same purchasing organizational data as that for Transportation Planning
Point 1000 and Shipment Cost Type 0001 by using the Copy As function.
Select the line with TPPt 1000 and SCTy 0001 and choose the Copy As button.
Enter your TPPt. AP##.
Select Enter.
Select Save.
4-5
Update the Shipping Point determination Table with your Plants and Shipping
Points.
R/3 IMG: Logistics Execution Shipping Basic Shipping Functions
Shipping Point and Goods Receiving Point Determination Assign Shipping
Points
Select the New Entries button.
Make the entries in the table from the data in your exercise.
(C) SAP AG
SCM612
56
Choose Save.
(C) SAP AG
SCM612
57
Solutions
Unit: R/3 Transportation Processing Overview
Topic: Stock Transport-related customizing
5-1
T-S090##
Company Code:
Sales Area:
1000
1000/12/00
1000/12/00
General data:
Name:
Plant 12##
Search term:
Plant 12##
Postal Code:
01069
City:
Dresden
English
1000
VAT Registration:
DE123456789
Choose Enter.
Select Company code data button.
Company data:
No data entry required.
Choose Enter.
Select Sales area data button.
Sales area data:
Select the Shipping tab.
(C) SAP AG
SCM612
58
group ##
0 non-taxable
Choose Save.
5-1-2 Create a new customer master to represent your plant 22## in outbound
delivery documents of transfers of materials to the plant.
R/3 Standard Menu: Logistics Logistics Execution Master Data
Partner Customer Create Total
Customer Account Group: 0001 Sold-to
Customer:
T-S200##
Company Code:
Sales Area:
1000
1000/12/00
1000/12/00
General data:
Name:
Plant 22##
Search term:
Plant 22##
Postal Code:
75015
City:
Paris
Region:
75
English
2200
VAT Registration:
FR93341612695
Choose Enter.
Select Company code data button.
Company data:
No data entry required.
Choose Enter.
Select Sales area data button.
Sales area data:
Select the Shipping tab.
Shipping Conditions: (50 + ##) Enter the sum of 50 plus your
group ##
0 non-taxable
Choose Save.
(C) SAP AG
SCM612
59
(C) SAP AG
SCM612
60
Solutions
Unit: R/3 Transportation Processing Overview
Topic: Settings Necessary for Integration
6-1
(C) SAP AG
SCM612
61
4
APO Overview
Contents:
Introduction to supply chain planning
Overview of APO Planning Components
SAP AG 2002
(C) SAP AG
SCM612
4.2
APO Overview: Unit Objectives
SAP AG 2002
(C) SAP AG
SCM612
4.3
APO Overview: Business Scenario
SAP AG 2002
(C) SAP AG
SCM612
4.4
The Supply Chain: From Supplier to Consumer
Information flow
Transfer
Supplier
Transfer
Manufacturer
Transfer
Distribution
Transfer
Retail Outlet
Consumer
CASH FLOW
SAP AG 2002
Supply Chain Management includes the management of materials, information, and financial flows
in a network consisting of suppliers, manufacturers, distributors, and customers. The coordination
and integration of these flows within and across companies are critical in effective Supply Chain
Management.
Why manage the supply chain?
Lower sourcing costs of finished goods and raw materials
Improve customer service
Dramatically lower inventory levels
Leverage all resources to bring substantial benefits to a company
(C) SAP AG
SCM612
4.5
Key Supply Chain Problems
Postponement
Customers
Pull
Delivery time
Bullwhip Effect
Lead time
Plants
Push
DCs
Suppliers
SAP AG 2002
Supply Chain
The key supply chain problem is the delivery time of products to the customer must be considerably
shorter than the production or the lead time. In order to realize this and guarantee a high delivery
service, inventory and safety stock must be built up at component or finished product level in plants
or distribution centers (DC).
You use postponement strategies to define how far the sales order links with the supply chain; in
other words, where the decoupling of make-to-stock production (push strategies) (MTS), and maketo-order production (pull strategies) (MTO), takes place.
The bullwhip effect refers to an increase in variability of a (constant) demand pattern due to large
fluctuations at the manufacturer or the supplier as we move along the supply chain, triggered by lot
size creation.
Implementing an Advanced Planning System (APS) does not solve supply chain problems. It is also
important that company bosses are prepared to consider making organizational changes to their
companies, or at least looking into the possible benefits.
(C) SAP AG
SCM612
4.6
SAP's Total Supply Chain Solution
Strategic Application Level
Customer
Relationship
Management
(CRM)
R/3
Core Business Application Level
Finance
Integration
Strategic
Enterprise
Management
(SEM)
Logistics
Database
structure
Interfaces
Development
tools
Communication
Materials
Management
Client-Server
HR
Core level
Sales
Production
Planning
Flexibility
Non-R/3
System s
Supply
Chain
Solutions
(APO)
liveCache
Electroni c
Commerce
B2B
Scalability
Business
Information
W arehouse
(BW )
Open Systems
SAP AG 2002
Advantages of APO
High performance using liveCache technology
Global server: Integrates multiple OLTP systems
Collaborative planning via the Internet
Simultaneous material and finite capacity requirements planning
Cross-plant optimization of the resource load
Sequence and setup time optimization of orders
Transportation optimization with route planning
Evaluation and analysis of orders
Seamless integration between the APO and R/3 Systems
(C) SAP AG
SCM612
4.7
Levels of Supply Chain Management
Planning
Strategy planning
planning)
SAP AG 2002
Production
planning
PP/DS SNP
SNP
Production
for example,
PP
Outbound
delivery
for example, LES,
MM, SD
Deliver y planning
ATP, TP/VS
External
procurement at
customer
Customer
planning)
Partner
Partner
Supplier
Execution
In Supply Chain Management, there is a planning level and an execution level. Within the planning level
APS systems are used (APS = Advanced Planning Systems) and at the execution level, ERP systems (ERP =
Enterprise Resource Planning) are used. The planning level is divided into different levels depending on if the
decisions are strategic, tactical or operational. The criteria for deciding what belongs to which planning level is
not primarily the planning horizon but rather the scope of the planning. Each hierarchically superior level
determines the ranges of the planning levels below it.
Strategic level (strategy planning): Comparatively unstructured and simple planning tools such as portfolio
techniques (product life cycle analysis, Boston Consulting Group portfolios, and McKinsey portfolios, for
example) are used to make decisions about the direction of the company (such as product diversification
strategies, quality strategies, and cost leadership).
Tactical level (strategy realization and infrastructure planning): Decisions about direction are realized at
this level when the company is restructured based on strategies. Tactical planning is decisive for operational
planning and execution because it forms the planning environment within the company (planning personnel, IT
systems for planning, implementation and setting parameters, and planning processes) as well as the part of the
company that physically executes (such as factory planning, personnel planning, transportation planning, and
logistically-relevant IT system for execution). This links the operational planning level and the execution level.
Operational level (operational aggregated and detailed planning): Structured, recurring planning based on
tactical realization decisions such as strategies for settling sales orders and pre-planning, which are not
questioned again in operational planning. Operational planning is also long-term to bridge bottlenecks that will
occur in the future, such as early planning for seasonal requirements or planning runs to determine components
with longer replenishment times. Planning for the future is usually done objectively or based on time since
planning data is uncertain. Aggregated planning also serves to redirect tactical planning if necessary (for
example, additional shifts, additional capacity, and outline agreements with suppliers.) Detailed planning
attempts to optimally use the logistic system within the limits set by tactical and aggregated planning and based
on the most current data.
(C) SAP AG
SCM612
Execution level: Along with the development of the product (production, stock transfer, sorting, receipt,
delivery), administrative activities are also performed at the execution level. These activities are supported by
execution systems, for example, when papers for production (production orders) are printed.
(C) SAP AG
SCM612
4.8
APO Planning Components
Monitor
Tactical
Networ k Design
Agg. Planning
Detailed Planning
Purchasing
Production
Planning
&
Detailed
Scheduling
Scheduling
Sales
Distribution Transportation
Planning
Planning
&
&
Deplo yment
Planning
Vehicle
Scheduling
BUY
MAKE
STORE
MOVE
SELL
SAP AG 2002
Supply Chain Cockpit: A graphic tool for evaluating and controlling the supply chain.
Network Design: Strategic planning for analyzing, optimizing, and reorganizing the supply chain.
Long-term sourcing, production, and distribution decisions are supported here.
Demand Planning (DP): Aggregated and detailed demand planning with a variety of forecasting
techniques based on aggregated sales figures.
Supply Network Planning (SNP): Finite, cross-location, mid to long-term production and
procurement planning with simultaneous material planning and capacity scheduling. Deployment is
used to plan short-term replenishment.
Production Planning/Detailed Scheduling (PP/DS): Finite, detailed production planning. PP/DS
uses simultaneous material planning and capacity scheduling, and optimization techniques to
generate feasible plans that are in the optimum sequence with the optimum setup times.
Transportation Planning/Vehicle Scheduling (TP/VS): Optimizes use of transportation vehicles
and selection of carriers. Generates deliveries and shipments.
Global Available-to-Promise (ATP): Rules-based availability check that is integrated with
production planning and product allocation.
(C) SAP AG
SCM612
4.9
Network Design
SAP AG 2002
Network Design is a component used specifically for strategic planning. Use this tool to make
assignment decisions (relationships between individual locations and assignment of products to
locations), as well as additional decisions regarding locations (location determination and location
selection), taking account of demand and cost structures. Network Design can also be implemented
for regular evaluation of the existing supply chain in order to discover any weaknesses and take any
necessary measures.
There are four methods available in Network Design for planning the supply chain network. These
methods optimize either geographical distances or costs, in each case taking the demand structures
into account.
(C) SAP AG
SCM612
10
4.10
APO Planning Sequence with R/3 Integration
R/3 or non-SAP s ystem
APO
Flexible Planning
Dem and
Planned ind.reqmts
management
Sales &
Sales order
Distribution (SD)
Planned ind.reqmts
Consumption
Sales order
Supply Network Planning (SNP)
Prod. Plng & Det. Schedlng (PP/DS)
Planned order
Conversion
Production order
Purchasing
(MM)
Planned order
Production order
Purchase requisition
Purchase order
Purchase requisition
Purchase order
Stock transport
requisition
In APO Demand Planning (DP), you base forecasts on aggregated historical data from the R/3 Systemor
Business Information Warehouse (BW) system (such as sales quantities from past sales orders). You use the
Administrator Workbench in APO to upload aggregated historical data from the R/3 System or BW System. In
APO Demand Planning you generate planned independent requirements (release forecast to APO Demand
Planning) that are used for make-to-stock planning.
Sales orders and planned independent requirements form the starting point for Supply Network Planning
(SNP), Production Planning/Detailed Scheduling (PP/DS) and TP/VS in APO. Existing storage location stock
is also included in the planning. Sales orders are entered in the R/3 System (sales module) but the availability
check (or ATP check-Available to Promise) is done in APO.
In Supply Network Planning (SNP) you plan for the short- or mid-term horizon for the entire supply chain:
you generate stock transport requisitions (for planning and stock transfer) between distribution centers and
plants, and can also generate planned orders (for in-house production planning) and purchase requisitions (for
external procurement planning) directly in the production plant for the longer term.
Transaction data generated in APO (such as planned orders) is transferred to the R/3 System through the R/3
APO interface (CIF: Core Interface).
As soon as planned orders and purchase requisitions get closer to the today-line, the stock planner or buyer can
collectively convert planned orders into production orders and purchase requisitions into purchase orders.
You use the APO Deployment/TLB (Transport Load Builder) to convert stock transport requisitions into stock
transport orders.
APO is a planning tool: Execution functions such as release, confirmation, material staging, or goods
movement for production orders or purchase orders are performed in the R/3 System. Confirmation and other
data is then transferred back to APO from the R/3 System.
You create planned deliveries and shipments in Transportation Planning and Vehicle Scheduling (TP/VS).
In APO, TP/VS different deliveries can also be grouped together into one shipment. It is then possible to
(C) SAP AG
SCM612
11
convert planned deliveries and planned shipments into real deliveries and shipments and transfer them to the
R/3 System.
(C) SAP AG
SCM612
12
4.11
Functions of Demand Planning
Cross-company Demand
Planning (Internet)
Consi stent, detailed, and
consolidated plans
Statistical and causal
forecasting technique s
Retail outlet
Lifecycle planning
Promotion planning
Suppliers
Production
units
Distribution
centers
SAP AG 2002
Demand Planning is a complex, powerful, and flexible tool that supports your company's demand
planning process. User-specific planning layouts and interactive planning books not only allow you
to include different departments, you can also use them to include other companies in the forecast
creation process. With APO Demand Planning you can use statistical forecasting methods and
advanced macro techniques to create forecasts from sales history based on many different causal
factors, You can test predefined, and user-defined forecast models, and forecast results, and use a
consensus-based approach to consolidate the demand plans of different departments. You can use
forecast overrides and promotions to add marketing intelligence and management adjustments. The
seamless integration with APO Supply Network Planning supports an efficient Sales and Operations
Planning (S&OP) process.
(C) SAP AG
SCM612
13
4.12
Collaborative Planning in APO
Collaboration
with Suppliers
Collaboration
with Customers
Manufacturer
Supplier
Product requirements
Production dates
Procurement
Delivery dates
Customer
The term collaborative planning refers to the process that makes it possible for different companies
along the supply chain to access cross-company information over the Internet, with the common goal
of identifying bottlenecks or date shifts as early as possible.
Collaborative planning allows the company to exchange demand, procurement, and stock data with
its partners. You can define your own exception messages (alerts) and integrate them into the general
alert management. If exceptions occur during planning, mail or fax messages can be generated
automatically. APO Collaborative Planning supports the CPFR standard.
(C) SAP AG
SCM612
14
4.13
Supply Network Planning (SNP)
Scre en Title
APO - Pro du ct
ID
Supply Network
Planning
Objec t
Tex t
Obj ect 1
Te xt 1
Des
Gra
igGrid
n
Titlep h
Obj ect 2
Te xt 2
Ke y Figure 1
Obj ect 3
Te xt 3
Ke y Figure 2
Obj ect 4
Te xt 4
Ke y Figure 3
To ta
l
To ta
l
W 24
W 25
Cap acit y
Lev elin g W 26
W 27
W 28
W 24
W 25
W 26
W 27
W 28
Ke y Figure 4
Se lec tion Profile
Ke y Figure 5
User
Se le c tion ID
Grid 2 Title
Ke y Figure 1
Ke y Figure 2
Ke y Figure 3
Ke y Figure 4
Ke y Figure 5
SAP AG 2002
SNP Planning plans on a mid to long-term basis. It creates a rough quantity-based, cross-location
production and distribution plan with individual rough bills of material (BOM) and routings.
The SNP BOM contains critical products that are produced on bottleneck resources and products
with a long replenishment lead time.
SNP ensures that the right quantity is available on the right day without critical resources being
overloaded. The smallest unit used for scheduling is days.
(C) SAP AG
SCM612
15
4.14
Supply Network Planning Scenario
Supplier
Plant
DC
Customer
(C) SAP AG
SCM612
16
4.15
Comparison of Mid- and Short-Term Planning
Sales orders
Forecasts
Sales orders
Forecasts
Purchase requisitions
Purchase requisitions
Stock transfers
Stock transfers
Pegging
No pegging
SAP AG 2002
Production
horizon
Time
(C) SAP AG
SCM612
17
4.16
Production Planning / Detailed Scheduling (PP/DS)
Production Planning/
Detailed Scheduling
SAP AG 2002
Supply Network Planning (SNP) is usually used for initial mid to long-term planning over the
entire supply chain (in particular, when there are several plants and distribution centers). Production
Planning and Detailed Scheduling (PP/DS) is usually used for to-the-minute, short-term planning
in a production plant.
In Supply Network Planning (SNP) demands are aggregated for a specified bucket (day for
example). It is irrelevant whether a requirement falls within an early or a late shift, as requirements
are only initially planned here. Planning does not include break times. The sequence of orders is
not an SNP time consideration. Cross-plant planning, and mid- to long-term planning in the
production plant do all play an important role in Supply Network Planning.
Production Planning and Detailed Scheduling schedules orders to-the-minute (meaning that
shifts and breaks are included here), and does include order sequences (sequencing and
optimization of sequences). In the short-term, these functions are highly important for the
production plant.
As soon as a requirement (such as a sales order or planned independent requirement) falls within a
specific horizon, it is no longer planned in the SNP planning run, but instead in the production
planning run of PP/DS.
(C) SAP AG
SCM612
18
4.17
Functions of Production Planning/Detailed
Scheduling (PP/DS)
Plans production, external
procurement, and stock transfer
within the production plant to-theminute
Customer
Resource 3
20
Resource 2
Resource 1
10
SAP AG 2002
Production Planning and Detailed Scheduling (PP/DS) is used mainly for short-term, to-theminute planning (both for in-house production and external procurement) in the production plant.
PP/DS schedules and plans all operations of an order that are relevant for planning the different
resources. PP/DS has the following functions:
It generates planned orders (to plan in-house production), and purchase requisitions or scheduling
agreement schedule lines (to plan external procurement) in the event of product shortage by using
simultaneous material and capacity requirements planning to do this: You can define
resources as finite resources (planning-critical resources) in the resource master. Order operations
are only created at these resources if there is sufficient capacity for the order quantity on the
corresponding date. When there is no available capacity, the system searches for a date on which
the order operation can be carried out, taking account of the capacity situation.
Takes order sequences into account: When new in-house production orders are created, the setup
times in the new order can be determined automatically from the setup status of the resources
(depending on the preceding order).
It is possible to display the orders in graphic format (in the detailed scheduling planning board),
and to sequence from there. You can use also the optimizer to execute a sequencing.
Machine scheduling optimization: During planning, it is possible for orders to be generated that
do not have an optimum order sequence. Therefore, you can change the sequence and resource
assignments of existing orders using the optimization run.
PP/DS is a planning tool. Execution functions such as confirmations and goods receipts are
performed in the execution system (for example, the R/3 System). Therefore, the planning results are
transferred to the execution system.
(C) SAP AG
SCM612
19
4.18
Deployment
Deployment adjusts the stock transfers for short-term changes
on both the supply and demand side (distribution detailed planning)
Fair Share
Proportional distribution
Proportional target
fulfillment
Winnipeg
Quota arrangements
Push deployment
DC1
Calgary
Plant
Customer
DC2
Chicago
Push horizon
SAP AG 2002
The deployment function in SNP determines how and when inventory and planned supplies are
deployed to distribution centers, customers, and vendor-managed inventory (VMI) accounts. It
generates optimized replenishment plans that take into account short-term changes on the supply or
demand side, as well as constraints, such as transportation and storage capabilities.
A variety of deployment strategies are used depending on the current situation (for example, fair
share, push deployment, and, pull-push deployment).
(C) SAP AG
SCM612
20
4.19
Global Available-to-Promise (Global ATP)
Is it possible to deliver the product
in the required quantity, and on the
required date?
Event-driven
Internet capabilities
Rules-ba sed ATP:
Location substitution
Product substitution
Product allocations
High performance (time series)
SAP AG 2002
You use Global ATP (Available To Promise) to check product availability and capacities, to provide
customers with reliable confirmation dates for their sales orders. ATP checks are triggered from the
OLTP system (R/3 System, or non-SAP system) as an event (event-driven). In the interface with
APO you can specify that the ATP check is to be done in APO and not the R/3 System. For example,
if you create a sales order in the R/3 System, the system first checks if there is enough of the
requested product in stock. The system can also check if receipts (for example, production orders and
planned orders) have already been planned by the requested date.
Global ATP has the following functions:
Rules-based ATP: When there is no stock available, it is possible in APO to set it so that the
system does an ATP check for the product at another location or else substitutes an alernative
product for (location and product substitution).
Integration with PP/DS: You can set Global ATP so that when a product is not available, the sales
order directly triggers production. If it triggers an order for in-house production, APO creates a
planned order for the required quantity in PP/DS.
Product allocations: Product allocation allows you to manage the supply of scarce products to
customers, so that each customer only receives an allocated amount.
Time series: Planned orders and production orders are aggregated and represented in a time series,
which can be used to evaluate the incoming requests from the sales orders. This improves
performance of the ATP check.
(C) SAP AG
SCM612
21
4.20
Transportation Management: Planning Solution
APO
Transportation
Planning
Vehicle
Scheduling
BW
(Monitoring)
LES (Execution)
SAP AG 2002
(C) SAP AG
SCM612
22
4.21
APO Planning Process
Supply Network
Planning
Unconstrained
Aggregat e Planning
Forecast
Forecast
Planned
Planned Prod
Prod
Orders
Orders
Constrained
Stock
Stock Transfer
Transfer
Orders
Orders
Mid-term
Sourcing/Repl en.
Deployment/Transport
Load Builder
Production Planning
Detailed Scheduling
Constrained
Detailed Planning
Transportation
Planning / Deployment
Planned
Planned
Delivery
Delivery Items
Items
Planned
Planned
Shipments
Shipments
Constrained
Vehicle Scheduling
Load Consolidation
Deliver y Schedul ing
SAP AG 2002
Supply Network Planning is used for long-term to mid-term planning. A major advantage of this
component is the Sourcing function, which allows you to specify at which location which product is
procured and how it is to be procured. Sourcing is optimized using functions such as Deployment
and the Transport Load Builder (TLB). Bucket capacities, which show the most detailed level for
day planning, are used for product planning in Supply Network Planning
Vehicle Scheduling (VS) is a component for short-term planning. You can define planning horizons
for both Supply Network Planning and Vehicle Scheduling. These horizons are independent of each
other and must be planned separately.
In Vehicle Scheduling, the resources and transportation processes are maintained in detail to allow
for very exact planning.
When the orders from Supply Network Planning are converted to VS orders, the following occurs:
The orders are put in a certain order.
The exact move time is determined.
Information and operations still required are added (data and operations that are not required for
Supply Network Planning but are necessary for Vehicle Scheduling, such as loading activities).
(C) SAP AG
SCM612
23
4.22
Differences Between TLB and TP/VS
SAP AG 2002
(C) SAP AG
SCM612
24
4.23
Optimization Solutions
Local search
+ Constraint
programming
Supply
Network
Design +
Planning
Genetic algorithm
constraint-based
programming
Production Planning/
Detailed Scheduling
Transportation
planning
SAP AG 2002
The following optimizers are available in APO: Optimizer for CTM, optimizer for PP/DS, optimizer
for Network Design, optimizer for Sequence Planning, optimizer for Supply Network Planning, and
optimizer for Transportation Planning.
In Supply Network Planning, optimization problems usually can be solved with an exact
mathematical solution procedure (which can be solved using linear equations). For this reason,
linear programming is used for optimization in Supply Network Planning. Linear programming is
able to calculate an exact solution.
In Production Planning and Detailed Scheduling (PP/DS) however, there are usually more
complex optimization problems for which no exact solutions can be found. Therefore, linear
programming is less suited for PP/DS. Instead, solutions approximate an optimum or exact solution.
Approximate optimization procedures are therefore more suited to be used in PP/DS (genetic
algorithm/constraint-based programming). This allows the optimization system to find a suitable
solution faster.
The different optimizers can be installed on the same server on which the APO application, the
liveCache, and the database are all installed (but you can also install them on different servers). The
APO application server and the optimizer are linked via a TCP/IP connection. Here you specify
whether the optimizer is to be called on the APO application server or on a different server
(transaction sm59).
(C) SAP AG
SCM612
25
4.24
APO Overview: Unit Summary
SAP AG 2002
(C) SAP AG
SCM612
26
4.25Exercises
Unit: APO Overview
Topic: Overview of APO Components
At the conclusion of this exercise, you will be able to:
Within supply chain management, there is a planning level and an execution level.
APO provides components at the _______________ level and the R/3 System
provides ERP for the ________________________ level.
1-2
1-3
The APO components PP/DS and TP/VS are examples of components used for
________________________________ planning.
1-4
1-5
True or False: Supply Network Planning (SNP) is usually used for short- term
planning over the entire supply chain.
1.6 Which of the following are not components of APO:
a) Material Requirements Planning (MRP)
b) Demand Planning (DP)
c) Supply Network Planning (SNP)
d) Task and Resource Management (TRM)
(C) SAP AG
SCM612
27
True or False: Planned independent requirements from Demand Planning are one of
the inputs to Supply Network Planning.
1-8
True or False: Sales orders and planned independent requirements are input to
Production Planning/Detailed Scheduling.
1.9
refers to the process that makes it possible for different companies along the supply
chain to all access cross-company information over the internet.
1-10
A major difference between planning by the Transport Load Builder (TLB) and
Vehicle Scheduling (VS) is that TLB consolidates loads for a _________________
transportation leg, whereas VS provides load consolidation for
_______________________ legs.
1-11
(C) SAP AG
SCM612
28
4.26Solutions
Unit: APO Overview
Topic: Overview of APO Components
1-1
Within supply chain management, there is a planning level and an execution level.
APO provides components at the planning level and the R/3 System provides ERP
for the execution level.
1-2
1-3
The APO components PP/DS and TP/VS are examples of components used for
short-term planning.
1-4
1-5
True or False. Supply Network Planning (SNP) is usually used for mid- to longterm planning over the entire supply chain.
1.6
True or False. Planned independent requirements from Demand Planning are one
of the inputs to Supply Network Planning.
1-8
True or False. Sales orders and planned independent requirements are input to
Production Planning/Detailed Scheduling.
1-9
The term collaborative planning refers to the process that makes it possible for
different companies along the supply chain to all access cross-company information
over the internet.
