You are on page 1of 68

ECSS-Q-ST-70C

6 March 2009

Space product
assurance
Materials, mechanical parts and
processes

ECSS Secretariat
ESA-ESTEC
Requirements & Standards Division
Noordwijk, The Netherlands

ECSSQST70C
6March2009

Foreword
This Standard is one of the series of ECSS Standards intended to be applied together for the
management, engineering and product assurance in space projects and applications. ECSS is a
cooperative effort of the European Space Agency, national space agencies and European industry
associationsforthepurposeofdevelopingandmaintainingcommonstandards.Requirementsinthis
Standardaredefinedintermsofwhatshallbeaccomplished,ratherthanintermsofhowtoorganize
and perform the necessary work. This allows existing organizational structures and methods to be
appliedwheretheyareeffective,andforthestructuresandmethodstoevolveasnecessarywithout
rewritingthestandards.
This Standard has been prepared by the ECSS Executive Secretariat endorsed by the document and
disciplinefocalpointandapprovedbytheECSSTechnicalAuthority.

Disclaimer
ECSSdoesnotprovideanywarrantywhatsoever,whetherexpressed,implied,orstatutory,including,
butnotlimitedto,anywarrantyofmerchantabilityorfitnessforaparticularpurposeoranywarranty
that the contents of the item are errorfree. In no respect shall ECSS incur any liability for any
damages,including,butnotlimitedto,direct,indirect,special,orconsequentialdamagesarisingout
of, resulting from, or in any way connected to the use of this Standard, whether or not based upon
warranty,businessagreement,tort,orotherwise;whetherornotinjurywassustainedbypersonsor
propertyorotherwise;andwhetherornotlosswassustainedfrom,oraroseoutof,theresultsof,the
item,oranyservicesthatmaybeprovidedbyECSS.

Publishedby:

Copyright:

ESARequirementsandStandardsDivision
ESTEC, P.O. Box 299,
2200 AG Noordwijk
The Netherlands
2009 by the European Space Agency for the members of ECSS

ECSSQST70C
6March2009

Change log

ECSSQ70A
19April1996

Firstissue

ECSSQ70B
14December2004

Secondissue

ECSSQST70C

Thirdissue

6March2009

ThemainchangesbetweenECSSQ70Bandthecurrentversionarethe
following:
RevisingECSSQST70accordingtoECSSdraftingrulesandnew
template.
Reorganizationofthecontenttoseparatedescriptivetextand
requirements,andcreationofDRD.

ECSSQST70C
6March2009

Table of contents

Change log .................................................................................................................3


1 Scope.......................................................................................................................9
2 Normative references ...........................................................................................10
3 Terms, definitions and abbreviated terms..........................................................12
3.1

Terms from other standards .....................................................................................12

3.2

Terms specific to the present standard ....................................................................12

3.3

Abbreviated terms .................................................................................................... 13

4 General requirements...........................................................................................15
4.1

4.2

MMPP management requirements........................................................................... 15


4.1.1

Overview.....................................................................................................15

4.1.2

MMPP plan .................................................................................................15

4.1.3

Customer reviews....................................................................................... 18

Management and consolidation of the activities....................................................... 19


4.2.1

Overview.....................................................................................................19

4.2.2

Establishing and processing of lists............................................................ 19

4.2.3

Management of the lists .............................................................................20

4.2.4

Supplier role and responsibilities................................................................ 20

4.3

Technical constraints................................................................................................21

4.4

Cleanliness and contamination control..................................................................... 21

4.5

Safety hazardous parts and materials ...................................................................... 22

4.6

Optical, mechanical or electrical GSE hardware ...................................................... 22

5 Materials control...................................................................................................23
5.1

Technical criteria for selection of materials .............................................................. 23


5.1.1

Overview.....................................................................................................23

5.1.2

Temperature ...............................................................................................23

5.1.3

Thermal cycling ..........................................................................................23

5.1.4

Vacuum ......................................................................................................23

5.1.5

Offgassing and toxicity ............................................................................... 24


4

ECSSQST70C
6March2009

5.2

5.1.6

Flammability ...............................................................................................24

5.1.7

Radiation ....................................................................................................24

5.1.8

Electrical charge and discharge ................................................................. 24

5.1.9

Corrosion ....................................................................................................24

5.1.10

Stress-corrosion ......................................................................................... 24

5.1.11

Fluid compatibility .......................................................................................24

5.1.12

Galvanic compatibility................................................................................. 25

5.1.13

Atomic oxygen ............................................................................................25

5.1.14

Micrometeoroids and debris ....................................................................... 25

5.1.15

Moisture absorption and desorption ........................................................... 25

5.1.16

Mechanical contact surface effects (cold welding, fretting, wear) .............. 27

5.1.17

Life..............................................................................................................27

Selection...................................................................................................................27
5.2.1

General.......................................................................................................27

5.2.2

Constraints .................................................................................................27

5.3

Declared materials list (DML) ...................................................................................28

5.4

Criticality analysis .....................................................................................................28

5.5

5.6

5.7

5.4.1

Overview.....................................................................................................28

5.4.2

Requirements .............................................................................................28

Evaluation and validation phases ............................................................................. 28


5.5.1

General.......................................................................................................28

5.5.2

Evaluation phase ........................................................................................ 29

5.5.3

Validation phase .........................................................................................29

5.5.4

Approval phase...........................................................................................29

5.5.5

Deviation request........................................................................................29

Procurement of materials .........................................................................................30


5.6.1

Procurement specifications ........................................................................ 30

5.6.2

Incoming inspection procedure................................................................... 30

Use of materials .......................................................................................................30


5.7.1

Validation status of materials......................................................................30

5.7.2

Traceability of materials.............................................................................. 30

5.7.3

Packaging, storage, removal from storage................................................. 31

5.7.4

Limited-life materials before implementation .............................................. 31

5.7.5

Limited-life materials after implementation ................................................. 31

5.7.6

Materials nonconformances and alerts....................................................... 31

5.7.7

Health and safety........................................................................................ 31

6 Mechanical parts control .....................................................................................32

ECSSQST70C
6March2009
6.1

Selection of mechanical parts ..................................................................................32

6.2

Selection...................................................................................................................32

6.3

Declared mechanical parts list (DMPL) ....................................................................32

6.4

Criticality analysis .....................................................................................................32

6.5

6.6

6.7

6.4.1

Overview.....................................................................................................32

6.4.2

Requirements .............................................................................................33

Evaluation and qualification phases ......................................................................... 33


6.5.1

General.......................................................................................................33

6.5.2

Evaluation phase ........................................................................................ 33

6.5.3

Qualification phase .....................................................................................34

6.5.4

Approval phase...........................................................................................34

6.5.5

Deviation request........................................................................................34

Procurement of mechanical parts............................................................................. 34


6.6.1

General.......................................................................................................34

6.6.2

Procurement specification .......................................................................... 34

6.6.3

Source inspection .......................................................................................35

6.6.4

Incoming inspection procedure................................................................... 35

Use of mechanical parts ...........................................................................................35


6.7.1

Qualification status of parts ........................................................................35

6.7.2

Traceability of parts .................................................................................... 35

6.7.3

Packaging, storage, removal from storage................................................. 35

6.7.4

Limited-life parts or parts subject to wearout................................................. 36

6.7.5

Parts nonconformance and alerts...............................................................36

7 Process control ....................................................................................................37


7.1

Specifications or procedures .................................................................................... 37

7.2

Associated materials and mechanical parts ............................................................. 37

7.3

Selection...................................................................................................................37

7.4

Declared processes list (DPL) .................................................................................. 38

7.5

Criticality analysis .....................................................................................................38

7.6

7.5.1

Overview.....................................................................................................38

7.5.2

Requirements .............................................................................................38

Evaluation and verification phase............................................................................. 38


7.6.1

General.......................................................................................................38

7.6.2

Evaluation phase ........................................................................................ 39

7.6.3

Verification phase .......................................................................................39

7.6.4

Approval phase...........................................................................................39

7.6.5

Deviation request........................................................................................39

ECSSQST70C
6March2009
7.7

Use of a process ......................................................................................................40


7.7.1

Verification status of a process................................................................... 40

7.7.2

Re-verification of a process ........................................................................ 40

7.7.3

Implementation of a process ......................................................................40

7.7.4

Traceability of processes............................................................................40

7.7.5

Process nonconformances and alerts ........................................................ 41

7.7.6

Mandatory inspection points (MIP) ............................................................. 41

7.7.7

Packaging, storage, removal from storage................................................. 41

Annex A (normative) Declared materials list (DML) - DRD...................................42


Annex B (normative) Declared mechanical parts list (DMPL) - DRD...................49
Annex C (normative) Declared process list (DPL) - DRD .....................................55
Annex D (normative) Request for approval (RFA) - DRD .....................................60
Annex E (informative) Relationship between materials, mechanical parts,
processes activities and programme phases ...................................................64
E.1

Feasibility phase (phase A) ...................................................................................... 64

E.2

Preliminary definition phase (phase B)..................................................................... 64

E.3

Detailed definition and production phase (phase C or D) .............................................. 64

E.4

Utilization phase (phase E) ......................................................................................65

Annex F (informative) MMPP documents delivery with respect to


milestones............................................................................................................66
Bibliography.............................................................................................................68
Figures
Figure 4-1: Materials, mechanical parts and processes flow chart ........................................ 16
Figure A-1 : Example of a realized DML ................................................................................ 48
Figure B-1 : Example of a realized DMPL .............................................................................. 54
Figure C-1 : Example of realized DPL....................................................................................59
Figure D-1 : Example of RFA (Page 1 of 2) ...........................................................................62
Figure D-1 : Example of RFA (Page 2 of 2) ...........................................................................63

Tables
Table 4-1: Steps to be taken to get approval for materials, mechanical parts and
processes (MMPP) .............................................................................................. 18
Table 5-1 Compatible couples for bimetallic contacts ............................................................ 26
Table A-1 : Material group numbers.......................................................................................43

ECSSQST70C
6March2009
Table A-2 : Environmental code .............................................................................................45
Table A-3 : Size code ............................................................................................................. 46
Table A-4 : Approval status ....................................................................................................47
Table B-1 : Mechanical part group numbers .......................................................................... 50
Table B-2 : Environmental code .............................................................................................51
Table B-3 : Approval status ....................................................................................................53
Table C-1 : Process group numbers ...................................................................................... 56
Table C-2 : Approval status....................................................................................................58
Table F-1 : MMPP documents delivery w.r.t. milestones ....................................................... 67

ECSSQST70C
6March2009

1
Scope
The purpose of this Standard is to define the requirements and statements
applicable to materials, mechanical parts and processes to satisfy the mission
performancerequirements.
ThisStandardalsodefinesthedocumentationrequirementsandtheprocedures
relevant to obtaining approval for the use of materials, mechanical parts and
processesinthefabricationofspacesystemsandassociatedequipment.
ThisStandardcoversthefollowing:

management, including organization, reviews, acceptance status and


documentationcontrol;

selectioncriteriaandrules;

evaluation,validationandqualification,orverificationtesting;

procurementandreceivinginspection;

utilizationcriteriaandrules.

TherelationshipbetweenactivitiesandprogrammephasesisdefinedinAnnexE.
TheprovisionsofthisStandardapplytoallactorsinvolvedatalllevelsinthe
production of space systems. These can include manned and unmanned
spacecraft, launchers, satellites, payloads, experiments, electrical ground
support equipment, mechanical ground support equipment, and their
correspondingorganizations.
Thisstandardmaybetailoredforthespecificcharacteristicsandconstraintsofa
spaceprojectinconformancewithECSSSST00.

