6 March 2009
Space product
assurance
Materials, mechanical parts and
processes
ECSS Secretariat
ESA-ESTEC
Requirements & Standards Division
Noordwijk, The Netherlands
ECSSQST70C
6March2009
Foreword
This Standard is one of the series of ECSS Standards intended to be applied together for the
management, engineering and product assurance in space projects and applications. ECSS is a
cooperative effort of the European Space Agency, national space agencies and European industry
associationsforthepurposeofdevelopingandmaintainingcommonstandards.Requirementsinthis
Standardaredefinedintermsofwhatshallbeaccomplished,ratherthanintermsofhowtoorganize
and perform the necessary work. This allows existing organizational structures and methods to be
appliedwheretheyareeffective,andforthestructuresandmethodstoevolveasnecessarywithout
rewritingthestandards.
This Standard has been prepared by the ECSS Executive Secretariat endorsed by the document and
disciplinefocalpointandapprovedbytheECSSTechnicalAuthority.
Disclaimer
ECSSdoesnotprovideanywarrantywhatsoever,whetherexpressed,implied,orstatutory,including,
butnotlimitedto,anywarrantyofmerchantabilityorfitnessforaparticularpurposeoranywarranty
that the contents of the item are errorfree. In no respect shall ECSS incur any liability for any
damages,including,butnotlimitedto,direct,indirect,special,orconsequentialdamagesarisingout
of, resulting from, or in any way connected to the use of this Standard, whether or not based upon
warranty,businessagreement,tort,orotherwise;whetherornotinjurywassustainedbypersonsor
propertyorotherwise;andwhetherornotlosswassustainedfrom,oraroseoutof,theresultsof,the
item,oranyservicesthatmaybeprovidedbyECSS.
Publishedby:
Copyright:
ESARequirementsandStandardsDivision
ESTEC, P.O. Box 299,
2200 AG Noordwijk
The Netherlands
2009 by the European Space Agency for the members of ECSS
ECSSQST70C
6March2009
Change log
ECSSQ70A
19April1996
Firstissue
ECSSQ70B
14December2004
Secondissue
ECSSQST70C
Thirdissue
6March2009
ThemainchangesbetweenECSSQ70Bandthecurrentversionarethe
following:
RevisingECSSQST70accordingtoECSSdraftingrulesandnew
template.
Reorganizationofthecontenttoseparatedescriptivetextand
requirements,andcreationofDRD.
ECSSQST70C
6March2009
Table of contents
3.2
3.3
4 General requirements...........................................................................................15
4.1
4.2
Overview.....................................................................................................15
4.1.2
4.1.3
Customer reviews....................................................................................... 18
Overview.....................................................................................................19
4.2.2
4.2.3
4.2.4
4.3
Technical constraints................................................................................................21
4.4
4.5
4.6
5 Materials control...................................................................................................23
5.1
Overview.....................................................................................................23
5.1.2
Temperature ...............................................................................................23
5.1.3
5.1.4
Vacuum ......................................................................................................23
5.1.5
ECSSQST70C
6March2009
5.2
5.1.6
Flammability ...............................................................................................24
5.1.7
Radiation ....................................................................................................24
5.1.8
5.1.9
Corrosion ....................................................................................................24
5.1.10
Stress-corrosion ......................................................................................... 24
5.1.11
5.1.12
Galvanic compatibility................................................................................. 25
5.1.13
5.1.14
5.1.15
5.1.16
5.1.17
Life..............................................................................................................27
Selection...................................................................................................................27
5.2.1
General.......................................................................................................27
5.2.2
Constraints .................................................................................................27
5.3
5.4
5.5
5.6
5.7
5.4.1
Overview.....................................................................................................28
5.4.2
Requirements .............................................................................................28
General.......................................................................................................28
5.5.2
5.5.3
5.5.4
Approval phase...........................................................................................29
5.5.5
Deviation request........................................................................................29
5.6.2
5.7.2
Traceability of materials.............................................................................. 30
5.7.3
5.7.4
5.7.5
5.7.6
5.7.7
ECSSQST70C
6March2009
6.1
6.2
Selection...................................................................................................................32
6.3
6.4
6.5
6.6
6.7
6.4.1
Overview.....................................................................................................32
6.4.2
Requirements .............................................................................................33
General.......................................................................................................33
6.5.2
6.5.3
6.5.4
Approval phase...........................................................................................34
6.5.5
Deviation request........................................................................................34
General.......................................................................................................34
6.6.2
6.6.3
6.6.4
6.7.2
6.7.3
6.7.4
6.7.5
7.2
7.3
Selection...................................................................................................................37
7.4
7.5
7.6
7.5.1
Overview.....................................................................................................38
7.5.2
Requirements .............................................................................................38
General.......................................................................................................38
7.6.2
7.6.3
7.6.4
Approval phase...........................................................................................39
7.6.5
Deviation request........................................................................................39
ECSSQST70C
6March2009
7.7
7.7.2
7.7.3
7.7.4
Traceability of processes............................................................................40
7.7.5
7.7.6
7.7.7
E.2
E.3
E.4
Tables
Table 4-1: Steps to be taken to get approval for materials, mechanical parts and
processes (MMPP) .............................................................................................. 18
Table 5-1 Compatible couples for bimetallic contacts ............................................................ 26
Table A-1 : Material group numbers.......................................................................................43
ECSSQST70C
6March2009
Table A-2 : Environmental code .............................................................................................45
Table A-3 : Size code ............................................................................................................. 46
Table A-4 : Approval status ....................................................................................................47
Table B-1 : Mechanical part group numbers .......................................................................... 50
Table B-2 : Environmental code .............................................................................................51
Table B-3 : Approval status ....................................................................................................53
Table C-1 : Process group numbers ...................................................................................... 56
Table C-2 : Approval status....................................................................................................58
Table F-1 : MMPP documents delivery w.r.t. milestones ....................................................... 67
ECSSQST70C
6March2009
1
Scope
The purpose of this Standard is to define the requirements and statements
applicable to materials, mechanical parts and processes to satisfy the mission
performancerequirements.
ThisStandardalsodefinesthedocumentationrequirementsandtheprocedures
relevant to obtaining approval for the use of materials, mechanical parts and
processesinthefabricationofspacesystemsandassociatedequipment.
ThisStandardcoversthefollowing:
selectioncriteriaandrules;
evaluation,validationandqualification,orverificationtesting;
procurementandreceivinginspection;
utilizationcriteriaandrules.
TherelationshipbetweenactivitiesandprogrammephasesisdefinedinAnnexE.
TheprovisionsofthisStandardapplytoallactorsinvolvedatalllevelsinthe
production of space systems. These can include manned and unmanned
spacecraft, launchers, satellites, payloads, experiments, electrical ground
support equipment, mechanical ground support equipment, and their
correspondingorganizations.
Thisstandardmaybetailoredforthespecificcharacteristicsandconstraintsofa
spaceprojectinconformancewithECSSSST00.
ECSSQST70C
6March2009
2
Normative references
The following normative documents contain provisions which, through
reference in this text, constitute provisions of this ECSS Standard. For dated
references,subsequentamendmentsto,orrevisionsofanyofthesepublications
donotapply.However,partiestoagreementsbasedonthisECSSStandardare
encouragedtoinvestigatethepossibilityofapplyingthemostrecenteditionsof
the normative documents indicated below. For undated references the latest
editionofthepublicationreferredtoapplies.