1-10
A major difference between planning by the Transport Load Builder (TLB) and
Vehicle Scheduling (VS) is that TLB consolidates loads for a single transportation
leg, whereas VS provides load consolidation for multiple legs.
1-11
The TP/VS component of APO uses the optimization technique called tabular
search.
(C) SAP AG
SCM612
29
5
APO Integration and Master Data
Contents:
APO Integration
Core Interface
RFC Links
Master Data Objects
Integration Models
Transfer of Master Data
SAP AG 2002
(C) SAP AG
SCM612
5.2
APO Integration and Master Data:Objectives
SAP AG 2002
(C) SAP AG
SCM612
5.3
APO Integration and Master Data: Business
Scenario
SAP AG 2002
(C) SAP AG
SCM612
5.4
APO Integration: Topic Objectives
SAP AG 2002
(C) SAP AG
SCM612
5.5
APO Integration (1)
Master data
Transaction data
Sales orders
Planned/production orders
Purchase orders
Supplies
...
Planning results
Manufacturing orders
Order proposals
Result of availability
check
...
APO
R/3
4.6C
R/3
4.6C
BW
SAP AG 2002
As a rule, the SAP-APO System is used in connection with other components of the SAP System or
with non-SAP Systems. There are two different integration concepts:
Linkage with non-R/3 Systems: The required interfaces are implemented as Business Application
Programming Interfaces (BAPIs).
Linkage with R/3 Systems (one or more): The required interface is marked as an APO Core
Interface (CIF). A mutual system connection has been set up in Customizing to enable the system
to transfer data relevant for the planning processes, from the execution R/3 System into APO, and
also to return the planning results from APO into the R/3.
The main tasks of the APO Core Interface include:
Determining the source and target system in complex system environments
Providing the SAP-APO System with the relevant master and transaction data
Transferring data changes (transaction data)
Returning planning results to the execution system (R/3 or external system).
TP/VS was introduced in Release 3.0A of APO and is intended for use in R/3 System Releases 4.6C
and higher. It's also possible to integrate TP/VS by using Release 4.6B and Plug-in 2001.1 or higher,
by contacting development.
(C) SAP AG
SCM612
5.6
APO Integration (2)
SAP R/3
Non
NonR/3
R/3System
System
LO
SD
SD
HR
BAPI
CIF
BAPI
(Core Interface)
SAP APO
BAPI s
BAPI
SAP AG 2002
The APO Core Interface (CIF) is responsible for the data exchange between the APO and R/3
Systems. The APO CIF is a real-time interface that links APO with one or several R/3 Systems.
The system only transfers the data objects needed in the data structures in APO for the different
planning and optimization processes, from the complex dataset of the R/3 into APO.
The APO Core Interface guarantees both the initial data transfer (initial transfer) and the data
changes (transfer of data changes) within APO.
The outbound delivery from APO CIF takes place as an R/3 Plug-in.
The integration of R/3 with the CIF is possible as of release 3.1I. Earlier releases or an R/2 System
can be connected with BAPIs as Non-R/3 Systems.
TP/VS was introduced in Release 3.0A of APO and is intended for use in R/3 Releases 4.6C and
higher. You need Plug-in 2000.2 or higher. It's also possible to integrate TP/VS by using Release
4.6B and Plug-in 2001.1 or higher, by contacting development.
(C) SAP AG
SCM612
5.7
APO Integration (3)
R/3
Sales order
Planned order
Production order
Purchase order
Delivery
Shipment
...
Plant, customer,...
Material master
Capacity
Rout ing and
bill of material
APO
CIF
Real-time
CIF
Order
live
live
Cache
Cache
Production
Procurem ent
Replenishm ent
Location
Product
Resource
Production
process model
SAP AG 2002
The planning in APO is based on its own master data, which is usually transferred automatically
from a R/3 System, but can also be created manually.
The transfer of master data from the R/3 System is represented in the corresponding master data in
APO. Only the master data relevant for planning in APO is transferred (firstly in the form of an
initial transfer, and then later as a transfer of data changes).
The R/3 System remains the execution system for the master data. You can only maintain the
settings that the system cannot transfer from the R/3 directly into APO.
The system transfers the transaction data relevant for planning, such as warehouse stock and sales or
purchase orders, from the R/3 into APO via the CIF interface. And vice versa, the results of the
planning in APO are returned to the R/3 via CIF and then performed there. This integration of
transaction data generally takes place in real-time.
(C) SAP AG
SCM612
5.8
R/3 Plug-In Technology
CIF
APO
R/3
Plug-in
CRM
BW
R/3
BBP
SEM
An R/3 interface is marked with an R/3 Plug-in, to enable the system to integrate a mySAP
component (for example, APO or BW) with one or more R/3 Systems. With R/3 Plug-ins, several
mySAP components can be inserted at the same time. Most Plug-ins concern Add-Ons (R/3 standard
software enhancements with additional functions).
Plug-ins supply the components with transaction and master data. In this way, the CIF interface does
not only provide the APO System with initial data records (initial supply), it also guarantees a stepby-step supply with all the relevant data changes. The system only transfers the object data relevant
for the individual planning and optimization process in APO, from the complex data records into
R/3. The integration between R/3 and APO is possible as of Release 3.1I. For TP/VS, it is possible as
of Release 4.6C and restricted as of release 4.6B.
For easy integration from R/3 and APO, it is necessary to install a Plug-In relevant to the R/3 release.
Support packages are also delivered for the Plug ins.
(C) SAP AG
SCM612
5.9
RFC: Link Between R/3 and APO
R/3
APO
Master/
Master/
transaction
transaction data
data
Core
Core Interface
Interface
(selection
(selection and
and
extraction
extraction of
of
data)
data)
Rem ote
Function
Call (RFC)
APO
APO ma
master/
ster/
transaction
transaction data
data
live
live
Cache
Cache
SAP AG 2002
A RFC (Remote Function Call) connection connects an SAP R/3 System and an APO System. The
system transfers the data that is selected with the Core Interface (CIF) via this connection. To avoid
confusion, an example of a data transfer from the R/3 into the APO System is shown on the diagram.
The transfer of transaction data from APO to the R/3 System also takes place with RFC technology.
The R/3 is a database-orientated system that stores the data in the database. The APO System, on the
other hand, is available next to the classic database via the LiveCache (main memory orientated).
(C) SAP AG
SCM612
5.10
Structure of a RFC Link: Overview
A RFC connection sets up communication between an R/3 System and an APO System.
The system defines logical system names. In R/3 and APO, a logical system is named for both the
R/3 and the APO Systems.
The system assigns logical systems to the R/3 and APO clients.
The system determines the actual RFC destination by specifying a physical connection for the logical
system. The RFC destination also contains the logon data for the relevant system.
The system defines the APO target destination from the view of the R/3 System, and vice versa.
There is an obvious connection between both systems.
Enter the release of the APO System in step five.
(C) SAP AG
SCM612
10
5.11
APO Integration with Non-R/3 Systems
SAP R/3
Non
NonR/3
R/3System
System
LO
SD
SD
HR
BAPI
CIF
BAPI
(Core Interface)
SAP APO
BAPI s
BAPI
SAP AG 2002
The data exchange between APO and non-R/3 Systems takes place via BAPIs.
BAPIs are documented standard interfaces that provide object-orientated access to SAP Systems (via
C++, Java, Visual Basic, IDOCs, COM/DCOM, DelphiConnect, and so on).
(C) SAP AG
SCM612
11
5.12
APO Master Data: Topic Objectives
SAP AG 2002
(C) SAP AG
SCM612
12
5.13
Master Data Objects of the CIF
Initial transfer
R/3
APO
Plant
Location
Customer
Product
Vendor
Resource
Material master
Transportation
Zones
Transportation Zones
The APO Core Interface concerns a real-time interface. The system only transfers the data objects
from the complex dataset in R/3 into APO, that are needed in the data structures of APO. These
objects have been determined to be required for the respective planning and optimization processes.
Both the initial data transfer (initial transfer) and the data changes (transfer of data changes) within
APO take place using the APO Core Interface.
The master data objects in APO are not the same as those in the R/3 System. For the master data
transfer it is the relevant R/3 master data that is displayed in the corresponding planning master data
in APO.
The R/3 System remains the source system for the master data. Maintain directly in APO the specific
APO master data that does not exist in the R/3 System.
(C) SAP AG
SCM612
13
5.14
Initial Data Transfer of Master Data: Overview
Name
Target system
Plant
Material master
Resource
...
SAP AG 2002
Define the integration model that controls the transfer of master and transaction data in the R/3
System. You can find the menu option Core Interface Advanced Planner and Optimizer (the CIF
menu) under Logistics Central Functions Supply Chain Planning Interface.
The integration model distinguishes between master data and transaction data. Select the two types
of data in separate integration models and then transfer them separately.
In the integration model, select the dataset (master or transaction data) that you want to transfer.
Specify the following in the integration model:
The APO target system for the data transfer
The data objects you want to transfer
You can delete integration models that you no longer need. You must first deactivate these
integration models.
(C) SAP AG
SCM612
14
5.15
Generate Integration Model for Initial Data Transfer
Name + application = unique definition of integration model
Name
PC
Target sys.
APOCLNT800
Application
MD
APO
System
Material m aster
Customers
Vendors
Plants
Work centers
Selection of master
data types
...
Relevant m aterials
Material
Plant
1000
MRP type
...
Execute
Save
SAP AG 2002
The master data that the system will transfer for the first time (initial transfer), from the R/3 System
into the APO System, is defined in an integration model. The R/3 System generates this integration
model (transaction CFM1).
An integration model is uniquely defined by its name and application. It is useful to create several
integration models with the same name but as different applications. Ensure that the data pools of
your integration models are generally not too big. This enables you to handle errors more easily.
The target system that you specify in the integration model determines the APO System that the
master data is transferred into. The target system is a logical (APO) system that must have a RFC
connection.
Use a particular integration model to specify which master data you want the system to transfer. First
specify the master data types that flow into the integration model. In the second step, you specify the
selection criteria to be used for the selection of the individual master data documents in the R/3
System.
You complete the generation of the integration model by executing the model (this means that the
data objects of the model are compiled) and then you save it.
(C) SAP AG
SCM612
15
5.16
Activate Integration Model for Initial Data Transfer
R/3
Integration model
PC
Name
MD
Active/Inact.
"Activate"
PC
Material
m aster AA
Material
Materialmmaster
aster B
Material m aster A
APOCLNT800 MD
10:00:00
Start
APO
Master data
in APO
Material
m
A
Material
master
aster
Product
B A
Product A
SAP AG 2002
To transfer data into APO, you must activate an integration model that has previously been
generated. You activate an integration model with the transaction Activate integration model
(transaction code CFM2) in the CIF.
You can have several integration models active at a time.
Choose the Start function to trigger the data transfer into APO. The master data, or the equivalent of
the R/3 master data will exist in the APO System when the run completes.
(C) SAP AG
SCM612
16
5.17
Transfer New APO-Relevant Master Data (1)
R/3
Name
New
Material m aster Q
X0
PC
Material m aster
...
Active/Inact.
PC
APOCLNT800 MD
11:00:00
PC
APOCLNT800 MD
10:00:00
Start
APO
Save
"Activate"
X0
MRP type
Difference i s transferred
Product Q
SAP AG 2002
New APO-relevant master data (in the example on the slide above, a new material with MRP type
X0), that corresponds with the selection criteria of an existing integration model (in the example,
materials with the MRP type X0 are selected in the integration model), can be transferred into APO.
The system regenerates the existing model (the new master data is also selected here) and then
activates it. Two models with the same name are then active, the only differences being the dates and
times. If the data transfer starts in this situation, the system simply transfers the difference data. The
system compares the existing, active integration models with the new model. After the data transfer,
the system deactivates the old integration model, leaving the new complete integration model as the
active model.
If you want the system to retransfer all the master data of an existing integration model, you must
deactivate the old models and activate only the new one. A comparison of all active models then
takes place. As in this case, the model with the old time is not active, all data is transferred again.
If you have activated model one with the material masters A and B, and activate a model two in the
second step with material masters B and C, then when you activate model two, only material C will
be transferred. Then when you deactivate model one, the integration for material B remains.
To ensure that the system has transferred all the APO-relevant master data, periodically regenerate
and activate the existing integration models.
(C) SAP AG
SCM612
17
5.18
Transfer New APO-Relevant Master Data (2)
...
JOB_1
PC
MD
Variant
PC_MAT
Execute
Step 1
Save
RIMODGEN report
Alternative:
JOB_1_AND_2
Activate integration model
Name
PC
MD
JOB_2
Variant
PC_MAT
Active/Inact.
Step 2
Start
RIMODAC2 report
SAP AG 2002
Defining jobs enables the system to regenerate and then activate the integration models in regular
intervals, as the R/3 System is constantly creating new APO-relevant master data.
The system generates an integration model with the RIMODGEN report. You schedule this report by
entering a variant (that you must have defined previously) as a job.
The system activates an integration model via the RIMODAC2 report. You need a variant for this
report too, in order to schedule it in a job.
Executing an integration model consists of the generation and activation of an integration model.
You can schedule these two steps with a job, where you define the two activities as two consecutive
steps. For this procedure, you also need the relevant variants for both steps.
(C) SAP AG
SCM612
18
5.19
Incremental Data Transfer of Master Data (1)
PC
Applicat. MD
Material m aster
...
Relevant m aterials
Material
Plant
1000
MRP type
X0
...
Material A
Material B
Material C
...
Materials (generally:
Master data) are
APO-relevant
APOCLNT800
MD
SAP AG 2002
Any changes you make to the master data in the R/3 System that are also APO-relevant must be
transferred into the APO System. The system does not usually carry out a new initial data transfer,
but just transfers the individual changes to the master data. In the same way, the system also transfers
a deletion flag for a material into APO.
An incremental data transfer assumes that an active integration model is available for the relevant
materials, and that the materials are APO-relevant.
With the transfer of master data changes, remember that the system will transfer the complete data
record. For example, if you change a field in the material master, the entire material master will be
retransferred within the incremental data transfer.
(C) SAP AG
SCM612
19
5.20
Incremental Data Transfer of Master Data (2)
Master data
change
Material master A
Change pointer
Matls. planning
MRP type
X0
Plan.del.time 10 days
Customizing
11 days
Variant
DELTA_MD
APO
...
Changed master
data in APO
Incremental
data transfer
Execute
Product A
Plan.del.time 11 days
SAP AG 2002
The R/3 System is the dominant master data system. As a rule, the system performs changes to the
master data in the R/3 System and transfers them from there into the APO System. With master data
changes, it is not necessary for the system to totally retransfer all the master data as an initial data
transfer. Instead, the system can transfer just the changed master data.
For an incremental data transfer, set in Customizing ALE change pointers that are written for master
data changes. First, you activate the change pointers (Activate change pointer in Customizing in
ALE, transaction BD61), before you determine (in Customizing, Change pointer per message type,
transaction BD50) which master data objects should have change pointers. (CIFMAT message type
for material masters, CIFVEN for vendors, CIFCUS for customers, and CIFSRC for info records)
If you use transaction CFC5, the settings for the message types CIFMAT, CIFVEN, and CIFCUS are
automatically set.
The process of incremental data transfer reverts to the ALE change pointer. This change pointer
selects the master data for the system to retransfer. When you call up the transaction Incremental
data transfer of master data (CFP1), specify the the logical target systems and the master data
objects (material masters, vendors, sources of supply, and customers), that have changes to be
transferred.
You can save your settings for the incremental data transfer as variants, and, if necessary, use these
variants for the periodic scheduling of incremental data transfer as a job (RCPTRAN4 report).
(C) SAP AG
SCM612
20
5.21
Real-Time Transfer of Master Data Changes
Configuration procedure for transfer of master data changes
APO
Transaction CFC5
Material master
Business Transaction Event, immed.
ALE change pointer, periodic
No incremental data transfer
Customers
Business Transaction Event, immed.
ALE change pointer, periodic
No incremental data transfer
Vendors
The system can transfer changes to APO-relevant master data (data contained in an active integration
model) the material master, customer, and vendor in real-time (directly when updating a data change
in the R/3 System) into the APO System.
Access the settings for this function with transaction CFC5. In real-time transfer, the system transfers
the complete data record that has been changed directly to the APO System (for numerous changes
there are corresponding repercussions on the system performance). In the periodic transfer, the
system collects and transfers the master data changes into the APO System, within a normal
incremental data transfer. The incremental data transfer can finally be deactivated.
You can control the incremental data transfer of master data with transaction CFC5. If the
incremental data transfer is set to Business Transaction Event, immediately, the processing takes
place without using change pointers. If the incremental data transfer is set periodically, the change
pointers are automatically activated.
(C) SAP AG
SCM612
21
5.22
Transfer Master Data Changes Periodically
...
Schedule periodically
Variant
DELTA_MD
JOB_DELTA
Execute
RCPTRAN4 report
APO
SAP AG 2002
This gives you the chance to periodically schedule the transfer of master data changes as a job.
Define a variant (containing the target system and the selection of master data objects) for the
RCPTRAN4 report (hidden behind transaction CFP1), and define the job.
(C) SAP AG
SCM612
22
5.23
Integration Model: Other Functions
Consistency check
You can check the consistency of the selected data
in the integration model
SAP AG 2002
Deactivate integration model: For example, relevant sales orders created in the R/3 Systemare no
longer transmitted to APO after you deactivate the integration model for movement data (that
contains sales and planned orders). Planned orders that are created in APO after deactivation of the
integration model are not transmitted to APO either. After you deactivate the integration model for
master data, no data changes are transmitted.
Delete integration model: Deleting an integration model does not mean that the previously selected
data in APO is also deleted. Note: For master data contained within an active integration model for
which you have set a deletion flag in the R/3 System, the deletion flag is transmitted to APO using
initial data transfer).
(C) SAP AG
SCM612
23
5.24
APO Integration and Master Data : Summary
(C) SAP AG
SCM612
24
5.25Exercises
Unit: APO Integration and Master Data
Topic: APO Integration
At the conclusion of these exercises, you will be able to:
Before you familiarize yourself with the functions of the CIF interace,
review the RFC connection that connects the R/3 System with the APO
System.
1-1
During the exercises, an R/3 System is linked to an APO System. Linking these
systems is based on a RFC connection that connects two logical systems.
1-1-1 With which R/3 client are you working? _________________
1-1-2 View in R/3 Customizing the logical system name assigned to your client.
Note the logical name of the R/3 System: ________________
1-1-3 With which APO client are you working with? ________________
1-1-4 View in Customizing of the APO System the logical system name assigned
to your client.
Note the logical names of the APO System: _________________
1-2
In the next step, view the RFC connection between the two systems.
1-2-1 In the R/3 System, display the RFC connection to the APO System. This
connection contains the name of the logical APO System that you noted
above. Which user name is used for logon to the APO System?
______________________________________
1-2-2 In the APO System, display the RFC connection to the R/3 System. This
connection contains the name of the logical R/3 System that you noted
above. Which user name is used for logon to the R/3 System?
______________________________________
(C) SAP AG
SCM612
25
Exercises
Unit: APO Integration and Master Data
Topic: Master Data
At the conclusion of these exercises, you will be able to:
Prepare R/3 material masters for planning in APO
Create a simple integration model for an initial data transfer and
execute the transfer.
The pump T-F1## should be planned in APO. Therefore, you first prepare
the material master in the R/3 for planning in APO, and then create an
integration model to transfer into APO.
2-1
The material T-F1## should be planned in APO. A materials planning in the R/3
System is controlled by the MRP type that you enter in the material master. If a
material is not to be planned in the R/3 System, it must have the corresponding
MRP type.
2-1-1 Display the X0 MRP type in the R/3 Customizing. Which MRP procedure
is entered in this MRP type?
_________________________________________
2-1-2 What effect is the effect of this MRP procedure?
_________________________________________
2-1-3 Which planning method is entered in this MRP type (in Additional selection
parameters)?
_________________________________________
2-2
(C) SAP AG
SCM612
26
2-3
MAT T-F1##
Select Data Type material masters then scroll down to Relevant Materials
area and enter T-F1## and Plant 1000 to be included in the integration
model.
Do not execute the integration model yet!
2-4
2-5
Check the result of the material master transfers in APO. In the APO System,
display the product T-F1## in location 1000.
2-5-1 What is the name of product T-F1##?
______________________________________________
2-5-2 Look at the Administration tab page. Which user created the product
master?
____________________
Where does this user come from?
____________________________________________________
2-5-3 Go to the Procurement tab page. Which procurement type is set?
____________________________________________________
(C) SAP AG
SCM612
27
5.26Solutions
Unit: APO Integration and Master Data
Topic: APO Integration
1-1
(C) SAP AG
SCM612
28
1-2
USERADMIN
USERADMIN
(C) SAP AG
SCM612
29
Solutions
Unit: APO Integration and Master Data
Topic: APO Master Data
2-1
2-2
2-3
2-3-1 Menu path in the R/3 System:
Logistics Central Functions Supply Chain Planning Interface
Core Interface Advanced Planner and Optimizer Integration Model
Generate Create
2-3-2 Save as a variant: Enter the variant name in the integration model under
Goto Variant Save as variant and then Save.
2-3-3 Choose Execute. On the resulting screen, double-click on the word Material
that appears under the Filter Object heading. Verify that your material has
been selected in the model.
Choose Save. You should get a message confirming that the Integration
Model was generated.
(C) SAP AG
SCM612
30
2-4
2-5
Menu path in the APO System: Master Data Product, enter product T-F1##,
select Location view and enter location 1000, then press the Display button
2-5-1 Name of product: The name is Pump PRECISION 100 (transferred from
the R/3 System).
2-5-2 User who created the product master: The product master was created by
user USERADMIN.
Origin of this user: The product master was transferred via the CIF interface
that is based on a RFC connection between the R/3 and the APO System.
The user USERADMIN is defined in this RFC connection the CIF
interface uses this user to logon to the APO System.
2-5-3 Procurement type: Procurement type E (In-house production) is set.
(C) SAP AG
SCM612
31
6
APO TP/VS Master Data
Contents:
APO TP/VS-related Master Data
Re sult of transfer of R/3 Ma ster Data into APO
Supplementing APO Master Data
SAP AG 2002
(C) SAP AG
SCM612
6.2
APO TP/VS Master Data: Unit Objectives
SAP AG 2002
(C) SAP AG
SCM612
6.3
APO TP/VS Master Data: Business Scenario
SAP AG 2002
(C) SAP AG
SCM612
6.4
Vehicle Scheduling Process Flow (1)
Configuration
Master Data
Modeling
Optimization
(Load Consolidation &
Vehicle Schedul ing)
Create/Transfer
Shipments
Backorder Processing
Create/Transfer
Deliveries
Carrier Selection
Carrier Tendering
Release Shipments
SAP AG 2002
(C) SAP AG
SCM612
6.5
Master Data: Overview (1)
APO
R/3
Location
Customer
Vendor/Carrier
Material master
Product
Transportation Zones
Location
SAP AG 2002
The system transfers the R/3 master data objects plant, customer, and vendor into APO as locations
with different location types.
The system also transfers classes and characteristics from the R/3 into the APO System.
(C) SAP AG
SCM612
6.6
Location Types
APO
R/3
Locations with
CIF
location type
Plant
Distribution center
MRP area
Customer
Transportation zone
1010 Customer
Vendor
1011 Supplier
1020
Carrier
When master data is transferred to APO, the corresponding Location Type is assigned to each master
record.
The transportation zone in the Customer Master record updates the APO transportation zone table, if
an entry does not already exist in the table for the transportation zone.
The R/3 Vendor Master does not contain a transportation zone; therefore, the transportation zones
used with Suppliers/Carriers must be set up manually in the APO Transportation Zone table.
(C) SAP AG
SCM612
6.7
Location Type: Plant
Plant
1000
Location
1000
Name
Loc.type
1001
Production plant
Street
Alsterstr. 13
Town
22222 Hamburg
General
APO
Address
Street
Alsterstr. 13
Town
22222 Hamburg
Time zone
CET
Region 02
Language
Germ an
Ham burg
Time zone
CET
Language
Germ an
SAP AG 2002
The system transfers a plant into the APO System as a location with location type 1001 (production
plant). The system also copies these basic settings for the plant: description, address data, time zone,
and regional assignment.
(C) SAP AG
SCM612
6.8
Additional Data in APO Location
APO
1000
Loc.type
General
Address
TP/VS
...
DE
EN
Street Alsterstr. 13
Town 22222 Hamburg
Country DE Germ any
Region
APO-specific planning
parameters
02 Ham burg
Time zone
CET
Language
Germ an
SAP AG 2002
For APO locations, you can maintain the short text in several languages (in contrast with the plant in
R/3, for example), so that after logon in a certain language, this language appears.
As a rule, APO locations contain many additional planning parameters that have no equivalents in
the R/3 System. You can then maintain these parameters in APO. The system cannot transfer them
from the R/3 System.
Enhanced For Transportation Specific Data:
Address/Postal Code Information
Reference Tables for Specifying Compatible/Incompatible Transportation Resources
Lead-Time Buffers (Picking/Packing, Document Creation, and so on)
Loading/Unloading Resources for Inbound/Outbound Shipping
Location Availability/Dock Hours
Transportation Zone Relationship
In order to get distance and time proposals, you should maintain the coordinates of a location.
The TP/VS tab specifies for each location:
If the transportation types must match (incompatible/compatible transportation type)
If a load is for one customer only, or if another customer order can be included in the load
Time needed for commission
Time needed to prepare the transportation
First or last point to be delivered
For capacity restrictions under Resources tab, define the resources used for loading and unloading a
vehicle, or the opening hours of the resource of this location, or whether no resources are needed for
loading and unloading.