ECSSQST70C
6March2009

2
Normative references
The following normative documents contain provisions which, through
reference in this text, constitute provisions of this ECSS Standard. For dated
references,subsequentamendmentsto,orrevisionsofanyofthesepublications
donotapply.However,partiestoagreementsbasedonthisECSSStandardare
encouragedtoinvestigatethepossibilityofapplyingthemostrecenteditionsof
the normative documents indicated below. For undated references the latest
editionofthepublicationreferredtoapplies.

ECSSSST0001

ECSSsystemGlossaryofterms

ECSSEST2006

SpaceengineeringSpacecraftcharging

ECSSQST10

SpaceproductassuranceProductassurance
management

ECSSQST1004

SpaceproductassuranceCriticalitemcontrol

ECSSQST1009

SpaceproductassuranceNonconformancecontrol
system

ECSSQST20

SpaceproductassuranceQualityassurance

ECSSQST40

SpaceproductassuranceSafety

ECSSQST7001

SpaceproductassuranceCleanlinessand
contaminationandcontrol

ECSSQST7002

SpaceproductassuranceThermalvacuum
outgassingtestforthescreeningofspacematerials

ECSSQST7004

SpaceproductassuranceThermaltestingforthe
evaluationofspacematerials,processes,mechanical
partsandassemblies

ECSSQST7006

SpaceproductassuranceParticleandUVradiation
testingofspacematerials

ECSSQST7021

SpaceproductassuranceFlammabilitytestingfor
thescreeningofspacematerials

ECSSQST7022

SpaceproductassuranceControloflimited
shelflifematerials

ECSSQST7029

SpaceproductassuranceDeterminationof
offgassingproductsfrommaterialsandassembled
articlestobeusedinamannedspacevehiclecrew
compartment

10

ECSSQST70C
6March2009
ECSSQST7036

SpaceproductassuranceMaterialselectionfor
controllingstresscorrosioncracking

ECSSQST7037

SpaceproductassuranceDeterminationofthe
susceptibilityofmetalstostresscorrosioncracking

ECSSQST7071

SpaceproductassuranceDataforselectionofspace
materialsandprocesses

11

ECSSQST70C
6March2009

3
Terms, definitions and abbreviated terms

3.1

Terms from other standards


ForthepurposeofthisStandard,thetermsanddefinitionsfromECSSSST0001
apply,inparticularforthefollowingterms:
material
mechanicalpart

3.2

Terms specific to the present standard


3.2.1

critical mechanical part

mechanical part that requires specific attention or control due to fracture


mechanics aspects and limitedlife aspects, or with which the supplier has no
previousexperienceofusingthemechanicalpartinthespecificapplicationand
environment or that are new or nonqualified, or that has caused problems
duringprevioususethatremainunresolved

3.2.2

critical process

process new to an individual company or nonverified for the application in


questionorhascausedproblemsduringprevioususethatremainunresolved

3.2.3

critical material

material that is new to an individual company or nonvalidated for the


particular application and environment, or that has caused problems during
previoususethatremainunresolved

3.2.4

part

mechanicalpart(see3.1)

3.2.5

process

set of interrelated resources and activities which transforms a material or


semifinishedproductintoasemifinishedproductorfinalproduct

12

ECSSQST70C
6March2009
3.2.6

request for approval (RFA)

document with which the supplier or user asks the competent body for
permissiontouseacriticalmaterial,partorprocess

3.2.7

special process

process where quality cannot be completely ensured by inspection of the end


articleonly

3.3

Abbreviated terms
ForthepurposeofthisStandard,theabbreviatedtermsfromECSSSST0001
andthefollowingapply:

Abbreviation

Meaning

AA

AluminiumAssociation

AOCS

attitudeandorbitcontrolsystem

ATOX

atomicoxygen

AISI

AmericanIronandSteelInstitute

CDA

CopperDevelopmentAssociation

CDR

criticaldesignreview

CFRP

carbonfibrereinforcedpolymer

CI

configurationitemnumber(asperprojectdefinition)

DML

declaredmateriallist

DMPL

declaredmechanicalpartlist

DPL

declaredprocesslist

DRD

documentrequirementsdefinition

EEE

electrical,electronicandelectromechanical

ESA

EuropeanSpaceAgency

GOX

gaseousoxygen

GSE

groundsupportequipment

LEO

lowEarthorbit

LOX

liquidoxygen

MAPTIS

MaterialsandProcessesTechnicalInformationSystem

MIP

mandatoryinspectionpoint

MMPP

Materials,mechanicalpartsandprocesses

NASA

NationalAeronauticsandSpaceAdministration

NCR

nonconformancereport

NRB

nonconformancereviewboard

PA

productassurance

13

ECSSQST70C
6March2009
PDR

preliminarydesignreview

PID

processidentificationdocument

PMP

parts,materials,processes

QR

qualificationreview

QRR

qualificationreviewreport

RFA

requestforapproval

SCC

stresscorrosioncracking

14

ECSSQST70C
6March2009

4
General requirements

4.1

MMPP management requirements


4.1.1

Overview

ThegeneralMMPPactivitywithintheframeworkofaprojectissummarizedin
Figure41.

4.1.2

MMPP plan

a.

The supplier shall prepare, maintain and implement a MMPP plan, as


part of the overall PA plan in conformance to ECSSQST10 and this
Standardorasaseparatedocument.

b.

TheMMPPplanshallbesubmittedtothecustomerforapproval.

15

ECSSQST70C
6March2009
Functional and technical specifications
Project list and incident databank

Start

Risk and contamination analysis


Results of previous uses

Identification of needs

Selection

Criticality analysis
Preliminary lists
No

Yes

Critical?

Yes

Evaluation
necessary?
No

Conform to
requirements?

Yes

No
Evaluation and validation or
qualification or verification
programme

Validation or qualification
or verification programme
Test
Programme

Test
Programme

RFA first Issue

Deviation
RFA first Issue

PDR
Accept?

Accept?

No

Yes

No

New test?

Evaluation tests

Yes

No

Test results
No

Accept?

Validation or qualification
or verification programme

Yes

Yes

New
selection?
Test results

Yes

No

No
Accept?

Deviation

Yes

New
test?

RFA final issue

Yes
No

No

Accept?
Yes

Validation or qualification or
verification programme

No

New
selection?

Accept?

Yes
Test results

Yes
No
New test?
Deviation

Yes

RFA final issue


No

New
selection?

Yes

No
Accept?
Yes

Accept?

No

No

Yes
Deviation

No
Accept?
Yes

CDR

as-designed lists

To P a rt 2

F ro m P a rt 2 (N RB d e c i s io n )

Figure41:Materials,mechanicalpartsandprocessesflowchart

16

ECSSQST70C
6March2009
To P a rt 1

F ro m P a rt 1

Procurement of materials

Procurement of mechanical parts

Packing, storage

Removal from storage, conformity


check with requirements

No
Accept?
Yes

Implementation of processes

No
Accept?
Yes
Yes
NCR

NRB

No
Use

Inspection

No
Accept?
Yes

Utilization

No
Accept?
Yes
-

as-built lists

QR
end

Figure41:Materials,mechanicalpartsandprocessesflowchart(Continued)

17

ECSSQST70C
6March2009

Table41:Stepstobetakentogetapprovalformaterials,mechanicalpartsand
processes(MMPP)
Materials
Phase

Step Comments

Mechanicalparts

Processes

Step Comments

Step Comments
1

CriticalAnalysis 1

2
Evaluation
(usuallybytest
methodsdefined
byECSS
standards)

Criticalmaterials
aretested,e.g.
outgassing,SCC,
flammability.

Mechanicalpartsare 2
testedby,for
example,vibration,
thermalanalysis,
offgassingandlife
test.

Criticalprocessesare
evaluatedbytesting
technology
samplesincluding
all,forexample,
electrical
interconnection
processesand
painting,adhesive
bonding.

Verification

Notapplicable

Notapplicable

Validation

Notapplicable

Notapplicable

Qualification

Notapplicable

Notapplicable

Approval

ByRFA(AnnexD)
orDML

ByRFA(AnnexD)or
DMPL/DPL

Verificationtests
usuallydefinedin
ECSSstandards

ByRFA(AnnexD)or
DPL

Note

NOTE 1 Project approval is always by means of the request for approval (RFA) form and the projects declared
materials list (DML), declared mechanical parts list (DMPL) and declared processes list (DPL).

Note

NOTE 2 The details for approvals of MMPP lists are contained in this Standard.

Note

NOTE 3 To summarize:

Materials are validated.


Mechanical parts are qualified.
Processes are verified.
Skills training schools are ESA-certified.
Outside test or evaluation laboratories are certified by agency or company audits.
Operators and inspectors for special and critical processes are trained, certified and
monitored.

In addition:

4.1.3

Customer reviews

a.

To obtain the validation status for materials and qualification status for
parts and verification status for processes, the MMPP manager shall
presenttothecustomerthoseactivitieswhichwereperformedinorderto
complywiththisStandardtogetherwithresultsobtained.

b.

The MMPP manager shall organize technical review meetings with his
suppliersatalllevels.

18

ECSSQST70C
6March2009

4.2

Management and consolidation of the activities


4.2.1

Overview

The relationship between materials and processes activities and programme


phasesisshowninAnnexE.

4.2.2

Establishing and processing of lists

a.

Eachsupplierandsubsuppliershallestablish,collect,reviewanddeliver
thedeclaredmaterials,mechanicalpartsandprocesseslistsincludingall
theitemsintendedforuseintheflightequipment.

b.

Thelistsshallreflectthecurrentdesignatthetimeofissue.

c.

These lists shall contain the materials, mechanical parts and processes
usedinthecurrentdesigninorderto:
1.

demonstratecompliancewithallrequirementsoftheprogramme;

2.

verifytheresultsofequipmentsupplieractivities;

3.

control and monitor the status of materials, mechanical parts and


processesinaccordancewithprogrammemilestones.
NOTE

d.

Thefollowingconstraintsshouldapply:
1.

maximum use of the materials and processes described in


approved data sources and items already approved on similar
projects;
NOTE

2.
e.

f.

g.

SeeAnnexF.

For approved data sources see for example


ECSSQST7071.

useofprojectrelatedpreferredlists,ifavailable.

Thefollowingconstraintsshallbetakenintoaccount:
1.

requirementsoriginatingfromtheinitialtechnicalspecification;

2.

programmaticprojectrequirementsandconditions;

Ananalysisofthecriticalityofthesepreliminarylistsshall,afterchecking
theconformityofthematerials,mechanicalpartsandprocesses,against
all the project requirements, allow them to be classified into three
categories:
1.

Critical items, subject to evaluation, validation, qualification, or


verificationprogrammes.

2.

Itemsthatarenotcriticalbutwhichdonotconformtooneormore
project requirements (a justified deviation request should be
draftedforthiscategory).

3.

Noncriticalitems.

For critical items a request for approval shall be submitted in


conformancewithAnnexD.

19

ECSSQST70C
6March2009

4.2.3

Management of the lists

a.

ThesuppliershalldocumentallmaterialsintheDeclaredmaterialslistin
conformancewithAnnexA.

b.

The supplier shall document all mechanical parts in the Declared


mechanicalpartslistinconformancewithAnnexB.

c.

ThesuppliershalldocumentallprocessesintheDeclaredprocesslistin
conformancewithAnnexC.

d.