ECSSSST0001
ECSSsystemGlossaryofterms
ECSSEST2006
SpaceengineeringSpacecraftcharging
ECSSQST10
SpaceproductassuranceProductassurance
management
ECSSQST1004
SpaceproductassuranceCriticalitemcontrol
ECSSQST1009
SpaceproductassuranceNonconformancecontrol
system
ECSSQST20
SpaceproductassuranceQualityassurance
ECSSQST40
SpaceproductassuranceSafety
ECSSQST7001
SpaceproductassuranceCleanlinessand
contaminationandcontrol
ECSSQST7002
SpaceproductassuranceThermalvacuum
outgassingtestforthescreeningofspacematerials
ECSSQST7004
SpaceproductassuranceThermaltestingforthe
evaluationofspacematerials,processes,mechanical
partsandassemblies
ECSSQST7006
SpaceproductassuranceParticleandUVradiation
testingofspacematerials
ECSSQST7021
SpaceproductassuranceFlammabilitytestingfor
thescreeningofspacematerials
ECSSQST7022
SpaceproductassuranceControloflimited
shelflifematerials
ECSSQST7029
SpaceproductassuranceDeterminationof
offgassingproductsfrommaterialsandassembled
articlestobeusedinamannedspacevehiclecrew
compartment
10
ECSSQST70C
6March2009
ECSSQST7036
SpaceproductassuranceMaterialselectionfor
controllingstresscorrosioncracking
ECSSQST7037
SpaceproductassuranceDeterminationofthe
susceptibilityofmetalstostresscorrosioncracking
ECSSQST7071
SpaceproductassuranceDataforselectionofspace
materialsandprocesses
11
ECSSQST70C
6March2009
3
Terms, definitions and abbreviated terms
3.1
3.2
3.2.2
critical process
3.2.3
critical material
3.2.4
part
mechanicalpart(see3.1)
3.2.5
process
12
ECSSQST70C
6March2009
3.2.6
document with which the supplier or user asks the competent body for
permissiontouseacriticalmaterial,partorprocess
3.2.7
special process
3.3
Abbreviated terms
ForthepurposeofthisStandard,theabbreviatedtermsfromECSSSST0001
andthefollowingapply:
Abbreviation
Meaning
AA
AluminiumAssociation
AOCS
attitudeandorbitcontrolsystem
ATOX
atomicoxygen
AISI
AmericanIronandSteelInstitute
CDA
CopperDevelopmentAssociation
CDR
criticaldesignreview
CFRP
carbonfibrereinforcedpolymer
CI
configurationitemnumber(asperprojectdefinition)
DML
declaredmateriallist
DMPL
declaredmechanicalpartlist
DPL
declaredprocesslist
DRD
documentrequirementsdefinition
EEE
electrical,electronicandelectromechanical
ESA
EuropeanSpaceAgency
GOX
gaseousoxygen
GSE
groundsupportequipment
LEO
lowEarthorbit
LOX
liquidoxygen
MAPTIS
MaterialsandProcessesTechnicalInformationSystem
MIP
mandatoryinspectionpoint
MMPP
Materials,mechanicalpartsandprocesses
NASA
NationalAeronauticsandSpaceAdministration
NCR
nonconformancereport
NRB
nonconformancereviewboard
PA
productassurance
13
ECSSQST70C
6March2009
PDR
preliminarydesignreview
PID
processidentificationdocument
PMP
parts,materials,processes
QR
qualificationreview
QRR
qualificationreviewreport
RFA
requestforapproval
SCC
stresscorrosioncracking
14
ECSSQST70C
6March2009
4
General requirements
4.1
Overview
ThegeneralMMPPactivitywithintheframeworkofaprojectissummarizedin
Figure41.
4.1.2
MMPP plan
a.
b.
TheMMPPplanshallbesubmittedtothecustomerforapproval.
15
ECSSQST70C
6March2009
Functional and technical specifications
Project list and incident databank
Start
Identification of needs
Selection
Criticality analysis
Preliminary lists
No
Yes
Critical?
Yes
Evaluation
necessary?
No
Conform to
requirements?
Yes
No
Evaluation and validation or
qualification or verification
programme
Validation or qualification
or verification programme
Test
Programme
Test
Programme
Deviation
RFA first Issue
PDR
Accept?
Accept?
No
Yes
No
New test?
Evaluation tests
Yes
No
Test results
No
Accept?
Validation or qualification
or verification programme
Yes
Yes
New
selection?
Test results
Yes
No
No
Accept?
Deviation
Yes
New
test?
Yes
No
No
Accept?
Yes
Validation or qualification or
verification programme
No
New
selection?
Accept?
Yes
Test results
Yes
No
New test?
Deviation
Yes
New
selection?
Yes
No
Accept?
Yes
Accept?
No
No
Yes
Deviation
No
Accept?
Yes
CDR
as-designed lists
To P a rt 2
F ro m P a rt 2 (N RB d e c i s io n )
Figure41:Materials,mechanicalpartsandprocessesflowchart
16
ECSSQST70C
6March2009
To P a rt 1
F ro m P a rt 1
Procurement of materials
Packing, storage
No
Accept?
Yes
Implementation of processes
No
Accept?
Yes
Yes
NCR
NRB
No
Use
Inspection
No
Accept?
Yes
Utilization
No
Accept?
Yes
-
as-built lists
QR
end
Figure41:Materials,mechanicalpartsandprocessesflowchart(Continued)
17
ECSSQST70C
6March2009
Table41:Stepstobetakentogetapprovalformaterials,mechanicalpartsand
processes(MMPP)
Materials
Phase
Step Comments
Mechanicalparts
Processes
Step Comments
Step Comments
1
CriticalAnalysis 1
2
Evaluation
(usuallybytest
methodsdefined
byECSS
standards)
Criticalmaterials
aretested,e.g.
outgassing,SCC,
flammability.
Mechanicalpartsare 2
testedby,for
example,vibration,
thermalanalysis,
offgassingandlife
test.
Criticalprocessesare
evaluatedbytesting
technology
samplesincluding
all,forexample,
electrical
interconnection
processesand
painting,adhesive
bonding.
Verification
Notapplicable
Notapplicable
Validation
Notapplicable
Notapplicable
Qualification
Notapplicable
Notapplicable
Approval
ByRFA(AnnexD)
orDML
ByRFA(AnnexD)or
DMPL/DPL
Verificationtests
usuallydefinedin
ECSSstandards
ByRFA(AnnexD)or
DPL
Note
NOTE 1 Project approval is always by means of the request for approval (RFA) form and the projects declared
materials list (DML), declared mechanical parts list (DMPL) and declared processes list (DPL).
Note
NOTE 2 The details for approvals of MMPP lists are contained in this Standard.
Note
NOTE 3 To summarize:
In addition:
4.1.3
Customer reviews
a.
To obtain the validation status for materials and qualification status for
parts and verification status for processes, the MMPP manager shall
presenttothecustomerthoseactivitieswhichwereperformedinorderto
complywiththisStandardtogetherwithresultsobtained.
b.
The MMPP manager shall organize technical review meetings with his
suppliersatalllevels.
18
ECSSQST70C
6March2009
4.2
Overview
4.2.2
a.
Eachsupplierandsubsuppliershallestablish,collect,reviewanddeliver
thedeclaredmaterials,mechanicalpartsandprocesseslistsincludingall
theitemsintendedforuseintheflightequipment.
b.
Thelistsshallreflectthecurrentdesignatthetimeofissue.
c.
These lists shall contain the materials, mechanical parts and processes
usedinthecurrentdesigninorderto:
1.
demonstratecompliancewithallrequirementsoftheprogramme;
2.
verifytheresultsofequipmentsupplieractivities;
3.
d.
Thefollowingconstraintsshouldapply:
1.
2.
e.
f.
g.
SeeAnnexF.
useofprojectrelatedpreferredlists,ifavailable.
Thefollowingconstraintsshallbetakenintoaccount:
1.
requirementsoriginatingfromtheinitialtechnicalspecification;
2.
programmaticprojectrequirementsandconditions;
Ananalysisofthecriticalityofthesepreliminarylistsshall,afterchecking
theconformityofthematerials,mechanicalpartsandprocesses,against
all the project requirements, allow them to be classified into three
categories:
1.
2.
Itemsthatarenotcriticalbutwhichdonotconformtooneormore
project requirements (a justified deviation request should be
draftedforthiscategory).
3.
Noncriticalitems.
19
ECSSQST70C
6March2009
4.2.3
a.
ThesuppliershalldocumentallmaterialsintheDeclaredmaterialslistin
conformancewithAnnexA.
b.
c.
ThesuppliershalldocumentallprocessesintheDeclaredprocesslistin
conformancewithAnnexC.
d.
The supplier shall process the lists of lower level suppliers to ensure
exchangeabililty, searchability, sortability, storability and retrievability
forthatsetoflists,beforesubmittingittothecustomer.
e.
Theselistsshallbeupdatedduringthecourseoftheproject.
f.
Thepreliminarylistsshallincludetheitemsfromsupplierspreliminary
needs.
NOTE
g.
The asdesigned lists shall include the items from the baselines various
designfiles(availablefortheCDR).
h.
AnychangeafterCDRorQRshallbereflectedinthelistandshallbein
accordancewithFigure41(Part2).
NOTE1 The MMPP manager is responsible within the
programme to ensure that all the information
neededisgivenandthattheapprovalstatusis
consistent with technical and scheduling
objectivesanddataisexchangeable.