(C) SAP AG
SCM612
6.9
Location Type: Distribution Center
2400
DC Milano
DC Milano
Loc.type 1002
Distribution center
General
Street
Via Castaldi 1
Town
20100 Milano
Country IT Italy
...
APO
Address
Street
Via Castaldi 1
Town
20100 Milano
Country IT Italy
...
Definition as DC
Customizing: DRP
Plant Node type Name
1000
Ham burg plant
2400
DC
DC Milano
SAP AG 2002
As of Release 4.0, the R/3 System can define plants as distribution centers, within the frames of the
DRP functionality (DRP: Distribution Resource Planning) in the R/3 System. For this, you use the
corresponding entry in the Customizing table (Customizing step Assign Node Type - Maintain Plant
in the settings of DRP Customizing).
When you transfer plants into APO that are defined in the R/3 System as distribution centers, the
system transfers them to location type 1002 (distribution center). The transfer of the individual R/3
plant settings (in R/3, a DC is a plant) takes place in exactly the same way as it does for production
plants.
(C) SAP AG
SCM612
6.10
Location Type: Customer
APO
Customer 1000
Location
1000
Becker Berlin
Name
Loc.type
1010
Customer
Becker Berlin
Street
Calvinstr. 36
Town
13467 Berlin
General
Address
Street
Calvinstr. 36
Town
13467 Berlin
Region
11
Berlin
Language
Germ an
Time zone
CET
Control data
Transportation zone
D10000
Berlin region
Region
11
Language
Berlin
Germ an
Transport.zone
SAP AG 2002
The system transfers customers from the R/3 System as locations with type 1010 (customer).
The system creates sales orders in the R/3 System and transfers them as transaction data into APO.
When the system transfers a customer master from the R/3 into APO, the actual customer location is
transferred, as is the transportation zone that is assigned to a customer in the R/3 System, as location
type 1005 (transportation zone). You then enter the missing data for use with this transportation zone
in the APO planning. You also need a transportation relevant hierarchy.
You can maintain the hierarchy in two ways:
Implement it manually in APO by attaching the relevant locations in the APO system to the
hierarchy
Assign the customers in the R/3 System to a transportation zone and transfer the customers to APO.
The transportation zones are then created automatically in APO and the corresponding hierarchy
entries are created.
(C) SAP AG
SCM612
10
6.11
Location Type: Vendor/Carrier/Service Provider
APO
Vendor
L1000
Location
Name
C.E.B. Berlin
Loc.type
1011
Street
Kolpingstr. 1
Town
12001 Berlin
General
Vendor
Address
Street
Kolpingstr. 1
Town
12001 Berlin
Region
11
Language
Berlin
Germ an
Region
11
Language
Berlin
Germ an
SAP AG 2002
The system transfers vendors from the R/3 System as locations with type 1011 (vendor).
Note: If the vendor and the customer have the same number in the R/3 System (for example,
customer and vendor 1000), then you must rename one of them in the APO inbox, using the
customer exit for the vendor master (for example, rename the vendor in S1000). Otherwise, you
cannot distinguish between the two locations.
The vendor must be known in APO in order for the vendor selection to take place in APO.
In the R/3 System, you must specify which account groups from the R/3 vendor master becomes the
carrier in the APO System.
To do this, choose the CIFVENTYPE table in the data browser (transaction SE16) and confirm
with Enter. Branch to the corresponding selection screen.
You can use the input help to choose an account group for the R/3 System and a location type for
the APO System so that data can be transferred between these two systems.
Account group 0005 (carrier) appears as a fixed value, however, you can define other account groups
in R/3 Customizing. For the location type on the APO side, the carrier (1020) or supplier (1011)
appear.
(C) SAP AG
SCM612
11
6.12
External Procurement Relationship
APO
General Data
Info rec.
Vendor
known
R3CLNT800 Source loc. L1000
in
APO?
53004711 Product
R-1150
Info rec.
53004711
Vendor
L1000
Material
R-1150
Target loc.
1000
Plant
1000
Valid from
01.01.2000
to
Settings
Plan.del.time
31.12.9999
Plan.del.time 12 days
31.12.9999
12 days
Transportation lanes
Valid 01. 01.2000 to 31.12. 9999
SAP AG 2002
The system can transfer a purchasing info record from the R/3 into APO as an external procurement
relationship. You should be aware that the source location (that corresponds with the vendor in the
purchasing info record) must be recognized in APO in order for a successful data transfer to take
place. If necessary, the system will transfer the vendor beforehand.
The system transfers the purchasing price from the purchasing info record into the external
procurement relationship (scale prices, too).
(C) SAP AG
SCM612
12
6.13
Master Data: Overview (2)
APO
R/3
Location
Customer
Vendor
Material master
Product
Resource
Transportation Zones
Location
SAP AG 2002
The system will transfer the R/3 material master into the APO System as a product master.
(C) SAP AG
SCM612
13
6.14
Product Master in APO
Demand
Attributes
Lot size
Units of measure
Classification
SNP2
Material
SNP1
PP/DS
Procurement
ATP
GR/GI
SAP AG 2002
The product master in APO is divided into different views according to topic. The header data (tab
pages characteristics, units of measure,and classification) is general and valid for more than one
location.
You can specify the planning of a product in APO according to the location. Locations can come
from plant type or MRP area (according to the R/3 storage location MRP areas).
Many of the fields for the product are automatically filled when the system transfers a material
master from the R/3 System. To guarantee the consistency of the data in the R/3 and APO Systems,
only maintain these fields in the R/3 System. The system then only changes the data during a transfer
(from the R/3) of the master data changes.
You can define the length of the APO product master number in APO Customizing (process step:
Determine Output Display Of Product Number). As is standard in R/3, an 18 digit product number is
used.
(C) SAP AG
SCM612
14
6.15
Product Master Data
Attributes
Units of measure
Classification
Administration
* Global Data
Procurement
Views
Extra
Location Data
Views
SNP 2
SNP 1
PP/DS
Demand
GR/GI
Lot Size
ATP
Transportation Group =
SAP AG 2002
The Transportation Group is entered in the General Data section under the Attributes tab.
The Loading Group is a key that identifies the equipment required to load the goods. For example, a
crane or fork lift truck. The Loading Group is entered in the Shipping Section under the GR/GI tab.
(C) SAP AG
SCM612
15
6.16
General Data
R/3
APO
Product A
Simple selection
in the integration
model
Mat A
X0
MRP type
X0
MRP procedure
Without materials
planning,w ith BOM
explosion
Attributes
Material group
001
Transportation grp
0001
Gross weight
280 KG
Volume
0,75 M3
Units of measure
1 pc
equals
1 pc
1 pal
equals
10 pc
Classification
Regarding classes and
characteristics that must exist
in APO
SAP AG 2002
The system transfers the following general data from the R/3 System material master into the APO
product: Material group (Basic data 1), transportation group (Sales and Distribution: gen./Plant),
gross weight and volume (Basic data 1), units of measure (Additional data), and classification data
(Classification). Note that, for classification data, the system transfers the classes and characteristics
into APO beforehand.
Materials that the system transfers into APO must be part of the integration model. The selection of
APO-relevant materials can usually be easily defined by the use of MRP type X0. In the integration
model Create screen this field is labeled MRP characteristic.
Materials can also be selected by any combination of the following fields: Material Number, Plant,
Material Type, MRP Controller, ABC Indicator, and Plant-specific Material Status.
(C) SAP AG
SCM612
16
6.17
Maintaining Additional Product Master Fields in APO
SAP AG 2002
Use mass maintenance to subsequently maintain product master records that you have copied from
R/3 (call from the initial screen in product master maintenance). In mass maintenance, for example,
you can maintain fields that are not transferred from R/3, because these fields do not exist.
Alternative solution using modification: You can extend the R/3 material master using customerspecific fields (Append structures, see SAP note 44410).
You can also enhance the R/3 material master, to maintain the settings for functions that do not exist
in R/3 in the R/3 material master. For the CIF transfer for these fields, you need to note that you need
to enhance CIF in the R/3 outbox and the APO inbox to define that these fields are transferred
(customer exits for material masters).
(C) SAP AG
SCM612
17
6.18
Resources
Transport (T)
Calendar
SAP AG 2002
Transportation planning relevant resources are Transport (T), Vehicle Resource (T), Calendar, and
Handling Resource (H).
Transport resources are only used by SNP.
The resource category (T, H) determines the usage of a resource. They are for descriptive purposes
only and do not play a role in planning.
TP/VS resources are created manually.
(C) SAP AG
SCM612
18
6.19
Transportation Planning Resources
Single or multi-resource s
Vehicle resource s
Calendar
Specification of working da ys
SAP AG 2002
(C) SAP AG
SCM612
19
6.20
Single Resource Example
Single or multi-resource s
SAP AG 2002
A single resource upon which only one activity can be executed at a time has a dimension-free
capacity of one. For single resources the capacity value is fixed in the system. A single resource can
have only two different situations; either it is loaded with an activity or it is not loaded at all.
Multi resources are used to map resources on which several activities can be carried out at a time.
The maximum number of activities that can be scheduled at the same time depends on the
organizational or technical conditions for the resource.
Path: SAP menuMaster DataResource
A Handling Resource (Resource Type H) is an example of a single or multi-resource that is used in
TP/VS.
Loading and unloading equipment such as fork-lifts are examples of this type of resource.
Capacities in the form of available working hours including downtimes are specified for the handling
resource.
(C) SAP AG
SCM612
20
6.21
Vehicle Resource Example)
Vehicle resource s
SAP AG 2002
you
do need to maintain limited availability, you can do so by means of shift sequences.
Key Consideration:
During Optimization, resources are considered according to Type/Method and Independent
of a Carrier
Solution for Aligning with Carrier Capabilities and Geographical Coverage
For Identical Resources, Create Multiple Vehicle Types/Methods in accordance with Carriers
(C) SAP AG
SCM612
21
6.22
Transport Method
Transport Method
Created in IMG
SAP AG 2002
Path: IMG Advanced Planner and Optimizer (APO) Supply Chain Engineer (SCE) Maintain
Transport Method
The first column (labeled Vehicle), is also called the Transportation Method. The transportation
method describes the vehicle used for shipments between locations.
If you set the flag Own means of transport the following applies to vehicles of the means of transport
in the optimization :
You start at the beginning of the optimization run with the last location
On completion of the route planned by the optimizer, you must return to the depot location
provided that a depot location is maintained (resource master data).
In particular there must be a transport link from the last unloading location back to the depot.
Otherwise, the optimizer cannot carry out these return journeys, and no transport is generated.
The entire vehicle route generated by the optimizer generates a single transport.
Example: you want to transport two orders from A to B using one vehicle; every order fills the
vehicle. The vehicle is assigned to the depot location A. The optimizer plans a route A-B AB A. The transport includes the sections A-B A-B. With a third-party means of transport you
would get two transports, A-B in each case.
(C) SAP AG
SCM612
22
6.23
Transportation Lane
Distr.Center
Transportation Lanes
Customer
Plant
Customer
SAP AG 2002
A transportation lane represents a direct route between two locations that can be used to source and
transport products. Each lane is defined by its source and target locations, depending on the
direction and its assigned products to be transported along the lane. Each lane is also assigned
available transportation methods.
Transportation lanes can be maintained individually or in groups. Mass maintenance of
transportation lanes facilitate the generation and maintenance of large quantities of transportation
supply chain data.
The supply chain network is represented by the locations and their connected transportation lanes.
Considered part of APO master data, transportation lanes usually remain unchanged over an
extended period of time.
The following APO components make use of transportation lanes:
Supply Network Planning
Network Design
Production Planning
TP/VS
(C) SAP AG
SCM612
23
6.24
Transportation Lanes
Information A ssigned to a Lane:
Source and target location
Product procurement
Validity
Date from
Date to
Carriers
Location
Transportation costs
Share of business
Priority
SAP AG 2002
(C) SAP AG
SCM612
24
6.25
Transportation Lanes
Transportation Method
Validity
Date from
Date to
Parameters used in VS
SAP AG 2002
Controls:
Check the box for Det. Planning is ON
If you want to use SNP, check Aggr. Planning
Discrete transportation method is used in SNP
The system proposes time and distance of transportation based on the coordinates of the locations.
You can maintain real data and set the flag for Fixed Transport Duration and Fixed Transport
Distance.
(C) SAP AG
SCM612
25
6.26
TP/VS Supply Chain Modeling - Hierarchies
Outbound
Transportation
Zone
Hierarchies
Replenishment
Inbound
SAP AG 2002
(C) SAP AG
SCM612
26
6.27
Distance/Duration Calculation
Runtime Lane Distance 104
Runtime Lane Geo Distance 80
Distance Calculation
Runtime Geo Distance 80 X
Duration Calculation
Distance / Average Speed Per Unit
SAP AG 2002
TP/VS will compute the runtime lanes during optimization. Corresponding transportation lanes are
generated between all locations assigned to the transportation zones. In the process, the cost
information is taken from the transportation lanes maintained. The distance/duration is calculated
according to the settings or taken from the transportation lane maintained.
The maintained distance in the Master Lane includes a factor for road/street map variability. The
Factor is obtained from the Maintain Transport Method table in Customizing. This factor
establishes the proportion between the linear distance between two locations and the actual distance
covered by the vehicle transporting goods between them.
Included in the Maintain Transport Method table is the Average Speed of the transport method.
The Runtime distance is divided by the average speed to calculate the estimated Duration.
(C) SAP AG
SCM612
27
6.28
Transportation Zone (Location) Hierarchy
To set up a hierarchy:
Create a hierarchy in Customizing
Specify these hierarchies in the TP/VSBasic Settings Maintain Transportation-Relevant
Hierarchy table in Customizing of APO.
Define the hierarchy application-wise in master data (get the transportation zone via CIF from R/3)
Assign the hierarchy to the active model in SCE if not from CIF. To see it in SCE, set the Display
hierarchies option in the SCE User-specific settings at menu path: SAP MenuMaster
DataSupply Chain EngineerMake Settings.
Note: A Circular relationship must be set up for creating intra-zone connections. To do this, create a
transportation lane with the source and target locations as the same transportation zone (= Intra-zone
Lane).
(C) SAP AG
SCM612
28
6.29
Carrier Structure Hierarchy
SAP AG 2002
TP/VS offers a trans-shipment function in conjunction with shipping using multiple modes of
transportation or the transfer of orders between vehicles. Trans-shipments are shipments for which
one or several orders must be transferred from one vehicle to another at some stage between the
start and destination locations of the order(s). This may involve vehicles of different types with
different modes.
Shipments of this kind can only be generated using the Optimizer. It is not possible to create them
manually using interactive planning.
The following data must be maintained so that the Optimizer can generate the shipments required:
Create a two-level location hierarchy structure in Customizing
In Customizing, enter this structure as the hierarchy structure for the transportation service
provider (transshipment structure). For this, choose TP/VS Basic Settings Maintain
Transportation-Relevant Hierarchy
Create a hierarchy for this structure
Assign the hierarchy to model 000
Maintain the hierarchy
(C) SAP AG
SCM612
29
6.30
Hierarchy: Example 1
Plant
DC
Customers
SAP AG 2002
Hierarchies can be maintained and displayed at: SAP Menu: Master Data Hierarchy
In this scenario, the DC represents a load transfer/consolidation point or cross-docking location.
For example, several orders are transported from a plant by truck to a DC and then they are
distributed to several customers using smaller trucks.
(C) SAP AG
SCM612
30
6.31
Hierarchy: Example 2
Rail
Truck
DC1
DC2
Plant
Truck
Customer
SAP AG 2002
In this example, a customer shipment is made using multiple modes of transportation, Truck and
Rail. The DCs represent load transfer points, such as rail yards and ports.
Between a plant/DC and a customer (Outbound shipments) or Vendor and Plant/DC (Inbound
shipments) there cannot be more than two stock transfer points.
If stock transfer points are used, there can be one alternative direct lane between a plant/DC and
customer for outbound shipments or vendor and plant/DC for inbound shipments. Which lane is
chosen depends on the maintained costs per lane.
A transfer transport generated by the optimizer can be edited manually. The times can be changed
and orders can be taken from the transport. It is not possible to add orders to the transport manually.
(C) SAP AG
SCM612
31
6.32
Example: Roundtrip outbound from one location
vehicles trip
source-destination
Depot
(as a warehouse)
Deliver
One source,
multiple destinations
Pickup
SAP AG 2002
(C) SAP AG
SCM612
32
6.33
Example: Round trip inbound into one location
vehicles trip
source-destination
Depot
(as a warehouse)
Deliver
Pickup
One destination,
multiple sources
SAP AG 2002
(C) SAP AG
SCM612
33
6.34
Example: Mixed round trip to and from one
location
Note:
You can create mixed
inbound and outbound in
APO, but R/3 can not process
these shipments
vehicles trip
source-destination
-
Depot
(as a warehouse)
Deliver
Pickup
SAP AG 2002
(C) SAP AG
SCM612
34
6.35
Example: Multi stop - no return
vehicles trip
source-destination
Depot
(as a warehouse)
Deliver
Pickup
SAP AG 2002
(C) SAP AG
SCM612
35
6.36
Example: Scheduled vehicles
Note:
arrival time =
departure time
2:00 pm
07:00 pm
1:00 pm
06:00 pm
3:00 am
08:00 pm
5:00 am
10:00 pm
station
Opening hours of
locations are not
considered when using
scheduled resources
vehicles trip
10:00 am
03:00 pm
source-destination
-destination
Depot
(as a warehouse)
8:00 am
01:00 pm
Deliver
Pickup
SAP AG 2002
(C) SAP AG
SCM612
36
6.37
Note: More complex problems ...can be solved by
decomposing the transport network
... can be solved by decomposing the transport network
Assignments:
S1 - IDC
Assignment:
IDC - ODC
S2 - IDC
C1
S2
C2
IDC
ODC
C3
S4
Supplier
ODC - C2
S1
S3
Decompose:
Assignments:
ODC - C1
C4
Inbound
DC
Outbound
DC
Customer
Note:
This onl y wor ks if the ship from
and ship to addresses are
changed appropriatel y
SAP AG 2002
(C) SAP AG
SCM612
37
6.38
APO TP/VS Master Data: Unit Summary
SAP AG 2002
(C) SAP AG
SCM612
38
6.39Exercises
Unit: APO TP/VS master Data
Topic: Master Data Integration Model
At the conclusion of this exercise, you will be able to:
Create, generate, and activate an integration model, GR##, in R/3 to transfer the
following master and organizational data to the target APO system:
Material masters
Plants
Customers
Vendors
Transportation Planning Point
(C) SAP AG
SCM612
39
Data to Select
T-ATC1-##
T-ATD2-##
T-ATD3-##
T-S11A##
T-S22A##
T-S33A##
T-S11B##
T-S11C##
T-S090##
T-S200##
T-S100##
T-S11F##
T-S11H##
Shipments*
TPPt: AP##
(C) SAP AG
SCM612
40
1-2
In the APO system, using the master data displays, verify that the following master
data was transferred:
Location Master Data:
T-S11A##: What is the Transportation Zone:
_______________________________
T-S11C##: What is the Transportation Zone:
_______________________________
T-S11F##:
_______________________________
Product Master Data:
T-ATC1-##:
What is the Transportation Group? _________
What is the Gross Wgt?: _________________
What is the Volume?: ___________________
T-ATD2-##:
What is the Transportation Group? _________
What is the Gross Wgt?: _________________
What is the Volume?: ___________________
1-3
Now that you have locations in APO master data, you will establish some
transportation lanes between your plant 10## and your Customers. The remaining
lanes will be created in a later unit. Create the lanes within Model 000. Set the
Product Procurement area to All Products. Put Group ## in the Header Description.
1-3-1 Create transportation lanes between Plant 10## and customers
T-S11A##, T-S22A##, T-S33A##, T-S11B## and T-S11C##. Remember,
you should also create a transportation lane going from the customer to the
plant/DC.
(C) SAP AG
SCM612
41
1-4
Check the settings for the transfer of master data from the R/3 System to APO using
transaction CFC5. Just document them. DO NOT CHANGE THEM.
1-4-1 Material Master:
___ Bus.Transaction Event, Immed.
___ ALE change pointer, periodic
___ No change transfer
1-4-2 Customers:
___ Bus.Transaction Event, Immed.
___ ALE change pointer, periodic
___ No change transfer
1-4-3 Vendors:
___ Bus.Transaction Event, Immed.
___ ALE change pointer, periodic
___ No change transfer.
(C) SAP AG
SCM612
42
6.40Solutions
Unit: APO TP/VS master Data
Topic: Master Data Integration Model
1-1
GR##
MD
SCM612
43
1-3
(C) SAP AG
SCM612
44
Enter today's date in the Start date field in the Validity box.
Enter '12/31/9999' in the End date field in the Validity box.
Choose Copy and Close.
Choose Save.
Perform these steps for all remaining combinations of the plant and
Customer locations in the list.
1-4
Document the setting for the transfer of master data from R/3 to APO:
R/3 SAP Standard Menu: Logistics Central Functions Supply Chain
Planning Interface Core Interface Advanced Planner and Optimizer
Settings CFC5 - Change transfer
1-4-1 ,2, and 3 Document the setting from the screen.
(C) SAP AG
SCM612
45
7
Models and Planning Versions
Contents:
Models and Planning Versions for Master Data and
Transaction Data
Maintaining Models via the Supply Chain Engineer
SAP AG 2002
(C) SAP AG
SCM612
7.2
Models and Planning Versions: Unit Objectives
SAP AG 2002
(C) SAP AG
SCM612
7.3
Models and Planning Versions: Business Scenario
SAP AG 2002
(C) SAP AG
SCM612
7.4
Models and Planning Versions
Master data
Non
Non-R/3
R/3 System
System
R/3
Simulation
model n
Simulation
model Z01
Active model 000
Locations
Resources Resources
Resources
Products
PPM
PPM
Planning
Planning vv ersion
ersion n+1
n+1
Version-depende
Version-dependent
nt master
master
data
data and
and transaction
transaction data
data
Transportation
lane
Activ
Activ ee planning
planning vv ersion
ersion 000
000
Version-depende
Version-dependent
nt master
master
data
data and
and transaction
transaction data
data
PPM
Planning
Planning vv ersion
ersion 11
Version-depende
Version-dependent
nt master
master
data
data and
and transaction
transaction data
data
Planning
Planning vv ersion
ersion nn
Version-depende
Version-dependent
nt master
master
data
data and
and transaction
transaction data
data
SAP AG 2002
The Supply Chain Model (abbreviated as model) represents the entire supply chain network, ranging
from suppliers over production and distribution sites up to the customer. It includes locations,
transportation lanes, products, resources, and Production Process Models (PPM). Thus, the model is
the basis for all planning functions in APO. It contains only master data and it is modeled in the
Supply Chain Engineer.
Master data from the R/3 System (or a non-R/3 System) is automatically assigned to the active APO
model (model 000) during the master data transfer to the APO System. The active model represents
the supply chain actually used in the enterprise. In this way, all master data transferred is
automatically available for operational planning in the APO model 000. Master data that you create
manually in APO must be explicitly assigned to one model.
If you want to plan another supply chain (for example, a different distribution center) in the
simulation, you can create an inactive model in APO. If you want to use certain master data in both
the active and inactive model, or in the inactive model alone, you must assign this master data to the
inactive model. You can either use the Supply Chain Engineer (SCE) as the modeling tool in APO or
a manual assignment from within master data maintenance (from the R/3-APO interface, master data
is automatically assigned to the active model only).
For simulation purposes, you can create several planning versions for a given supply chain model.
Note that only model 000 and planning version 000 are active. The planning version comprises
master data and transaction data. In an inactive planning version, you can, for example, simulate
increased planned independent requirements and plan production based on an increased demand.
You cannot transfer the planning results from the inactive planning version to the active version.
You must repeat the planning in the active planning version.
You can use version management to copy models and planning versions or create them manually.
Their names must be unique, which means that there cannot be two planning versions of the same
name in different models. The active planning version 000 only exists in model 000.
(C) SAP AG
SCM612
7.5
Models and Planning Versions for Locations and
Products
R/3
APO
Assignment
Activ
Activ ee planning
planning vv ersion
ersion 000
000
Create
master data
Locations
Products
Reference
Reference
Planning
Planning vv ersion
ersion 001
001
Locations
Products
SAP AG 2002
Planning
version-specific
fields may be
added
(only valid in
version 001)
Master data added
If locations and products are created in APO via the R/3-APO interface, they are automatically
created in the active planning version 000 and assigned to the active model 000.
If planning is simulated in an inactive planning version (for example, planning version 001), the
master data fields of the location and the product master of the active planning version 000 are read
(location and product in an inactive planning version thus refer to the active planning version 000).
If you want to use modified master data in simulated planning (for example, different MRP attributes
of a product), you can maintain certain fields specifically for the planning version in the location or
the product master in APO (manually or mass maintenance). During planning in planning version
001, these version-specific fields from planning version 001 are then read. For fields that are specific
to a planning version, and can be maintained as such, the system reads the fields from active
planning version 000 (reference) if no alternative settings have been made.
If you want to use certain locations and products in inactive models, you must manually assign these
locations and products to the inactive model required. You can do so from within master data
maintenance or via the Supply Chain Engineer. Within the inactive model, planning can be carried
out in one or several inactive planning versions.
