You are on page 1of 2

DISC 212 Project Proposal

Project Proposal
Please fill out the following information and upload the document
on LMS by midnight tomorrow (Friday, March 21, 2014). ONE
submission from each group is required. Failure to submit the
proposal by the deadline will result in 20% grade reduction on
your project.

Group Number 12
Name
Areesha
Minahil
Osama
Ramsha
Usman

Roll No.

1. Briefly describe the problem you are going to study. Your description should include the
name of the company as well as a brief description of their business.
Kleanex aims to be a leading developer and marketer of services, products
and systems. The customers included most chain hotels, hospitals, food
industries, food packaging companies, clubs, restaurants and janitorial
service providers.
One of the challenges Kleneax is facing is failure to meet its capacity. Its
Current capacity is 100 tons per months, but the company only produces 6070 tons, floor layout creates a bottleneck to meet its capacity. Moreover,
capacity of 300 tons is targeted in the near future.

2. What data will you require to study this problem? How are you going to collect the data?
One of our group members contacted the company and they are willing to give us
electronic data of their cost structure of constructing a new floor and the warehouse. The
layout of the floor also has been provided. Besides that field study would be conducted to
get information regarding how much time does each worker takes to transfer one product
from one place to another and the area required by each worker.
3. What modeling technique(s) (that you have learned in this course) will you apply to study
the problem(s) stated in bullet 1 above?
We will be using different alternatives which can be evaluated via decision and pay-off
matrices and then after the evaluation we can give a better idea to which alternative
should be considered in order to increase the output. These alternatives include adding
another floor. Secondly, the current floor layout can be re-designed in a manner which
smoothens the flow of work and maximizes output. Thirdly, there is about 5,000 square
ft. of free space. A separate warehouse can be constructed whereby the raw materials will
be placed separately in the warehouse. This will allow the company to utilize its

DISC 212 Project Proposal

production unit more efficiently by adding more production vessels and eventually
increasing output.

You might also like