CRONOGRAMA DE OBRA VALORIZADO

OBRA
PROPIETARIO
CONSTRUCTOR
UBICACIN
VALORIZACION
ITEM

DESCRIPCION

PRESUPUESTO

MES 1

MES 2

1.00.00 OBRAS PROVISIONALES


1.01.00 CARTEL DE OBRA TRIPLAY Y MADERA

821.58

821.58

1.02.00 ALMACEN DE OBRA

408.36

408.36

2.00.00 OBRAS PRELIMINARES


2.01.00 LIMPIEZA PRELIMINAR DE OBRA MANUAL

116.44

116.44

2.02.00 TRAZO NIVEL Y REPLANTEO PRELIMINAR

167.56

167.56

676.83

676.83

3.00.00 MOVIMIENTO DE TIERRA


3.01.00 EXCAVACION MANUAL EN ROCA SUELTA
3.02.00 RELLENO MATERIAL PROPIO MANUAL

85.88

85.88

269.26

269.26

9704.52

9704.52

5.01.01 CONCRETO F'c=175 Kg/cm2 SOBRECIMIENTO

2069.21

2069.21

5.01.02 ACERO DE REFUERZO F'y=4200 Kg/cm2

2550.19

2550.19

5.01.03 ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO

1991.42

1991.42

3.03.00 ELIMINACION MATERIAL EXCEDENTE MANUAL


4.00.00 OBRAS DE CONCRETO SIMPLE
4.01.00 CONCRETO 1:10 + 30% P.G. CIMIENTO CORRIDO
5.00.00 OBRAS DE CONCRETO ARMADO
5.01.00 SOBRECIMIENTO REFORZADO

5.02.00 COLUMNAS
5.02.01 CONCRETO F'c=175 Kg/cm2 COLUMNAS

2173.82

2173.82

5.02.02 ACERO DE REFUERZO F'y=4200 Kg/cm2

10358.84

10358.84

2743.81

2743.81

5.02.03 ENCOFRADO Y DESENCOFRADO COLUMNAS


5.03.00 VIGAS
5.03.01 CONCRETO F'c=175 Kg/cm2 VIGAS

1194.41

1194.41

5.03.02 ACERO DE REFUERZO F'y=4200 Kg/cm2

3466.65

3466.65

5.03.03 ENCOFRADO Y DESENCOFRADO VIGAS

2045.53

2045.53

6.00.00 MUROS Y TABIQUES


6.01.00 MURO LADRILLO ARCILLA KK SOGA, 2CV Mo. Co. 1:5

10749.69

10749.69

6.02.00 MURO LADRILLO ARCILLA KK SOGA, 1CV Mo. Co. 1:5

4993.56

4993.56

7.00.00 REVOQUES Y ENLUCIDOS


7.01.00 TARRAJEO Co. FROTACHADO SOBRECIMIENTO

502.98

502.98

1082.98

1082.98

835.20

835.20

4281.70

4281.70

9.01.00 PINTURA LATEX MURO EXTERIOR C/BASE IMPRIMANTE

203.19

203.19

9.02.00 PINTURA LATEX MURO INTERIOR C/BASE IMPRIMANTE

499.62

499.62

9.03.00 PINTURA LATEX CIELO RASO C/BASE IMPRIMANTE

536.33

536.33

7.02.00 TARRAJEO Co. FROTACHADO COLUMNAS


7.03.00 TARRAJEO Co. FROTACHADO VIGAS
8.00.00 CARPINTERIA METALICA
8.01.00 PUERTA PERFIL Fe. PLANCHA Ao. CONTRAPLACADA
9.00.00 PINTURA

9.04.00 PINTURA ESMALTE CARPINTERIA METALICA

165.70

165.70
VALORIZACION

ITEM

DESCRIPCION

PRESUPUESTO

MES 1

MES 2

10.00.00 VARIOS
10.01.00 TRANSPORTE
10.02.00 JUNTA DE CONSTRUCCION
10.03.00 LIMPIEZA FINAL DE OBRA

9918.20

9918.20

17.48

17.48

265.54

265.54

COSTO DIRECTO
GASTOS GENERALES VARIABLES (10 %)

74896.48
7489.65

59816.65
5981.67

15079.83
1507.98

TOTAL PRESUPUESTO

82386.13

65798.32

16587.81