The supplier shall process the lists of lower level suppliers to ensure
exchangeabililty, searchability, sortability, storability and retrievability
forthatsetoflists,beforesubmittingittothecustomer.

e.

Theselistsshallbeupdatedduringthecourseoftheproject.

f.

Thepreliminarylistsshallincludetheitemsfromsupplierspreliminary
needs.
NOTE

They are used to identify critical items


(availableforthePDR).

g.

The asdesigned lists shall include the items from the baselines various
designfiles(availablefortheCDR).

h.

AnychangeafterCDRorQRshallbereflectedinthelistandshallbein
accordancewithFigure41(Part2).
NOTE1 The MMPP manager is responsible within the
programme to ensure that all the information
neededisgivenandthattheapprovalstatusis
consistent with technical and scheduling
objectivesanddataisexchangeable.
NOTE2 Where no project requirements exist for a
separate DMPL, the mechanical parts can be
enteredintoaseparatesectionoftheDML.
NOTE3 The materials of, for example,screws and nuts
that are made up of a few materials can be
listed in the DMPL. The materials (metals and
plastics) of complex parts can be listed in the
DML with, for example, outgassing, toxicity,
flammability, corrosion and stress corrosion
valuesandreferencetotheDMPLitem.

4.2.4
a.

b.

Supplier role and responsibilities

Thesuppliershallperformthefollowingtasks:
1.

obtainingthecorrectandcompletelistsfromlowerlevelsuppliers;

2.

providingprovisionaland,later,definitiveapprovalforeachlist;

3.

submittingtheprojectdeclaredlistsforapprovalpriortoinitiation
ofthehardwarephase(beforecriticaldesignreview).

The lists established by the suppliers shall include all the information
describedinthisStandard.

20

ECSSQST70C
6March2009
c.

Amendmentstothelistsshallbeimplementedonlythroughestablished
changeprocedures.

d.

The following documentation shall be delivered to the customer upon


request:

e.

1.

RFA(referenceandissue);

2.

evaluationreports;

3.

deviationrequests.

Thematerial,mechanicalpartsorprocessjustificationfilesshallbemade
availabletothecustomeruponrequesteitheronthesuppliersite,orby
anyotherprocessagreedbybothparties.
NOTE

4.3

Forexample,bynondisclosureagreement.

Technical constraints
a.

Partsandmaterialsshallsatisfythemissionsfunctionalconstraints.

b.

Parts and materials shall satisfy both ground environment constraints


andflightconstraints.
NOTE

Examplesare:
Ground
environment
constraints:
manufacture, tests, storage, maintenance,
transportandintegration
Flightconstraints:launchandorbit.

4.4

c.

The technical criteria from clause 5.1 shall be taken into account,
accordingtothemission.

d.

The estimated availability of the parts and products obtained from


materialsandprocessesusedshallbecompatiblewiththefinalsystems
lifecycle(tests,storageandmission).

Cleanliness and contamination control


a.

Thesuppliershallestablishandmaintainacontaminationandcleanliness
controlprogrammeincluding,asaminimum:
1.

cleaningprocedures,and

2.

cleanlinessmonitoringproceduresormethods.

b.

The risks of chemical or particle pollution generated by parts, materials


or processes used shall be identified and reduced in accordance with
missionrequirements(cleanlinessorcontaminationanalysis).

c.

For cleanliness or contaminationcritical applications, a requirement


specification (chemical and particle) and a specific cleanliness control
planandshallbeestablishedinconformancewithAnnexA(CRSDRD)
andAnnexB(C&CCPDRD)ofECSSQST7001.

21

ECSSQST70C
6March2009

4.5

Safety hazardous parts and materials


a.

4.6

Parts and materials with hazardous characteristics shall be identified,


managedandprocessedinconformancewithECSSQST40.

Optical, mechanical or electrical GSE hardware


a.

Whenoptical,mechanicalorelectricalGSEmaterialsareusedinthermal
vacuum or interfacing with flight hardware, possible degradation shall
betakenintoaccount.
NOTE

For
example,
contamination,
surface
degradation, electromechanical and chemical
effects.

22

ECSSQST70C
6March2009

5
Materials control

5.1

Technical criteria for selection of materials


5.1.1

Overview

The following requirements apply when the environmental conditions of the


mission require their application. The specific requirements, test methods and
acceptorrejectcriteriaarepresentedintheECSSQST70seriesofdocuments.

5.1.2
a.

Temperature

Materialpropertiesshallbecompatiblewiththethermalenvironmentto
whichtheyareexposed.

5.1.3

Thermal cycling

a.

Materials subject to thermal cycling shall be assessed for their ability to


withstandinducedthermalstress.

b.

ThefollowingmaterialsshallbetestedinconformancewithECSSQST
7004:
1.

Materialssusceptibletothermalvacuumeffect.
NOTE

2.
c.

For a nonexhaustive listof such materials, see


ECSSQST7004Clause1.

Materials of unknown characteristics in respect to thermal


vacuum.

Materials subject to thermal cycling other than those covered by 5.1.3b,


shallbetestedinaccordancewithaprocedureapprovedbythecustomer.

5.1.4

Vacuum

a.

MaterialsselectionshallbemadeinconformancewithECSSQST7071.

b.

OutgassingtestsshallbecarriedoutinconformancewithECSSQST7002.
NOTE

The need for retest of materials used for an


extended period of time at a temperature
higher than 50 C should be mutually agreed
withthecustomer.

23

ECSSQST70C
6March2009

5.1.5

Offgassing and toxicity

a.

Spacecraft and associated equipment shall be manufactured from


materials and by processes that do not cause a hazard to personnel or
hardware,whetheronthegroundorinspace.

b.

ECSSQST7029 shall apply for the characterization of offgassing


products.
NOTE

5.1.6
a.

Flammability

Thematerialsflammabilityresistanceshallbeevaluatedinconformance
with ECSSQST7021 for the most hazardous environment envisaged
fortheiruse.
NOTE

5.1.7
a.

Radiation

Electrical charge and discharge

External surfaces of the spacecraft shall be sufficiently conductive,


interconnected and grounded to the spacecraft structure to avoid the
buildupofdifferentialchargesinconformancewithECSSEST2006.

5.1.9
a.

ForNASASTSpayloadsseeNASASTD6001.

Materials used on the spacecraft external surfaces shall be assessed in


conformancewithECSSQST7006inordertodeterminetheirresistance
totheradiationdosageexpectedduringthemission.

5.1.8
a.

MAPTISandMILHDBK454testmethodisnot
spacerelevant.

Corrosion

Forallmaterialsthatcomeintocontactwithatmosphericgases,cleaning
fluidsorotherchemicals,itshallbedemonstratedthatthedegradationof
properties during their anticipated servicelife is acceptable in terms of
theperformanceandintegrityrequirements.

5.1.10

Stress-corrosion

a.

Materials used for structural and loadbearing applications (subject to


tensilestress)shallbechoseninconformancewithECSSQST7036.

b.

AnymaterialnotcoveredbystandardECSSQST7036shallbetestedin
conformancewithECSSQST7037.

5.1.11
a.

Fluid compatibility

Materials within the system exposed to liquid oxygen (LOX), gaseous


oxygen (GOX) or other reactive fluids, both directly and as a result of
single point failures when failure propagation effects cause hazardous

24

ECSSQST70C
6March2009
operation of interfacing hardware shall be compatible with that fluid in
theirapplication.
b.

The possibility of hydrogen embrittlement occurring during component


manufacture or use shall be assessed, and an material evaluation be
undertaken,includingtheassessmentofadequateprotectionandcontrol.

5.1.12
a.

Galvanic compatibility

When bimetallic contacts are used, the choice of the pair of metallic
materialsusedshallbeagreedwiththecustomer.
NOTE

Thisalsoincludesmetaltoconductive
fibrereinforcedmaterialscontacts.

b.

GalvaniccompatibilitiesshallbeselectedinconformancewithTable51.

c.

Materials not listed in Table 51 shall be evaluated in a flightsimulated


configuration using an accelerated environment to be agreed by the
customer.

5.1.13

Atomic oxygen

a.

All materials considered for use on the external surfaces of spacecraft


intendedforuseinLowEarthOrbit(LEO)altitudes(between200kmand
700km)shallbeevaluatedfortheirresistancetoatomicoxygen(ATOX).

b.

Testproceduresshallbesubjecttotheapprovalofthecustomer.

5.1.14
a.

Theeffectofimpactsbymicrometeoroidsanddebrisonmaterialsshall
1.

bereviewedandassessedonacasebycasebasis,and

2.

their use comply with safety evaluation and assessment results


concerningdesignandapplicationcriteriaordetails.

5.1.15
a.

Micrometeoroids and debris

Moisture absorption and desorption

Precautions shall be taken to avoid moisture absorption during


manufacture and storage of CFRPtype materials in conformance with
ECSSQST7001andECSSQST7022.

25

ECSSQST70C
6March2009

Steel(carbon,lowalloy),Castiron

Stainlesssteel13Cr(400series)

Stainlesssteel18/8(300series)

SnPballoys(all),Tin,Lead

Nickel,Monel,Inconel,
Nickel/Molybdenumalloys

Gunmetal(CuZn10alloy),Pbronzes,
Snbronzes

Gold,Platinum,Carbon,Rhodium

Cadmium

Castiron(austenic)

Chromium

Copper,Brasses

CuproNickel
Albronzes
Sibronzes
Gold
Platinum,
Carbon
Rhodium

Gunmetal(CuZn10alloy)
Pbronzes
Snbronzes
Magnesium

Nickel
Monel
Inconel
Nickel/Molybdenumalloys
Silver

Zinc,Beryllium

TitaniumandTialloys

Silver

Magnesium

Copper,Brasses

Chromium

Al(pure)
AlZincalloys

Castiron(austenic)

Al(pure),AlZincalloys

AluminiumCopperalloys

Cadmium

AluminiumCopperalloys

CuproNickel,Albronzes,Sibronzes

Table51Compatiblecouplesforbimetalliccontacts
Puremetalsandalloysin
alphabeticalorder
(includingcarbon)

SnPballoys(all)
Tin,Lead

Stainlesssteel18/8
(300series)

Stainlesssteel13Cr
(400series)

Steel(carbon,lowalloy)
Castiron

TitaniumandTialloys

Zinc
Beryllium

Key:
0 Canbeusedwithoutrestriction.
1 Canbeusedinanoncontrolledenvironment(e.g.assemblyareaandgeneralnoncleanroomenvironment).
2 Canbeusedinacleanroomenvironment.
3 Needsspecificmeasurestoavoidgalvaniccorrosionwhenthesecombinationsareselected.

26

ECSSQST70C
6March2009

5.1.16
a.

Forallsolidsurfacesinmovingcontactwithothersolidsurfaces,itshall
be demonstrated that the degradation of surface properties over the
completemissionisacceptablefromaperformancepointofview.

5.1.17
a.

5.2

Mechanical contact surface effects (cold


welding, fretting, wear)

Life

Materials shall be selected to ensure sufficient life with respect to the


intendedapplication.

Selection
5.2.1
a.

General

Materialsshallbechosengivingpreferencetothefollowing:
1.

those successfullyused for anidentical applicationin other space


programmes similar with respect to environment constraints and
lifetimetotheproposedapplication;

2.

those for which satisfactory evaluation results are obtained on


samplesrepresentativeoftheapplicationwithasufficientmargin
asregardsconditionsofuse;

3.

thoseincludedinapproveddatasources.
NOTE

b.

