You are on page 1of 1
Ref. : ICIP/KH/HAFEZ) (1/2015) Date: 19 April, 2015 department of eee To Contractor: Hammad Sons Company po box st ee Subject :Laboratory Tests EEE: Project :Construction of L-type School in Mustafa Sree etme Hafez Elem. Boys " A&B" - Khan Younis 59728 677 744s rwennewa.org Referring to your letter dated on 13.04.2015, the clarifications you are asked are included in the contract conditions (p/5 — Tests): The Contractor shall allow for carrying out all tests required by the Specification, including all necessary materials and samples for testing. The Director of Works (DOW) may require any test that he deems necessary to satisfy himself that the materials are in accordance with the Contract Documents. The cost of making tests, except for those required by the Specification, will be borne by the AGENCY except where, in the opinion of the Director of Works (DOW), the results of the tests indicate that the materials and/or workmanship are not of the standard required by the Contract Documents, in which case the cost of such tests shall be borne by the Contractor. be on All our tests are required by the specification which w your expense. With Regards se? Wajih Abu-Khrais A.ACE/KH Ce. Eng. Salah El-Buhisi Eng. Isam Amer ae Atethousosia Holammrecl wa wus an

You might also like