The Ap1000
The Ap1000
Gl b l Experience
Global
E
i
and
d UK Prospects
P
t
Adrian Bull
Head of Stakeholder Relations
Westinghouse UK
O tli
Outline
Introduction
I t d ti to
t Westinghouse
W ti h
The AP1000 Reactor
Construction Update China
Prospects for AP1000 in the UK
Nuclear Fuel
Nuclear Services
Westingho se in the UK
Westinghouse
Based at Springfields
Springfields site
site, near Preston
Operating
p
g safelyy since 1946
Makes the fuel for the UKs nuclear
power stations
t ti
O tli
Outline
Introduction
I t d ti to
t Westinghouse
W ti h
The AP1000 Reactor
Construction Update China
Prospects for AP1000 in the UK
The AP1000 N
Nuclear
clear Po
Power
er Plant
A single AP1000 power plant
AP1000
Modular Construction
Passive Safety
Systems
Construction
Procurement
Operations
Short Engineering
g
g and
Construction Schedule
Innovative Design
Features
Maintenance
US Licensing Approval
NRC Approves Certification of
Westinghouses AP1000 Advanced
Reactor Design
Standardisation
Means:
All plants use the same suppliers for all engineered components
(identical pumps, valves, instruments and heat exchangers)
Plants
Pl t are iimplemented
l
t db
by th
the same W
Westinghouse
ti h
tteam
There is one and only one design
There is an Organisation Structure that manages and determines
the plant configuration (Configuration Control)
g is 100% complete
p
no field routing
g
The Design
And Brings:
Predictable and timely construction
construction, and reliable performance
Reduced risk, coupled with improved economics
35% Fewer
Pumps
80% Less
Pipe*
45% Less
Seismic
Building
Volume
85% Less
Cable
Current
Plants
Utility
New Plant AP1000
Results
Requirements
q
1 x 10-4
5 x 10-5
<1 x 10-5
5 x 10-7
**
10
Sizewell B:
AP1000:
Sizewell B
Concrete, m3
520,000
<100,000
Power, MWe
1188
1117
AP1000
11
12
13
O tli
Outline
Introduction
I t d ti to
t Westinghouse
W ti h
The AP1000 Reactor
Construction Update China
Prospects for AP1000 in the UK
14
15
16
18
May13
Fuel
loaded
Sanmen 1 Construction
Excavation
Nov 13
50 months
12 months
6 months
Sept 09
Nov 13
Haiyang 1 Construction
Excavation
Sept 08
Sanmen 2 Construction
Excavation
July 10
July 09
May 14
Mar 14
Jan 10
Jan 09
Fuel
loaded
Excavation
Fuel
loaded
Sept 14
Sept 14
Haiyang 2 Construction
Fuel
loaded
March 15
6
50 months
10
16
12 months
6 months
19
China Project Ke
Key Milestones
February
y 28, 2007 Framework Contract
Signed
July 24, 2007 Contracts Signed
Nuclear Island
Consortium Technology Transfer
Fuels
Sub-supplier
pp
Technology
gy Transfer Contracts
September 24, 2007 All Contracts Effective
December 31, 2007 Authorization to Proceed
March 31, 2009 Sanmen 1 First Concrete
September 27, 2009 Haiyang 1 First
Concrete
p
November 2013 Sanmen 1 Operational
May 2014 Haiyang 1 Operational
20
S
Sanmen
1&2P
Progress S
Summary
SM 1 Fi
Firstt C
Concrete
t Mil
Milestone
t
C
Completed
l t d (M
(March
h 2009)
SM 1 Auxiliary Building Module Set in Place (June 2009)
SM 1 CV B
Bottom
tt
H
Head
dS
Sett iin Pl
Place (D
(December
b 2009)
SM 1 Reactor Vessel Module Set in Place (January 2010)
SM 1 CA05 (W
(Walls)
ll ) M
Module
d l S
Sett iin Pl
Place (F
(February
b
2010)
SM 1 CV 1st Ring Set in Place (March 2010)
SM 1 CA01 (St
(Steam G
Gen. +) S
Sett iin Pl
Place (M
(March
h 2010)
SM 1 CV 2nd Ring Set in Place (June 2010)
SM 2 Fi
Firstt C
Concrete
t Mil
Milestone
t
C
Completed
l t d (D
(December
b 2009)
SM 2 CV Bottom Head Set in Place (June 2010)
21
22
Actual
26-Mar-09
29-Jun-09
21 Dec 09
21-Dec-09
18-Mar-10
2-Jun-10
Delta
0
1
6
3
0
23
24
Sanmen Unit 1
December 21, 2009
Sanmen Unit 2
June 13
13, 2010
Haiyang Unit 1
April
p 10,, 2010
25
Sanmen Unit 1
June 29, 2009
Sanmen Unit
S
U it 2
June 27, 2010
Haiyang Unit 1
January 30, 2010
26
CA01
(Steam Generator & Refueling Canal Module)
Sanmen Unit 1
March 27
27, 2010
27
S
Sanmen
U
Unitit 1 September
S t b 2010
28
Steam Generators
RCP
C C
Casing ffrom S
Sheffield
ff
Forgemasters
HY Channel Head
Forging
HY Inter
I t Shell
Sh ll Assembly
A
bl
29
Reactor Vessel
HY 1 RV Closure Head
SM #1 RV Upper Shell
30
32
O tli
Outline
Introduction
I t d ti to
t Westinghouse
W ti h
The AP1000 Reactor
Construction Update China
Prospects for AP1000 in the UK
33
34
B ilding on S
Building
Success
ccess
The experience
p
g
gained in China will p
provide valuable insights
g
as
additional standard plants are built in China and the U.S., UK,
mainland Europe, India, and other parts of the world
Increased efficiencies in construction
Improved processes
Broader, more localized supply chains
Sanmen 1
Haiyang 1
Sanmen 2
Haiyang 2
Vogtle 3
V C Summer 2
Vogtle 4
V C Summer 3
Levy 1
Levy 2
35
Ti
Timescales
l ffor Horizon
H i
P
Project
j t
37
38
UK Jobs Potential
Around 80% of nuclear new build
work is conventional construction, not
nuclear.
p g
the value of a UK nuclear programme.
39
P t ti l 30 Billion
Potential
Billi value
l tto UK economy
Around half from supply chain
during construction
Around 35% from operation
Around 15% from fuel
40
L
Localisation
li ti Considerations
C
id ti
Specifications
177
263
20
11
11
Qty
700
4700
46
42
32
Significant Non
Non-Safety
Safety Opportunity
42
Summary
In the UK
UK, Westinghouse and our team-mates
team mates are preparing
for success with Horizon Nuclear Power and are confident that
we can meet Horizons needs