(C) SAP AG
SCM612
7.6
Models and Planning Versions for Resources
R/3
APO
Capacity
Create
master data
Resource
Copy
Activ
Activ ee planning
planning vv ersion
ersion 000
000
Copy
Resource
Planning
Planning vv ersion
ersion 001
001
Resource
SAP AG 2002
Assignment
Independent
Independent of planning
vv ersion
ersion
Planning
version-specific
fields may be
added
(only valid in
version 001)
If resources are created in APO via the R/3-APO interface, they are automatically created in a
planning version-independent version 000 (planning version blank) and assigned to the active model
000. In addition, these planning version-independent resources are automatically copied into all
planning versions (active planning version 000 as well as all inactive planning versions) that exist in
this model during master data transfer. You are left with a planning version independent resource, an
active planning version resource, and inactive planning version resources.
When version management is used to create a new planning version at a later stage, all resources are
automatically copied to the new planning version (as a copy of the planning version-independent
resource) when the new version is created.
If planning is simulated in a certain planning version (for example, in the active planning version 000
or the inactive planning version 001), the resource master data fields in the relevant planning version
are read. If you want to use modified master data in the simulated planning (for example, different
operating times of resources in simulation), you can change the resources specifically for a planning
version in APO.
If you also want to use certain resources in inactive models, you must manually assign these
resources to the required inactive model. You can do so from within master data maintenance or via
the Supply Chain Engineer. When you assign the resource to the inactive model, the resource is
automatically created in all planning versions of the inactive model (copy of the planning versionindependent resources to the planning version-specific resources of the active model).
If you do not work in the active model and version (000) and you use TP/VS, only consolidation
is possible. Carrier Selection and Publication of Orders and Deliveries are not possible.
(C) SAP AG
SCM612
7.7
Supply Chain Engineer (SCE) as the Modeling Tool
for Models
Network structure
Work
area
folder
Planning
objects
Network map
SAP AG 2002
Maintain the supply chain network in the Supply Chain Engineer (SCE), by placing locations on
the map and create a network by adding transportation lanes. The lane direction shows the direction
of the product transportation flow.
The SCE enables you to look at the data that belongs to particular elements in your supply chain. In
addition, it allows you to maintain the model objects simultaneously. You can make queries about
information via individual or combined elements in your supply chain. For example, you can query a
list of all the products belonging to a specific location in your model. At the same time, you can add
products to this location or make changes in the location master.
(C) SAP AG
SCM612
7.8
Objects in the Supply Chain Engineer
Locations
Vendor
Plant
DC
Transportation
SAP AG 2002
The supply chain model also allows you to keep track of other supply chain elements, as well as
locations and transportation lanes. These include products, PPMs (production process models), and
resources.
You may have to assign or delete large numbers of objects in your model during supply chain
modeling. Many of these objects have dependent objects assigned to them. To guarantee consistency
within the model, you can automatically assign or delete the dependent objects, together with the
primary object. Automatic assignment guarantees not only consistency but also enables easier model
maintenance.
(C) SAP AG
SCM612
7.9
Work Areas in the Supply Chain Engineer
SAP AG 2002
If you have a lot of master data, viewing it in the network map in the Supply Chain Engineer can
become very confusing. To limit your view to only the master data you want to concentrate on,
define work areas. The work area is used exclusively as a filter for displaying objects in the
Engineer. You can maintain different work areas. This enables you to obtain manageable amounts of
data.
In the work area of the Supply Chain Engineer, you can select:
Locations (plant, distribution center, vendor, and customer)
Products
Resources
Production
Transportation Lanes
(C) SAP AG
SCM612
7.10
Models and Planning Versions: Unit Summary
SAP AG 2002
(C) SAP AG
SCM612
10
7.11Exercises
Unit: Models and Planning Versions
Topic: Supply Chain Engineer
At the conclusion of this exercise, you will be able to:
Create a new Work Area, GR##, for Model 000 for your supply chain network.
1-1-1 Add the following Plants to your work area:
10##
12##
22##
Hamburg Plant
Dresden Plant
Paris Plant
1-1-3 Using the Connect icon on the network map, create a transportation lane
between plant 12## and plant 22##.
1-1-4 Add your customers locations to the work area:
T-S11A##
T-S22A##
T-S33A##
T-S11B##
T-S11C##
(C) SAP AG
CompuMax GmbH
PILAR am Neckar
DELA Handelsgesellschaft mbH
PC-World Stuttgart KG
Riedel Computer OHG
SCM612
11
Sunny Sunny 01
Maxitec R 3200 Personal computer
Diskette Drive, 3.5", HD
(C) SAP AG
SCM612
12
7.12Solutions
Unit: Models and Planning Versions
Topic: Supply Chain Engineer
1-1
Create a new Work Area for Model 000 for your supply chain network:
APO SAP Menu Master Data Supply Chain Engineer /SAPAPO/SCE01 Maintain Model
1-1-1 Enter Model 000
Enter Work Area: GR##
Choose Change.
In the Location tab, right-click on the word Plant next to the plant icon.
Select Add objects to work area. The Select work area dialog box will
appear.
Enter the plants in the Internal char. value fields.
Choose Copy.
The plant icons representing your plants will appear on the map and will be
listed.
1-1-2 Right-click on the words Distribution Center next to the DC icon.
Select Add objects to work area. Select work area will appear.
Enter the distribution center, 25##,in the Internal char. value fields.
Choose Copy.
The plant icons representing your plants will appear on the map and will be
listed.
1-1-3 Create a transportation lane from plant 12## to plant 22## using the
Connect icon.
Select the Connect icon located in the toolbar above the map.
Put your cursor on the plant 12## icon and Drag&Drop a transportation lane
to plant 22##. When the left mouse button is released, the system will
display the transportation lane create screen.
Select the Header data button. When the header data General data box
appears, enter Group ## in the description field.
Choose Copy and close.
Select Create in the Product Procurement area.
When the Product Procurement box is displayed, select All Products and
enter today's date in the Start date field and 12/31/9999 (if your date format
is different, then use it) in the End date field.
Choose Copy and close.
(C) SAP AG
SCM612
13
(C) SAP AG
SCM612
14
1-1-7 Display the list of transportation lanes that exists in Model 000 by first
selecting the right arrowhead the the right of the tabs until the
Transportation lane tab comes into view.
Select the Transportation lane tab. The list of transportation lanes will
appear.
Find one of the transportation lanes in your network and double-click on it.
The system will take to the transportation lane change transaction.
Choose Back to return to the SCE.
1-1-8 Choose Save to save your work area.
(C) SAP AG
SCM612
15
8
Transfer of Transaction Data
Contents:
Transfer of Transaction Data between the R/3 and
APO Systems
Initial and Incremental Transaction Data Transfer
Integration Model for the Transfer of Transaction
Data
Publication of Delivery and Shipment data from the
APO to the R/3 System s
SAP AG 2002
(C) SAP AG
SCM612
8.2
Transfer of Transaction Data: Unit Objectives
SAP AG 2002
(C) SAP AG
SCM612
8.3
Transfer of Transaction Data: Business Scenario
SAP AG 2002
(C) SAP AG
SCM612
8.4
Transaction Data Interface: Core Interface (CIF)
APO
R/3
R/3 tran saction data
Purchase orders
Purchase requisitions
Sales orders
Planned orders
Planned ind.reqmts
Reservations
Stocks and so on
CIF
Integration
model
Orders
- Replenishment order
- Manufacturing order
- Procurement order
and so on
(distinction by
ATP category)
SAP AG 2002
The transaction data that is to be transferred into APO is specified in an integration model you define
in the R/3 System. The transaction data is mapped to orders in APO that differ by ATP category.
(C) SAP AG
SCM612
8.5
Transaction Data Objects of the CIF
APO
R/3
R/3 transaction data
Purchase orders
Initial data
transfer
Purchase requisitions
Sales orders
Planned orders
Planned ind.reqmts
Reservations
Stocks
...
Incremental
data transfer
Realtime
SAP AG 2002
The initial data transfer of transaction data is performed via the APO Core Interface (CIF). This is
usually automatically followed by the incremental data transfer between the R/3 and APO Systems
for transaction data objects that are members of an active integration model. New transaction data or
changes to existing transaction data are transferred automatically.
The APO transaction data objects are generally not identical to those of the R/3 System. The system
transfers various R/3 transaction data into APO as orders that differ by ATP category.
(C) SAP AG
SCM612
8.6
Initial Data Transfer of Transaction Data: Overview
Name
Target sys.
Sales orders
Production/process ord ers
Storage lo cation stock
...
SAP AG 2002
Define the integration model that controls the transfer of transaction data in the R/3 System. You can
find the menu option Core Interface Advanced Planner and Optimizer (the CIF menu) under
Logistics Central Functions Supply Chain Planning Interface.
The integration model distinguishes between master data and transaction data. Select the two types
of data in separate integration models and then transfer them separately.
Select the transaction data you want to transfer in the integration model. Specify the following in the
integration model:
You can delete integration models that you no longer need, but you must first deactivate them.
The system usually performs a continuous real-time incremental data transfer between the R/3
System and APO for any transaction data from the production planning that is contained in an active
integration model.
(C) SAP AG
SCM612
8.7
Integration Model for Transaction Data
Name + application = unique definition of integration model
Name
PC
Target sys.
APOCLNT800
Application
TD
APO
System
Sales orders
Production/process orders
Planned orders
Selection of
transaction data types
...
Sales orders
Material
Plant
1000
...
Execute
Save
SAP AG 2002
The transaction data transferred from the R/3 System to the APO System is defined in an integration
model. The R/3 System generates this integration model (transaction CFM1).
An integration model is uniquely defined by its name and application. It is useful to create several
integration models with the same name, but as different applications. Ensure that the data pools of
your integration models are generally not too big. This allows you to handle errors more easily.
The target system you specified in the integration model determines the APO System that the
transaction data is transferred into. The target system is a logical (APO) system that must have an
RFC connection. The APO System determines the (R/3) target system to be used for a retransfer
from APO to the R/3 System.
You use a particular integration model to specify which transaction data you want to transfer. To do
so, you first specify the transaction data types that are to be added to the integration model.
Secondly, you specify the selection criteria that will be used to select the individual documents in the
R/3 System.
You complete the generation of the integration model by executing the model (this means that the
data objects of the model are compiled) and then you save it.
(C) SAP AG
SCM612
8.8
Activate Integration Model for Transaction Data
R/3
Integration model
PC
Name
Material
m aster
AA
Material
asterB
Salesm
order
Sales order A
"Activate"
R/3
TD
Active/Inact.
Sales order B
PC
APOCLNT800
TD
Start
APO
Transaction data
in APO
10:00:00
automatic
Material
m aster
Material
asterA
Sales m
order
BA
Sales order A
Incremental
data transfer
Sales order A
SAP AG 2002
You must activate the integration model to transfer transaction data between R/3 and APO. You
activate an integration model with the transaction Activate integration model (transaction code
CFM2) in the CIF.
You can have several integration models active at a time.
Choose the Start function to trigger the initial data transfer. This means that the transaction data you
have selected is transferred into APO for the first time. This initial transfer is usually automatically
followed by the real-time link between the R/3 System and the APO System, concerning the selected
transaction data. This means that once a storage location stock of a selected material changes due to
a goods movement posting, the new stock is transferred into APO. In the same way, production
orders that are generated in APO are immediately transferred to the R/3 System.
(C) SAP AG
SCM612
8.9
Publication of Planning Results
APO
Planning results in
APO
For example
Delivery x
or
Which
R/3 System?
Collect the
changes
Online
transfer
R/3
Delivery x
R/3
Plant B
Plant A
SAP AG 2002
For TP/VS, there are three transactions that are used to process transfers of APO planned documents
to the R/3 System:
/SAPAPO/VS50 Transfer Orders to Delivery Generation
/SAPAPO/VS52 Check release of Planned Orders
/SAPAPO/VS51 Transmit planned Shipments to OLTP System
In the Basic settings (publication of planning results) operation in APO Customizing, specify for
each plant and publication type (for example, deliveries and transports (shipments) ), the R/3 System
in which you are going to publish your planning results (name of the logical system). You must
complete this table, even if you only operate one R/3 System.
The publication process can be performed in TP/VS after the shipments have been planned and
released.
(C) SAP AG
SCM612
8.10
Distribution Definition
SAP AG 2002
(C) SAP AG
SCM612
10
8.11
Transfer of Transaction Data: Unit Summary
SAP AG 2002
(C) SAP AG
SCM612
11
8.12Exercises
Unit: Transfer of Transaction Data
Topic: Integration Model for Transaction Data
At the conclusion of this exercise, you will be able to:
1. Create an Integration Model to transfer TP/VS-related
transaction data via the CIF to APO.
Transportation-relevant transactions from the R/3 System must be
transferred via the CIF to APO. In addition, inventory-relevant
stocks must also be transferred to APO if ATP checking is to be
performed in APO. You will create an integration model to
enable this transfer.
1-1
Create, generate, and activate an integration model GR## in R/3 to transfer the
following transaction and inventory-relevant stocks to the target APO system:
Sales Orders
Purchase Orders
Storage Location
Stocks in transit
1-1-1 Create the integration model: GR##.
Use TD as your Application code.
Restrict your transaction data (Sales orders, purchase orders, and stock
transports) selection to that data that belongs to your group number. Use the
data in the following table to restrict the selection of data to your supply
chain network.
(C) SAP AG
SCM612
12
Transaction Type
Data to
Select
T-ATC1-##
T-ATD2-##
T-ATD3-##
10##
12##
22##
25##
________________________________
Plant 12##
________________________________
Plant 22##
________________________________
Plant 25##
________________________________
(C) SAP AG
Plant 10##
________________________________
Plant 12##
________________________________
Plant 22##
________________________________
Plant 25##
________________________________
SCM612
13
1-3
Plant 10##
________________________________
Plant 12##
________________________________
Plant 22##
________________________________
Plant 25##
________________________________
To test the CIF interface and your integration model, you will create sales orders to
be shipped from your Dresden plant to two different customers. To test the
purchasing transaction transfer, you will create a purchase order from one of your
vendors for materials to be received in your Hamburg plant. A stock transport order
will be created to transfer stock for a material to your Paris plant.
1-3-1 Create a sales order:
Order Type:
OR
Customer Sold-to:
T-S11A##
Purchase Order Number: 09-1-##
Requested Delivery Date: Today + 2 weeks
Material:
T-ATC1-##
50 PC
T-ATC1-##
55 PC
(C) SAP AG
SCM612
14
NB
T-S11F##
Purchasing Org:
Purchasing Group:
Company Code:
1000
001
1000
Material:
T-ATD2-## 300 PC
Price:
850.00 EUR
Delivery Date:
In two weeks
Plant:
10##
Set the Confirmation Control on the line item for ANLI Inbound delivery.
1.3.8
NB
T-S100## (Intercompany Plant vendor)
Purchasing Org:
Purchasing Group:
Company Code:
2200
220
2200
Material:
T-ATC1-##100 PC
Price:
345.00 EUR
Delivery Date:
In two weeks
Plant:
22##
1-3-10 Record the Document Number: ____________________________
(C) SAP AG
SCM612
15
Exercises
Unit: Transfer of Transaction Data
Topic: Customizing for Publication
At the conclusion of this exercise, you will be able to:
2. Make the necessary customizing settings in APO to publish
and transfer delivery and shipment document data to the R/3
Sysytem.
After the transportation planning has been performed by TP/VS,
the planned delivery and shipment documents are transferred to
the R/3 System for the execution process.
2-1
You will make the required settings in APO to allow the transfer of planned
delivery and shipment document data from APO to the R/3 System via the CIF.
There are two Publication Types that are relevant for TP/VS planned documents:
(C) SAP AG
SCM612
16
8.13Solutions
Unit: Transfer of Transaction Data
Topic: Integration Model for Transaction Data
1-1
GR##
TD
Sales orders
Stck in trnsit
In POs and PReqs, enter your material numbers by first selecting Multple
selection on the Material line.
Then, in the Single vals tab enter your material numbers.
Choose Copy.
Iin the Plants line, choose Multiple selection and enter the plants for which
to copy the material masters in the Single vals tab.
Choose Copy.
In Sales Orders, enter your material numbers by first selecting Multple
selection button on the Material line.
Then, in the Single vals tab enter your material numbers.
Choose Copy.
In the Plants line, choose Multiple selection and enter the plants for which to
copy the material masters in the Single vals tab.
Choose Copy.
(C) SAP AG
SCM612
17
In Stock figures, enter your material numbers by first selecting the Multple
selection on the Material line.
In the Single vals tab enter your material numbers.
Choose Copy.
Then, in the Plants line, choose Multiple selection and enter, in the Single
vals tab, the plants for which to copy the relevant quantities.
Choose Copy.
Before the model is generated, you will create a Variant of the model. This
variant is necessary if you want to run the model in a background process
later.
Choose Save.
In the ABAP Variant screen, enter your variant name: GR##-TD and a
description of your own choosing.
Choose Save.
1-1-2 Generate the model.
Choose Execute.
Upon completion of the model generation, you will get a message indicating
the model was generated.
1-1-3 Activate the Model.
R/3 SAP Standard Menu: Logistics Central Functions Supply Chain
Planning Interface Core Interface Advanced Planner and Optimizer
Integration Model Generate Activate
Enter your Model, Logical System, and APO Application code if not present
in the fields.
Choose Execute.
Place your cursor on the line with the Date, Time, and User-ID.
Select Active/Inactive.
A green check mark should appear next to the line indicating that the model
has been made active.
Select the Start button to do the actual transfer of data to the APO system.
After the transfer has been activated, you will get a confirmation message.
1-2
Record the stock balances that have been transferred from the R/3 System to APO
by using the Global ATP Product Availability Report.
APO SAP Menu Global ATP Reporting /SAPAPO/AC03 - Product
Availability
1-2-1 Enter T-ATC1-## in the Product field
Enter the plant 10## in the Location field
Enter A in the Business Event field.
Choose Enter.
(C) SAP AG
SCM612
18
NB
SCM612
19
NB
(C) SAP AG
SCM612
20
Solutions
Unit: Transfer of Transaction Data
Topic: Customizing for Publication
2.1
(C) SAP AG
SCM612
21
9
Monitoring and Error Handling
Contents:
Monitoring of Application Errors Usi ng the qRFC
Monitor
Error Analysi s in the Application Log
SCM Queue Manager
Notification about Queue Blocks Using qRFC Alert
Compare and Reconcile Functions to Ensure Data
Consi stency in the R/3 and APO Systems
SAP AG 2002
(C) SAP AG
SCM612
9.2
Monitoring and Error Handling: Unit Objectives
SAP AG 2002
(C) SAP AG
SCM612
9.3
Monitoring and Error Handling: Business Scenario
SAP AG 2002
(C) SAP AG
SCM612
9.4
Integration Monitoring
R/3
APO
Transaction SLQ
R/3
APO
SAP AG 2002
The APO Core Interface (CIF) offers two monitoring functions to monitor the data transfer from R/3
to APO, as well as from APO to R/3; the Application log evaluation and transfer queue(s) display.
In addition, the qRFC Alert is used to monitor the outbound queues in APO and R/3 that are
relevant to APO-R/3 integration. If queue blocks are detected, a message is sent to a predefined
destination.
Instead of evaluating the application logs in both systems (R/3 and APO) separately when errors
occur, the user can use the central SCM Queue Manager available in APO to monitor the queues
and application logs in both systems.
You can find the Troubleshooting Guidelines Integration R/3 APO on the R/3 Plug-in homepage
on SAPNet (alias: R3-Plug-in) under Media Center Literature. This document is intended to help
you to localize and solve problems that arise when integrating R/3 and APO. It describes the transfer
technology, the prerequisites that a data transfer must fulfill, systematic troubleshooting, the steps
that must be taken when a particular error occurs, as well as how to handle special cases.
(C) SAP AG
SCM612
9.5
qRFC Monitor: Motivation
R/3
APO
qRFC Monitor
Rem ote
Function
Call (RFC)
Master/
Master/
Movement
Movement data
data
Core
Core Interface
Interface
(Selection
(Selection and
and
extraction
extraction of
of
data)
data)
APO
transaction data
- Communication errors
- Application errors
Asynchronous transfer technology
Rem ote
Function
Call (RFC)
APO ma ster/
transaction data
qRFC Monitor
live
live
Cache
Cache
1. Buffer data
2. Transfer to target system
SAP AG 2002
Usage: The communication between R/3 and APO is based on the asynchronous transfer technology
of the queued Remote Function Call (qRFC). A Remote Function Call (RFC) enables calling a
function module on a different server. This technology is used in the integration between APO and
R/3 both for the initial data supply and incremental data transfer (from R/3 to APO) as well as for the
publication of planning results (from APO to R/3).
The data is first buffered by the sending system and then transferred to the target system. The major
advantage of this is that the application that triggered the data transfer does not have to wait until the
update has been completed in the target system. However, this means that return parameters cannot
be passed on, and potential error messages cannot be returned to the application directly.
Two types of errors are distinguished for the processing of qRFC modules:
1. Communication errors: This includes network problems, a non-existing RFC destination, and so
on. Since the data transfer is repeated after certain periods, most of these communication errors
should disappear once the network connection is available again.
2. Application errors: This includes program errors, failed data update in the target system, locking
of objects, and missing master data for specific transaction data. Application errors cannot be solved
by the system and must be handled by the system administrator.
The main instance for monitoring application errors is the qRFC Monitor. It is available both in R/3
and APO. Any queue for the target system is displayed here. Current qRFC entries can be displayed,
activated, debugged, or deleted in the qRFC Monitor.
(C) SAP AG
SCM612
9.6
Using the qRFC Monitor (1)
Example:
Example:qRFC
qRFCMonitor
Monitor in
in R/3
R/3
qRFC Monitor (Outbound queue)
R/3
Refresh
Client
Queue name
800
800
Destination
Entries
CF_ADC_LOAD
APOCLNT800 3
CRM_DELT _MATERIAL IPC
3
Refresh
Client
800
Activate queue
Loc k queue
Queue name
Destination
CF_ADC_LOAD APOCLNT800
Refresh
Client
800
800
800
User
MUSTER
MUSTER
MUSTER
Execut e LUW
Master data
transf er
Unlock queue
Status
1. Date
SYSFAIL 02.10.2002
...
...
Function module
/SAPAPO/CIF_LOC_INBOUND
/SAPAPO/CIF_PROD_INBOUN
/SAPAPO/CIF_RES_ INBOUND
Status text
You are not authorized to logon
T ransaction recorded
T ransaction recorded
During the initial data supply, transfer errors are automatically detected when an integration model is
activated. A dialog box appears from which the user can navigate to the qRFC Monitor (by choosing
qRFC Monitor). In addition, you can choose the Repeat and Ignore functions in the dialog box. If
you choose Repeat, the system attempts to start initial data transfer again (for example, only a
temporary problem in system communication). You can choose Ignore if an online transfer (for
example, stocks) is stuck in the qRFC Monitor. As online transfers (for example, stocks) do not
block the data channel completely, the initial data transfer can be carried out in the dialog mode,
ignoring the entry in the qRFC Monitor. If, however, an earlier initial data transfer (for example,
master or transaction data) has failed, it blocks further initial transfers. In this case, you must
navigate to the qRFC Monitor and analyze the problem.
During online transfer (for example, during stock posting in the R/3 System), transfer errors during
runtime are not displayed in the dialog mode. This means that if data has not been transferred
between APO and R/3, you need to check for red entries in the qRFC Monitor of the system sending
the data. This check can be carried out automatically by qRFC Alert.
A qRFC Monitor is available in R/3 outbound processing (transaction SMQ1) and in APO outbound
processing (transaction SMQ1). By double-clicking the relevant line, all function calls for the
transfer channel selected are displayed in the qRFC Monitor (you can find the INBOUND function
modules available in APO in the Object Navigator, transaction SE80, under development class
/sapapo/cif). The top function module blocks all following entries in the case of an error. You can
display the current status text from the error short text. A detailed error message is stored in the
application log of the target system. In the above example, the user from the RFC destination was
either locked in APO or did not exist.
(C) SAP AG
SCM612
9.7
Queue Channels for Data Transfer: Example
Queue channels
R/3
APO
Integration mo del X
PPM f or material A, B; material A, B
(active)
CF_ADC_LOAD
Integration mo del Y
PPM f or material C, D, material D
Initial transf er
Master and
transaction data
Integration mo del Z
Material E
Material C
Material A
Material B
PPM Material A
PPM Material B
CFMAT[mat.no.]
Material A
Incremental
data transf er
Material
Online
transf er
Purchase
orders
Material B
APO ma ster/
transaction data
CFPO[PO number]
live
live
Cache
Cache
PO number 4711
Material A
PO number 4712
Material A
SAP AG 2002
In the above example, material C could not be transferred. It blocks the queue for the following data
to be transferred initially (to ensure data consistency, a queue is processed sequentially). However,
incremental data transfers for master data or online transfers for transaction data can still be carried
out at the same time, provided that an active integration model exists for the master or transaction
data in question.
The following queue channels are available in the interface: Initial data transfer CF_ACD_LOAD,
stocks CFSTK*, purchase orders and purchase requisitions CFPO*, planned orders/production
orders CFPLO*, sales orders CFSLS*, manual reservations CFRSV*, confirmations CFCNF*,
planned independent requirements CFPIR*, requirement reduction independent requirements
CFMAT*, production campaigns CFPCM*, master data classes CFCLA*, master data characteristics
CFCHR*, transportation CFSHP*, and planning tables CFCUVT* (in online transfers, * stands for
the number of the purchase order, sales order, and so on, and in incremental data transfers of master
data, for example, * stands for the material number).