NOTE2 Where no project requirements exist for a
separate DMPL, the mechanical parts can be
enteredintoaseparatesectionoftheDML.
NOTE3 The materials of, for example,screws and nuts
that are made up of a few materials can be
listed in the DMPL. The materials (metals and
plastics) of complex parts can be listed in the
DML with, for example, outgassing, toxicity,
flammability, corrosion and stress corrosion
valuesandreferencetotheDMPLitem.
4.2.4
a.
b.
Thesuppliershallperformthefollowingtasks:
1.
obtainingthecorrectandcompletelistsfromlowerlevelsuppliers;
2.
providingprovisionaland,later,definitiveapprovalforeachlist;
3.
submittingtheprojectdeclaredlistsforapprovalpriortoinitiation
ofthehardwarephase(beforecriticaldesignreview).
The lists established by the suppliers shall include all the information
describedinthisStandard.
20
ECSSQST70C
6March2009
c.
Amendmentstothelistsshallbeimplementedonlythroughestablished
changeprocedures.
d.
e.
1.
RFA(referenceandissue);
2.
evaluationreports;
3.
deviationrequests.
Thematerial,mechanicalpartsorprocessjustificationfilesshallbemade
availabletothecustomeruponrequesteitheronthesuppliersite,orby
anyotherprocessagreedbybothparties.
NOTE
4.3
Forexample,bynondisclosureagreement.
Technical constraints
a.
Partsandmaterialsshallsatisfythemissionsfunctionalconstraints.
b.
Examplesare:
Ground
environment
constraints:
manufacture, tests, storage, maintenance,
transportandintegration
Flightconstraints:launchandorbit.
4.4
c.
The technical criteria from clause 5.1 shall be taken into account,
accordingtothemission.
d.
Thesuppliershallestablishandmaintainacontaminationandcleanliness
controlprogrammeincluding,asaminimum:
1.
cleaningprocedures,and
2.
cleanlinessmonitoringproceduresormethods.
b.
c.
21
ECSSQST70C
6March2009
4.5
4.6
Whenoptical,mechanicalorelectricalGSEmaterialsareusedinthermal
vacuum or interfacing with flight hardware, possible degradation shall
betakenintoaccount.
NOTE
For
example,
contamination,
surface
degradation, electromechanical and chemical
effects.
22
ECSSQST70C
6March2009
5
Materials control
5.1
Overview
5.1.2
a.
Temperature
Materialpropertiesshallbecompatiblewiththethermalenvironmentto
whichtheyareexposed.
5.1.3
Thermal cycling
a.
b.
ThefollowingmaterialsshallbetestedinconformancewithECSSQST
7004:
1.
Materialssusceptibletothermalvacuumeffect.
NOTE
2.
c.
5.1.4
Vacuum
a.
MaterialsselectionshallbemadeinconformancewithECSSQST7071.
b.
OutgassingtestsshallbecarriedoutinconformancewithECSSQST7002.
NOTE
23
ECSSQST70C
6March2009
5.1.5
a.
b.
5.1.6
a.
Flammability
Thematerialsflammabilityresistanceshallbeevaluatedinconformance
with ECSSQST7021 for the most hazardous environment envisaged
fortheiruse.
NOTE
5.1.7
a.
Radiation
5.1.9
a.
ForNASASTSpayloadsseeNASASTD6001.
5.1.8
a.
MAPTISandMILHDBK454testmethodisnot
spacerelevant.
Corrosion
Forallmaterialsthatcomeintocontactwithatmosphericgases,cleaning
fluidsorotherchemicals,itshallbedemonstratedthatthedegradationof
properties during their anticipated servicelife is acceptable in terms of
theperformanceandintegrityrequirements.
5.1.10
Stress-corrosion
a.
b.
AnymaterialnotcoveredbystandardECSSQST7036shallbetestedin
conformancewithECSSQST7037.
5.1.11
a.
Fluid compatibility
24
ECSSQST70C
6March2009
operation of interfacing hardware shall be compatible with that fluid in
theirapplication.
b.
5.1.12
a.
Galvanic compatibility
When bimetallic contacts are used, the choice of the pair of metallic
materialsusedshallbeagreedwiththecustomer.
NOTE
Thisalsoincludesmetaltoconductive
fibrereinforcedmaterialscontacts.
b.
GalvaniccompatibilitiesshallbeselectedinconformancewithTable51.
c.
5.1.13
Atomic oxygen
a.
b.
Testproceduresshallbesubjecttotheapprovalofthecustomer.
5.1.14
a.
Theeffectofimpactsbymicrometeoroidsanddebrisonmaterialsshall
1.
bereviewedandassessedonacasebycasebasis,and
2.
5.1.15
a.
25
ECSSQST70C
6March2009
Steel(carbon,lowalloy),Castiron
Stainlesssteel13Cr(400series)
Stainlesssteel18/8(300series)
SnPballoys(all),Tin,Lead
Nickel,Monel,Inconel,
Nickel/Molybdenumalloys
Gunmetal(CuZn10alloy),Pbronzes,
Snbronzes
Gold,Platinum,Carbon,Rhodium
Cadmium
Castiron(austenic)
Chromium
Copper,Brasses
CuproNickel
Albronzes
Sibronzes
Gold
Platinum,
Carbon
Rhodium
Gunmetal(CuZn10alloy)
Pbronzes
Snbronzes
Magnesium
Nickel
Monel
Inconel
Nickel/Molybdenumalloys
Silver
Zinc,Beryllium
TitaniumandTialloys
Silver
Magnesium
Copper,Brasses
Chromium
Al(pure)
AlZincalloys
Castiron(austenic)
Al(pure),AlZincalloys
AluminiumCopperalloys
Cadmium
AluminiumCopperalloys
CuproNickel,Albronzes,Sibronzes
Table51Compatiblecouplesforbimetalliccontacts
Puremetalsandalloysin
alphabeticalorder
(includingcarbon)
SnPballoys(all)
Tin,Lead
Stainlesssteel18/8
(300series)
Stainlesssteel13Cr
(400series)
Steel(carbon,lowalloy)
Castiron
TitaniumandTialloys
Zinc
Beryllium
Key:
0 Canbeusedwithoutrestriction.
1 Canbeusedinanoncontrolledenvironment(e.g.assemblyareaandgeneralnoncleanroomenvironment).
2 Canbeusedinacleanroomenvironment.
3 Needsspecificmeasurestoavoidgalvaniccorrosionwhenthesecombinationsareselected.
26
ECSSQST70C
6March2009
5.1.16
a.
Forallsolidsurfacesinmovingcontactwithothersolidsurfaces,itshall
be demonstrated that the degradation of surface properties over the
completemissionisacceptablefromaperformancepointofview.
5.1.17
a.
5.2
Life
Selection
5.2.1
a.
General
Materialsshallbechosengivingpreferencetothefollowing:
1.
2.
3.
thoseincludedinapproveddatasources.
NOTE
b.
continuityofsupply;
2.
reproducibilityofcharacteristics.
5.2.2
a.
Constraints
Puretinfinishwithmorethan97%purityshallnotbeused.
NOTE
b.
Forexample:ECSSQST7071,ESAandNASA
databanks.
Thisisduetothepossibilityofwhiskergrowth
and transformation to grey tin powder at low
temperatures.
27
ECSSQST70C
6March2009
5.3
5.4
Criticality analysis
5.4.1
Overview
Toconformtomissionrequirements,theobjectiveoftheanalysisistoidentify
whetherfurtherdataarerequired.
5.4.2
Requirements
a.
Thesuppliershallanalyseallthematerialscontainedinhispreliminary
lists with respect to criticality and in correlation with the risk analysis
performed.
b.
c.
d.
Foranymaterialnotmeetingtheprojectrequirementsthesuppliershall
submitaRFAinconformancewithAnnexD.
NOTE
5.5
General
a.
b.
Incaseofanextensionofanexistingapplication,theevaluationindicated
in5.5.1aneednotbeperformedifsoagreedwiththecustomer.
c.
28
ECSSQST70C
6March2009
5.5.2
a.
b.
Evaluation phase
Theevaluationshallconsiderthefollowingasaminimum:
1.
thelimitsofuse;
2.
thematerialsphysical,chemicalorfunctionalcharacteristicsalong
withtheirvaluesandtolerances;
3.
4.
acceptancecriteria.
5.5.3
Validation phase
a.