Whether the materials are already validated or remain to be validated,


theirselectionshalltakeintoaccountthefollowingcriteria:
1.

continuityofsupply;

2.

reproducibilityofcharacteristics.

5.2.2
a.

Constraints

Puretinfinishwithmorethan97%purityshallnotbeused.
NOTE

b.

Forexample:ECSSQST7071,ESAandNASA
databanks.

Thisisduetothepossibilityofwhiskergrowth
and transformation to grey tin powder at low
temperatures.

The incoming inspection of each component batch shall include the


verificationoftheterminationcomposition(toavoidassemblyofpuretin
finish).

27

ECSSQST70C
6March2009

5.3

Declared materials list (DML)


a.

5.4

The supplier shall establish and maintain a declared materials list in


conformancewithAnnexA.

Criticality analysis
5.4.1

Overview

Toconformtomissionrequirements,theobjectiveoftheanalysisistoidentify
whetherfurtherdataarerequired.

5.4.2

Requirements

a.

Thesuppliershallanalyseallthematerialscontainedinhispreliminary
lists with respect to criticality and in correlation with the risk analysis
performed.

b.

Any material not meeting the project requirements shall be subject to a


RFDtobesubmittedtothenextcustomer.

c.

Any critical material shall be subject to a RFA to be submitted to the


customer.

d.

Foranymaterialnotmeetingtheprojectrequirementsthesuppliershall
submitaRFAinconformancewithAnnexD.
NOTE

5.5

Any material when specifically required,


markinginkscanbeexcluded.

Evaluation and validation phases


5.5.1

General

a.

Depending on the results of the criticality analysis, the supplier shall


perform an evaluation phase before the validation phase for all critical
materials with unknown characteristics (new materials) or with major
changesintheuseorintheconfiguration

b.

Incaseofanextensionofanexistingapplication,theevaluationindicated
in5.5.1aneednotbeperformedifsoagreedwiththecustomer.

c.

Guarantied characteristics of materials and material supplier inspection


methods, together with associated documents, shall be available for
review at the suppliers premises before the start of evaluation or
qualificationphases.

28

ECSSQST70C
6March2009

5.5.2
a.

b.

Evaluation phase

Theevaluationshallconsiderthefollowingasaminimum:
1.

thelimitsofuse;

2.

thematerialsphysical,chemicalorfunctionalcharacteristicsalong
withtheirvaluesandtolerances;

3.

behavioural tendencies and degradation processes depending on


environmentalparameters(includingsensitivitytopollution);

4.

acceptancecriteria.

When evaluation is performed, an evaluation programme (available at


PDR, according to Figure 41) shall be drawn up, implemented and an
evaluation report (available before CDR, according to Figure 41 and
Table41)shallbedrawnup.

5.5.3

Validation phase

a.

Forallcriticalmaterials,avalidationprogramme(availableatPDR)shall
bedrawnupbythesupplierandthenimplementedtocheckorconfirm
that the materials satisfy the mission requirements with appropriate
marginsasnecessarytoobtainvalidationstatus.

b.

Validationstatusshalldependontheresultsobtained(validationreport)
andthereviewofcorrespondingdocumentation(availableatCDR).

5.5.4

Approval phase

a.

The materialshall not receive anapprovalidentification in the declared


materiallistfortheprojectunlesstherequirementsin5.5.2and5.5.3are
satisfied.

b.

Ifapprovalisnotgranted,thesupplierinchargeoftheitemshalleither:
1.

selectanothermaterial,or

2.

propose a modified evaluation programme and resubmit for


approval,or

3.

if actions 5.5.4b.1 and 5.5.4b.2 fail to achieve positive results,


initiateadeviationprocedure.

5.5.5
a.

Deviation request

Formaterialsnotconformingtoprojectrequirements,whetherattheend
of criticality analysis or of evaluation and validation tests, the supplier
shallsubmitarequestfordeviationinconformancewithECSSQST1009.

29

ECSSQST70C
6March2009

5.6

Procurement of materials
5.6.1
a.

All materials shall be procured to an internationally or nationally


recognized specification or an inhouse fully configured procurement
specification which defines the materials properties, the materials
requirements, the test methods, the acceptance criteria for the specific
applications,sourceinspection(ifany)andmaterialsupplierinspection.

b.

Wherematerialsuppliersdonotacceptspecificationsandprocurementis
by means of a datasheet the supplier shall introduce internal, inhouse
receipt inspection to ensure that the validation status of the material is
maintainedduringthesubsequentprocurements.

c.

Materials with long lead times or long procurement delays (versus the
projectschedule)shallbeidentifiedbeforetheformalsubsystemPDR.

d.

Procurement shall be thoroughly planned, documented and


implemented in a timely manner to obtain reliable product assurance
provisionatCDR.

e.

Backupplansshallbepreparedandinitiatedwheneverthereisevidence
ofdelaysortechnicalproblems.

f.

The material requirements shall be explicitly accepted by the material


supplierormanufacturer.

5.6.2

5.7

Procurement specifications

Incoming inspection procedure

a.

Allmaterialsshallbesubmittedtoanincominginspection.

b.

Anincominginspectionprocedureshalldefinetheinspectionsandtests
tobecarriedout,particularlyformaterialsthatareknowntobevariable
intheirfinalproperties.

Use of materials
5.7.1

Validation status of materials

a.

The supplier shall verify that all critical materials are validated before
beingusedinthemanufactureofqualificationorflightproducts.

b.

Any modification, change of condition or configuration of application


shall lead to a reevaluation in conformance with the process shown in
Figure41.

5.7.2
a.

Traceability of materials

ThesuppliershallapplythetraceabilityrulesdefinedinECSSQST20to
allmaterials.

30

ECSSQST70C
6March2009
b.

Materials should be identified by a unique reference number, code or a


lot number to provide traceability should there be an incident or
nonconformance,oraneedforatechnicalinvestigationfollowingfailure
or damage, to reconstruct the materials history, either individually
(individual traceability) or by the manufacturing lot of which it was a
part(lottraceability).

5.7.3

Packaging, storage, removal from storage

a.

Thesuppliershalldefineprovisionsforpackaging,storageandremoval
fromstorageformaterials.

b.

Measurements and inspections used to guarantee the material integrity


and monitoring during storage and removal from storage shall be
identified.

5.7.4

Limited-life materials before implementation

a.

The supplier shall ensure that all materials which have limitedlife
characteristicshavetheirdateofmanufacture(whenavailable,otherwise
date of delivery) and shelflife expiry date accurately identified and
clearlymarkedoneachlotorbatch.

b.

Materials which have exceeded their shelflife expiry date may be


recertified only after the physical and chemical characteristics are
inspectedandtheparameters,subjecttodeterioration,areevaluatedfor
continued acceptability according to the accept and reject criteria in
conformancewithECSSQST7022.

5.7.5
a.

Limited-life materials after implementation

Materialswithlimitedlifeafterimplementation(suchaspropellant)shall
beidentifiedandcontrolledinconformancewithECSSQST1004.
NOTE

5.7.6
a.

Materials nonconformances and alerts

Nonconformances and alerts shall be managed in conformance with


ECSSQST10.

5.7.7
a.

Storage and mission life are criteria for the


assessmentandcontrolofthosematerials.

Health and safety

Material safety data sheet or equivalent shall be available for all


materials.

31

ECSSQST70C
6March2009

6
Mechanical parts control

6.1

Selection of mechanical parts


a.

6.2

6.3

Selection
a.

Parts shall be chosen from those successfully used for an identical


application in other space programmes similar with respect to
environmentconstraintsandlifetimewheneverthosepartsexist.

b.

Type reduction actions shall be implemented at all levels of the


programme.

c.

Whether the parts are already qualified or remain to be qualified, their


selectionshalltakeintoaccountthefollowingcriteria:
1.

durabilityofsupply;

2.

reproducibilityofcharacteristics.

Declared mechanical parts list (DMPL)


a.

6.4

The supplier shall verify that all materials and processes used in the
manufactureofpartssatisfythemissiontechnicalrequirements.

Thesuppliershallestablishandmaintainadeclaredmechanicalpartslist
inconformancewithAnnexB.

Criticality analysis
6.4.1

Overview

Toconformtomissionrequirements,theobjectiveoftheanalysisistoidentify
whetherfurtherdataarerequired.

32

ECSSQST70C
6March2009

6.4.2

6.5

Requirements

a.

Thesuppliershallanalyseallthepartscontainedintheirpreliminarylists
with respect to criticality and in correlation with the risk analyses
performedinconformancewithECSSQST1004.

b.

CriticalpartsshallbeidentifiedintheDMPLandincludedinthecritical
itemslist.

c.

AnycriticalpartshallbethesubjectofaRFA.

Evaluation and qualification phases


6.5.1

General

a.

Depending on the results of the criticality analysis, the supplier shall


perform an evaluation phase before the validation phase for all critical
partswithunknowncharacteristicsorwithmajorchangesintheuseorin
theconfiguration.

b.

Incaseofanextensionofanexistingapplication,theevaluationindicated
in6.5.1aneednotbeperformedifsoagreedwiththecustomer.

c.

Guarantied characteristics of materials and material supplier inspection


methods, together with associated documents, shall be available for
review at the suppliers premises before the start of evaluation or
qualificationphases.
NOTE

6.5.2
a.

Refer to Table 41 for an explanation of the


stepsinvolved.

Evaluation phase

The evaluation shall consider the following, as a minimum, for each


criticalpart:
1.

thelimitsofuse,

2.

the parts physical or functional characteristics, along with its


valuesandtolerances,

3.

behavioural tendencies and degradation processes depending on


environmentparameters(includingsensitivitytopollution),and

4.

acceptancecriteria.

b.

Whenanevaluationisperformedanevaluationprogramme(availableat
PDR) shall be drawn up, implemented, and an evaluation report
(availablebeforeCDR)shallbedrawnup.

c.

The behaviour of the parameters to be monitored which were also


recorded during the evaluation programme tests, shall serve as a
referencefortheanalysisofqualificationtestresults.
NOTE

Example of such behaviour is variation and


changeovertime.

33

ECSSQST70C
6March2009

6.5.3
a.

Foreachcriticalpartaqualificationprogrammeshallbedrawnupbythe
supplier(oftheequipmentusingthecriticalpart)andthenimplemented
tocheckorconfirmwhetherthepartssatisfymissionrequirementswith
appropriatemargins.

b.

Qualification status shall depend on the results obtained (qualification


report) and the reviews of corresponding documentation (available at
CDR).

6.5.4

Approval phase

a.

The mechanical parts shall not receive an approval identification in the


declared mechanical parts list for the project unlessthe requirements in
6.5.2and6.5.3aresatisfied.

b.

Ifapprovalisnotgranted,thesupplierinchargeoftheitemshalleither:
1.

selectanothermechanicalpart,or

2.

propose a modified evaluation programme and resubmit for


approval,or

3.

if actions 6.5.4b.1 and 6.5.4b.2 fail to achieve positive results,


initiateadeviationprocedure.

6.5.5
a.

6.6

Qualification phase

Deviation request

For parts not conforming to project requirements, whether at the end of


criticalityanalysisorofevaluationandqualificationtests,thesuppliershall
submitarequestfordeviationinconformancewithECSSQST1009.

Procurement of mechanical parts


6.6.1

General

a.

Mechanicalpartswithlongleadtimesorprocurementdelays(versusthe
projectschedule)shallbeidentifiedbeforethesubsystemPDR.

b.