If only temporary communication errors occur in the network connection, the failed transfers (entry
in the qRFC Monitor) can be re-started (by choosing Activate queue in the qRFC Monitor). If you
only want to re-start one object type (for example, locations) within a queue, you can choose the
Execute LUW function to repeat the transfer of locations. If you want to specify that the queue is
automatically activated again if transfer errors occur, you can set up the RFC destination (transaction
SM59) in such a way that the system makes several new attempts to transfer the data at certain time
intervals. To do so, choose Destination TRFC Options in the RFC destination and maintain, for
example, the value 20 in the Connection attempts up to task field and the value 2 in the Time betw. 2
tries [mins] field. The system then makes 20 attempts in two-minute intervals to start the transfer (if
no entries are made in these fields, the default setting applies, that is, 20 attempts in 15-minute
intervals). If you do not want to use this function, enter X in the Suppress background job field.
(C) SAP AG
SCM612
9.8
Using the qRFC Monitor (2)
Example:
Example:qRFC
qRFCMonitor
Monitor in
in APO
APO
qRFC Monitor (Outbound queue)
APO
Refresh
Client
800
800
Queue name
Destination
Entries
CFEP3040
CFIP3056
R3CLNT800
R3CLNT800
1
1
Activate queue
Refresh
Client
800
Queue name
CFIP3056
Refresh
Client
800
800
User
MUSTER
MUSTER
Loc k queue
Destination
R3CLNT 800
Execut e LUW
Planned order
created in APO
Unlock queue
Status
1. Date
SYSFAIL 02.10.2002
...
...
Function module
CIF_ORDER_INBOUND_30A
CIF_ORDER_INBOUND_30A
Status text
No active integration model
T ransaction recorded
In the example, a planned order for a finished product and purchase requisitions for the components
of the finished product were created in APO. However, they were not included in any active
integration model in the R/3 System at the time when the order was created in APO.
(C) SAP AG
SCM612
9.9
Application Log: Motivation
R/3
APO
Application
log
R/3:
Error
RFC
Master/
Master/
transaction
transaction data
data
Core
Core Interface
Interface
- Communication errors
- Application errors
APO ma ster/
transaction data
RFC
Application
log
APO:
Error
live
live
Cache
Cache
SAP AG 2002
Display entries: You can use the application log to trace when (time), and what (data objects and
integration model) was transferred by whom (user). In addition, the application log provides a
detailed error message if an application error occurred. As a prerequisite, logging must have been
switched on. If errors occurred during transfers, detailed error messages are stored in the application
log of the target system.
Prerequisite: Logging mode switched on (transaction CFC2 in R/3 and /SAPAPO/C4 in APO; you
can make settings as required under Logging).
Normal (only the number of data records transferred is logged)
Detailed (the number and content of the data records transferred is logged): Detailed logging can
easily lead to large database tables and decreased performance when used in a productive system.
For this reason, we recommend using detailed logging only when the data is needed (for example,
in the implementation phase).
Delete entries: You can delete logs of the application log in R/3 and APO. The system does not
delete the logs automatically. To prevent extreme database load, we recommend deleting the logs
periodically. If you want, you can schedule background processing. If you do not make an entry in
the date and time fields, all logs older than two weeks are deleted automatically.
(C) SAP AG
SCM612
9.10
Using the Application Log (1)
Example:
Example:Application
Application Log
Log in
in R/3
R/3
qRFC Monitor
Refresh R/3
Client
800
800
User
MUST ER
MUST ER
Function module
Status text
/SAPAPO/CIF_T PSRC_INBOU Loc. 0000001003 does not exist
/SAPAPO/CIF_GEN_EVENT Transaction recorded
User
02.10.2002 MUSTER
Number
Subobject type
530
User
Number
Subobject type
02.10.2002 USERADMIN 4
Sources of supply
Problem class: very important
Problem class: medium
Problem class: additional information
Location 0000001003 does not exist
SAP AG 2002
In the example, an initial data supply was carried out in the R/3 System to transfer several different
master data, including purchasing info records. One of the purchasing info records transferred was
for a vendor that does not exist in APO.
Message display: You can select different subobjects for the CIF object in the R/3 and APO
application log. These include, EP External procurement (inbound), IP In-house production
(inbound), or INITIAL Initial supply and LOCATION Location: customer, plant, vendor (for
performance reasons, the entries for an initial supply and an incremental data transfer are grouped
under the subobject INITIAL). For more subobjects, choose F4 for the Subobject field on the initial
screen of the application log. By double-clicking on a subobject, you can navigate to Messages for
the relevant transfer log. This provides an overview of the data objects that have been sent between
the systems. This function is particularly helpful when determining errors.
qRFC Monitor: The transaction ID of the sending application serves as the key of an error message
(TID field in the qRFC line of the qRFC Monitor of the sending system). When you enter this
number, you can display all messages for this qRFC call in the target system. In the application log,
you enter the number of the transaction ID in the Ext. identif. field and execute the selection. The
system displays all messages for the call in question.
(C) SAP AG
SCM612
10
9.11
Using the Application Log (2)
Example:
Example:Application
Application Log
Log in
in APO
APO
APO qRFC
Refresh
Monitor
Client
800
800
User
Function module
Status text
MUSTER
MUSTER
CIF_ORDER_INBOUND_30A
CIF_ORDER_INBOUND_30A
User
02.10.2002 MUST ER
Number
Subobject type
120
In-house production
User
Number
Subobject type
02.10.2002 USERADMIN 1
In-house production
Problem class: very important
Problem class: medium
Problem class: additional information
Inbound R3CLNT800: For system APOCLNT800 no active integration
model for type T_PLO filter object P-102 1000
SAP AG 2002
In the example, a planned order for a finished product and purchase requisitions for the components
of the finished product have been created in APO. However, they were not included in any active
integration model in the R/3 System at the time when the order was created in APO. Therefore, the
orders were not created in R/3, but kept in the queue. In the outbound log, you always recognize the
log of successful transfers. In the logging of the target system, error messages are displayed if errors
occurred during transfers.
(C) SAP AG
SCM612
11
9.12
SCM Queue Manager (1)
APO
R/3
Execute
Expand nodes
Systems
R3CLNT800
Object types
R/3
RFC
APO
- Communication errors
- Application errors
RFC
SAP AG 2002
Instead of separately evaluating the application logs in both systems (R/3 and APO) when errors
occur, the user can use the central SCM Queue Manager available in APO (transaction
/n/SAPAPO/CQ) to monitor the queues and application logs in both systems.
(C) SAP AG
SCM612
12
9.13
SCM Queue Manager (2)
APOCLNT800
External procurement
In-house production
Planned ind. reqmnts
Planning f ile entries
Production campaigns
Sales order
Transportation
Delivery
Reservations
...
Queue
Appl.log
User
Date
...
R3CLNT800
Initial supply
Purchase orders
Planned orders
Production orders
Sales orders
Planned ind. requirements.
Manual reservations
Production campaigns
Confirmations
Transportations
Stocks
Characteristics
Classes
R32CLNT800
SAP AG 2002
(C) SAP AG
SCM612
13
9.14
qRFC Monitoring: Notification about Exception
Messages (1)
R/3
APO
RFC
Master/
Master/
Movement
Movement data
data
Core
Core Interface
Interface
- Communication errors
- Application errors
APO
APO ma
master/
ster/
transaction
transaction data
data
RFC
Mail to initiator or
adm inistrator
live
live
Cache
Cache
SAP AG 2002
Usage: Application errors that occur during data transfer are not reported directly to the user because
data transfer between APO and R/3 is asynchronous. Instead, the qRFC entries block the outbound
queue. Any subsequent data transfers cannot pass the outbound queue. By monitoring the qRFC
exception message, queue blocks are detected and the following are notified:
The initiator of the block via SAPOffice Inbox Mail (the initiator of every queue block receives a
message stating that he or she has caused a block)
The administrator, via SAP Office Inbox or an Internet mail (one person is chosen to receive all
messages). If you want to send the messages to an e-mail address, you must make the necessary
settings in SAPconnect (Transaction /SCOT).
Features: The report (transaction /N/SAPAPO/CW) monitors all APO outbound queues, and the
queues of the logical R/3 Systems connected to APO. Depending on the settings on the selection
screen, local qRFC-API modules in the APO system, or qRFC-API (Application Program Interface)
modules in the connected R/3 System, or both are called up synchronously and the status of the
relevant outbound queues is queried. You can find out the names of the relevant logical systems
from the selection screen entries, and from the entries in the /SAPAPO/SYSDIR table (to maintain,
use /SAPAPO/C2).
If the system recognizes queue errors or blocks, a message is generated from the status information.
The message is sent via the SAPOffice API to the relevant destination(s) or administrator(s),
provided the settings are made accordingly. In addition, the list of all incorrect outbound queries is
output in list form.
(C) SAP AG
SCM612
14
9.15
qRFC Monitoring: Notification about Exception
Messages (2)
R/3
APO
Execute
qRFC M onitoring
Local outbound queues
Target systems
*
Local queue names
CF*
Queue errors only
Notification
No
To initiator
To administrator
MUSTER
Remote systems
Destinations
Remote queue names CF*
Queue errors only (remote system)
Notification
...
SAP AG 2002
Remote outbound queues: In the Remote outbound queue groupbox, you define the settings for
monitoring the outbound queues of connected R/3 Systems:
1. In the Remote systems field, enter the name of the RFC destinations whose outbound queues you want to
monitor. You may use wildcards (for example SX*). If you do not enter anything, none of the outbound
queues of the connected systems are monitored.
2. In the Destinations in the remote system field, enter the name of the target systems called in the remote
system (usually the APO system itself). You may use wildcards (for example SX*).
3. In the Remote queue name field, enter the names of the R/3 outbound queues to be examined in the remote
systems to be monitored. All R/3 outbound queues that are addressed via the APO CIF integration have CF
as the prefix.
4. All other entries are made in the same way as for local outbound queues. If you want to run the qRFC Alert
periodically, you must schedule the report via the SAP job definition (transaction SM37).
(C) SAP AG
SCM612
15
9.16
Compare/Reconcile Function for Data
Inconsistencies in R/3 and APO: Compare
APO
R/3
Report /SAPAPO/CIF_DELTAREPORT2
Partner system (R/3) R3CLNT800
Material
P-102
(optional)
Plant
100
(optional)
Integration model
Pump
(optional)
Objects to be checked
Sales orders
Production/process orders
Purchase requisition
...
...
Storage location stocks
Sales order stocks
...
...
Database
Compare
live
Cache
SAP AG 2002
Usage: Data inconsistencies between APO and R/3 can arise in certain circumstances (for example,
due to application errors or manual deletion of queue entries). The compare/reconcile function helps
you to identify and correct such data inconsistencies. In APO, the function covers the following
objects: Stock, sales order, planned order, production order, purchase order, and purchase
requisition.
When you use the compare/reconcile function, the system performs a comparison and lists any
inconsistent objects it identifies. Then you can select individual, several, or all objects for the
reconcile function. The selected data can be sent from R/3 to APO.
Procedure: Start report program /SAPAPO/CIF_DELTAREPORT2 in the ABAP Editor of APO
(transaction SE38). Choose the R/3 System in the Partner system field. In addition, you can restrict
the compare/reconcile function to certain products, locations, integration models, or stocks and
transaction data by entering selection parameters, and therefore reducing the runtime of the
transaction.
After the report has been executed, an overview of the results of the comparison is shown on the next
output screen, separated according to orders and stocks. A line with the following information is
displayed for every object type checked: Total (total number of R/3 objects selected for comparison),
Errors (total number of errors found), All other columns: (distribution of the errors to individual
error areas).
You can run the DELTAREPORT also with Transaction /SAPAPO/CCR or report
/SAPAPO/CIF_DELTAREPORT3. This Deltareport is available from Release 3.1. You can
downgrade it for Release 3.0 by starting with Support Pack 19.
(C) SAP AG
SCM612
16
9.17
Compare/Reconcile Function for Data
Inconsistencies in R/3 and APO: Reconcile
APO
R/3
Execute
Sales orders
Deviations in APO
Send to APO
Sent
Material
Storage
Plant location Stock
P-102
1000
0002
11
Quantity
APO
10
Documents
Storage loc.
stocks
Reason
...
Sales orders
Production/process orders
...
Supplies
Database
Reconcile
live
Cache
SAP AG 2002
(C) SAP AG
SCM612
17
9.18
Monitoring and Error Handling: Unit Summary
SAP AG 2002
(C) SAP AG
SCM612
18
10
Vehicle Scheduling (VS): Basic Settings
Contents:
Configuration and Customization Activities
SAP AG 2002
(C) SAP AG
SCM612
10.2
Vehicle Scheduling (VS): Basic Settings: Unit
Objectives
SAP AG 2002
(C) SAP AG
SCM612
10.3
Vehicle Scheduling (VS):
Basic Settings: Business Scenario
SAP AG 2002
(C) SAP AG
SCM612
10.4
Vehicle Scheduling Process Flow (1)
Configuration
Master Data
Modeling
Optimization
(Load Consolidation &
Vehicle Schedul ing)
Create/Transfer
Shipments
Backorder Processing
Create/Transfer
Deliveries
Carrier Selection
Carrier Tendering
Release Shipments
SAP AG 2002
(C) SAP AG
SCM612
10.5
VS General Customizing Activities
Basic Settings
Carrier Selection
Geocoding
Number Ranges
Transportation Modes
Transportation Groups
Transportation
Methods/Vehicles
Freight Units
Carrier Profile
Assignment of
Transportation Zone to
Locations
Field Mapping of
Communication
Structures
Backorder Processing
Optim ization
Profiles (Optimization/Cost)
Transportation Groups
Compatibility
Definition of Dimension
Units
Filters
Sort Profiles
Scheduling
SAP AG 2002
APO IMG: Advanced Planner and Optimizer (APO) Transportation Planning/Vehicle Scheduling
(TP/VS)
(C) SAP AG
SCM612
10.6
Order of Maintenance
1. Creation of Master Data in R/3
2. Creation of Integration Models and the transfer of Master Data R/3 APO
Plants, DCs
Customers
Suppliers
Carriers
Materials
Locations
Products
SAP AG 2002
(C) SAP AG
SCM612
10.7
Geocoding
Geocoding enables the system to assign longitude and latitude coordinates to the various locations in
APO. These coordinates are used to estimate distances between locations.
The geocoding program supplied by the SAP System determines the longitude and latitude based on
the Country and Region codes.
the steps required to install third-party geocoding programs are included in the APO IMG
customizing activities. Customizing settings allows the geocoding program(s) to be assigned at the
Country code level.
(C) SAP AG
SCM612
10.8
TP/VS Number Ranges
APO IMG: Advanced Planner and Optim izerTransportation Planning/Vehicle
Scheduling (TP/VS) Basic Settings
SAP AG 2002
The temporary shipment number range is used to assign shipment numbers to shipment documents
created during the Route Optimization process.
The Number Range for Shipments table is used to assign shipment numbers to shipment documents
that have been released to the R/3 System. This number range MUST match the number range
assignment in the R/3 System for External Number assignment.
(C) SAP AG
SCM612
10.9
Transportation Mode, Transportation Method,
Resources
Transp.
Mode
Transportation
Method
Vehicle
Re source s
SAP AG 2002
Transportation Mode:
APO IMG: Advanced Planner and Optimizer (APO) Transportation Planning/Vehicle
Scheduling (TP/VS) Basic Settings Maintain Transportation Mode
The Transportation Mode is a code defined to indicate the actual mode of transportation. This
code is assigned to the Transport Method. The Transportation Mode in TP/VS should
correspond to the Transportation Mode used in the R/3 System (R/3 IMG: Logistics
ExecutionTransportationBasic Transportation FunctionsRoutesDefine RoutesDefine
Modes of Transport).
Transport Method:
APO IMG: Advanced Planner and Optimizer (APO) Supply Chain Engineer (SCE)
Maintain Transport Method
The Transport Method is used to identify a method of transportation (for example, a 48 truck
with full truck load capacity or refrigerated truck). The Transportation Methods are assigned to
Vehicle Resources in APO master data. In addition, the Transport Methods will be assigned to
Transportation Lanes.
Vehicle Resources
APO SAP Menu: Master DataResource
Vehicle Resources are used to represent a unit of transportation and its capacity and planning
parameters.
A Vehicle Resource is independent of a particular carrier.
(C) SAP AG
SCM612
10.10
Transportation Groups
R/3
APO
SAP AG 2002
(C) SAP AG
SCM612
10
10.11
Freight Units
SAP AG 2002
(C) SAP AG
SCM612
11
10.12
Determine Shipment Type
R/3 Shipment
Type
SAP AG 2002
APO IMG: Advanced Planner and Optimizer (APO) Transportation Planning/Vehicle Scheduling
(TP/VS) InterfacesDetermine Shipment Type
This customizing activity is used to map the Transportation Method and Inbound/Outbound
Shipment to the corresponding Shipment Type in the specified Logical System where the planned
shipment documents are to be transferred.
The Shipment Types(Vehicle Column) must be defined in the R/3 System for the transfer of the
shipment to take place.
R/3 Shipment Type can be found :
R/3 IMG:
Logistics Execution Transportation Shipments Define Shipment Types
(C) SAP AG
SCM612
12
10.13
Transportation Matrix, Used for Deadheads
Point A
Plant
Point B
Customer
Point D
Plant
= Loaded Trip
= Deadhead
= Continued route
SAP AG 2002
APO IMG: Advanced Planner and Optimizer (APO) Transportation Planning/Vehicle Scheduling
(TP/VS) Basic Settings Maintain Transportation Matrix
This customizing activity is used for private fleet vehicles and is not required for TP/VS for Route
Optimization and Scheduling.
This activity indicates that a vehicle is not available immediately after a shipment has been
delivered, since the vehicle needs a certain amount of return time or time to reach the next loading
point.
Example:
A shipment is transported from departure point A to destination B. Loading occurs at point A. While
it is on the way from A to B, this vehicle is not available for scheduling (the resource is in use). Once
the shipment has been delivered to point B, the resource is still not available, since it must first return
to point A to be loaded again. Therefore, the resource vehicle is in use for the following routes:
Transportation lane: A B
Dead-heading: B A
or
Continued route: B D
Available again: as of point A or D
A Transportation Matrix is not used for an APO3.0 SP21 or greater or APO3.1 system.
(C) SAP AG
SCM612
13
10.14
How to maintain a Transportation Matrix
SAP AG 2002
Standard Settings:
You have maintained the corresponding transportation lanes and transportation times in the Supply
Chain Engineer.
Activities:
Enter the vehicle key on the Transfer the Distance Matrix for Vehicles into the liveCache screen.
The liveCache uses the transportation times that were maintained in the Supply Chain Engineer
(Transportation Method) as a basis for calculating the empty run (deadheading) from the destination
point to the departure point.
It is not necessary to maintain a transportation matrix starting with Support Package 20.
(C) SAP AG
SCM612
14
10.15
Vehicle Scheduling (VS):
Basic Settings: Unit Summary
SAP AG 2002
(C) SAP AG
SCM612
15
10.16Exercises
Unit: Vehicle Scheduling (VS): Basic Settings
Topic: Transportation Methods and Resources
At the conclusion of this exercise, you will be able to:
(C) SAP AG
SCM612
16
1-2
Create two new transportation methods (vehicles) that you will use in your TP/VS
environment:
1-2-1 Create Transportation Method FTL## with the following settings:
Description:
AverageSp:
Factor:
Work Time:
Component:
FTL Gr. ##
80
1.200
24:00
Compatible with all
TranspMode: FTL
OwnTrMeth: blank
Schedule:
blank
1-2-2 Create Transportation Method: LTL## with the following settings:
Description :
AverageSp:
Factor:
Work Time:
Component:
TranspMode:
OwnTrMeth:
Schedule:
LTL Gr. ##
60
1.400
24:00
Compatible with all
LTL
blank
blank
Select
Choose Enter.
Select the Standard Capacity tab.
Create an addition dimension: Volume of 150 M3
Choose Save.
(C) SAP AG
SCM612
17
1-4 Create four additional vehicle resources with characteristics identical to the one you
just created: G##-FTRK01. They should have Vehicle Resource Numbers of G##FTRK02, G##-FTRK03, G##-FTRK04 and G##-FTRK05. Use the resource
Copy function to create these.
1-5 Create a Vehicle Resource: G##-LTRK01 with the following characteristics:
Resource:
G##-LTRK01
Location:
leave blank (This resource will be valid for all locations)
Planner:
leave blank
Resource Category: T
Choose the Create button.
In the Create Resources Header Data screen, select the Vehicle tab and enter the
following data on the resource line:
Location:
Leave blank
Vehicle:
LTL##
Time zone:
CET
Dimension:
Mass
Factory Calendar: W8
Start:
00:00:00
End:
23:59:00
Capacity:
9000
Unit of Measure:
KG
Finite Scheduling:
Select
Choose Enter.
Select the Standard Capacity tab.
Create an addition dimension: Volume of 75 M3
Choose Save.
1-6 Create four additional vehicle resources with characteristics identical to the one you
just created: G##-LTRK01. They should have Vehicle Resource Numbers of G##LTRK02, G##-LTRK03, G##-LTRK04 and G##-LTRK05. Use the resource
Copy function to create these.
1-7
Select and assign your new vehicle resources to your SCE work area:
Model:
000
Work Area: GR##
Transportation Resources: G##-FTRK01 through G##-FTRK05 and
G##-LTRK01 through G##-LTRK05.
After assigning the resources, Choose Save.
(C) SAP AG
SCM612
18
Exercises
Unit: Vehicle Scheduling (VS): Basic Settings
Topic: Transportation Lane Creation
At the conclusion of this exercise, you will be able to:
(C) SAP AG
SCM612
19
2-2 Using the Mass Creation of Transportation Lanes function create the following
transportation lanes based on the transportation lane from 10## to 12##.
2-2-1 Source
12##
Target
T-S11A##
T-S22A##
T-S33A##
T-S11B##
T-S11C##
2-2-2 Source
2-3
(C) SAP AG
Target
T-S11F##
10##
T-S11H##
10##
After creating the transportation lanes, display them to verify that both
transportation methods have been assigned to each lane. Use the Supply Chain
Engineer to do this check. In addition, delete the circular lanes created during the
mass transportation lane creation process.
SCM612
20
Exercises
Unit: Vehicle Scheduling (VS): Basic Settings
Topic: Shipment Type Determination
At the conclusion of this exercise, you will be able to:
(C) SAP AG
Update the Shipment Type determination table to assign the Shipment Types you
created in the R/3 System, AI## and AO##.
3.1.1
3.1.2
Choose Save.
SCM612
21
Exercises
Unit: Vehicle Scheduling (VS): Basic Settings
Topic: Mapping Table for Vehicles
At the conclusion of this exercise, you will be able to:
Create an entry in the Mapping Table for Vehicles for the packaging materials
created in R/3, FTL-## and LTL-##, that represent the transportation methods
FTL## and LTL##, respectively.
Note: The alphabetic characters in the material number in the ExtVehDesc
field must be entered in all capital letters.
(C) SAP AG
SCM612
22
10.17Solutions
Unit: Vehicle Scheduling (VS): Basic Settings
Topic: Transportation Methods and Resources
1-1
1-2
1-3
(C) SAP AG
SCM612
23
1-4
1-5
(C) SAP AG
SCM612
24
1-6
1-7
Update your SCE work area to include your new vehicle resources:
APO SAP Menu Master Data Supply Chain Engineer Maintain Model
Enter:
Model:
000
Work Area: GR##
(C) SAP AG
SCM612
25
Solutions
Unit: Vehicle Scheduling (VS): Basic Settings
Topic: Transportation Lane Creation
2-1
Create the transportation lanes from Plant 10## to Plant 12## and from Plant 12##
to Plant 10##:
APO SAP Menu Master data Transportation Lanes
2-1-1 Enter the following:
Model:
000
Source loc.:
10##
Target loc.:
12##
(C) SAP AG
SCM612
26
Choose Save.
000
Source loc.:
12##
Target loc.:
10##
Create the remaining transportation lanes using the Mass Creation of Transportation
Lanes function:
APO SAP Menu Master data Mass Creation of Transportation Lanes
2-2-1 Create the transportation lanes using the following:
Copy from:
Source:
Target:
10##
12##
12##
Target:
T-S11A##
T-S22A##
T-S33A##
T-S11B##
T-S11C##
(Use the Multiple Selection function to enter the list of Target locations)
Select Execute.
When the dialog box pops up asking if you want to continue and displays
the number of lanes to be created (there should be 5), select Y.
2-2-2 Create the transportation lanes between the Vendors and Plant 10## and
create the return lanes:
Create the transportation lanes using the following:
Copy from:
(C) SAP AG
Source:
10##
SCM612
27
Target:
12##
T-S11F##
10##
Target:
10##
T-S11F##
Select the Execute button.
When the dialog box pops up asking if you want to continue and displays
the number of lanes to be created (there should be 4), select Y.
Why are there four lanes? _____________________________
__________________________________________________
__________________________________________________
Create the lanes between Vendor T-S11H## and Plant 10##:
Copy from:
Source:
Target:
10##
12##
T-S11H##
10##
Target:
10##
T-S11H##
Select the Execute button.
When the dialog box pops up asking if you want to continue and displays
the number of lanes to be created (there should be four), select Y.