Forallcriticalmaterials,avalidationprogramme(availableatPDR)shall
bedrawnupbythesupplierandthenimplementedtocheckorconfirm
that the materials satisfy the mission requirements with appropriate
marginsasnecessarytoobtainvalidationstatus.
b.
Validationstatusshalldependontheresultsobtained(validationreport)
andthereviewofcorrespondingdocumentation(availableatCDR).
5.5.4
Approval phase
a.
b.
Ifapprovalisnotgranted,thesupplierinchargeoftheitemshalleither:
1.
selectanothermaterial,or
2.
3.
5.5.5
a.
Deviation request
Formaterialsnotconformingtoprojectrequirements,whetherattheend
of criticality analysis or of evaluation and validation tests, the supplier
shallsubmitarequestfordeviationinconformancewithECSSQST1009.
29
ECSSQST70C
6March2009
5.6
Procurement of materials
5.6.1
a.
b.
Wherematerialsuppliersdonotacceptspecificationsandprocurementis
by means of a datasheet the supplier shall introduce internal, inhouse
receipt inspection to ensure that the validation status of the material is
maintainedduringthesubsequentprocurements.
c.
Materials with long lead times or long procurement delays (versus the
projectschedule)shallbeidentifiedbeforetheformalsubsystemPDR.
d.
e.
Backupplansshallbepreparedandinitiatedwheneverthereisevidence
ofdelaysortechnicalproblems.
f.
5.6.2
5.7
Procurement specifications
a.
Allmaterialsshallbesubmittedtoanincominginspection.
b.
Anincominginspectionprocedureshalldefinetheinspectionsandtests
tobecarriedout,particularlyformaterialsthatareknowntobevariable
intheirfinalproperties.
Use of materials
5.7.1
a.
The supplier shall verify that all critical materials are validated before
beingusedinthemanufactureofqualificationorflightproducts.
b.
5.7.2
a.
Traceability of materials
ThesuppliershallapplythetraceabilityrulesdefinedinECSSQST20to
allmaterials.
30
ECSSQST70C
6March2009
b.
5.7.3
a.
Thesuppliershalldefineprovisionsforpackaging,storageandremoval
fromstorageformaterials.
b.
5.7.4
a.
The supplier shall ensure that all materials which have limitedlife
characteristicshavetheirdateofmanufacture(whenavailable,otherwise
date of delivery) and shelflife expiry date accurately identified and
clearlymarkedoneachlotorbatch.
b.
5.7.5
a.
Materialswithlimitedlifeafterimplementation(suchaspropellant)shall
beidentifiedandcontrolledinconformancewithECSSQST1004.
NOTE
5.7.6
a.
5.7.7
a.
31
ECSSQST70C
6March2009
6
Mechanical parts control
6.1
6.2
6.3
Selection
a.
b.
c.
durabilityofsupply;
2.
reproducibilityofcharacteristics.
6.4
The supplier shall verify that all materials and processes used in the
manufactureofpartssatisfythemissiontechnicalrequirements.
Thesuppliershallestablishandmaintainadeclaredmechanicalpartslist
inconformancewithAnnexB.
Criticality analysis
6.4.1
Overview
Toconformtomissionrequirements,theobjectiveoftheanalysisistoidentify
whetherfurtherdataarerequired.
32
ECSSQST70C
6March2009
6.4.2
6.5
Requirements
a.
Thesuppliershallanalyseallthepartscontainedintheirpreliminarylists
with respect to criticality and in correlation with the risk analyses
performedinconformancewithECSSQST1004.
b.
CriticalpartsshallbeidentifiedintheDMPLandincludedinthecritical
itemslist.
c.
AnycriticalpartshallbethesubjectofaRFA.
General
a.
b.
Incaseofanextensionofanexistingapplication,theevaluationindicated
in6.5.1aneednotbeperformedifsoagreedwiththecustomer.
c.
6.5.2
a.
Evaluation phase
thelimitsofuse,
2.
3.
4.
acceptancecriteria.
b.
Whenanevaluationisperformedanevaluationprogramme(availableat
PDR) shall be drawn up, implemented, and an evaluation report
(availablebeforeCDR)shallbedrawnup.
c.
33
ECSSQST70C
6March2009
6.5.3
a.
Foreachcriticalpartaqualificationprogrammeshallbedrawnupbythe
supplier(oftheequipmentusingthecriticalpart)andthenimplemented
tocheckorconfirmwhetherthepartssatisfymissionrequirementswith
appropriatemargins.
b.
6.5.4
Approval phase
a.
b.
Ifapprovalisnotgranted,thesupplierinchargeoftheitemshalleither:
1.
selectanothermechanicalpart,or
2.
3.
6.5.5
a.
6.6
Qualification phase
Deviation request
General
a.
Mechanicalpartswithlongleadtimesorprocurementdelays(versusthe
projectschedule)shallbeidentifiedbeforethesubsystemPDR.
b.
Procurementshallbeplanned,documentedandimplementedinatimely
mannertoobtainreliableproductassuranceprovisionatCDR.
c.
Backupplansshallbepreparedandinitiatedwheneverthereisevidence
ofpossibledelaysortechnicalproblems.
6.6.2
Procurement specification
a.
Eachpartshallbecoveredbyaprocurementspecificationorastandard.
b.
34
ECSSQST70C
6March2009
c.
6.6.3
a.
Forcomplexpartsrelatedtoaspecificprojectdevelopment,eachsupplier
shall define the nature and frequency of their own source inspection
points.
b.
Sourceinspectionshallbecarriedoutbythecustomeronthepremisesof
thesupplier(partmanufacturer)inconformancewithECSSQST20.
6.6.4
6.7
Source inspection
a.
Eachpartorbatchofpartsshallbesubmittedtoanincominginspection.
b.
a.
Thesuppliershallensurethatallcriticalpartsarequalifiedbeforebeing
usedinthemanufactureofqualificationorflightproducts.
b.
6.7.2
Traceability of parts
a.
ThesuppliershallapplythetraceabilityrulesdefinedinECSSQST20to
hisparts.
b.
Partsshouldbeidentifiedbyauniquereferencenumberorcodeandalot
number to provide traceability where there is an incident or
nonconformance, or for the purposes of technical investigations
following failure or damage to reconstruct the parts history, either
individually (individual traceability) or by the manufacturing lot it was
partof(lottraceability).
6.7.3
a.
Thesuppliershalldefineprovisionsforpackaging,storageandremoval
fromstorageforparts.
b.
35
ECSSQST70C
6March2009
6.7.4
a.
b.
Limitedlifepartsshallbeassessedascandidatestothecriticalitemslist
inconformancewithECSSQST1004.
6.7.5
a.
36
ECSSQST70C
6March2009
7
Process control
7.1
7.2
Specifications or procedures
a.
b.
Referenceshallbemadetoacceptandrejectcriteria.
7.3
Thesuppliershallverifythatthematerialsandthemechanicalpartsused
during the implementation of processes satisfy the requirements of this
Standard.
Selection
a.
b.
2.
thoseforwhichsatisfactoryevaluationandverificationresultsare
obtained on samples representative of the application with a
sufficientmarginasregardsconditionsofuse;
3.
Whethertheprocessesarealreadyverifiedorremaintobeverified,their
selectionshalltakeintoaccountthefollowingcriteria:
1.
reliability;
2.
inspectability;
3.
reworkabilityoftheprocessitem;
4.
reproducibility.
37
ECSSQST70C
6March2009
7.4
7.5
Criticality analysis
7.5.1
Overview
Toconformtomissionrequirements,theobjectiveoftheanalysisistoidentify
whetherfurtherdataisrequired.
7.5.2
7.6
Requirements
a.
Thesuppliershallanalysealltheprocessescontainedintheirpreliminary
lists with respect to criticality and in correlation with the risk analyses
performed.
b.
CriticalprocessesshallbeidentifiedintheDPLandincludedinthelistof
criticalitems.
c.
AnycriticalprocessshallbethesubjectofanRFA.
d.
Specialprocessesshallbeidentifiedandcontrolled.
e.
f.
Wheneverfeasibleastatisticalprocessmaybecarriedout.
General
a.
b.
Incaseofanextensionofanexistingapplication,theevaluationindicated
in7.6.1aneednotbeperformedifsoagreedwiththecustomer.
c.
For confidential processes, the supplier shall prove that the process has
beenverified.
NOTE1 For example, by presenting a verification
certificate from space agencies or other
governmentalorganizationresponsibletocheck
theapplicabilityofthisverification.