Procurementshallbeplanned,documentedandimplementedinatimely
mannertoobtainreliableproductassuranceprovisionatCDR.

c.

Backupplansshallbepreparedandinitiatedwheneverthereisevidence
ofpossibledelaysortechnicalproblems.

6.6.2

Procurement specification

a.

Eachpartshallbecoveredbyaprocurementspecificationorastandard.

b.

The procurement specifications shall define the part characteristics,


requirements, tests methods, acceptance criteria, lot acceptance testing,
sourceinspection(ifany)andmaterialsupplierinspection.

34

ECSSQST70C
6March2009
c.

The procurement specifications shall be explicitly accepted by the part


supplierormanufacturer.

6.6.3
a.

Forcomplexpartsrelatedtoaspecificprojectdevelopment,eachsupplier
shall define the nature and frequency of their own source inspection
points.

b.

Sourceinspectionshallbecarriedoutbythecustomeronthepremisesof
thesupplier(partmanufacturer)inconformancewithECSSQST20.

6.6.4

6.7

Source inspection

Incoming inspection procedure

a.

Eachpartorbatchofpartsshallbesubmittedtoanincominginspection.

b.

An incoming inspection procedure shall be established defining the


inspectionsandteststobecarriedout.

Use of mechanical parts


6.7.1

Qualification status of parts

a.

Thesuppliershallensurethatallcriticalpartsarequalifiedbeforebeing
usedinthemanufactureofqualificationorflightproducts.

b.

Any modification, change in condition or configuration of application


shall lead to a reevaluation in conformance with the process shown in
Figure41.

6.7.2

Traceability of parts

a.

ThesuppliershallapplythetraceabilityrulesdefinedinECSSQST20to
hisparts.

b.

Partsshouldbeidentifiedbyauniquereferencenumberorcodeandalot
number to provide traceability where there is an incident or
nonconformance, or for the purposes of technical investigations
following failure or damage to reconstruct the parts history, either
individually (individual traceability) or by the manufacturing lot it was
partof(lottraceability).

6.7.3

Packaging, storage, removal from storage

a.

Thesuppliershalldefineprovisionsforpackaging,storageandremoval
fromstorageforparts.

b.

Measurements and inspections used to guarantee the part integrity and


monitoringduringstorageandremovalfromstorageshallbeidentified.

35

ECSSQST70C
6March2009

6.7.4
a.

Limited-life parts or parts subject to wearout

Limitedlife parts after implementation or subject to wear out shall be


identifiedandcontrolled,takingintoaccountstorageandmissionlife.
NOTE

b.

Limitedlifepartsshallbeassessedascandidatestothecriticalitemslist
inconformancewithECSSQST1004.

6.7.5
a.

Examples of such parts are mechanisms, pyro


initiatorsandOrings.

Parts nonconformance and alerts

Management of nonconformances and alerts shall be in conformance


withECSSQST10.

36

ECSSQST70C
6March2009

7
Process control

7.1

7.2

Specifications or procedures
a.

Each process to be used in the manufacturing or assembly of a product


shallbeidentifiedbyaspecificationorprocedure.

b.

Referenceshallbemadetoacceptandrejectcriteria.

Associated materials and mechanical parts


a.

7.3

Thesuppliershallverifythatthematerialsandthemechanicalpartsused
during the implementation of processes satisfy the requirements of this
Standard.

Selection
a.

b.

Processes shall be chosen from those already verified according to the


followingorderofpreferenceandpriority:
1.

those covered by space agencies or other governmental


organizationcertificationforidenticalconditionsofuse;

2.

thoseforwhichsatisfactoryevaluationandverificationresultsare
obtained on samples representative of the application with a
sufficientmarginasregardsconditionsofuse;

3.

those already successfully used by the same supplier for other


spaceprogrammesinthesameconditionsofuse.

Whethertheprocessesarealreadyverifiedorremaintobeverified,their
selectionshalltakeintoaccountthefollowingcriteria:
1.

reliability;

2.

inspectability;

3.

reworkabilityoftheprocessitem;

4.

reproducibility.

37

ECSSQST70C
6March2009

7.4

Declared processes list (DPL)


a.

7.5

The supplier shall establish and maintain a declared processes list in


conformancewithAnnexC.

Criticality analysis
7.5.1

Overview

Toconformtomissionrequirements,theobjectiveoftheanalysisistoidentify
whetherfurtherdataisrequired.

7.5.2

7.6

Requirements

a.

Thesuppliershallanalysealltheprocessescontainedintheirpreliminary
lists with respect to criticality and in correlation with the risk analyses
performed.

b.

CriticalprocessesshallbeidentifiedintheDPLandincludedinthelistof
criticalitems.

c.

AnycriticalprocessshallbethesubjectofanRFA.

d.

Specialprocessesshallbeidentifiedandcontrolled.

e.

Process control shall be ensured by means of procedures or personnel


certificationorinlineprocesscontrol.

f.

Wheneverfeasibleastatisticalprocessmaybecarriedout.

Evaluation and verification phase


7.6.1

General

a.

Depending on the results of the criticality analysis, the supplier shall


perform an evaluation phase before the validation phase for all critical
processes which are new or with major changes in the use or in the
configuration.

b.

Incaseofanextensionofanexistingapplication,theevaluationindicated
in7.6.1aneednotbeperformedifsoagreedwiththecustomer.

c.

For confidential processes, the supplier shall prove that the process has
beenverified.
NOTE1 For example, by presenting a verification
certificate from space agencies or other
governmentalorganizationresponsibletocheck
theapplicabilityofthisverification.
NOTE2 Refer to Table 41 for an explanation of the
stepsinvolved.

38

ECSSQST70C
6March2009

7.6.2
a.

b.

Evaluation phase

The evaluation shall consider the following as a minimum for each


criticalprocess:
1.

thelimitsofuse,

2.

the values, determined by test samples or technology samples, of


relevantparametersandtheirtolerances,and

3.

acceptancecriteria.

Whenanevaluationisperformed,thesuppliershallprovide
1.

anevaluationplanatPDRand

2.

anevaluationreportbeforeCDR.

7.6.3

Verification phase

a.

For each critical process, the supplier shall implement a verification


programme.

b.

The verification programme shall be defined in conformance with


existingECSSornationalagencystandardsofverification.

c.

The supplier shall ensure that the processes satisfy the mission
requirementsandthattheparametersneededfortheproductdesignare
definedsoastoobtainverificationstatus.

d.

Verification status shall depend on the results obtained (verification


report) and the review of corresponding documentation (available at
CDR).

7.6.4
a.

Theprocessesshallnotreceiveanapprovalidentificationinthedeclared
processes list unless requirements in 7.6.2 and 7.6.3 are satisfied. If
approvalisnotgranted,thesupplierinchargeoftheitemshalleither
1.

selectotherprocesses,or

2.

propose a modified evaluation programme and resubmit for


approval,or

3.

if actions 7.6.4a.1 and 7.6.4a.2 fail to achieve positive results,


initiateadeviationprocedure.

7.6.5
a.

Approval phase

Deviation request

Forprocessesnotconformingtoprojectrequirements,whetherattheend
of criticality analysis or of evaluation and verification tests, the supplier
shallsubmitarequestfordeviationinconformancewithECSSQST1009.

39

ECSSQST70C
6March2009

7.7

Use of a process
7.7.1

Verification status of a process

a.

The supplier shall confirm that all critical processes have been verified
beforebeingusedinthemanufactureofqualificationorflightproducts.

b.

Any modification, change of condition or configuration of application


shall lead to a reevaluation in conformance with the process shown in
Figure41.

7.7.2
a.

Re-verification of a process

When a process needs to be reverified, a request for approval (RFA)


shall be established and a reverification programme shall be
implemented.
NOTE

7.7.3

Anyprolongedstoppageinmanufacturing,any
major change of the facilities or procedures or
anytransferofproductiontoanotherentitycan
invalidate partially or completely the initial
verificationofaprocess.

Implementation of a process

a.

Before implementation of a process, the supplier shall ensure that


personnel are trained and that environment, means and documentation
areadequate.

b.

Thisverificationshallensurethat:
1.

manufacturing and quality control tools associated with the


processareadequate,calibratedandproperlymaintainedareused
under appropriate environmental and cleanliness conditions, see
clause4.4,

2.

personnelareproperlytrainedandcertified,and

3.

the processes specifications, manufacturing and inspection


proceduresandworkmanshipstandardsincludingcleardefinition
ofmanufacturingoperationsandclearacceptancecriteriaexist.
NOTE1 Photographically documented if possible for
visual acceptance criteria at the appropriate
workandinspectionstations.
NOTE2 For planning of manufacturing, assembly and
integration operationandinspection see ECSS
QST20.

7.7.4
a.

Traceability of processes

TraceabilityofprocessesshallbeensuredinconformancewithECSSQ
ST20.

40

ECSSQST70C
6March2009

7.7.5
a.

Nonconformances and alerts shall be processed in conformance with


ECSSQST10.

7.7.6
a.

Mandatory inspection points (MIP)

MIPsshallbedefinedinconformancewithECSSQST20.

7.7.7
a.

Process nonconformances and alerts

Packaging, storage, removal from storage

Thesuppliershalldefineprovisionsforpackaging,storage,andremoval
from storage for products or semifinished products before and after
implementationofprocesses.

41

ECSSQST70C
6March2009

Annex A (normative)
Declared materials list (DML) - DRD

A.1

DRD identification
A.1.1

Requirement identification and source document

ThisDRDiscalledfromECSSQST70,requirement4.2.3a.

A.1.2

Purpose and objective

ThepurposeoftheDMListohaveadetailedrecordofallthematerialsusedto
producetheproductsofaprojectorprogramme.
ThedataintheDMLmakepossibletoassesswhetherthematerialsaresuitable
for a specific application, at the supplier and the customer levels (in the
approvalstatuscolumn).
TheDMLispreparedforeachConfigurationitemattherelevantstages(e.g.
atthestart,PDR,CDRandQR)asdefinedintheflowchartgiveninFigure41.
ThefollowingdocumentsarelinkedtotheDML:

A.2

thedeclaredprocesslist(DPL);

requestforapproval(RFA)materials.

Expected response
A.2.1
<1>
a.

Scope and content


Materialsgroups

TheDMLshallcontainthefollowingstatements:
1.

Materialsareclassifiedinto20groupsdependingontheirtypeor
theirmainuse,seeTableA1.

2.

Primers are classified in the group of their associated


component.

42

ECSSQST70C
6March2009
3.

b.

Where no project requirement exists for a separate DMPL,


mechanicalpartsareenteredontheDMLasaseparategroupwith
thecorrespondingnumbers.

Ifnewgroupsarecreated,foragivenproject,theseshallhavenumbers
over21.

TableA1:Materialgroupnumbers
Group
number

Description

Aluminiumandaluminiumalloys

Copperandcopperalloys

Nickelandnickelalloys

Titaniumandtitaniumalloys

Steels

Stainlesssteels

Fillermetals:welding,brazingsoldering

Miscellaneousmetallicmaterials

Opticalmaterials

10

Adhesives,coatings,varnishes

11

Adhesivetapes

12

Paintsandinks

13

Lubricants

14

Pottingcompounds,sealants,foams

15

Reinforcedplastics(includingPCBs)

16

Rubbersandelastomers

17

Thermoplastics(e.g.nonadhesivetapesandfoils[MLI])

18

Thermosetplastics(includingPCBs)

19

Materialaspectsofwiresandcables

20

Miscellaneousnonmetallicmaterials,e.g.ceramics

<2>
a.