(C) SAP AG
SCM612
28
2-3
Check your Work Area in the Supply Chain Engineer to make sure the lanes were
created properly:
APO SAP Menu Master Data Supply Chain Engineer Maintain Model
Model:
000
Work Area:
GR##
(C) SAP AG
SCM612
29
Solutions
Unit: Vehicle Scheduling (VS): Basic Settings
Topic: Shipment Type Determination
3-1
Update the Shipment Type Determination table to assign your R/3 System shipment
types:
APO IMG: Advanced Planner and Optimizer (APO) Transportation
Planning/Vehicle Scheduling (TP/VS) Interfaces Determine Shipment Type
3-1-1 Select New Entries button.
Enter FTL## in the Trsp.Meth field.
Enter the R/3 Logical System Number.
Select I Inbound in the In/outbound Shipment field.
Enter AI## in the Vehicle field.
On the next line, repeat the process but:
Select O Outbound in the In/outbound Shipment field and
Enter AO## in the Vehicle field.
Create two more lines in the table using the same steps as above but with
Transportation Method LTL##
3-1-2 Choose Save.
(C) SAP AG
SCM612
30
Solutions
Unit: Vehicle Scheduling (VS): Basic Settings
Topic: Mapping Table for Vehicles
4-1
(C) SAP AG
SCM612
31
11
Vehicle Scheduling (VS)
Contents:
The optimization process flow in TP/VS
The VS Optimizer
Creating the Cost Profile
Creating the VS Alert Profile
Creating the Optimization Profile
Interactive Planning
Releasing and Publishing Planned Deliveries and
Shipments
SAP AG 2002
(C) SAP AG
SCM612
11.2
Vehicle Scheduling (VS): Unit Objectives
SAP AG 2002
(C) SAP AG
SCM612
11.3
Vehicle Scheduling (VS): Business Scenario
SAP AG 2002
(C) SAP AG
SCM612
11.4
Vehicle Scheduling Process Flow (1)
Configuration
Master Data
Modeling
Optimization
(Load Consolidation &
Vehicle Schedul ing)
Create/Transfer
Shipments
Backorder Processing
Create/Transfer
Deliveries
Carrier Selection
Carrier Tendering
Release Shipments
SAP AG 2002
After the basic TP/VS customizing, establishment of the appropriate master data and creation of the
planning and cost profiles, the optimization of transportation demands is performed. This is called
the optimization process. It may be performed interactively or in background.
Backorder processing carried out in the global ATP component can affect the vehicle scheduling
determination in TP/VS.
Upon completion of the planning for one or more shipments, automatic carrier selection may be
performed. Based on the carrier selection profile a carrier will be assigned to each shipment selected.
In order to transfer planned shipments and their corresponding delivery documents to the OLTP or
R/3 System for execution. The process of publishing must be performed first.
An optional process that is part of the collaborative planning strategy of supply chain management is
carrier tendering. The carrier tendering process, available in different scenarios, gives the shipper the
ability to notify potential carriers of the availability of a shipment and its characteristics. The carrier,
in turn, can accept or decline the tender offer and report that decision back to the shipper using
various automated techniques.
After shipments are published, they and their related delivery documents can be transferred to the
OLTP or R/3 System for execution. This step represents the final process in the Vehicle Scheduling
(VS) process flow.
(C) SAP AG
SCM612
11.5
Transactional Exchange relevant for Vehicle
Scheduling
Transfer R/3Sales
Order to APO
via CIF
Create R/3
Sales Order
Create APO
Order
OPTIMIZER
Transfer Shipment
to R/3via CIF
Release Shipment
Allocate Carrier
Allocate Vehicle
Resource,
Consolidate, Route
Opt., Scheduling
CS-Optimizer
Adjust / Optimize
Shipment
SAP AG 2002
Sales orders are created in the R/3 System and then transferred to APO via the CIF.
The transactions required are CFM1 for creating an integration model and CFM2 for activating and
deactivating the integration model.
VS consists of a two-step optimization process:
1. Optimization on the basis of planning costs: Using an optimization and cost profile, the optimizer
decides what has to be transported by which method/vehicle, when it needs to be transported, and
over what transportation lane the shipment should be taken.
2. Carrier Selection: On the basis of a carrier selection profile, a carrier is assigned based on real
freight costs, business share, and/or priority.
After the optimization processes have been completed, the shipments and related delivery documents
are published and transferred to the OLTP-R/3 System.
(C) SAP AG
SCM612
11.6
VS Optimizer: How does it work?
The problem of the Traveling Salesman cons ists in
the detection of the s hortest way (or one of the
shortest ways), whic h connects a numbe r of
locations a traveling salesman has to visit on a
sales tour.
SAP AG 2002
The Travelling Salesman Problem (TSP) belongs to a group of problems that cannot be solved
optimally in a reasonable time (NP-complete problems). The Vehicle Scheduling Problem in TP/VS
is a generalization of the TSP and is harder to solve. The algorithm uses search strategies to try and
find a good solution during the given runtime. Usually, the solution found is not necessarily optimal.
(C) SAP AG
SCM612
11.7
VS Optimizer Process
Costs
Phase 2: Non-Improvement Moves
First
Solution
Phase 1:
Greedy Search
Solution Runtime
SAP AG 2002
(C) SAP AG
SCM612
11.8
Results of an optimization run
3.00E+08
2.50E+08
2.00E+08
C
O
S
T
1.50E+08
1.00E+08
5.00E+07
1:21:43
1:15:32
1:09:26
1:03:11
1:00:55
0:51:57
0:49:35
0:46:43
0:44:06
0:32:16
0:26:26
0:25:25
0:21:43
0:17:38
0:15:03
0:11:25
0:03:08
0:02:02
0:01:15
0:00:37
0:00:19
0:00:10
0:00:00
0.00E+00
(C) SAP AG
SCM612
11.9
Constraints
Vehicle Capacity
Schedules of
Vehicle Types
(Trains, Ships,
Aircraft, and
Trucks)
Depot Location
Vehicle (In-)
Compatibibility
by Location
Vehicle
Type/Transport
Group (In-)
Compatibility
Optimizer
Constraints
Handling Resources
Opening Hours of
Locations
Maximum
Storage Time at
Location
Transport
Group/Transport
Group (In-)
Compatibility
SAP AG 2002
Vehicle capacities are defined in the vehicle tab in the Resource master data.
Vehicle (in-)compatibilities for Locations are defined in Location master data in the TP/VS tab.
The maximum time a freight unit may be stored at a location is defined in the Location master
(TP/VS tab, Goods wait time). This constraint is used only in cross-docking scenarios.
Load/Unload handling resources and opening hours are defined in the Resources tab of the Location
master:
Specify the resource used to load and unload a vehicle during a delivery process. You must also
define the resource consumption (in pieces), which are required for delivery (Docks, forklifts, and
so on) Each freight unit uses the same capacity, independent of its size; the capacity is used during
the load/unload time.
Opening hours are also defined in the Resources tab of the Location master. You have to indicate
the resource for which the opening times of this location are maintained. The break times of the
resource define when the location is not available.
You can either define load/unloading times or opening hours, but not both.
Note: Picking lead time as well as transportation creation time which are defined in the TP/VS tab of
the location master are not relevant for the TP/VS optimizer.
picking lead time is the time required to make an order from the APO system available before the
material availability date of the OLTP system, so that picking can take place in the OLTP system
based on the corresponding deliveries.
Transportation creation time is the time required for the transportation documents to be transferred
from APO to the OLTP system, so that the appropriate shipment documents can be created before
loading begins.
(C) SAP AG
SCM612
11.10
Costs in Optimization
C
O
S
T
P
R
O
F
I
L
E
GENERAL
GENERAL
LOCATION
LOCATION
SHIPMENT
SHIPMENT
DIMENSION
DIMENSION
TRANSPORTATION
TRANSPORTATIONLANE
LANE
SAP AG 2002
(C) SAP AG
SCM612
10
11.11
Location-Related Costs
LOCATION
LOCATION
SAP AG 2002
Penalty costs are not actually a currency amount, but rather a theoretical value that is used by the
Optimizer to calculate the most favorable delivery date.
The maintained delay costs refer to the units (time units) specified in the same row. This unit is
specified in days. Calculation of the penalty costs in the objective function are re-calculated in
seconds.
(C) SAP AG
SCM612
11
11.12
Penalty Costs: Delayed Delivery and Non-Delivery
Costs
COST PROFIL E
Delay and non-delivery costs can be defined location dependent. For each location, a certain priority
can be defined, and for each priority different penalty costs can be specified.
Note: The TP/VS optimizer does not use the delay/non-delivery costs which are defined in the
Location Product master. Those costs are only used by SNP.
Note: The penalty costs are maintained on a daily basis. Calculation of the penalty costs in the
objective function are recalculated in seconds.
The priority in the General tab of the location master data corresponds to the priority on the
Location tab in Cost profile. Orders for locations with a certain priority receive the appropriate
penalty costs for non-delivery or delayed delivery. This priority is taken into account if you maintain
a delivery priority in your order.
Enter the value one for the highest priority. The higher the number entered, the lower the priority.
If you do not enter a value, the system automatically assigns the value zero, giving the location the
highest priority.
(C) SAP AG
SCM612
12
11.13
Shipment-Related Costs
SHIPMENT
SHIPMENT
SAP AG 2002
(C) SAP AG
SCM612
13
11.14
Dimension-Related Costs
DIMENSION
DIMENSION
SAP AG 2002
Cost dimension is the dimension on which the transportation costs and cost unit are based. You also
have to maintain the Cost Unit.
Quantity costs per unit and distance
Distance costs per distance unit (e.g. km)
Duration costs per time unit (e.g. day)
Stopovers costs per additional stop
Definition of maximum distance/duration/number of stopovers
Example 1: Variable transportation costs Distance related
Cost dimension Transportation cost
Cost unit
distance
50.00
KM => costs of 50.00 per KM
Note: The dimension quantity is related to the transported quantity per KM
Example 2: Variable transportation costs Weight and distance related:
Cost dimension transportation costs Cost unit
quantity
2.00
KG
=> transportation costs of 2.00 per KG per KM.
If the transportation route has a distance of 100 km, then the costs for 30 KG are calculated as
2.00 x 30 KG x 100 KM = 6,000. For 200 km, we would have costs of 12,000.
Instead of the variable costs defined in the Dimensions tab of the Cost profile, you may also use the
costs from the tab Transportation Lane.
(C) SAP AG
SCM612
14
11.15
Stopovers, used in Cost Profile
Lane 1
Loc. A
Lane 2
Loc. B
Stopover 1
Lane 3
Loc. C
Stopover 2
Loc. D
+1
SAP AG 2002
(C) SAP AG
SCM612
15
11.16
Costs for Transportation Lane
TRANSPORTATION
TRANSPORTATIONLANE
LANE
SAP AG 2002
You have to maintain transportation costs for the unit of measure on which the specified product
transportation costs are based (means what unit of measure you have maintained on the dimension
tab).
(C) SAP AG
SCM612
16
11.17
Vehicle Scheduling Alert Profile
SAP AG 2002
(C) SAP AG
SCM612
17
11.18
Optimization Profile (1)
Planning Data
Depot Selection
Planning Horizon
Offset
Offset End
SAP AG 2002
There are three tabs to maintain settings for the optimization profile:
Planning Data
General Settings
Automatic Shipment Creation
In the Planning tab, the parameters include:
Version: the planning version to be used during Interactive Planning.
Depot Selection/With No Depot Locations
Refers to resources that have not been assigned to a depot location. Resources can be
assigned to specific locations. Choose With no depot locations when you want to
select all resources that are not assigned to a depot location.
A depot location can be a production plant, distribution center, supplier, carrier, or
MRP area.
Transfer Requirements define the demand horizon, the demand categories, source, and target
locations.
The Planning Horizon defines the period within which shipments should be planned.
(C) SAP AG
SCM612
18
11.19
Planning Horizon
Start of
Planning Horizon
today
10 Days
Latest Requested
Delivery Date
50 Days
Offset
End of Planning
Horizon
9 Days
End of Offset
Planning Horizon
= Sales Order
= Material Availability Date
= Requested Delivery Date
SAP AG 2002
Offset in days:
Starting from current date, defines the period (in days) after which the planning horizon should
commence.
The planning horizon commences after this period has elapsed. You can also maintain the offset
duration to the exact hour and minute. This can result in either of the following:
Time-dependent: If offset (in days) is set to zero, the planning horizon commences from the
current time, after the offset duration has elapsed (in hours and minutes).
Time-independent: If offset is set to one or higher, the planning horizon commences after the
offset in days plus the maintained offset (in hours and minutes) from 0:00h.
If you want to specify the offset more precisely, specify it in hours and minutes via Offset Duration.
Example:
Time dependent: Offset in Days=zero Offset Dur=3:00 means after three hours from current
time
Time independent: Offset in Days=one Offset Dur=7:00 means after one day and seven hours,
(the seven hours are counted after the end of the first day, from 0:00 am the next day)
Note: A day is defined as being 0:00h until 23:59h and the time refers to the local time zone of user
End of Offset
Indicates a time span in days. For example, if you enter three, there is a period of three days after
the latest required delivery date during which the order can be executed. If you enter a zero, the
order must be executed on the latest delivery date.
(C) SAP AG
SCM612
19
11.20
Optimization Profile (2)
Transfer Requirement
Demand Horizon
Demand Categor y
Source Locations
Target Locations
SAP AG 2002
The Transfer requirements screen is accessed by selecting Multiple selection in the Transfer
Requirements box on the Planning Data tab of the Optimization Profile screen.
The tabs located in the Transfer Requirement screen are used to:
Define the time period that will be used to select the requirements (Sales Orders, Deliveries, Stock
Transport Orders, and so on)
Select the documents to be planned (the requirements).
Select the Source Locations to limit the selection of the outbound requirements.
Select the Target Locations to limit the selection of the inbound requirements.
(C) SAP AG
SCM612
20
11.21
Demand Horizon
Start of
Dem and Horizon
today
10 Days
.
Offset
End of
Dem and Horizon
.
50 Days
. .
Dem and Horizon
= Duration
= Sales Order
= Material Availability Date
= Requested Delivery Date
SAP AG 2002
(C) SAP AG
SCM612
21
11.22
Demand Categories
SAP AG 2002
The Demand category controls which requirements categories are included during Interactive Planning. The
categories can be combined with each other (for example, a combined outbound/replenishment scenario).
However, disconnected relationships do not work. For example, an inbound/outbound combination. Customerdesigned ATP categories can be used to enhance these categories.
The following lists identify the various order categories by transportation requirement.
Inbound:
AH Purchase order memo
BF Order item schedule line
BV Line in a scheduling agreement
Stock transports:
(AH)
Purchase order memo (only if necessary)
BF Order item schedule line
BI Stock transport order
BR Delivery
(EI) TLB: Purchase requisition (only if necessary)
(IT) VMI delivery (only if necessary)
Outbound:
BM Sales order
BQ Delivery free of charge
BR Delivery
BT Returns delivery
TLB:
EI TLB: Purchase requisition
EK TLB: VMI order
EQ Replenishment delivery
ER VMI delivery
(C) SAP AG
SCM612
22
11.23
Optimization Profile (3)
General Settings
Cost Profile
SAP AG 2002
Assign your cost and alert profile to the optimization profile on this tab.
(C) SAP AG
SCM612
23
11.24
Optimization Profile (4)
Automatic Shipment Generation
(for Parcel or TLB orders)
Category Selection
SAP AG 2002
(C) SAP AG
SCM612
24
11.25
Vehicle Scheduling Consistency Check
SAP AG 2002
After modeling your Supply Chain and finishing IMG-Activities, run the report /SAPAPO/VSCC.
Use the transaction /SAPAPO/VSCC.
(C) SAP AG
SCM612
25
11.26
Interactive Planning (1)
Planned Shipments
Shipment A ssigned
Orders
Unassigned Orders
for Consolidation
Resource, Shipments, and
Order Overview
SAP AG 2002
(C) SAP AG
SCM612
26
11.27
Interactive Planning (2)
Re source view
Order view
SAP AG 2002
(C) SAP AG
SCM612
27
11.28
Create a shipment manually
1.
3.
2.
SAP AG 2002
You are in the maintenance view for interactive vehicle scheduling: Vehicle Scheduling Resource.
Double-click a resource in the left area of the screen. The screen name displays the resource
description.
In tabular planning, go to the right screen area when you can move orders from the planning table
Not yet scheduled/to be scheduled to the planning table Assigned/unplanned shipments. Use Drag &
Drop to do this, or choose Assign order.
To remove an order from the table, choose Remove order.
The Transportation Scheduling Specifications for Scheduling screen appears (see next page). Here
you maintain:
Loading and unloading durations
Sequence of the stops
Transportation duration
Arrival or departure date and time
The default values for the loading duration are determined in Transportation and Shipping
Scheduling. A default value is also generated for the itinerary determined by the drive to all
source locations and to all target locations. The sequence of the stops is determined by setting the
stopoff sequence. The transport duration is read from the transportation relationships. They can
be adjusted if necessary. At least one date must be entered for each shipment (usually the arrival
time at the last target location). After you confirm, a shipment is created as long as there is a
possible date for the execution of the shipment in the planning horizon, and the resource selected
has enough capacity.
Confirm your entries with Enter. In the Transportation activities planning table and the upper
planning table of Assigned/unplanned shipment units, a line is added with the corresponding
information.
(C) SAP AG
SCM612
28
11.29
Create Shipments Manually
SAP AG 2002
If the vehicle is assigned to a transportation vehicle that is not suitable for schedules and a shipment
is created, this vehicle resource is not available for other shipments for the duration of the shipment,
regardless of any remaining capacity.
(C) SAP AG
SCM612
29
11.30
VS Optimization Run
Interactive Optimization
or
Optimizing in the Background
SAP AG 2002
Interactive Optimization
From the interactive vehicle scheduling Vehicle Scheduling Resource screen, select VS Optimizer.
Optimizing in the Background
Transportation Planning/Vehicle Scheduling (TP/VS) Planning Planning in the Background
Schedule Optimization Run.
Enter a job name.
Choose an optimization profile.
Choose Enter. The Start Times screen appears.
Specify a date for background optimization.
Choose Save. The screen closes and the message Background job was successfully scheduled
appears in the message bar.
The Optimization is carried out in the background at the time you selected.
If the optimization run finishes without any problems or messages being displayed, the Optimizer
does not create any transports. Reasons for this include:
Non-delivery costs are so low, the Optimizer determines that non-delivery is cheaper than the
transport of the order.
Transportation lanes are missed.
Total time of transport activities, including work breaks, is too long for the planning horizon.
(C) SAP AG
SCM612
30
11.31
Optimization Logfile
SAP AG 2002
(C) SAP AG
SCM612
31
11.32
History of Optimization Runs
SAP AG 2002
To get documentation of the Optimizer actions during an Optimization run, use Transaction
/SAPAPO/OPT11.
For analysis and error handling set the Dump Level to 1 in /SAPAPO/OPT10. In transaction
/SAPAPO/OPT11 you can see if input and/or output data is written.
(C) SAP AG
SCM612
32
11.33
Changing Shipments
2.
1.
3.
SAP AG 2002
Reschedule on the Vehicle Scheduling Shipments screen. Select a shipment (by double-clicking a
shipment in the left screen area) and choose Reschedule shipment on the Transportation activities
tab.
If additional orders are added to a shipment in the transportation view, the whole shipment is
rescheduled. You can do this until the shipment has been released.
(C) SAP AG
SCM612
33
11.34
Deleting Shipments
SAP AG 2002
Delete a shipment in the left screen area of the Vehicle Scheduling Shipments screen by doubleclicking the shipment, clicking the right mouse button, and choosing Delete shipment.
If you deallocate all of the orders assigned to a shipment, the shipment is also deleted. If an order is
assigned to a shipment to be deleted as well as to other shipments, it is deallocated from all
shipments. You can do this until the shipment has been released.
(C) SAP AG
SCM612
34
11.35
On-Line Scheduling View
SAP AG 2002
Online scheduling:
In the Transportation activities chart, the orders are displayed with their transportation activities on
a time axis. This time axis corresponds to the planning horizon defined in the optimization profile.
The activities load, transport, and unload are displayed in the form of bars, each in a different color.
These bars cover the start and finish of activities.
In the Resources chart, all of the resources involved in the shipments are displayed. This includes all
of the vehicle resources, handling resources, and opening time resources. Resource breaks are
displayed in gray.
(C) SAP AG
SCM612
35
11.36
Resource Utilization View
SAP AG 2002
You can maintain a planning table which shows your resources and their used capacities in the
customizing of PP/DS. Choose: Advanced Planner and Optimizer (APO) Supply Chain Planning
Production Planning and Detailed Scheduling (PP/DS) Product Planning Table Detailed
Planning Board in the Product Planning Board Maintain DS Planning Board Profiles.
(C) SAP AG
SCM612
36
11.37
Maintenance of Resource Utilization View
SAP AG 2002
The standard profile for TP/VS is SAP004. Never change this profile. Copy it to a user specific copy
and enter your user name to the field Customizing ID.
Mark your planning table profile and select Chart on the left side. You will see two charts: one
Transportation activity and two Resources. To add a resource utilization view press New entries. In
the upcoming screen enter a name on top; the chart number is three.
Select in the next step the chart object one (Resource). In the field Displayed objects select Resource
load, go to Histogram data (last tab at the bottom) and maintain the look of the diagram.
Go to Interactive Planning Board (/SAPAPO/VS01) and select Overview Plan Board. There you will
now also see the capacity of your resources.
For a more detailed view you also can choose on the application side in Production Planning
Interactive Production Planning Detailed Scheduling Planning Board Variable. View the tab
Planning Board. Put in your profile and choose Execute.
(C) SAP AG
SCM612
37
11.38
Exception Management
SAP AG 2002
View the alerts in the Alert Monitor window (Alert Monitor Display alerts)
Take action on alerts in the Alert Monitor window (access context menu with right mouse click).
There are three possible priority levels:
Error
Warning
Information
Alert types are automatically assigned certain priority levels, but you can change the priority level of
an alert in APO Customizing.
(C) SAP AG
SCM612
38
11.39
Set up Alerts for TP/VS
SAP AG 2002
Maintain an alert profile if you want to track Vehicle Scheduling alerts in APO. The profile allows
you to maintain a user-specific selection of alerts corresponding to your area of responsibility.
To set up Alerts for TP/VS choose APO Menu: Supply Chain Monitoring Current Settings Set
Alert Monitor or choose transaction code /SAPAPO/AMON_SETTING.
Determine planning version and time frame for alert selection in initial settings screen. If no version
is defined, the system considers the version of the VS optimization profile
Select Maintain profile, name your alert profile and choose the alerts you want to achieve. You also
have to assign the relevant optimization profile. Save and go back.
Assign your alert profile to the version-dependent alert selection. Save.
Note: Keep alerts to a minimum. Too many alerts slow performance
(C) SAP AG
SCM612
39
11.40
Vehicle Scheduling Process Flow (4)
Configuration
Master Data
Modeling
Optimization
(Load Consolidation &
Vehicle Schedul ing)
Create/Transfer
Shipments
Backorder Processing
Publishing
Create/Transfer
Deliveries
Carrier Selection
Release Shipments
Carrier Tendering
SAP AG 2002
(C) SAP AG
SCM612
40
11.41
Releasing Shipments
SAP AG 2002
Before each optimization run, all (fixed) shipments that are not yet released are deallocated. The
optimizer reschedules the orders. For an order to be fixed, it must be released (published).
When a shipment is released:
Planning result is accepted as final
Shipment is prepared for transfer to the OLTP system
Published shipment is not deallocated before an optimization run
Optimizer considers its resource load as a starting solution
Process Flow:
Vehicle Scheduling Shipments view. To release orders, select one or more shipments in the left
area of the screen by double-clicking them.
Choose Release shipment.
Note: After you release the shipments, you cannot make any changes to them in the APO System.
There is one exception, if you use manual Carrier Selection, you are able to choose or change your
carrier.
(C) SAP AG
SCM612
41
11.42
Communication Layer
Publishing
(Live Cache)
Tendering on
Planned Shipments
VS-Communication
Layer
EDI
XML
WEB
Orders
Orders
Deliveries
Deliveries
Shipments
Shipments
SAP AG 2002
Executable function releasing planned shipments from APO into the Communication Layer
Shipments are given a firm status and made available for tendering
(C) SAP AG
SCM612
42
11.43
Publishing Shipments
SAP AG 2002
(C) SAP AG
SCM612
43
Choose Execute. The Display logs screen appears containing information on the current user of the
log and an list of the shipments that are currently being transferred.
(C) SAP AG
SCM612
44
11.44
Shipment Program (Outbound Process)
R/3 Plug-In
(CIF)
APO Middleware
(CIF)
Orders
Sales Orders,
Deliveries,
and so on
Orders
Subscribe
Key Selection
Det. Dest. Sys
Mapping
Call BAPI
Optimization
Load Consolidation
Vehicle Scheduling
Creates
Outbound
Shipment
Planned Shipments
SAP AG 2002
(C) SAP AG
SCM612
45
11.45
Shipment Change Process
R/3 Plug-In
(CIF)
manual
changes
APO Middleware
(CIF)
update
Orders
Orders
update
manual
changesShipments
update
Shipments
SAP AG 2002
Any planning-relevant change to an order will invalidate the shipment in APO. If the shipment
consists of only the order that is changed, it will be deleted. If other orders exist in the shipment, the
status of the shipment will be changed.
Orders, deliveries and shipments must be changed in the OLTP System (R/3 System). Planning
relevant changes will be updated in the APO system.