NOTE2 Refer to Table 41 for an explanation of the
stepsinvolved.
38
ECSSQST70C
6March2009
7.6.2
a.
b.
Evaluation phase
thelimitsofuse,
2.
3.
acceptancecriteria.
Whenanevaluationisperformed,thesuppliershallprovide
1.
anevaluationplanatPDRand
2.
anevaluationreportbeforeCDR.
7.6.3
Verification phase
a.
b.
c.
The supplier shall ensure that the processes satisfy the mission
requirementsandthattheparametersneededfortheproductdesignare
definedsoastoobtainverificationstatus.
d.
7.6.4
a.
Theprocessesshallnotreceiveanapprovalidentificationinthedeclared
processes list unless requirements in 7.6.2 and 7.6.3 are satisfied. If
approvalisnotgranted,thesupplierinchargeoftheitemshalleither
1.
selectotherprocesses,or
2.
3.
7.6.5
a.
Approval phase
Deviation request
Forprocessesnotconformingtoprojectrequirements,whetherattheend
of criticality analysis or of evaluation and verification tests, the supplier
shallsubmitarequestfordeviationinconformancewithECSSQST1009.
39
ECSSQST70C
6March2009
7.7
Use of a process
7.7.1
a.
The supplier shall confirm that all critical processes have been verified
beforebeingusedinthemanufactureofqualificationorflightproducts.
b.
7.7.2
a.
Re-verification of a process
7.7.3
Anyprolongedstoppageinmanufacturing,any
major change of the facilities or procedures or
anytransferofproductiontoanotherentitycan
invalidate partially or completely the initial
verificationofaprocess.
Implementation of a process
a.
b.
Thisverificationshallensurethat:
1.
2.
personnelareproperlytrainedandcertified,and
3.
7.7.4
a.
Traceability of processes
TraceabilityofprocessesshallbeensuredinconformancewithECSSQ
ST20.
40
ECSSQST70C
6March2009
7.7.5
a.
7.7.6
a.
MIPsshallbedefinedinconformancewithECSSQST20.
7.7.7
a.
Thesuppliershalldefineprovisionsforpackaging,storage,andremoval
from storage for products or semifinished products before and after
implementationofprocesses.
41
ECSSQST70C
6March2009
Annex A (normative)
Declared materials list (DML) - DRD
A.1
DRD identification
A.1.1
ThisDRDiscalledfromECSSQST70,requirement4.2.3a.
A.1.2
ThepurposeoftheDMListohaveadetailedrecordofallthematerialsusedto
producetheproductsofaprojectorprogramme.
ThedataintheDMLmakepossibletoassesswhetherthematerialsaresuitable
for a specific application, at the supplier and the customer levels (in the
approvalstatuscolumn).
TheDMLispreparedforeachConfigurationitemattherelevantstages(e.g.
atthestart,PDR,CDRandQR)asdefinedintheflowchartgiveninFigure41.
ThefollowingdocumentsarelinkedtotheDML:
A.2
thedeclaredprocesslist(DPL);
requestforapproval(RFA)materials.
Expected response
A.2.1
<1>
a.
TheDMLshallcontainthefollowingstatements:
1.
Materialsareclassifiedinto20groupsdependingontheirtypeor
theirmainuse,seeTableA1.
2.
42
ECSSQST70C
6March2009
3.
b.
Ifnewgroupsarecreated,foragivenproject,theseshallhavenumbers
over21.
TableA1:Materialgroupnumbers
Group
number
Description
Aluminiumandaluminiumalloys
Copperandcopperalloys
Nickelandnickelalloys
Titaniumandtitaniumalloys
Steels
Stainlesssteels
Fillermetals:welding,brazingsoldering
Miscellaneousmetallicmaterials
Opticalmaterials
10
Adhesives,coatings,varnishes
11
Adhesivetapes
12
Paintsandinks
13
Lubricants
14
Pottingcompounds,sealants,foams
15
Reinforcedplastics(includingPCBs)
16
Rubbersandelastomers
17
Thermoplastics(e.g.nonadhesivetapesandfoils[MLI])
18
Thermosetplastics(includingPCBs)
19
Materialaspectsofwiresandcables
20
Miscellaneousnonmetallicmaterials,e.g.ceramics
<2>
a.
ContentsoftheDML
The DML shall include the information stated in Figure A1, where the
header information identifies the list as the declared materials list and
includestheissuenumberanddateofissue,asfollows:
1.
Itemnumber(applicabletoequipmentmanufacturerlevelonly)
(a)
NOTE
the
group>.<running
Forexample:11.5.1.KOF.
43
ECSSQST70C
6March2009
(b)
Characteristicsoftheitemnumberare:
Theuser,identifiedbyanagreedusercodeforthe
project.
Oneonlypermaterialtype.
Doesnotchangeduringthelifeofthematerialslist
(subitemsarepermittedwhendeemednecessary).
2.
Commercialidentificationorstandardizeddesignation
(a)
Enterthecorrectandstandarddesignation,suchasthetrade
nameplusnumber.
(b)
Ifnotradenameexists,enterthemanufacturersnameplus
number.
(c)
Formetalalloys,theAluminiumAssociation(AA)systemis
recommendedforaluminiumalloys,andtheAmericanIron
andSteelInstitute(AISI)systemforsteel.Forothermetalsor
alloys,themainconstituentisenteredfirstexceptinthecase
ofatraditionalname.
NOTE
(d)
3.
Foreachmaterial,asdesignatedinA.2.1<2>a2(a)to(c),usea
unique item number. If several lines are used for different
applicationsorprocessing,addsubitemnumbers.
Chemicalnatureandproducttype
(a)
NOTE
(b)
(c)
Exampleofsuchconditionsarerolledandheat
treatment.
Whereasemifinishedproductisprocured,givetherelevant
state.
NOTE
Exampleofsuchstateareform,plateandsheet.
Givethethicknessofthematerial,thatcanbeanimportant
parameter.
NOTE
4.
Forexample:brassorbronze.
Procurementinformation
(a)
Manufacturerordistributor:nameofthemanufacturerand
nameofthedistributorifdifferent.
(b)
44
ECSSQST70C
6March2009
5.
Processingparameters
Listhereasummaryoftheprocessparametersappliedbytheuser
oftheprocess.
NOTE
6.
Useandlocation
(a)
NOTE
(b)
7.
Includeanyrestrictionsthatapplytotheuseofaparticular
materialinthecorrespondingcommentcolumn.
Environmentalcode
TheenvironmentalcodeisdefinedusingTableA2.
TableA2:Environmentalcode
Radiation/UV/ATOX(R)a
Ambience(A)
Temperature(T)b,c
G:Geostationary
S:Outsideshadow
V:Vacuum
1:0Kto100K
L:Loworbit
L:Outsidelight
H:Hermetic
2:101Kto200K
B:Radiationbelt
M:Manned
3:201Kto300K
I:Interplanetary
E:Elevatedpressure
P:Planetary
Forallmaterials,aletterisselectedfromthelefthandcolumn.Formaterialsonthesurfaceofthe
spacecraft,theletterLorSisadded.
b
c
Thermalcyclingtobeindicatedbytwovalues,e.g.3/5.
RT(roomtemperature)canbeacceptedasacodebetween283K(10C)and313K(40C).
NOTE:Thematerialsthatareataboundarybetweenenvironmentsaredescribedbytwosetsofcodes.
8.
Sizecode
The size code is indicated by an alphanumeric combination, such
asA5,V2orM3,asinTableA3.
45
ECSSQST70C
6March2009
TableA3:Sizecode
Sizecode Value
0
0<AorVorM1
1<AorVorM10
10<AorVorM100
100<AorVorM1000
where: Aisthearea,incm2
Visthevolume,incm3
Misthemass,ing
9.
10.
(b)
(c)
(d)
(e)
SelectthesupplierapprovalstatuscodefromTableA4.
Customerapprovalstatuscodeandcomments
(a)
SelectthiscodefromTableA4.
(b)
Includeadditionalcommentswhereappropriate.
46
ECSSQST70C
6March2009
TableA4:Approvalstatus
Code
Description
Approved.
AllmaterialsclassifiedAmaybeusedwithoutrestriction.
ApprovedwithanRFA.
Thesematerialsaresubjectedtoanevaluationorvalidation
programme.TheRFAnumberisenteredasacomment.
Approvedwithaconcession.
Thesematerialsdonotmeettherequirementsbutareusedfor
functionalreasons.Theconcessionnumberisenteredasa
comment.