ContentsoftheDML
The DML shall include the information stated in Figure A1, where the
header information identifies the list as the declared materials list and
includestheissuenumberanddateofissue,asfollows:
1.

Itemnumber(applicabletoequipmentmanufacturerlevelonly)
(a)

This consists of the material group identifier and the user


code.Ittakestheformof:
<groupnumber>.<identifierwithin
number>.<usercode>

NOTE

the

group>.<running

Forexample:11.5.1.KOF.

43

ECSSQST70C
6March2009
(b)

Characteristicsoftheitemnumberare:
Theuser,identifiedbyanagreedusercodeforthe
project.
Oneonlypermaterialtype.
Doesnotchangeduringthelifeofthematerialslist
(subitemsarepermittedwhendeemednecessary).

2.

Commercialidentificationorstandardizeddesignation
(a)

Enterthecorrectandstandarddesignation,suchasthetrade
nameplusnumber.

(b)

Ifnotradenameexists,enterthemanufacturersnameplus
number.

(c)

Formetalalloys,theAluminiumAssociation(AA)systemis
recommendedforaluminiumalloys,andtheAmericanIron
andSteelInstitute(AISI)systemforsteel.Forothermetalsor
alloys,themainconstituentisenteredfirstexceptinthecase
ofatraditionalname.

NOTE
(d)

3.

Foreachmaterial,asdesignatedinA.2.1<2>a2(a)to(c),usea
unique item number. If several lines are used for different
applicationsorprocessing,addsubitemnumbers.

Chemicalnatureandproducttype
(a)

For metallic materials, add the condition as procured if


applicable.

NOTE
(b)

(c)

Exampleofsuchconditionsarerolledandheat
treatment.

Whereasemifinishedproductisprocured,givetherelevant
state.

NOTE

Exampleofsuchstateareform,plateandsheet.

Givethethicknessofthematerial,thatcanbeanimportant
parameter.

NOTE
4.

Forexample:brassorbronze.

Examples of chemical nature are: epoxy resin,


polyurethaneadhesive,Ti6Al4V.

Procurementinformation
(a)

Manufacturerordistributor:nameofthemanufacturerand
nameofthedistributorifdifferent.

(b)

Procurement specification: reference of the procurement


specification with issue, revision and date. It may be
replaced by a national or international specification or
standard, if this exists, and identifies the source of
procurement, if relevant. Indication of issue or date is not
applicablewhendatasheetsareused

44

ECSSQST70C
6March2009
5.

Processingparameters
Listhereasummaryoftheprocessparametersappliedbytheuser
oftheprocess.
NOTE

6.

E.g. mixture proportions, cure temperature,


special cleaning agent, surface treatment,
thermal treatment and temperature, and
referencetospecificationnumber.

Useandlocation
(a)

Use codes able to define the location of the material with


respecttothe:
subsystem;
particularpieceofequipment(boxoritem);
useoftheequipment,e.g.astructuralelement,thermal
control,electricalinsulation.

NOTE

(b)
7.

If the CI number is not included in the list


header, then a suitable abbreviation of the
relevantsubsystemisincluded.

Includeanyrestrictionsthatapplytotheuseofaparticular
materialinthecorrespondingcommentcolumn.

Environmentalcode
TheenvironmentalcodeisdefinedusingTableA2.

TableA2:Environmentalcode
Radiation/UV/ATOX(R)a

Ambience(A)

Temperature(T)b,c

G:Geostationary

S:Outsideshadow

V:Vacuum

1:0Kto100K

L:Loworbit

L:Outsidelight

H:Hermetic

2:101Kto200K

B:Radiationbelt

M:Manned

3:201Kto300K

I:Interplanetary

E:Elevatedpressure

P:Planetary

Forallmaterials,aletterisselectedfromthelefthandcolumn.Formaterialsonthesurfaceofthe
spacecraft,theletterLorSisadded.

b
c

Thermalcyclingtobeindicatedbytwovalues,e.g.3/5.

RT(roomtemperature)canbeacceptedasacodebetween283K(10C)and313K(40C).

NOTE:Thematerialsthatareataboundarybetweenenvironmentsaredescribedbytwosetsofcodes.

8.

Sizecode
The size code is indicated by an alphanumeric combination, such
asA5,V2orM3,asinTableA3.

45

ECSSQST70C
6March2009
TableA3:Sizecode
Sizecode Value
0

0<AorVorM1

1<AorVorM10

10<AorVorM100

100<AorVorM1000

where: Aisthearea,incm2

Visthevolume,incm3

Misthemass,ing

9.

10.

Validation references, justification for approval and prime


commentsandprimeapproval
(a)

Make reference to relevant test data that demonstrates the


acceptability of the material under the environmental
conditions and the application relevant to the particular
project concerned. Specifically, in column 9.1, corrosion
(CORR), stress corrosion (SCC), flammability (FLAM),
offgassing (OFFG) and outgassing (OUTG) data or
reportreferencesareentered.

(b)

Use standard abbreviations to summarize the acceptance


statusofamaterialforaparticularproperty.

(c)

Use the justification for approval (column 9.2) and prime


approval (column 9.3) columns for any additional
informationtoobtaincustomerapproval.

(d)

Standard abbreviations are used to summarize the


acceptability or otherwise of a material for a specific
property.Thesearedefinedfortheproject.

(e)

SelectthesupplierapprovalstatuscodefromTableA4.

Customerapprovalstatuscodeandcomments
(a)

SelectthiscodefromTableA4.

(b)

Includeadditionalcommentswhereappropriate.

46

ECSSQST70C
6March2009
TableA4:Approvalstatus
Code

Description

Approved.
AllmaterialsclassifiedAmaybeusedwithoutrestriction.

ApprovedwithanRFA.
Thesematerialsaresubjectedtoanevaluationorvalidation
programme.TheRFAnumberisenteredasacomment.

Approvedwithaconcession.
Thesematerialsdonotmeettherequirementsbutareusedfor
functionalreasons.Theconcessionnumberisenteredasa
comment.

Pendingadecision.
Materialsforwhichanevaluationreportoraconcessionis
waitingforthecustomersprovisionalordefinitiveapproval.

Open.
Newmaterialsormaterialsforwhichinvestigationsand
validationsareinprogress.

Rejected.

Deleted.
Thisclassificationisusedforamaterialthatisnolongerused.

NOTE Ifapprovalcannotbegivenandoneoftheothercodesareentered,enter
thecommentsintheappropriatecolumn.

A.2.2

Special remarks

a.

Thechangerecordshalllistthesuccessiveissuesandtheirreleasedates
sincethefirstformalissueofthedocument.

b.

Thechangerecordshallincludeabriefdescriptionoftheupdateswhich
contributedtoeachissueorrevision.
NOTE

This DRD recommends the format and define


thecontentwithintheframeworkofaprojector
aprogramme.

47

ECSSQST70C
6March2009

DECLAREDMATERIALSLIST(DML)
Programmename:ABCDEFG

CIno.:12345676890

Docno.:001

Date:01.10.2000

Group(Title):abcdefg

Issue/Revision:1/4

Page:1

9
1

Itemno.and Commercial
identification
usercode
or
standardized
designation

1)Chemical
nature

1)Manufacturer/
suppliername

2)Producttype

2)Procurement
spec.

5
Summaryof
process
parameters

1)Subsystem

1)R

1)A

2)Equipment

2)A

2)V

3)Use

3)T

3)M

1)LS

1)

2)V

2)

3)Structure

3)3

3)M3

1)PCU

1)G

1)

2)Experiment
tray

2)V

2)

3)34

3)M3

1)GP

1)LS

1)

2)Platform

2)M

2)V3

3)Package
potting

3)34

3)

9.1

9.2

10

9.3

Acronym/rating/ 1)Justificationfor
Prime
ValidationRef.
approval
approval
forapplicable
status
2)Primecomments
properties

Customer
approvalstatus/
comments

Issue/RevDate
1.2.1.TXES

AZ5GU

1)Al.Zn5.6Mg2.5 1)AlmetPechiney
Cdu1.6,Cr0.3
2)CRB527
eq.AA7075
01/02/01.02.1996

2)Plate
10.1.1.ETCA DC93500

1)Silicon

1)DowCorning

2)Twoparts

2)E3846MC10S
02/02/1984

11.5.1.KOF

ECCOFOAM
EPH

T7351andIridit 1)PL
14heat
2)E4package
treatment

1)Polyurethane
2)Resin/Catalyst
1202H

1)Emersonand
Cuming
2)SP/FOK/05/684
03/01/25.06.1992

Mixture:
10/1ing
Curing:
4h/65C
Resin/Cat:
100/65g
4h/40C
+48h/100C

1)UsedonETS2

1)ECSSQST7001 A

2)

2)

3)Partpotting

1)DU96352

2)Usedat
T>100C
(Riskofdistortion
beyond)

FigureA1:ExampleofarealizedDML

48

ECSSQST70C
6March2009

Annex B (normative)
Declared mechanical parts list (DMPL) DRD

B.1

DRD identification
B.1.1

Requirement identification and source document

ThisDRDiscalledfromECSSQST70,requirement4.2.3b.

B.1.2

Purpose and objective

ThepurposeoftheDMPListohavedetailedrecordofallthemechanicalparts
usedtoproducetheproductsofaprojectorprogramme.
ThedataintheDMPLmakepossibletoassesswhetherthemechanicalpartsare
suitable for a specific application, at the supplier and customer levels (in the
approvalstatuscolumn).
TheDMPLispreparedforeachConfigurationitemattherelevantstages(e.g.
Start,PDR,CDRandQRR)asdefinedintheflowchartgiveninFigure41of
ECSSQST70.
The following document is linked to the DMPL: request for approval (RFA)
mechanicalparts.

B.2

Expected response
B.2.1
<1>
a.

Scope and content


Mechanicalpartsgroups

TheDMPLshallcontainthefollowingstatements:
Mechanicalpartsareclassifiedinto11groupsdependingontheirtype
ortheirmainuse(seeTableB1).

b.

If, for a given project it is considered necessary to create new groups,


theseshallhavenumbersover61.

49

ECSSQST70C
6March2009

c.

ItemsthatappearintheEEEpartslistshouldnotberepeatedhere.
NOTE

Forexample,heaters,somevalves,thermostats,
relays,transformercoilsandsolenoids.

TableB1:Mechanicalpartgroupnumbers
Group
number

Description

51

Spacingparts(e.g.washersandspacers)

52

Connectingparts(e.g.bolts,nuts,rivets,insertsand
clips)

53

Bearingparts(e.g.ballbearingsandneedlebearings)

54

Separatingparts(e.g.pyrotechnics,springsandcutters)

55

Controlparts(e.g.gears)

56

Fluidhandlingparts(e.g.diffusers)

57

Heatingparts

58

Measuringinstruments(e.g.gaugesandthermocouples)

59

Opticalpassiveequipment

60

Magneticparts

61

Otherparts

<2>
a.

ContentsoftheDMPL
TheDMPLshallincludetheinformationinFigureB1,wheretheheader
information identifies the list as the declared mechanical parts list and
includestheissuenumberanddateofissue,asfollows:
1.

Itemnumber(applicableatequipmentsupplierlevelonly)
(a)

This consists of the mechanical part identifier and the user


code.Ittakestheformof:
<group number>.<identifierwithin the group>.<running
number>.<usercode>
NOTE

(b)

Forexample:7.2.1.ACSA.