(C) SAP AG
SCM612
46
11.46
End Shipments
SAP AG 2002
By setting the flag Shipment end in OLTP R/3 System, the shipment in APO is no longer relevant
for planning. A deletion indicator for those shipments is set.
If a shipment has been deleted in the OLTP System, the shipment in APO will also be deleted.
Those shipments and their deliveries for which a deletion indicator has also been set are deleted.
To delete those shipments choose in APO Menu Transportation Planning/Vehicle Scheduling
Planning Delete Shipments. The Display logs screen appears. Along with the general information
on the user of this activity, a list of shipments that are due appears. Data on this screen can only be
displayed. Choose Back to exit this screen.
a deletion indicator is set for the delivery if you post goods issue or goods receipt. To delete those
deliveries choose in APO Menu Transportation Planning/Vehicle Scheduling Planning Delete
Deliveries. The Display logs screen appears.
A deletion indicator is also set for a delivery, if:
The delivery has been deleted in the OLTP System
The delivery has been posted as a goods issue in the OLTP System and is not assigned to a
shipment anymore
The shipment has been deleted in the OLTP System
To delete the delivery, choose in the APO menu: Transportation Planning/Vehicle Scheduling
Planning Delete Deliveries. The Display logs screen appears. Along with the general information
on the user of this activity, a list of deliveries that are due appears. Data on this screen can only be
displayed. Choose Back to exit this screen.
(C) SAP AG
SCM612
47
11.47
Archiving Deliveries
SAP AG 2002
From time to time, inbound and outbound deliveries that are no longer required in the system can be
archived. To execute this function, use the archiving object RV_LIKP. This writes the deliveries to
an archive file and then deletes them from the database.
Central archiving is set up, executed, and managed using transaction SARA.
During the archiving run, the deliveries are checked on the basis of different criteria as to whether
they can actually be archived. These checks include (excerpt):
Total status of the delivery is complete
Delivery has reached the residence time (residence time in the system)
The shipment to which the delivery belongs is complete
You can determine the residence time yourself on the basis of the sales organization and the delivery
type. As a rule, all the other checks cannot be changed.
(C) SAP AG
SCM612
48
11.48
Archiving Shipments
SAP AG 2002
The archiving program checks several criteria for each shipment. A shipment can be archived if the
following conditions are met:
The creation date of the shipment must be at least N days in the past.
The last change date fo the shipment must be at least M days in the past.
The overall status of the shipment must be at least X. You set X in archiving control for
transportation (column: Minimum overall status).
All deliveries in the shipment must have transportation planning status C (fully planned).
All deliveries in the shipment must have goods movement status ' ' (not relevant) or C (fully
processed ).
The shipment must have the overall shipment costs calculation status ' ' (not relevant) or C
(completely processed).
If the overall shipment costs calculation status of the shipment is C (completely processed), the
relevant shipment cost document must already have been archived. This means that is must no
longer exist in the system. During archiving, the document flow must be processed starting with
the last document in the list.
All shipments that are included in a transportation chain with the shipment currently being
processed must also be fully relevant for archiving. This means, these shipments must also meet
preconditions 1-5 and fall within the shipment number range you specified when you started
archiving.
The last five criteria are always checked in the program and cannot be altered. The first three criteria,
however, can be set in Customizing (archiving control for transportation).
(C) SAP AG
SCM612
49
11.49
Available Functions for Mass Processing
Optimization
Create Job
Job
Profile
Carri er Selection
Create/Delete Deliveries
Create/Delete Shipments
Schedule Job
Date
Sequence:
Job, Event, or
operation
11
10
12
1
2
3
8
4
7
6 5
SAP AG 2002
The above sequence depicts the steps you perform to carry out mass processing.
You can carry out several planning actions within one job as long as they have the same activity.
For example, you might run a mass processing job that executes several macros at the same time, or
a job that carries out a VS optimization, carrier selection then publishing of the data to the R/3
(OLTP) System.
The sequence in which actions within one activity are processed depends on the sequential numbers
you define for them in the activity.
The system performs all actions for the first characteristic value before processing the second
characteristic value. Consequently, if you want the system to perform one action for all
characteristic values before it starts the next action, you must define separate planning activities.
For each job, define the selection of data which should be considered in the processing of the job as
well as the level to which it should be aggregated before the actions are executed.
Planning jobs are reusable.
See: APO SAP Menu Transportation Planning/Vehicle Scheduling Environment OLTP
Interface Mass Processing Interface.
(C) SAP AG
SCM612
50
11.50
Mass Processing Job Log
Date/Time of job
Characteristic combinations
processed
SAP AG 2002
The system can nowcreate a log of a mass processing job. Set an indicator on the job creation screen.
The job log shows:
Name of the job
Date and time which the job started
Whether the job completed successfully (green), with warnings (yellow) or with errors (red)
A message relating to every characteristic value combination that was processed in the job along
with long text
You can also use the following functions:
Show/hide all characteristic value combinations that completed successfully/with warnings/with
errors
Sort and filter according to characteristic value combination or message text
Print, download, or send the current view of the log
Define display variants for the log
(C) SAP AG
SCM612
51
11.51
Vehicle Scheduling (VS): Interactive Planning: Unit
Summary
SAP AG 2002
(C) SAP AG
SCM612
52
Release shipments
1-1
For Model 000 create cost profiles for: general costs, location costs, shipment costs,
and dimension costs as follows:
Model:
000
General Costs:
New Profile Name:
GRP##
Earliness Cost:
250.00
Location:
Priority:
Delay Cost:
2000.000
Non-Delivery Cost:
(C) SAP AG
1,000,000.000
SCM612
53
Priority:
Delay Cost:
1000.000
Non-Delivery Cost:
500,000.000
Shipment:
Transport.Method:
FTL##
50.000
Transport.Method:
LTL##
40.000
Dimension:
Transport.Method:
FTL##
Cost Dimension:
E Distance
Transp.Costs:
1.00
Cost Unit:
KM
0 Dimension
Transport.Method:
LTL##
Cost Dimension:
E Distance
Transp.Costs:
.50
Cost Unit:
KM
0 Dimension
Choose Save.
(C) SAP AG
SCM612
54
1-2
VSAP-##
No Carrier Found
1-3
000
With no depot locations
Transfer Requirement:
Fixed Horizon:
Start date:
Start time:
End date:
End time:
leave blank
00:00:00
leave blank
23:59:00
Run the Consistency Check on your inbound profile. If there are any errors you
should correct the errors before proceeding.
Transaction: /n/SAPAPO/VSCC
1-5
(C) SAP AG
SCM612
55
000
With no depot locations
Transfer Requirement:
Fixed Horizon:
Start date:
Start time:
End date:
End time:
leave blank
00:00:00
leave blank
23:59:00
GRP##
Runtime Optimization:
60
Run the Consistency Check on your outbound profile. If there are any errors you
should correct the errors before proceeding.
Transaction: /n/SAPAPO/VSCC
(C) SAP AG
SCM612
56
1-7
Create an optimization variant and conduct an interactive vehicle scheduling run for
inbound shipments:
1-7-1 Create a variant for the Vehicle Scheduling Selection screen after you have
entered your optimization profile.
Enter the following:
Optimization profile: OPIN-##
Select Enter.
Selection period:
Enter Start date: Today's Date
End date: Today's Date + 4 Wks
Resource: Use Multiple Selection to enter your resources,
G##-FTRK01 G##-FTRK05
G##-LTRK01 G##-LTRK05
Choose Save to create the variant.
Enter the Variant Name:
OPIN-##
Enter the Variant description: OPIN-##.
Choose Save.
1-7-2 Initiate the optimization process and review the data that is displayed on the
Vehicle Scheduling screen and review the unassigned Freight units.
Answer the following questions:
How many unassigned Freight units are there? ______
How many resources are available? _______
How many assigned/Unplanned Freight units? ______
How many shipments were created ? _______
Run the VS OPtimizer.
Answer the following questions:
How many unassigned Freight units are there? ______
How many resources are available? _______
How many assigned/unplanned Freight units? ______
How many shipments were created ? _______
Check the Alert Monitor:
How many alerts were displayed ? ________
Save the session.
1-8
Create an optimization variant and conduct an interactive vehicle scheduling run for
outbound shipments:
1-8-1 Create a variant for the Vehicle Scheduling Selection screen after you have
entered your optimization profile.
Enter the following:
Optimization profile: OPOUT-##
(C) SAP AG
SCM612
57
Select Enter.
Selection period:
Enter Start date: Today's Date
End date: Today's Date + 4 Wks
Resource: Use Multiple Selection to enter your resources,
G##-FTRK01 G##-FTRK05
G##-LTRK01 G##-LTRK05
Choose Save to create the variant.
Enter the Variant Name:
OPOUT-##
Enter the Variant description: OPOUT-##.
Choose Save.
1-8-2 Initiate the optimization process and review the data that is displayed on the
Vehicle Scheduling screen and review the unassigned Freight units.
Answer the following questions:
How many unassigned Freight units are there? ______
How many resources are available? _______
How many assigned/unplanned Freight units? ______
How many shipments were created ? _______
1-8-3 Create a planned and release a shipment manually from the sales order with
only one line item. Use an LTL resource.
1-8-4 Run the VS Optimizer.
Answer the following questions:
How many unassigned Freight units are there? ______
How many resources are available? _______
How many assigned/Unplanned Freight units? ______
How many shipments were created ? _______
Check the Alert Monitor:
How many alerts were displayed ? _______
Save the session.
1-8-5 Release the planned shipments.
Shipment document number: _______________________
Shipment document number: _______________________
Shipment document number: _______________________
1-8-6 Perform Manual Carrier Assignment for the shipments. Assign carrier
0000001058 to each shipment.
1-8-7 Choose Save.
1-8-8 Transfer the delivery data to the R/3 System using the publishing process.
1-8-9 Check the release status of all shipment documents.
1-8-10 Transfer the shipment data for your shipments to the R/3 System.
(C) SAP AG
SCM612
58
1-8-11 View the delivery and shipment documents in the R/3 System for one of the
sales orders.
(C) SAP AG
SCM612
59
Exercises
Unit: Vehicle Scheduling (VS)
Topic: Using Transportation Zone Hierarchies
At the conclusion of this exercise, you will be able to:
(C) SAP AG
2.1.2
2.1.3
2.1.4
SCM612
60
T-S11A##
P.O.Number:
12-1-##
T-ATD2-## 50 PC
Document Number:
_______________________
Sold-to:
T-S22A##
P.O.Number:
12-2-##
T-ATD2-##
T-ATD3-##
Document Number:
50 PC
50 PC
_______________________
Sold-to:
T-S33A##
P.O.Number:
12-3-##
T-ATD2-##
T-ATD3-##
Document Number:
50 PC
50 PC
_______________________
Sold-to:
T-S33A##
P.O.Number:
12-4-##
T-ATD2-##
T-ATD3-##
Document Number:
(C) SAP AG
50 PC
50 PC
_______________________
SCM612
61
Use your optimizing profile OPOUT-## to plan the shipments and save the
planned data but document the following:
How many shipments were created?
What were the optimized costs?
____________________
____________________
(C) SAP AG
SCM612
62
11.53Solutions
Unit: Vehicle Scheduling (VS)
Topic: Interactive Planning
1-1
For Model 000, create cost profiles for: general costs, location costs, shipment costs
and dimension costs as follows:
APO SAP Menu Master Data Master Data for Transportation
Planning/Vehicle Scheduling /SAPAPO/CTRP - Maintain Vehicle Scheduling
Costs
Model name: 000
Select Change.
General costs tab:
Select Add rows.
Add a row:
Cost profile: GR##
Earliness cost:250.000
Select the Location costs tab:
Select Add rows.
Add two rows:
Cost profile: GR##
Priority:
1
Delay costs: 2000.000
Nondelivery costs:1,000,000.000
Cost profile: GR##
Priority:
2
Delay costs: 1000.000
Nondelivery costs:500,000.000
(C) SAP AG
SCM612
63
VSAP-##
VS Alert Profile Gr ##
No Carrier Found
(C) SAP AG
SCM612
64
1-2
INBOUND SHPMNTS - GR ##
000
23:59:00.
Run the Consistency Check on your inbound profile. If there are any errors you
should correct the errors before proceeding.
Transaction: /n/SAPAPO/VSCC
1-5
(C) SAP AG
Model:
000
Profile:
OPIN-##
SCM612
65
OUTBOUND SHPMNTS - GR ##
000
23:59:00.
Run the Consistency Check on your outbound profile. If there are any errors you
should correct the errors before proceeding.
Transaction: /n/SAPAPO/VSCC
1-7
Model:
000
Profile:
OPOUT-##
(C) SAP AG
SCM612
66
1.7.1
OPIN-##
Choose Enter.
Planning Version:
000
Planning area:
Select the Multiple selection icon.
Select the Ranges tab.
Enter on one line: 1st col.:
2nd col:
G##-FTRK01
G##-FTRK05
G##-LTRK01
G##-LTRK05
(C) SAP AG
SCM612
67
(C) SAP AG
SCM612
68
_______________________
Overall Status:
_______________________
Carrier Number:
_______________________
_______________________
Choose Save.
1-8
OPOUT-##
Choose Enter.
Planning Version: 000
Selection period: Enter Start date: Today's date
Enter End date:
Planning area:
Select Multiple selection.
Select the Ranges tab.
Enter on one line: 1st col.:
2nd col:
G##-FTRK01
G##-FTRK05
G##-LTRK01
G##-LTRK05
(C) SAP AG
SCM612
69
SCM612
70
_______________________
Overall Status:
_______________________
Carrier Number:
_______________________
_______________________
Choose Save.
1-8-5 Release the shipments:
Select Shipment in the shuffler.
Select all of the planned shipments in the list.
The status of each shipment should be changed to Published.
1.8.5
SCM612
71
(C) SAP AG
SCM612
72
1-8-11 Display the R/3 delivery and shipment data that was generated during the
publishing process:
R/3 SAP Menu Logistics Sales and Distribution Sales Order
VA02 Change
In the Search criteria field: Sold-to party enter: T-S11A##
Select the Search button.
Select your order.
Choose Enter.
From the Sales Order Overview screen, place the cursor in the Sold-to party
field.
Choose: Environment Display document Flow
In document flow, select the shipment document.
Go to the Shipment document overview screen and:
Verify the carrier assignment:
Verify the Stages:
______________
______________
(C) SAP AG
SCM612
73
Solutions
Unit: Vehicle Scheduling (VS)
Topic: Using Transportation Zone Hierarchies
2-1
TZONE
(C) SAP AG
SCM612
74
12##
Target:
DE-D00006000
DE-D000060000
Target: DE-D000060000
Update the lane with your Transportation Methods:
FTL##
LTL##
2-1-8 Run Interactive Planning:
APO SAP Menu Transportation Planning/Vehicle Scheduling
Planning /SAPAPO/VS01 - Interactive Vehicle Scheduling
Use your variant OPOUT-18.
When running the VS Optimizer, record your number of shipments planned
and the total optimized costs.
2-1-9 Choose Save.
(C) SAP AG
SCM612
75
12
Carrier Selection
Contents:
The Carrier Selection process
Customizing activities related to Carrier Selection
SAP AG 2002
(C) SAP AG
SCM612
12.2
Carrier Selection: Unit Objectives
SAP AG 2002
(C) SAP AG
SCM612
12.3
Carrier Selection: Business Scenario
SAP AG 2002
(C) SAP AG
SCM612
12.4
Vehicle Scheduling Process Flow (3)
Configuration
Master Data
Modeling
Optimization
(Load Consolidation &
Vehicle Schedul ing)
Create/Transfer
Shipments
Backorder Processing
Create/Transfer
Deliveries
Carrier Selection
Carrier Tendering
Releasing Shipments
SAP AG 2002
The Carrier responsible for transporting the shipment is selected after the shipment and its deliveries
are determined in Optimization and Scheduling. Carrier selection is performed through specific rules
in APO or through private/public exchanges in the R/3 System.
Rules-based carrier selection is based on the lowest total cost, highest priority, or pre-defined
business share amongst the eligible carriers. These rules are stored in the Carrier Optimization
Profile.
Carrier selection does not need to be performed in APO, but can be manually completed in the R/3
system.
(C) SAP AG
SCM612
12.5
Carrier Selection
M
S
a n u a l
le c t i o n
r io
r it y
a r r i e r
e le c t io n
A
S
u t o m a t ic
e le c t io n
S i n g le
s s ig n m
o s t s
C o n t i n u o u s
e n tM o v e
s i n e
s s
FS r he a i gr eh t
x c h a n
S AP A G 2002
Carrier selection provides a number of methods that are used to assign a carrier to a shipment:
Manual Selection: A carrier is assigned to the selected shipments manually.
Automatic Selection: This process can be performed interactively or in a background process using
a Carrier Selection profile to direct the assignment of the carrier to shipments.
If only one carrier is available for selection for the transport (only one carrier is maintained for the
transportation lane), this carrier is assigned (single assignment).
In the continuous move scenario a carrier is selected to provide transportation services for more leg
in a transportation itinerary. In a continuous move the selected carrier transports goods to a location
and then picks up goods to transport to another location(s).
The checks for single assignment and continuous move occur before the selection strategies of the
Carrier Profile are taken into account.
(C) SAP AG
SCM612
g e
12.6
Manual Carrier Selection
2. Carrier Selection
1. Selection
3. Enter Carrier
SAP AG 2002
(C) SAP AG
SCM612
12.7
Automatic Carrier Selection
2. Carrier Selection
1. Select Shipment
4. Select Log
SAP AG 2002
Use a Carrier Profile with automatic carrier selection to direct the system when determining the
shipments carrier.
Select the log option when automatic carrier selection is used.
(C) SAP AG
SCM612
12.8
Carrier Profile
Defines Run/Selection Boundaries
Model/Version
Locations
Vehicles
Transportation Mode
SAP AG 2002
All selected shipments will get a carrier according to the carrier selection profile when using
automatic Carrier Selection from interactive planning.
You can also perform automatic carrier selection as a background process.
(C) SAP AG
SCM612
12.9
Carrier Profile: Carr.sel.
(C) SAP AG
SCM612
12.10
Carrier Profile: Planning Data
SAP AG 2002
(C) SAP AG
SCM612
10
12.11
Carrier Profile: Selection criteria
Order in which
strategies are used
R/3 System
Costing
SAP AG 2002
Use the Selection strategies to direct the optimizer in choosing a carrier for the selected shipments.
Use any or all of them in carrier selection.
When using the Costs or Business Share selection strategies, you must select a cost location; either
costs from the R/3 System (OLTP) (external costs) or costs stored in the transportation lane (internal
costs).
(C) SAP AG
SCM612
11
12.12
Selection Strategies
SAP AG 2002
Costs: The carrier is selected by determining the least total cost for the shipment. The costs are
determined by using either the internal costs defined in the Carrier data assigned to the
Transportation Lanes or external costs by querying the transportation freight costs in the R/3 System
Logistics Execution application. The total cost is determined for each carrier that has rates set for the
shipments transportation lanes or from the external system.
Priority: The carrier is selected by the highest priority on the lane of transportation. The priority is
stored on the transportation lane by carrier.
Business Share: The carrier is selected based on the business share maintained for the carrier. The
percentage of shipments each carrier receives for a time period (day, week, and month) is based on
the maintained percentage on the transportation lane. The actual values come from the maintained
planning book.
Private/Public Exchange: Private/Public Exchange is possible in the R/3 System. Enter a carrier in
APO. The necessary information for the Private/Public Exchange is in the R/3 System..
(C) SAP AG
SCM612
12
12.13
Functionality of Automatic Carrier Selection
Priority
Explicit priorities
Single
Assignment
Costs
Continuous
Move
Business
Share
Maintained on Lane
Freight
Exchange
Private/ Public Exc hanges (R/3)
1. Level
2. Level
SAP AG 2002
(C) SAP AG
SCM612
13
12.14
Strategy of the Direct Lane
Carrier 4
Point A
Plant
Carrier 4
Carrier 3
Carrier 3
Carrier 2
Carrier 2
Carrier 2
Carrier 1
Carrier 1
Carrier 1
Point B
Customer
Point C
Customer
Point D
Customer
Carrier 5
Carrier 2
Carrier 1
SAP AG 2002
Example: A transport travels from A via B and C to D. The system checks which transportation
service providers cover all sections of the transport (A to B, B to C, C to D). The strategy of the
direct lane (A to D) is then applied for the possible carriers.
(C) SAP AG
SCM612
14
12.15
Intra-zone Lanes and Carrier Selection
Intra-zone
lane
SAP AG 2002
(C) SAP AG
SCM612
15
12.16
Continuous Move
Carrier 2
Carrier 2
Carrier 1
Carrier 1
Consideration
of m aximum
SAP AG 2002
The Continuous Move setting manages whether a carrier arriving at a point of destination after
having finished a shipment accepts a complete new shipment, starting from this point of destination.
Requirements:
The previous shipment has to be assigned to the respective carrier.
When there are two or more carriers to select, the assignment is done
by selection criteria (without consideration of the minimum).
Settings for Continuous Move:
APO: SAP Menu: Master Data Location Location; Tab Carrier
(C) SAP AG
SCM612
16
12.17
Quotation of Shipments
Priority
Minimum - Maximum
Single
Assignment
Maximum is
considered
Costs
Minimum - Maximum
Continuous
Move
Business
Share
Maximum is
considered
- Quotation has to be
maintained - Actual Values
- Allocation of Minimum
is at optimal costs
Minimum - Maximum
1. Level
2. Level
SAP AG 2002
The allocation of quotas is above the selection strategies of the carrier selection profile. The strategies always
occur under consideration of the allocations.
For the Business Share strategy the allocation must be maintained. Actual values are required!
During allocation, the following characteristics are used:
Transportation allocation object
Start location
Target location
Carrier
Means of transport
The following key figures are used:
Maximum
Minimum
Actual value
The maximum of the maintained allocation of quotas is taken into account during the manual assignment of a
carrier.
(C) SAP AG
SCM612
17
12.18
Business Share Configuration
2.
3.
4.
SAP AG 2002
The Business Share carrier selection strategy is based on the number of carrier shipments. A
minimum and maximum number of shipments that a carrier can tender is the basic selection criteria.
Customizing activities create in APO a way to track the number of shipments a carrier has made in a
time period. The time period is configurable (day, week, or month).
The minimum and maximum number of shipments are set for a carrier within a transportation lane,
by transportation method.
(C) SAP AG
SCM612
18
12.19
Vehicle Scheduling Process Flow (5)
Configuration
Master Data
Modeling
Optimization
(Load Consolidation &
Vehicle Schedul ing)
Create/Transfer
Shipments
Backorder Processing
Create/Transfer
Deliveries
Carrier Selection
Carrier Tendering
Releasing Shipments
SAP AG 2002
(C) SAP AG
SCM612
19
12.20
TP/VS Tendering
EDI
Business Scenario:
Internet Tendering
Create
Shipment
Publish
Transportation Planner
Release
for
Execution
Business Scenario:
Internet Tendering
XML
Front end
View
Front end
HTML
Service Agent
Accept / Decline
SAP AG 2002
Collaborative Transportation Planning between shippers and their carriers allows both partners to
streamline work processes and ultimately benefit from reduced handling costs, greater transparency,
and efficiency.
Shippers can inform their carriers about their shipment plans, and the carriers can accept, reject or
change shipment requests. For example, the carrier could suggest an alternate pickup or delivery
date.
This process begins after all the prerequisites are fulfilled. Tendering is possible via EDI, fax,
Internet, or a similar method of communication.
Once planned shipments are released in APO, a tendering announcement is created.
(C) SAP AG
SCM612
20
12.21
Collaborative Transportation Planning: EDI
CARRIER
SHIPPER
Transportation
Planner
Review
offered
shipments
Transportation
Planner
Se
nd
4
Ac
ce
pt
Carrier
Carrier
system
system
or
d
off
er s
en
y
to
off
er s
5
ca
rri
er
via
via
ED
I
ED
I
Alert if
offer denied
APO
APO
TP/VS
TP/VS
1
5
Vehicle
Scheduling
R/3
R/3
SAP AG 2002
The transportation planner executes shipment planning using APO TP/VS and makes a carrier
selection, either manually or via a VS optimization run.
A shipment request is sent to the carrier via EDI using IDOC PLNSHP.
The carrier reviews the request and either accepts or rejects it via EDI. The carrier can also change a
pickup or delivery date and time for each stage of the shipment request.
If the shipment request was rejected or modified, the shippers transportation planner is notified via
the APO Alert Monitor. The planner can then select another carrier via carrier selection.
If the shipment request was accepted, APO TP/VS issues a shipment order for execution in the R/3
System.
(C) SAP AG
SCM612
21
12.22
Bidding Alerts
SAP AG 2002
Bidding Alerts are generated during the tendering process between APO TP/VS and external
carriers. After the APO VS run, the shipment proposals are transmitted to external carriers.
Sometimes they are transmitted to the execution system (R/3) before confirmation from the external
carrier arrives. In this case,, the system also triggers an execution system alert if there is a change or
a rejection.
Configure Bidding Alerts using the Alert Monitor. They are configured in the VS Alert Profile.
(C) SAP AG
SCM612
22
12.23
New tendering process after declination
SAP AG 2002
You can get an alert after declination of a shipment. Right-click on the generated alert and you can
offer this shipment to a new carrier or to the same carrier who was previously chosen.