Pendingadecision.
Materialsforwhichanevaluationreportoraconcessionis
waitingforthecustomersprovisionalordefinitiveapproval.
Open.
Newmaterialsormaterialsforwhichinvestigationsand
validationsareinprogress.
Rejected.
Deleted.
Thisclassificationisusedforamaterialthatisnolongerused.
NOTE Ifapprovalcannotbegivenandoneoftheothercodesareentered,enter
thecommentsintheappropriatecolumn.
A.2.2
Special remarks
a.
Thechangerecordshalllistthesuccessiveissuesandtheirreleasedates
sincethefirstformalissueofthedocument.
b.
Thechangerecordshallincludeabriefdescriptionoftheupdateswhich
contributedtoeachissueorrevision.
NOTE
47
ECSSQST70C
6March2009
DECLAREDMATERIALSLIST(DML)
Programmename:ABCDEFG
CIno.:12345676890
Docno.:001
Date:01.10.2000
Group(Title):abcdefg
Issue/Revision:1/4
Page:1
9
1
Itemno.and Commercial
identification
usercode
or
standardized
designation
1)Chemical
nature
1)Manufacturer/
suppliername
2)Producttype
2)Procurement
spec.
5
Summaryof
process
parameters
1)Subsystem
1)R
1)A
2)Equipment
2)A
2)V
3)Use
3)T
3)M
1)LS
1)
2)V
2)
3)Structure
3)3
3)M3
1)PCU
1)G
1)
2)Experiment
tray
2)V
2)
3)34
3)M3
1)GP
1)LS
1)
2)Platform
2)M
2)V3
3)Package
potting
3)34
3)
9.1
9.2
10
9.3
Acronym/rating/ 1)Justificationfor
Prime
ValidationRef.
approval
approval
forapplicable
status
2)Primecomments
properties
Customer
approvalstatus/
comments
Issue/RevDate
1.2.1.TXES
AZ5GU
1)Al.Zn5.6Mg2.5 1)AlmetPechiney
Cdu1.6,Cr0.3
2)CRB527
eq.AA7075
01/02/01.02.1996
2)Plate
10.1.1.ETCA DC93500
1)Silicon
1)DowCorning
2)Twoparts
2)E3846MC10S
02/02/1984
11.5.1.KOF
ECCOFOAM
EPH
T7351andIridit 1)PL
14heat
2)E4package
treatment
1)Polyurethane
2)Resin/Catalyst
1202H
1)Emersonand
Cuming
2)SP/FOK/05/684
03/01/25.06.1992
Mixture:
10/1ing
Curing:
4h/65C
Resin/Cat:
100/65g
4h/40C
+48h/100C
1)UsedonETS2
1)ECSSQST7001 A
2)
2)
3)Partpotting
1)DU96352
2)Usedat
T>100C
(Riskofdistortion
beyond)
FigureA1:ExampleofarealizedDML
48
ECSSQST70C
6March2009
Annex B (normative)
Declared mechanical parts list (DMPL) DRD
B.1
DRD identification
B.1.1
ThisDRDiscalledfromECSSQST70,requirement4.2.3b.
B.1.2
ThepurposeoftheDMPListohavedetailedrecordofallthemechanicalparts
usedtoproducetheproductsofaprojectorprogramme.
ThedataintheDMPLmakepossibletoassesswhetherthemechanicalpartsare
suitable for a specific application, at the supplier and customer levels (in the
approvalstatuscolumn).
TheDMPLispreparedforeachConfigurationitemattherelevantstages(e.g.
Start,PDR,CDRandQRR)asdefinedintheflowchartgiveninFigure41of
ECSSQST70.
The following document is linked to the DMPL: request for approval (RFA)
mechanicalparts.
B.2
Expected response
B.2.1
<1>
a.
TheDMPLshallcontainthefollowingstatements:
Mechanicalpartsareclassifiedinto11groupsdependingontheirtype
ortheirmainuse(seeTableB1).
b.
49
ECSSQST70C
6March2009
c.
ItemsthatappearintheEEEpartslistshouldnotberepeatedhere.
NOTE
Forexample,heaters,somevalves,thermostats,
relays,transformercoilsandsolenoids.
TableB1:Mechanicalpartgroupnumbers
Group
number
Description
51
Spacingparts(e.g.washersandspacers)
52
Connectingparts(e.g.bolts,nuts,rivets,insertsand
clips)
53
Bearingparts(e.g.ballbearingsandneedlebearings)
54
Separatingparts(e.g.pyrotechnics,springsandcutters)
55
Controlparts(e.g.gears)
56
Fluidhandlingparts(e.g.diffusers)
57
Heatingparts
58
Measuringinstruments(e.g.gaugesandthermocouples)
59
Opticalpassiveequipment
60
Magneticparts
61
Otherparts
<2>
a.
ContentsoftheDMPL
TheDMPLshallincludetheinformationinFigureB1,wheretheheader
information identifies the list as the declared mechanical parts list and
includestheissuenumberanddateofissue,asfollows:
1.
Itemnumber(applicableatequipmentsupplierlevelonly)
(a)
(b)
Forexample:7.2.1.ACSA.
Characteristicsoftheitemnumberare:
Identifythesubcontractorbyanagreedusercodeforthe
project.
Oneonlypermechanicalparttype.
Doesnotchangeduringthelifeofthemechanicalparts
list.
2.
Commercialidentification
(a)
(b)
Ifnotradenameexiststhenenterthemanufacturersname
andnumber.
50
ECSSQST70C
6March2009
3.
Typeofpart
Describethematerialandsurfacetreatment(ifapplicable).
4.
5.
Procurementinformation
(a)
Manufacturerordistributor:nameofthemanufacturerand
nameofthedistributorifdifferent.
(b)
Elementaryfunction,maincharacteristics
(a)
Enterthefunctionofthemechanicalpart.
(b)
Enterthemaincharacteristicsofthemechanicalpart.
NOTE
6.
Forexample,numberofrevolutionsperminute
foraballbearing.
Useandlocation
Use codes able to define the location of the mechanical part with
respecttothe:
7.
(a)
subsystem;
(b)
particularpieceofequipment(boxoritem);
(c)
useoftheequipment.
Environmentalcode
TheenvironmentalcodeisdefinedusingTableB2.
TableB2:Environmentalcode
Radiation/UV/ATOX(R)a
Ambience(A)
Temperature(T)b,c
G:Geostationary
S:Outsideshadow
V:Vacuum
1:0Kto100K
L:Loworbit
L:Outsidelight
H:Hermetic
2:101Kto200K
B:Radiationbelt
M:Manned
3:201Kto300K
I:Interplanetary
E:Elevatedpressure
P:Planetary
Forallmechanicalparts,aletterisselectedfromthelefthandcolumn.Formechanicalpartsonthe
surfaceofthespacecraft,theletterLorSisadded.
b
c
Thermalcyclingtobeindicatedbytwovalues,e.g.3/5.
RT(roomtemperature)canbeacceptedasacodebetween283K(10C)and313K(40C).
8.
Criticality
EnterCforcriticalorNfornoncritical.Ifamechanicalpartis
considered critical, describe the reason for the criticality and
methodsofcontrol.
51
ECSSQST70C
6March2009
9.
10.
Supplierreference,primecommentsandprimeapprovalstatus
(a)
(b)
(c)
(d)
(e)
(f)
SelecttheprimeapprovalstatuscodefromTableB3.
Thecustomerapprovalstatuscodeandcomments
(a)
SelectthiscodefromTableB3.
(b)
Includeadditionalcommentswhereappropriate.
52
ECSSQST70C
6March2009
TableB3:Approvalstatus
Code Description
A
Approved
AllmechanicalpartsclassifiedAmaybeusedwithout
restriction.
ApprovedwithanRFA
Thesemechanicalpartsaresubjectedtoanevaluationor
validationprogramme.TheRFAnumberisenteredasa
comment.
Approvedwithaconcession
Thesemechanicalpartsdonotmeettherequirementsbutare
usedforfunctionalreasons.Theuseofsuchmechanicalpartsis
approvedbythecustomer.Theconcessionnumberisenteredas
acomment.
Pendingadecision
Mechanicalpartsforwhichanevaluationreportoraconcession
iswaitingforthecustomersprovisionalordefinitiveapproval.
Open
Newmechanicalpartsormechanicalpartsforwhich
investigationsandvalidationsareinprogress.