Characteristicsoftheitemnumberare:
Identifythesubcontractorbyanagreedusercodeforthe
project.
Oneonlypermechanicalparttype.
Doesnotchangeduringthelifeofthemechanicalparts
list.

2.

Commercialidentification
(a)

Enter the correct and standard designation, such as trade


nameplusnumber.

(b)

Ifnotradenameexiststhenenterthemanufacturersname
andnumber.

50

ECSSQST70C
6March2009

3.

Typeofpart
Describethematerialandsurfacetreatment(ifapplicable).

4.

5.

Procurementinformation
(a)

Manufacturerordistributor:nameofthemanufacturerand
nameofthedistributorifdifferent.

(b)

Procurement specification: reference of the procurement


specification with issue, revision and date. It may be
replaced by a national or international specification or
standard if this exists and identifies the source of
procurementifrelevant.

Elementaryfunction,maincharacteristics
(a)

Enterthefunctionofthemechanicalpart.

(b)

Enterthemaincharacteristicsofthemechanicalpart.

NOTE
6.

Forexample,numberofrevolutionsperminute
foraballbearing.

Useandlocation
Use codes able to define the location of the mechanical part with
respecttothe:

7.

(a)

subsystem;

(b)

particularpieceofequipment(boxoritem);

(c)

useoftheequipment.

Environmentalcode
TheenvironmentalcodeisdefinedusingTableB2.

TableB2:Environmentalcode
Radiation/UV/ATOX(R)a

Ambience(A)

Temperature(T)b,c

G:Geostationary

S:Outsideshadow

V:Vacuum

1:0Kto100K

L:Loworbit

L:Outsidelight

H:Hermetic

2:101Kto200K

B:Radiationbelt

M:Manned

3:201Kto300K

I:Interplanetary

E:Elevatedpressure

P:Planetary

Forallmechanicalparts,aletterisselectedfromthelefthandcolumn.Formechanicalpartsonthe
surfaceofthespacecraft,theletterLorSisadded.

b
c

Thermalcyclingtobeindicatedbytwovalues,e.g.3/5.

RT(roomtemperature)canbeacceptedasacodebetween283K(10C)and313K(40C).

8.

Criticality
EnterCforcriticalorNfornoncritical.Ifamechanicalpartis
considered critical, describe the reason for the criticality and
methodsofcontrol.

51

ECSSQST70C
6March2009

9.

10.

Supplierreference,primecommentsandprimeapprovalstatus
(a)

Use the supplier reference, prime comments and approval


columns to enter any additional information that can be
necessaryinordertoobtaincustomerapproval.

(b)

This information comprises reference and issue of the RFA


or approval, mechanical parts justification file, evaluation
reportsanddeviationrequests.

(c)

Make reference to the relevant test data that demonstrates


acceptabilityof the mechanical part under the environment
conditions and the application relevant to the particular
projectconcerned.

(d)

Use standard abbreviations, defined by the customer, to


summarize the acceptance status of amechanical part for a
particularproperty.

(e)

In order to justify the use of a material for flammability


resistance, list here the material thickness and height of
oxygenshare.

(f)

SelecttheprimeapprovalstatuscodefromTableB3.

Thecustomerapprovalstatuscodeandcomments
(a)

SelectthiscodefromTableB3.

(b)

Includeadditionalcommentswhereappropriate.

52

ECSSQST70C
6March2009

TableB3:Approvalstatus
Code Description
A

Approved
AllmechanicalpartsclassifiedAmaybeusedwithout
restriction.

ApprovedwithanRFA
Thesemechanicalpartsaresubjectedtoanevaluationor
validationprogramme.TheRFAnumberisenteredasa
comment.

Approvedwithaconcession
Thesemechanicalpartsdonotmeettherequirementsbutare
usedforfunctionalreasons.Theuseofsuchmechanicalpartsis
approvedbythecustomer.Theconcessionnumberisenteredas
acomment.

Pendingadecision
Mechanicalpartsforwhichanevaluationreportoraconcession
iswaitingforthecustomersprovisionalordefinitiveapproval.

Open
Newmechanicalpartsormechanicalpartsforwhich
investigationsandvalidationsareinprogress.

Rejected.

Deleted
Thisclassificationisusedforamechanicalpartthatisnolonger
used.

NOTE: Ifapprovalcannotbegivenandoneoftheothercodesareentered,enter
thecommentsintheappropriatecolumn.

B.2.2

Special remarks

a.

Thechangerecordshalllistthesuccessiveissuesandtheirreleasedates
sincethefirstformalissueofthedocument.

b.

This record shall include a brief description of the updates which


contributedtoeachissueorrevision.
NOTE

This DRD recommends the format and defines


thecontentwithintheframeworkofaprojector
aprogramme.

53

ECSSQST70C
6March2009

DECLAREDMECHANICALPARTSLIST(DMPL)
Programmename:ABCDEFG

CIno.:12345676890

Docno.:001

Date:01.10.2000

Group(Title):abcdefg

Issue/Revision:1/4

Page:1

9
1
Itemno.and
usercode

51.2.1.ACSA

Commercial
identification

Typeofpart

ESA003521000 Copper/AL
120
bimetalring

1)Procurement
specification

1)Elementary
function

2)Issue/Revision/
Date

2)Main
characteristics

1)AIEV

1)Separator
ring

2)Fromcatalogue

2)Heat
conductor
52.2.1.ASAD

60.1.1.ACSA

A0090TX...XA Ti6Al4V
screws>M4

42908TC/F

Ferritecores
magnetic

9.1

1)Subsystem

1)R

1)Criticality

2)Equipment

2)A

3)Use

3)T

2)Reasonand
methodof
2)primecomments
control

1)TC

1)G

1)N

2)Plateinterface

2)V

2)

3)Spacingand
heatinspection

3)34

1)Supplier
Reference

Primeapproval
status

Customer
approval
status/comments

1)Usedonall
projects

2)

1)Whiteareo

1)assembly

1)PTANK

1)G

1)N

1)UsedonTC2

2)ASNA0090
DSN2413

2)

2)plate

2)V

2)

2)

3)fixing

3)34

1)Magnetics,Data
sheet

1)Coilcoreof
transformer

1)TC

1)G

1)C

1)

2)V

2)

2)SP/MAGN/003

2)Magnetic
component

2)tobe
qualified

01.02/03.06.1999

2)Southface

10

9.2

3)Heatregulation 3)34

FigureB1:ExampleofarealizedDMPL

54

ECSSQST70C
6March2009

Annex C (normative)
Declared process list (DPL) - DRD

C.1

DRD identification
C.1.1

Requirement identification and source document

ThisDRDiscalledfromECSSQST70,requirement4.2.3c.

C.1.2

Purpose and objective

ThepurposeoftheDPListohaveadetailedrecordofalltheprocessesusedto
producetheproductsofaprojectorprogramme.
ThedataintheDPLmakepossibletoassesswhethertheprocessesaresuitable
for a specific application, at the supplier and customer levels (in the approval
statuscolumn).
TheDPLispreparedforeachConfigurationitemattherelevantstages(e.g.
Start,PDR,CDRandQRR)asdefinedintheflowchartgiveninFigure41of
ECSSQST70.
ThefollowingdocumentsarelinkedtotheDPL:

C.2

declaredmateriallist(DPL),

requestforapproval(RFA)processes.

Expected response
C.2.1
<1>
a.

Scope and content


Processgroups

TheDPLshallcontainthefollowingstatements:
Processes are classified into 17 groups depending on their type or their
mainuse,seeTableC1.

b.

If, for a given project it is considered necessary to create new groups,


theseshallhavenumbersover17.

55

ECSSQST70C
6March2009

TableC1:Processgroupnumbers
Group
number

Description

Adhesivebonding

Compositemanufacture

Encapsulation/moulding

Painting/coating

Cleaning

Welding/brazing

Crimping/stripping/wirewrapping

Soldering

Surfacetreatments

10

Plating

11

Machining

12

Forming

13

Heattreatment

14

Specialfabrication:processesdevelopedspecificallyforthe
programme

15

Marking

16

Miscellaneousprocesses

17

Inspectionprocedures

<2>
a.

ContentsoftheDPL
The DPL shall include the information in Figure C1, where the header
informationidentifiesthelistasthedeclaredprocesseslistandincludes
theissuenumberanddateofissue,asfollows
1.

Itemnumber(applicabletoequipmentsupplierlevelonly)
(a)

This consists of the process identifier and the user code. It


takestheformof
<group number>.<identifierwithin the group>.<running
number>.<usercode>

NOTE
(b)

Forexample:1.2.1.SSEX

Characteristicsoftheitemnumberare:
Identifythesubcontractorbyanagreedusercodeforthe
project.
Oneonlyperprocesstype.
Doesnotchangeduringthelifeoftheprocesslist.

56

ECSSQST70C
6March2009

2.

Processidentification
Indicatethecorrectandstandardidentificationoftheprocess,e.g.
theprocessnameortitle:bonding,coatingorsoldering.

3.

Specification
(a)

Identifythenameorabbreviationoftheprocessexecutor.

(b)

Makeareferencetotheassociatedprocedure,togetherwith
theissue,revisionanddate.

NOTE
4.

For example, national, international, EN, ISO,


ECSSorcompanyinhouse.

Processdescription
Enterhereashortdescriptionoftheprocess.

5.

Useandlocation
Usecodesabletodefinethelocationoftheprocesswithrespectto
the:
(a)

subsystem,

(b)

particularpieceofequipment(boxoritem),

(c)

useoftheequipment.

NOTE

For example, a structural element, thermal


control,electricalinsulation).

6.

Thiscolumnnumberisnotused.

7.

Associateditemnumbers
Enter the associated material list (DML) or mechanical parts list
(DMPL)withtheprocess.

8.

9.

10.

Criticality
(a)

EnterCforcriticalorNfornoncritical.

(b)

Ifaprocessisconsideredtobecritical,Enterthereferences
totherelevantRFA.

Supplierreference,primecommentsandapproval
(a)

Use the supplier reference and approval columns to enter


any additional information that can be necessary to obtain
customerapproval.

(b)

SelectthesupplierapprovalstatuscodefromTableC2.

Thecustomerapprovalstatuscodeandcomments
(a)

SelectthiscodefromTableC2.

(b)

Includeadditionalcommentswhereappropriate.

57

ECSSQST70C
6March2009

TableC2:Approvalstatus
Code Description
A

Approved
AllprocessesclassifiedAmaybeusedwithoutrestriction.

ApprovedwithanRFA
Theseprocessesissubjectedtoanevaluationorvalidation
programme.TheRFAnumberisenteredasacomment.

Approvedwithaconcession
Theseprocessesdonotmeettherequirementsbutareusedfor
functionalreasons.Itisimportanttoreducetheuseofsuch
processestoaminimum.Alldeviationrequestsareapproved
bythecustomer.Theconcessionnumberisenteredasa
comment.

Pendingadecision
Processesforwhichanevaluationreportoraconcessionis
waitingforthecustomersprovisionalordefinitiveapproval.

Open
Newprocessesorprocessesforwhichinvestigationsand
validationsareinprogress.

Rejected.

Deleted
Thisclassificationisusedforaprocessthatisnolongerused.

Ifapprovalcannotbegivenandoneoftheothercodesareentered,enter
thecommentsintheappropriatecolumn.

C.2.2

Special remarks

b.

Thechangerecordshalllistthesuccessiveissuesandtheirreleasedates
sincethefirstformalissueofthedocument.

c.