(C) SAP AG
SCM612
23
12.24
Collaborative Transportation Planning: Internet
CARRIER
SHIPPER
Transportation
Planner
Transportation
Planner
2
3
Review
offered
shipments
Internet
Inf
orm
ca
rri
er
5
( vi
a
e- m
4 Accep
ail
t or
)
den
y
off e
Get shipment
rs
Alert if
offer denied
APO
APO
TP/VS
TP/VS
1
Carrier
Carrier
system
system
Vehicle
Scheduling
R/3
R/3
SAP AG 2002
The transportation planner at the shippers site plans shipments using APO TP/VS and makes a
carrier selection, either manually or via a VS optimization run.
The planner then sends a hyperlink via e-mail to a Web page with the current shipment requests.
The carrier reviews the shipment requests in the Internet and either accepts or rejects them. The
carrier can also change a pickup or delivery date and time for each stage of a shipment request.
Furthermore, the carrier can display an XML file with all details of the shipment request by clicking
on the shipment number. The XML file can be displayed in a carrier-specific layout that is
maintained in the APO partner settings.
If a shipment request was rejected or modified, the shippers transportation planner is notified via the
APO Alert Monitor. The planner can then select another carrier via carrier selection.
If the shipment request was accepted, APO TP/VS issues a shipment order for execution in the R/3
System.
Tendering can occur automatically or at the discretion of the shipper, but only after the shipment is
released in APO.
Collaboration for Tendering via the Web requires an Internet Transaction Server (ITS) with the
Collaborative HTML Templates installed
(C) SAP AG
SCM612
24
12.25
Collaboration Configuration (Tendering)
SAP AG 2002
(C) SAP AG
SCM612
25
12.26
Shipment Details in a Carrier-Specific Layout
2.
3.
SAP AG 2002
Note: The IDOC generation is only required for the XML display. In the IDOC partner profile
(transaction /WE20) you should define a receiver port with a physical directory located on your own
application server.
There is a default XSLT stylesheet that can be modified by the customer in the directory
../MIMES/CLPGLOBAL/99/STYLE/plnshp.xsl.
The URL for the XML style sheet is:
http://<server>:<port>/sap/ist/mimes/clpglobal/99/style/plnshp.xsl
(C) SAP AG
SCM612
26
12.27
Carrier Selection: Unit Summary
SAP AG 2002
(C) SAP AG
SCM612
27
12.28Exercises
Unit: Carrier Selection
Topic: Carrier Profile
At the conclusion of this exercise, you will be able to:
1-1
Three carriers have already been created in APO for your use:
0000001058
0000001925
0000001930
The first thing you must do is assign the carriers to the transportation methods in
the transportation lanes where they will be used.
1-1-1 Assign these carriers to your transportation methods: FTL## and LTL## in
transportation lanes:
12## T-S11B##
12## T-S11C##
Set the internal costs of the carriers as follows:
Carrier: 0000001058 LTL rate is .900 per KM
Carrier: 0000001058 FTL rate is .750 per KM
Carrier: 0000001925 LTL rate is .850 per KM
Carrier: 0000001925 FTL rate is .800 per KM
Carrier: 0000001930 LTL rate is .800 per KM
Carrier: 0000001930 LTL rate is .750 per KM
1-2
(C) SAP AG
SCM612
28
(C) SAP AG
SCM612
29
1-4
1-5
Freight rates have been set up in the R/3 System for the three carriers. Change your
Carrier Selection profile to selct the carriers based on "External" costs.
1-5-1 Change your CS profile, GR##.
1-5-2 Return to Interactive Vehicle Scheduling and select the planned shipments
that were created in 1-4 and perform Carrier Selection. Select the "log"
option on the selection screen.
Did the results of the carrier selection change? ____________
In the Appendix is a copy of the freight rates established in the R/3 System.
Use them to verify that the correct carrier was selected.
(C) SAP AG
SCM612
30
Update the Transportation Methods within the transportation lanes with the carrier
information:
APO SAP Menu Master Data /SAPAPO/SCC_TL1 - Transportation Lanes
1-1-1 Update each transportation lane:
Model name: 000
Source loc.: 12##
Target loc.: T-S11B##
Select Change.
In the means of trans. section, select your FTL##.
Select the Carrier assignment icon (the truck) in the toolbar.
The bottom section of the screen will now become the Carrier for transport
type FTL## area.
Select the Creation of new entry icon in the toolbar.
The Carrier detail box will open up on the right side of the screen. You
might have to resize the left side of the window to see all of the data fields
in the detail box.
Create the carrier entry:
Enter the Carrier location number.
Enter the rate for the carrier in the Carrier costs (per KM) field.
Select Copy at the top of the screen.
Enter the second and third carriers for the Transportation Method.
After completing the entry for the third carrier, select Copy and close.
Select the next Transportation Method, LTL## and repeat the process for
the carriers and their rates for this method.
Choose Save after all data has been entered for the lane.
Perform this process for the next transportation lane.
1-2
GR##
Select Create.
(C) SAP AG
SCM612
31
000
1-4
(C) SAP AG
SCM612
32
After a few seconds, you should get a message Carrier selection completed
successfully.
Double-click on the shipment for which carrier selection was just performed.
Select the Details tab on the right-side of the screen and find the assigned carrier.
Repeat the carrier selection process for the remaining shipment related to your
second sales order.
1-5
Modify your carrier selection profile to use the external costs in the R/3 System and
rerun carrier selection for your two shipments:
1-5-1 Update your carrier profile:
APO IMG: Advanced Planner and Optimizer (APO) Transportation
Planning/Vehicle Scheduling (TP/VS) Carrier Selection Define
Carrier Profile
Enter Carr. profile:
GR##
Select Change.
Select the Sel. criteria tab.
In the Costs selection strategy, select External costs.
Choose Save.
(C) SAP AG
SCM612
33
1-5-2 In interactive vehicle scheduling, rerun your carrier selection and review the
results.
APO SAP Menu Transportation Planning/Vehicle Scheduling
Planning /SAPAPO/VS01 - Interactive Vehicle Scheduling
On the Vehicle Scheduling Selection screen, select your variant OPOUT18 by selecting the Get variant icon.
Select Execute.
Select Shipments in the shuffler.
Select one of the shipments created for your sales orders by double-clicking
on it.
Select Carrier selection in the application toolbar.
When the Carrier Profile dialog box displays, enter your Carrier Selection
profile and select the Log checkbox.
Select Execute.
After a few seconds, you should get a message Carrier selection completed
successfully.
Double-click on the shipment for which carrier selection was just
performed.
Select the Details tab on the right-side of the screen and find the assigned
carrier.
Repeat the carrier selection process for the remaining shipment related to
your second sales order.
(C) SAP AG
SCM612
34
13
TP/VS: Additional Topics
Contents:
Backorder Proce ssing (BOP )
Shipment and Transportation Scheduling
Shipment scheduling
SAP AG 2002
(C) SAP AG
SCM612
13.2
TP/VS: Additional Topics : Unit Objectives
SAP AG 2002
(C) SAP AG
SCM612
13.3
TP/VS: Additional Topics : Business Scenario
SAP AG 2002
(C) SAP AG
SCM612
13.4
Backorder Rescheduling/ Processing
SAP AG 2002
Backorder processing is essentially set to process entered requirements and to diagnose and cancel
backorder situations. A backorder situation can require the changing of confirmed quantities or dates
After a changed availability situation
After the arrival of priority orders
After a planning run in PP/DS or in SNP
After changes in the location-specific product master data for ATP
The Backorder Processing (BOP) plays an important role within the Transportation Management
Solution for the Sales Order Fulfillment Process: when running BOP on sales orders which have
been consolidated previously by TP/VS, the scheduling is based on the given loading dates. With the
update of the orders into the R/3 System, the documents have the correct dates and times as defined
by the shipments activities.
BOP is only possible for Sales Orders.
(C) SAP AG
SCM612
13.5
Backorder Processing and Scheduling (1)
A Monitor
Alert
Filter
Individual
Filter
PP/DS
TP/VS
Load. Activity
SNP
Master Data
NetChange
Filter
(C) SAP AG
SCM612
13.6
Backorder Processing and Scheduling (2)
Filter
Available To Promise
Product
Location
Order creation date
And so on
(C) SAP AG
SCM612
13.7
Backorder Processing and Scheduling (3)
Sorter
Product
Location
Delivery prioritiy
And so on
SAP AG 2002
(C) SAP AG
SCM612
13.8
ATP and Transportation Planning
Allocations for Transports
Local MS
Global
APO
Local SCE
**
ERP
Pick/Pack
Loading time
Load
GI time
Transit
Transport
Dispo
Delivery time
UnLoad
Mat. Availability time
* MS = Manufacturing System
**SCE = Supply Chain Execution System
SAP AG 2002
(C) SAP AG
SCM612
13.9
Direct Update of Batch BOP
Filter
Sort
Rejection of the
confirmed quantities
ATP check
New date/quantities
SAP AG 2002
Process:
Carry out batch backorder processing to redistribute previously-confirmed quantities for the order
items of backorders, according to a list of priorities
As long as the update in the connected OLTP system is not yet completed, the assigned quantities
are protected in APO as temporary quantity assignments.
The changes are updated in the R/3 System.
The update is confirmed to APO.
You can delete the results in the buffer. These are only used as a log.
If you have to define unforeseen short-term sales priorities, use interactive backorder processing
(C) SAP AG
SCM612
13.10
Batch BOP with Postprocessing
Manually redistribute
confirmed quantities
of one or more
products
Processing occurs at
schedule line level
Dates of schedule
lines can be changed,
deleted, or created
SAP AG 2002
Purpose: You do not want to update the results of backorder processing directly, you want to carry out
an operative simulation first.
Prerequisite: Maintain the settings for backorder processing and have orders in APO.
Process:
Set the parameter Execution mode with postprocessing on the tab page and carry out backorder
processing.
The results are not updated immediately; rather, they are saved in a buffer.
Call the results display to process the results. The assigned quantities are protected by temporary
quantity assignments.
You can process the results via interactive backorder processing from the results list.
You can update or reject the results afterwards.
If necessary, delete the results list or the results in the buffer.
(C) SAP AG
SCM612
10
13.11
Shipment and Transportation Scheduling
Shipment Scheduling
All processe s that are necessary to initiate goods shipment
are included in shipment scheduling. These processe s include
loading, picking, and packing. Shipment scheduling
determines the material availability date and loading start.
Transportation Scheduling
All deadlines that affect shipment preparation and execution
are included in transportation scheduling. These include
transportation lead time, transportation time, and the
unloading/loading time (for stock transfers). Transportation
scheduling use s the requested delivery date to determine the
goods i ssue deadline and the transportation planning
deadline. The possible delivery date is determined if the
system use s forward scheduling.
SAP AG 2002
You can specify a requested delivery date for each schedule line in an item when you enter an
order. The customer should receive the goods by this date. During order processing, the system can
automatically plan when the necessary shipment activities such as picking, loading, and
transportation must begin in order to stay on schedule for the requested delivery date.
The system starts with the requested delivery date and schedules chronologically backwards. For
this reason, this process is called backward scheduling. The system determines the deadlines as
follows:
Requested delivery date transportation time = Goods issue deadline
Goods issue deadline loading time = loading start
The planning date and the material availability date are determined based on the loading start.
Loading start planning lead time = planning date
Loading start pick/pack time = material availability date
If the system recognizes that the material availability date or the planning date fall in the past, it
automatically runs forward scheduling in order to determine a delivery date that can be confirmed.
Note: If there is no material available on the material availability date, the SAP system can run an
availability check according to the system settings. The resulting material availability date is then
used as a basis for forward scheduling.
Note: In a rules-based availability check, backward scheduling is carried out to determine the
material availability date for a location/product substitution, starting from the original requested
delivery date. This is necessary, since the substitution can influence the scheduling result (for
example, because of another transportation lane in location determination).
Note: For scheduling to occur properly, the transportation zones and shipping conditions must be
copied from the SAP R/3 System into the SAP APO system.
(C) SAP AG
SCM612
11
13.12
Scheduling Process
APO
R/3 Plug-In
Creat e
sales order
Material
Material
(Plant APO (Plant
relevant) not APO
relevant)
Call
scheduling
Calculate
dates and times
Calculate dates
and times
Call
ATP
Check
ATP
Deter mine
process durations
Deter mine
process durations
Calculate
dates and times
Delete
temporary quantity
assignments
Deter mine
process durations
Calculate
dates and times
Save
sales order
SAP AG 2002
Start the process by creating a sales order. Enter the requested material, quantity, and delivery date.
The R/3 System uses the order type to determine whether shipment scheduling or transportation
scheduling should be carried out. The following points are valid for order types for which
scheduling is requested.
The R/3 System determines the plant for the material in each item. The CIF integration model
defines whether the availability check in the APO system is to be run for materials in this plant. If
this is the case, scheduling can also occur in the APO system.
Note: You mix items within a sales order whose availability is checked in the APO system and in
the R/3 System: Due to the various scheduling techniques, there can be considerable deviations
between the times calculated (the transit time, in particular). Functions involving several items,
such as complete delivery and delivery groups, are especially susceptible to such detrimental
effects.
The material availability date is calculated either in the APO system or in the R/3 System for the
requested delivery date of an item.
The system checks availability for material, plant, and quantity on the material availability date.
R/3 System or APO system: If the material availability date that was determined previously cannot
be confirmed, the system redetermines the process duration, recalculates the dates and times,
adds more schedule lines, and returns this information to the R/3 System. This normally occurs
when availability is found to be insufficient or when the material availability date lies in the past.
Save the sales order.
(C) SAP AG
SCM612
12
13.13
Schedules
1. Create a Transport Method (flag for Schedule has to be set)
2. Create a Vehicle Resource
3. Assign Vehicle Resource to Model/Planning Version
4. Assign Transport Method to Transportation Lane
5. Maintain Vehicle Scheduling Costs for Transport Methods
6. Maintain Itinerary
7. Assign Itinerary to active Model
8. Maintenance from here on for Scenario 1 or Scenario 2
Scenario 1:
Departure at a fixed day of the week
(for example, every Monday)
Scenario 2:
Departure in a predefined rhythm
(for example, every 10 days)
SAP AG 2002
IMG: Advanced Planner and Optimizer (APO) Supply Chain Engineer (SCE) Maintain
Transport Method
Relevant fields for maintenance of schedules are: Vehicle (= Transport Method), Transportation
Mode. and Schedule.
SAP Menu: Master Data Resource; Tab Vehicle
The Schedule flag has to be set for the Vehicle Resource you have maintained at number one.
Is done in the Supply Chain Engineer (SCE) or in Create-View of Resource Master Data.
SAP Menu: Master Data Transportation Lanes or SAP Menu: Master Data Supply Chain
Engineer Maintain Model
The whole transport duration should be maintained here. To calculate the time of arrival, the
transport duration is added up to departure time.
SAP Menu: Master Data Master Data for Transportation Planning/Vehicle Scheduling
Maintain Vehicle Scheduling Costs
SAP Menu: Master Data Master Data for Transportation Planning/Vehicle Scheduling
Schedules Maintain Itinerary
SAP Menu: Master Data Master Data for Transportation Planning/Vehicle Scheduling
Schedules Maintain Itinerary (Initial Screen)
(C) SAP AG
SCM612
13
13.14
Schedules (Scenario 1)
1. Maintain Calendar
2. Maintain Schedule Validity Period
3. Maintain Schedule
SAP AG 2002
(C) SAP AG
SCM612
14
13.15
Schedules (Scenario 2)
1. Maintain Calendar
2. Maintain Schedule Validity Period
3. Maintain Schedule; departure times have to be maintained
manually
SAP AG 2002
(C) SAP AG
SCM612
15
13.16
Schedules
SAP AG 2002
The travel time maintained in the schedule and the transport connections apply to the resource that is
assigned to the schedule.
Schedule A B C: Departure from location A at 10:00
Duration A B: three hours, duration B C: two hours
Arrival at B at 13:00; at C at 15:00
(C) SAP AG
SCM612
16
13.17
TP/VS: Additional Topics : Unit Summary
SAP AG 2002
(C) SAP AG
SCM612
17
14
TP/VS - Monitoring
Contents:
An overview of transportation content in BW
An overview of Supply Chain Event Management
(SCEM)
SAP AG 2002
(C) SAP AG
SCM612
14.2
TP/VS Monitoring: Unit Objectives
SAP AG 2002
(C) SAP AG
SCM612
14.3
TP/VS Monitoring: Business Scenario
SAP AG 2002
(C) SAP AG
SCM612
14.4
SAP BW-Definition
SAP Busine ss Information Warehouse ...
SAP AG 2002
(C) SAP AG
SCM612
14.5
Positioning of BW within the SAP Environment
R/2
R/2 le
leg
gaacy
cy
3
3rd
rd
Open pa
rty
pa
Internet rty
standard
nonmySAP.com
3.1H
Single
Port
Portaall
sign- Industry-specific
Industry-specific
Coc
on
Cockk-ro
role
leba
base
sed
d
pit
pitss
pe
lize
perrso
sona
na
lized
d
Dra
Drag
g&
&Re
Rela
lattee
WorkingwithWeb-Browser
M
Maarrkkeett-pla
place
ce
APO
APO
CR
CRM
M
B2
B2B
B
BW
BW
Ente
inside
rpri s
e fro
nti er
Pa
Part
rtne
nerr
outside
SAP
SAP mySAP.comInternet Services
Other InternetServices
SAP AG 2002
(C) SAP AG
SCM612
14.6
Main Topics of BW
A system that is easy to h andle for standard r eporting and multid imensional
ad-hoc anal ysis (OL AP)
Take the load off the operating system and relieve the IT-organization
High performance
SAP AG 2002
(C) SAP AG
SCM612
14.7
BW-Architecture
SAP AG 2002
(C) SAP AG
SCM612
14.8
Data Process Chain
Role
Decision, prep aration
Workbook
Report
Query
Definition
Analysi s
InfoCube
Update rules
Updating
Transformation,
Aggregation
Communication structure
InfoSource
Extraction
Source system
Mapping &
Transformationrules
Transfer
structure
Transfer
structure
OLTP
Syn. Data
Provider
SAP AG 2002
(C) SAP AG
SCM612
14.9
Possible Use of the Busine ss Content
Roles
Standard
Standard analysi
analysis,s,
Ready-to-go
Ready-to-go solutions
solutions
Web reports
Workbooks
ive
ct
e
sp
er
Queries
P
er
s
Best
Practices
U
InfoCubes
ew
Vi
r
e
Us
InfoObjects
d
In
Transfer rules
InfoSources
d
an
t
S
Customer
Customer
Order
Order Entry
Entry
d
ar
id
iv
is
lys
a
n
lA
a
u
n
t io
a
z
i
Standard
Standard Content,
Content,
Ea
sy
to
Extend!
Ea sy to Extend!
Maintenance
Maintenancethrough
through SAP
SAP
Extractors
SAP AG 2002
(C) SAP AG
SCM612
14.10
Transportation Content In BW: Overview
Shipment Header
Shipment Stages
SAP AG 2002
(C) SAP AG
SCM612
10
14.11
Example: Freight Cost Reporting Overview (1)
Key figure s:
Characteristics from:
Transportation Header
Stages
SAP AG 2002
(C) SAP AG
SCM612
11
14.12
Example: Freight Cost Reporting Overview (2)
SAP AG 2002
(C) SAP AG
SCM612
12
14.13
Logistics Content: Outlook
(C) SAP AG
SCM612
13
14.14
Definition of Supply Chain Event Management
SAP AG 2002
(C) SAP AG
SCM612
14
14.15
Types of Events and Tracking
Actual events
Event 1
Event 2
Event 3
Event 2
Event 1
Regular
event
Unexpected event
Event 4
Overdue
event
Expected events
Process milestones
Unreported event
SAP AG 2002
Tracking:
Is gathering real time data for events, status, locations, and parties involved for elements in a
logistics process
Can be used for warnings, messages, data progression, or follow-up processes when:
(C) SAP AG
SCM612
15
14.16
SCEM Example: Procurement Process
W arehouse
Ordering
Part y
RF
RF Dev
Device
ice
Goods
Goods Receipt
Receipt
Quality
QualityCheck
Check
Availability
Availability
Inb. Del.
EDI
EDI
Departure
Departure
ETA
ETA
Arrival
Arrival
EDI
EDI
Arrival
Arrival
Import
Import Documents
Documents
Loading
Loading Ship
Ship
PO
TO
Event
Manager
EDI
Incoming Order
Scheduling Confirmation
Carrier
Carrier
Purchase
Order
Transfer
Order
S AP
System
Singapore
Port of
Departure
Pickup POD
Inbound Deliv ery Warehouse
Scenario:
Internet
Internet
Loading
Loading
Departure
Departure
Border
Border Crossing
Crossing
Arrival
ArrivalPOL
POL
Supplier
Internet
Internet
Incoming
Incoming Purchase
Purchase Order
Order
Start
Start of
of Production
Production
End
End of
of Production
Production
Goods
Goods Issue
Issue
Malaysia
Added Value:
The timely processing of the purchase order can be
monitored.
SAP AG 2002
SCEM can be used for whole processes. Procurement uses one single point of entry for its various
documents
Many parties send events to the Event Manager using different ways of communication,such as the
Internet (Portals), EDI, Radio Frequency devices, and so on
(C) SAP AG
SCM612
16
14.17
SCEM Example: Tracking Pallets for Recall
Loading Point
DC1
Customer
A
ALERT
ALERT !!
Batch
Batch on
on
PAL
PAL 1,2,3
1,2,3
contaminated
contaminated !!
Event
Manager
DC3
Pick-up
Pal.1,2,3
SAP
System
Crossdock
Pal 1,2,3.
Tracking
Ev ents
Dispatch
Pal 1
Dispatch
Pal 2,3
Customer
B
DC2
Crossdock
Pal 2,3.
Dispatch
Pal 3
POD
Pal 3
Locations
Locations
PAL
PAL 1:
1: Shipped
Shipped to
to DC
DC 11
PAL
PAL 2:
2: In
In DC
DC 22
PAL
PAL 3:
3: Deliver
Delivered
ed to
to Customer
Customer C
C
Customer
C
SAP AG 2002
(C) SAP AG
SCM612
17
14.18
SCEM Scenario
Manufacturer
Customer
Carrier
Start Production
Track
Production
End Production
Truck driver is informed about
pick up time via SMS
Load truck at dock
Leave
manufacturing
site
Track Shipment
Monitors shipment using
web access
Warehouse employee
confirmes loading
completion )
Truck driver confirmes
departure, delay, and arrival
using car mounted device
Proof of delivery
SAP AG 2002
(C) SAP AG
SCM612
18
14.19
Embedded Status Reporting: Example
SAP AG 2002
(C) SAP AG
SCM612
19
14.20
A Few Application Scenarios for Event
Management
Proce
Process
ss Automation
Automation
Recalculation
Recalculation of
of arrival
arrival time
time
Production
Production rescheduling
rescheduling for
for late deliveries
deliveries
Progressive
Progressive run
run times
times
Calculation
Calculation of
of demurrage
demurrage
Verification
Verification of
of completeness
completeness of
of the
the process
process steps
steps
Informs
Informs business
business
partners
partners
Displays
Displays alarms
alarms
monitor
monitor
On
Customer service
On time
time deliveries
deliveries
Sets
Sets up
up trouble
trouble
Average
shooting
Average run
run time
time
shooting
Uniform
Uniform status
status messages
messages
Last
Last recorded
recorded status
status
Alarm
Alarm
Valuation
Valuation
Supply Chain Event Management actively supports
managing the logistics process of an enterprise as well as the business partners
SAP AG 2002
(C) SAP AG
SCM612
20
14.21
SCEM: Scope and Integration
Primarily used in transportation, but al so usedfor upstream and
downstream processe s
Supply Chain Event Management offers generic service s for
creating, saving, proce ssing, and administrating status data
from a supply chain process
Supply Chain Event Management is completely integrated with
mySAP.com
Supply Chain Event Management supports all transport modes
Road
Sea
Air
Rail
Container
Parcel
SAP AG 2002
(C) SAP AG
SCM612
21
14.22
TP/VS Monitoring: Unit Summary
SAP AG 2002
(C) SAP AG
SCM612
22
15
Course Objectives
TP/VS
SAP AG 2002
(C) SAP AG
SCM612
15.2
Recommended Follow-up Activities
SAP AG 2002
(C) SAP AG
SCM612
16
Appendix
Contents:
Carrier Rates for Carrier Selection Exercise
APO-R/3 CIF Troubleshooting Guide
Tips and Tricks for APO CIF
OSS Note s
SAP AG 2002
(C) SAP AG
SCM612
16.2
Carrier Rates for Carrier Selection Exercise
SAP AG 2002
(C) SAP AG
SCM612
16.3Freight Rates:
Condition Type: FB00
Key: Service Agent / TZ-Dep. / TZ-target
Gross Weight Scale Id: 3
Currency: EUR
500
1000
5000
10000
DE00-DE60
35
32
29
24
15
DE00-DE70
40
38
37
32
21
DE00-DE80
45
43
42
37
26
Cheaper: TL's
500
1000
5000
10000
DE00-DE60
34
31
28
23
19
DE00-DE70
38
36
35
30
22
DE00-DE80
43
41
40
35
28
Cheaper: LTL's
500
1000
5000
10000
Cheaper: DE70
DE00-DE60
37
34
30
26
20
DE80
DE00-DE70
35
33
32
27
19
DE00-DE80
41
39
37
33
23
(C) SAP AG
SCM612
16.4
Tips and Tricks for APO CIF
SAP AG 2002
(C) SAP AG
SCM612
16.5
OSS Note s
SAP AG 2002
(C) SAP AG
SCM612