Ref. : ICIP/KH/HAFEZ) (1/2015)
Date: 19 April, 2015
department of
eee To Contractor: Hammad Sons Company
po box st
ee Subject :Laboratory Tests
EEE: Project :Construction of L-type School in Mustafa
Sree etme Hafez Elem. Boys " A&B" - Khan Younis
59728 677 744s
rwennewa.org
Referring to your letter dated on 13.04.2015, the clarifications
you are asked are included in the contract conditions (p/5 —
Tests):
The Contractor shall allow for carrying out all tests
required by the Specification, including all necessary
materials and samples for testing.
The Director of Works (DOW) may require any test that he
deems necessary to satisfy himself that the materials
are in accordance with the Contract Documents. The cost
of making tests, except for those required by the
Specification, will be borne by the AGENCY except where,
in the opinion of the Director of Works (DOW), the
results of the tests indicate that the materials and/or
workmanship are not of the standard required by the
Contract Documents, in which case the cost of such tests
shall be borne by the Contractor.
be on
All our tests are required by the specification which w
your expense.
With Regards se?
Wajih Abu-Khrais
A.ACE/KH
Ce.
Eng. Salah El-Buhisi
Eng. Isam Amer ae
Atethousosia Holammrecl wa
wus an