This record shall include a brief description of the updates which


contributedtoeachissueorrevision.
NOTE

This DRD recommends the format and define


thecontentwithintheframeworkofaprojector
aprogramme.

58

ECSSQST70C
6March2009

DECLAREDPROCESSLIST(DPL)
Programmename:ABCDEFG

CIno.:1234567890

Docno.:001

Date:14.05.2000

Group(Title):abcdefg

Issue/Revision:1/5

Page:1

9
1
Itemno.and
usercode

Process
identification

1)Username
2)Associated
procedure
issue/revision/
date

Processdescription 1)Subsystem
code
2)Equipment
code

4.3.1.KOF

8.3.1.KOF

Bonding

1)EREMS

Coating

Vapourphase
solderingof
SMDs

Associated
DMLorDMPL
itemnumber

1)Criticality

6.1.2.ETC

1)N

2)Reasonfor
criticality

9.1

10

9.2
Primeapproval
status

Customerapproval
status/comments

1)QM/04L123/
BD/MHTable1

2)

1)Supplier
Reference
2)Primecomments

3)Use

1.2.1.SSEX

Applyingaspotof
gluewitha
2)E/SQ/PI/012
stainlesssteel
02/01/02.08.1984 dispenser

1)BE3

1)CERCO

Coatingby
paintbrushorby
2)E/SQ/PI/023
immersioninthe
02/01/08.12.1985 resin

1)BE3

1)EREMS

ECSSQST7038

1)BE3

2)E/SQ/PI/026

2)C3

01/02/09.09.1997

2)C5board

2)

1)Usedon
ANTARES
2)

3)Tofixparts

2.1.1.KOF

2)C1C2boards

1)N
2)

3)Protectionof
CIandEEE
parts

1)Usedon
PASTEC,
ANTARES
2)

15.1.1.AST

1)C
2)

3)

FigureC1:ExampleofrealizedDPL

59

ECSSQST70C
6March2009

Annex D (normative)
Request for approval (RFA) - DRD

D.1

DRD identification
D.1.1

Requirement identification and source document

ThisDRDiscalledupfromECSSQST70,requirement5.4.2d.

D.1.2

Purpose and objective

TheobjectiveofanRFAistoenablethesuppliertorequestfromthecustomer
permissiontouseacriticalmechanicalpart,materialorprocess.
The information provided by the supplier makes possible for the customer to
assesswhetherthecriticalmechanicalpart,materialorprocessissuitablefora
specificapplication.
The RFA is prepared for each critical mechanical part, material or process at the
relevantstagesasdefinedintheinflowchartgiveninFigure41ofECSSQST70.
ThefollowingdocumentsarelinkedtotheRFA:

D.2

declaredmechanicalpartslist;

declaredmaterialslist;

declaredprocesslist.

Expected response
D.2.1
a.

Scope and content

TheRFAshouldcontaintheinformationinFigureD1(pages1and2),as
follows:
1.

Theheaderinformation,identifyingthedocumentasarequestfor
approval together with the project logo and project name, RFA
reference,issuerevisionanddate.

2.

Originator
Originatorsnameandreference.

3.

Location
Subsystemandequipmentcodes.

60

ECSSQST70C
6March2009

4.

Itemdescription
Briefdescriptionoftheitem.

5.

PMPinformation
TheDML,DMPLorDPLitemnumberandlistreference.

6.

7.

Itemstatus,includingthefollowinginformation:
(a)

manufacturersnameandqualificationreference;

(b)

suppliersnameandqualificationstatus;

(c)

productormaterialspecification;

(d)

procurementspecification;

(e)

processorhandlingspecification;

(f)

otherrelatedprocessorhandlingspecifications;

(g)

verificationorqualificationspecification;

(h)

reportonverificationorqualification.

ReasonforRFA
EnterthereasonfortheRFA.

8.

Applicationandlocationdetails
Enter here the details of the application and exact location of the
item.
GivethereferenceintheCIL.

9.

Evaluationandvalidationprogramme
Referenceanddetailsofmaintests.

10.

SubcontractorsupplierapprovalforthefirstissueoftheRFA.

11.

Customerinitialdecision,tobeenteredonfirstissueoftheRFA
providing:
thedecisionconcerningtheproposedmaterial,

(b)

the requirement to perform tests (deviation request as


necessary),and

(c)

thedecisionconcerningtheproposedtestprogramme.

12.

Customersandfinalcustomers(ifapplicable)signature

13.

Justification results obtained with reference to the suppliers


validationreportandconclusion.

14.

SubcontractorsupplierapprovalonRFAfinalissue.

15.

FinalapprovalstatusoftheRFAbythecustomer.

D.2.2
a.

(a)

Special remarks

TheRFAshallbecompletedbythesupplier(parts1to10,13and14)and
thecustomer(parts1112and15).

61

ECSSQST70C
6March2009

1 Company:

Project:

Page

Reference:RFA

1of2

Issue

Revision

Date

Requestforapproval(RFA)
2 Originator:

3 Subsystem:

Originatorreference:

Equipment:

4 Itemdescription:

5 PMPlistitemnumber:

PMPlistreference:

6 Itemstatus
Manufacturer:

Manufacturerqualificationreference:

Supplier:

Qualificationstatus:

Product/materialspecification:

Procurementspecification:

Process/handlingspecification:

Relatedspecification:

Verification/qualificationspecification:

Report:

7 ReasonforRFA

8 Application/locationdetails:

CILReference:

9 Evaluation/validationprogramme(title,reference)

Tests

Plan,procedures,scheduletobeattached
FigureD1:ExampleofRFA(Page1of2)

62

ECSSQST70C
6March2009

Page
2of2

Company:

Project:

Reference:RFA

Issue

Revision

Date

Requestforapproval(RFA)
Materialsandprocesses
responsible

10
Supplierapprovalon
RFAfirstissue

PAresponsible

11 DecisiononRFAfirstissue:

Projectresponsible

Comments:

Requestrefused:

Submitdeviation:

Proceedwithvalidationprogramme:
Materialsandprocesses
responsible

12 Decision

PAresponsible

Projectresponsible

Customer
agree/disagree

Finalcustomer(if
applicable)
agree/disagree

13 Justificationresults
Validationreport(titleandreference)

Conclusion:

Validationreporttobeattached
Materialsandprocesses
responsible

14 Supplierapprovalon
RFAfinalissue

15 DecisiononRFAfinal

Materialsandprocesses
responsible

issue

PAresponsible

Customer

Projectresponsible

PAresponsible

Projectresponsible

agree/disagree

Higherlevelcustomers
(asnecessary)
agree/disagree

FigureD1:ExampleofRFA(Page2of2)

63

ECSSQST70C
6March2009

Annex E (informative)
Relationship between materials,
mechanical parts, processes activities and
programme phases

E.1

Feasibility phase (phase A)


In phase A, the materials, mechanical parts and processes product assurance
tasksarecarriedoutinorderto:

E.2

a.

identifymainprogrammeconstraintsonmaterials,mechanicalpartsand
processes,

b.

definethepolicy,and

c.

plantheproductassurancetasksfortheprojectdefinitionphase.

Preliminary definition phase (phase B)


In phase B, the materials, mechanical parts and processes product assurance
tasksarecarriedoutinorderto:

E.3

a.

defineoridentifyrequirements,

b.

identify main new items needed and plan corresponding necessary


actionsforphaseC,

c.

plan the product assurance tasks for the detailed design, development,
manufacturing, integration and test phase and prepare the materials,
mechanicalpartsandprocessesplanaspartofthePAplan,and

d.

supportpreliminarydesignreview.

Detailed definition and production phase (phase C or D)


In phase C or D, the materials, mechanical parts and processes product
assurancetasksarecarriedoutinorderto:
e.

identifymaterials,mechanicalpartsandprocesses;

f.

issuepreliminarylists;

64

ECSSQST70C
6March2009

E.4

g.

identifycriticalitems;

h.

establishorreviewRFA;

i.

supportmandatoryinspectionpointsidentification;

j.

establishevaluationprogramme,performtestorreviewtestresults;

k.

establish validation, qualification, or verification programmes (e.g.


performtestsorreviewtestresults);

l.

supportnonconformanceprocessing(NRB,failurereviewboard);

m.

establishtheasdesignedlists;

n.

supportthecriticaldesignreview;

o.

supportthequalificationreview;

p.

establishthefinalasdesigned(updated)lists;

q.

supportreleaseofmanufactureofflighthardware;

r.

supportfinalacceptancereview.

Utilization phase (phase E)


In phase E, the materials, mechanical parts and processes product assurance
tasksarecarriedoutinorderto:
a.

supporttheseriesmanufacturingofrecurringproducts,

b.

supporttheinvestigationofoperationalphaseanomalies,and

c.

updatetheasflownmaterialsliststoincorporatethenewmaterialsthat
havebeenaddedorchangedasaresultofNCRactivities.Inparticular,
thePMPlistsshouldincludetheactualmaterialsflownonmannedand
reusablespacecraftandtheirpayloads.

65

ECSSQST70C
6March2009

Annex F (informative)
MMPP documents delivery with respect to
milestones
Scope of the Table F1 is to present relation of documents associated to Parts,
material and processes activities to support project review objectives as
specifiedinECSSMST10.
NOTE

This table constitutes a first indication for the


data package content at various reviews. The
fullcontentofsuchdatapackageisestablished
as part of the business agreement, which also
defines the delivery of the document between
reviews.

The table lists the documents necessary for the project reviews (identified
by+).
The various crosses in a row indicate the increased levels of maturity
progressivelyexpectedversusreviews.Thelastcrossinarowindicatesthatat
thatreviewthedocumentisexpectedtobecompletedandfinalized.
NOTE

All documents, even when not marked as


deliverables in Table F1 are expected to be
available and maintained under configuration
management as per ECSSMST40 (e.g. to
allowforbacktrackingincaseofchanges).

TableF1presentsthereviewsatwhichthedifferentissuesoftheECSSQST70
andECSSQST7001documentsareexpected.
NOTE

Other
MMPP
deliverable
document
requirements definitions (DRDs) are contained
intheECSSQST70XXdocuments.

66

ECSSQST70C
6March2009

TableF1:MMPPdocumentsdeliveryw.r.t.milestones
Phase
DocumentTitle

DRDRef.

MDR

PRR

SRR

PDR

CDR

QR

AR

ORR

FRR

LRR

CRR

ELR

Declaredmaterialslist
(DML)

ECSSQST70,AnnexA

Declaredmechanicalparts
list(DMPL)

ECSSQST70,AnnexB

Declaredprocesslist(DPL)

ECSSQST70,AnnexC

Requestforapproval(RFA)

ECSSQST70,AnnexD

CleanlinessRequirement
Specifications(CRS)

ECSSQST7001,AnnexA

Cleanlinessand
contaminationcontrolplan
(C&CCP)

ECSSQST7001,AnnexB

67

ECSSQST70C
6March2009

Bibliography

ECSSSST00

ECSSsystemDescription,implementationandgeneral
requirements

ECSSMST10

SpaceprojectmanagementProjectplanningand
implementation

ECSSMST40

SpaceprojectmanagementConfigurationand
informationmanagement

MILHDBK454

GeneralGuidelinesforElectronicEquipment

NASAMAPTIS

MaterialsandProcessesTechnicalInformationSystem

NASASTD6001

Flammability,odour,offgassingandcompatibility
requirementsandtestproceduresformaterialsin
environmentsthatsupportcombustion(previously
NHB80601C)

68