Rejected.
Deleted
Thisclassificationisusedforamechanicalpartthatisnolonger
used.
NOTE: Ifapprovalcannotbegivenandoneoftheothercodesareentered,enter
thecommentsintheappropriatecolumn.
B.2.2
Special remarks
a.
Thechangerecordshalllistthesuccessiveissuesandtheirreleasedates
sincethefirstformalissueofthedocument.
b.
53
ECSSQST70C
6March2009
DECLAREDMECHANICALPARTSLIST(DMPL)
Programmename:ABCDEFG
CIno.:12345676890
Docno.:001
Date:01.10.2000
Group(Title):abcdefg
Issue/Revision:1/4
Page:1
9
1
Itemno.and
usercode
51.2.1.ACSA
Commercial
identification
Typeofpart
ESA003521000 Copper/AL
120
bimetalring
1)Procurement
specification
1)Elementary
function
2)Issue/Revision/
Date
2)Main
characteristics
1)AIEV
1)Separator
ring
2)Fromcatalogue
2)Heat
conductor
52.2.1.ASAD
60.1.1.ACSA
A0090TX...XA Ti6Al4V
screws>M4
42908TC/F
Ferritecores
magnetic
9.1
1)Subsystem
1)R
1)Criticality
2)Equipment
2)A
3)Use
3)T
2)Reasonand
methodof
2)primecomments
control
1)TC
1)G
1)N
2)Plateinterface
2)V
2)
3)Spacingand
heatinspection
3)34
1)Supplier
Reference
Primeapproval
status
Customer
approval
status/comments
1)Usedonall
projects
2)
1)Whiteareo
1)assembly
1)PTANK
1)G
1)N
1)UsedonTC2
2)ASNA0090
DSN2413
2)
2)plate
2)V
2)
2)
3)fixing
3)34
1)Magnetics,Data
sheet
1)Coilcoreof
transformer
1)TC
1)G
1)C
1)
2)V
2)
2)SP/MAGN/003
2)Magnetic
component
2)tobe
qualified
01.02/03.06.1999
2)Southface
10
9.2
3)Heatregulation 3)34
FigureB1:ExampleofarealizedDMPL
54
ECSSQST70C
6March2009
Annex C (normative)
Declared process list (DPL) - DRD
C.1
DRD identification
C.1.1
ThisDRDiscalledfromECSSQST70,requirement4.2.3c.
C.1.2
ThepurposeoftheDPListohaveadetailedrecordofalltheprocessesusedto
producetheproductsofaprojectorprogramme.
ThedataintheDPLmakepossibletoassesswhethertheprocessesaresuitable
for a specific application, at the supplier and customer levels (in the approval
statuscolumn).
TheDPLispreparedforeachConfigurationitemattherelevantstages(e.g.
Start,PDR,CDRandQRR)asdefinedintheflowchartgiveninFigure41of
ECSSQST70.
ThefollowingdocumentsarelinkedtotheDPL:
C.2
declaredmateriallist(DPL),
requestforapproval(RFA)processes.
Expected response
C.2.1
<1>
a.
TheDPLshallcontainthefollowingstatements:
Processes are classified into 17 groups depending on their type or their
mainuse,seeTableC1.
b.
55
ECSSQST70C
6March2009
TableC1:Processgroupnumbers
Group
number
Description
Adhesivebonding
Compositemanufacture
Encapsulation/moulding
Painting/coating
Cleaning
Welding/brazing
Crimping/stripping/wirewrapping
Soldering
Surfacetreatments
10
Plating
11
Machining
12
Forming
13
Heattreatment
14
Specialfabrication:processesdevelopedspecificallyforthe
programme
15
Marking
16
Miscellaneousprocesses
17
Inspectionprocedures
<2>
a.
ContentsoftheDPL
The DPL shall include the information in Figure C1, where the header
informationidentifiesthelistasthedeclaredprocesseslistandincludes
theissuenumberanddateofissue,asfollows
1.
Itemnumber(applicabletoequipmentsupplierlevelonly)
(a)
NOTE
(b)
Forexample:1.2.1.SSEX
Characteristicsoftheitemnumberare:
Identifythesubcontractorbyanagreedusercodeforthe
project.
Oneonlyperprocesstype.
Doesnotchangeduringthelifeoftheprocesslist.
56
ECSSQST70C
6March2009
2.
Processidentification
Indicatethecorrectandstandardidentificationoftheprocess,e.g.
theprocessnameortitle:bonding,coatingorsoldering.
3.
Specification
(a)
Identifythenameorabbreviationoftheprocessexecutor.
(b)
Makeareferencetotheassociatedprocedure,togetherwith
theissue,revisionanddate.
NOTE
4.
Processdescription
Enterhereashortdescriptionoftheprocess.
5.
Useandlocation
Usecodesabletodefinethelocationoftheprocesswithrespectto
the:
(a)
subsystem,
(b)
particularpieceofequipment(boxoritem),
(c)
useoftheequipment.
NOTE
6.
Thiscolumnnumberisnotused.
7.
Associateditemnumbers
Enter the associated material list (DML) or mechanical parts list
(DMPL)withtheprocess.
8.
9.
10.
Criticality
(a)
EnterCforcriticalorNfornoncritical.
(b)
Ifaprocessisconsideredtobecritical,Enterthereferences
totherelevantRFA.
Supplierreference,primecommentsandapproval
(a)
(b)
SelectthesupplierapprovalstatuscodefromTableC2.
Thecustomerapprovalstatuscodeandcomments
(a)
SelectthiscodefromTableC2.
(b)
Includeadditionalcommentswhereappropriate.
57
ECSSQST70C
6March2009
TableC2:Approvalstatus
Code Description
A
Approved
AllprocessesclassifiedAmaybeusedwithoutrestriction.
ApprovedwithanRFA
Theseprocessesissubjectedtoanevaluationorvalidation
programme.TheRFAnumberisenteredasacomment.
Approvedwithaconcession
Theseprocessesdonotmeettherequirementsbutareusedfor
functionalreasons.Itisimportanttoreducetheuseofsuch
processestoaminimum.Alldeviationrequestsareapproved
bythecustomer.Theconcessionnumberisenteredasa
comment.
Pendingadecision
Processesforwhichanevaluationreportoraconcessionis
waitingforthecustomersprovisionalordefinitiveapproval.
Open
Newprocessesorprocessesforwhichinvestigationsand
validationsareinprogress.
Rejected.
Deleted
Thisclassificationisusedforaprocessthatisnolongerused.
Ifapprovalcannotbegivenandoneoftheothercodesareentered,enter
thecommentsintheappropriatecolumn.
C.2.2
Special remarks
b.
Thechangerecordshalllistthesuccessiveissuesandtheirreleasedates
sincethefirstformalissueofthedocument.
c.
58
ECSSQST70C
6March2009
DECLAREDPROCESSLIST(DPL)
Programmename:ABCDEFG
CIno.:1234567890
Docno.:001
Date:14.05.2000
Group(Title):abcdefg
Issue/Revision:1/5
Page:1
9
1
Itemno.and
usercode
Process
identification
1)Username
2)Associated
procedure
issue/revision/
date
Processdescription 1)Subsystem
code
2)Equipment
code
4.3.1.KOF
8.3.1.KOF
Bonding
1)EREMS
Coating
Vapourphase
solderingof
SMDs
Associated
DMLorDMPL
itemnumber
1)Criticality
6.1.2.ETC
1)N
2)Reasonfor
criticality
9.1
10
9.2
Primeapproval
status
Customerapproval
status/comments
1)QM/04L123/
BD/MHTable1
2)
1)Supplier
Reference
2)Primecomments
3)Use
1.2.1.SSEX
Applyingaspotof
gluewitha
2)E/SQ/PI/012
stainlesssteel
02/01/02.08.1984 dispenser
1)BE3
1)CERCO
Coatingby
paintbrushorby
2)E/SQ/PI/023
immersioninthe
02/01/08.12.1985 resin
1)BE3
1)EREMS
ECSSQST7038
1)BE3
2)E/SQ/PI/026
2)C3
01/02/09.09.1997
2)C5board
2)
1)Usedon
ANTARES
2)
3)Tofixparts
2.1.1.KOF
2)C1C2boards
1)N
2)
3)Protectionof
CIandEEE
parts
1)Usedon
PASTEC,
ANTARES
2)
15.1.1.AST
1)C
2)
3)
FigureC1:ExampleofrealizedDPL
59
ECSSQST70C
6March2009
Annex D (normative)
Request for approval (RFA) - DRD
D.1
DRD identification
D.1.1
ThisDRDiscalledupfromECSSQST70,requirement5.4.2d.
D.1.2
TheobjectiveofanRFAistoenablethesuppliertorequestfromthecustomer
permissiontouseacriticalmechanicalpart,materialorprocess.
The information provided by the supplier makes possible for the customer to
assesswhetherthecriticalmechanicalpart,materialorprocessissuitablefora
specificapplication.
The RFA is prepared for each critical mechanical part, material or process at the
relevantstagesasdefinedintheinflowchartgiveninFigure41ofECSSQST70.
ThefollowingdocumentsarelinkedtotheRFA:
D.2
declaredmechanicalpartslist;
declaredmaterialslist;
declaredprocesslist.
Expected response
D.2.1
a.
TheRFAshouldcontaintheinformationinFigureD1(pages1and2),as
follows:
1.
Theheaderinformation,identifyingthedocumentasarequestfor
approval together with the project logo and project name, RFA
reference,issuerevisionanddate.
2.
Originator
Originatorsnameandreference.
3.
Location
Subsystemandequipmentcodes.
60
ECSSQST70C
6March2009
4.
Itemdescription
Briefdescriptionoftheitem.
5.
PMPinformation
TheDML,DMPLorDPLitemnumberandlistreference.
6.
7.
Itemstatus,includingthefollowinginformation:
(a)
manufacturersnameandqualificationreference;
(b)
suppliersnameandqualificationstatus;
(c)
productormaterialspecification;
(d)
procurementspecification;
(e)
processorhandlingspecification;
(f)
otherrelatedprocessorhandlingspecifications;
(g)
verificationorqualificationspecification;
(h)
reportonverificationorqualification.
ReasonforRFA
EnterthereasonfortheRFA.
8.
Applicationandlocationdetails
Enter here the details of the application and exact location of the
item.
GivethereferenceintheCIL.
9.
Evaluationandvalidationprogramme
Referenceanddetailsofmaintests.
10.
SubcontractorsupplierapprovalforthefirstissueoftheRFA.
11.
Customerinitialdecision,tobeenteredonfirstissueoftheRFA
providing:
thedecisionconcerningtheproposedmaterial,
(b)
(c)
thedecisionconcerningtheproposedtestprogramme.
12.
Customersandfinalcustomers(ifapplicable)signature
13.
14.
SubcontractorsupplierapprovalonRFAfinalissue.
15.
FinalapprovalstatusoftheRFAbythecustomer.
D.2.2
a.
(a)
Special remarks
TheRFAshallbecompletedbythesupplier(parts1to10,13and14)and
thecustomer(parts1112and15).
61
ECSSQST70C
6March2009
1 Company:
Project:
Page
Reference:RFA
1of2
Issue
Revision
Date
Requestforapproval(RFA)
2 Originator:
3 Subsystem:
Originatorreference:
Equipment:
4 Itemdescription:
5 PMPlistitemnumber:
PMPlistreference:
6 Itemstatus
Manufacturer:
Manufacturerqualificationreference:
Supplier:
Qualificationstatus:
Product/materialspecification:
Procurementspecification:
Process/handlingspecification:
Relatedspecification:
Verification/qualificationspecification:
Report:
7 ReasonforRFA
8 Application/locationdetails:
CILReference:
9 Evaluation/validationprogramme(title,reference)
Tests
Plan,procedures,scheduletobeattached
FigureD1:ExampleofRFA(Page1of2)
62
ECSSQST70C
6March2009
Page
2of2
Company:
Project:
Reference:RFA
Issue
Revision
Date
Requestforapproval(RFA)
Materialsandprocesses
responsible
10
Supplierapprovalon
RFAfirstissue
PAresponsible
11 DecisiononRFAfirstissue:
Projectresponsible
Comments:
Requestrefused:
Submitdeviation:
Proceedwithvalidationprogramme:
Materialsandprocesses
responsible
12 Decision
PAresponsible
Projectresponsible
Customer
agree/disagree
Finalcustomer(if
applicable)
agree/disagree
13 Justificationresults
Validationreport(titleandreference)
Conclusion:
Validationreporttobeattached
Materialsandprocesses
responsible
14 Supplierapprovalon
RFAfinalissue
15 DecisiononRFAfinal
Materialsandprocesses
responsible
issue
PAresponsible
Customer
Projectresponsible
PAresponsible
Projectresponsible
agree/disagree
Higherlevelcustomers
(asnecessary)
agree/disagree
FigureD1:ExampleofRFA(Page2of2)
63
ECSSQST70C
6March2009
Annex E (informative)
Relationship between materials,
mechanical parts, processes activities and
programme phases
E.1
E.2
a.
identifymainprogrammeconstraintsonmaterials,mechanicalpartsand
processes,
b.
definethepolicy,and
c.
plantheproductassurancetasksfortheprojectdefinitionphase.
E.3
a.
defineoridentifyrequirements,
b.
c.
plan the product assurance tasks for the detailed design, development,
manufacturing, integration and test phase and prepare the materials,
mechanicalpartsandprocessesplanaspartofthePAplan,and
d.
supportpreliminarydesignreview.
identifymaterials,mechanicalpartsandprocesses;
f.
issuepreliminarylists;
64
ECSSQST70C
6March2009
E.4
g.
identifycriticalitems;
h.
establishorreviewRFA;
i.
supportmandatoryinspectionpointsidentification;
j.
establishevaluationprogramme,performtestorreviewtestresults;
k.
l.
supportnonconformanceprocessing(NRB,failurereviewboard);
m.
establishtheasdesignedlists;
n.
supportthecriticaldesignreview;
o.
supportthequalificationreview;
p.
establishthefinalasdesigned(updated)lists;
q.
supportreleaseofmanufactureofflighthardware;
r.
supportfinalacceptancereview.
supporttheseriesmanufacturingofrecurringproducts,
b.
supporttheinvestigationofoperationalphaseanomalies,and
c.
updatetheasflownmaterialsliststoincorporatethenewmaterialsthat
havebeenaddedorchangedasaresultofNCRactivities.Inparticular,
thePMPlistsshouldincludetheactualmaterialsflownonmannedand
reusablespacecraftandtheirpayloads.
65
ECSSQST70C
6March2009
Annex F (informative)
MMPP documents delivery with respect to
milestones
Scope of the Table F1 is to present relation of documents associated to Parts,
material and processes activities to support project review objectives as
specifiedinECSSMST10.
NOTE
The table lists the documents necessary for the project reviews (identified
by+).
The various crosses in a row indicate the increased levels of maturity
progressivelyexpectedversusreviews.Thelastcrossinarowindicatesthatat
thatreviewthedocumentisexpectedtobecompletedandfinalized.
NOTE
TableF1presentsthereviewsatwhichthedifferentissuesoftheECSSQST70
andECSSQST7001documentsareexpected.
NOTE
Other
MMPP
deliverable
document
requirements definitions (DRDs) are contained
intheECSSQST70XXdocuments.
66
ECSSQST70C
6March2009
TableF1:MMPPdocumentsdeliveryw.r.t.milestones
Phase
DocumentTitle
DRDRef.
MDR
PRR
SRR
PDR
CDR
QR
AR
ORR
FRR
LRR
CRR
ELR
Declaredmaterialslist
(DML)
ECSSQST70,AnnexA
Declaredmechanicalparts
list(DMPL)
ECSSQST70,AnnexB
Declaredprocesslist(DPL)
ECSSQST70,AnnexC
Requestforapproval(RFA)
ECSSQST70,AnnexD
CleanlinessRequirement
Specifications(CRS)
ECSSQST7001,AnnexA
Cleanlinessand
contaminationcontrolplan
(C&CCP)
ECSSQST7001,AnnexB
67
ECSSQST70C
6March2009
Bibliography
ECSSSST00
ECSSsystemDescription,implementationandgeneral
requirements
ECSSMST10
SpaceprojectmanagementProjectplanningand
implementation
ECSSMST40
SpaceprojectmanagementConfigurationand
informationmanagement
MILHDBK454
GeneralGuidelinesforElectronicEquipment
NASAMAPTIS
MaterialsandProcessesTechnicalInformationSystem
NASASTD6001
Flammability,odour,offgassingandcompatibility
requirementsandtestproceduresformaterialsin
environmentsthatsupportcombustion(previously
NHB80601C)
68