Design Project of NH (India)
Design Project of NH (India)
By Group-7
Ch.Madhav (CE11B063)
P.Nava Teja(CE11B066)
P.Sreedhar(CE11B067)
Deepak Patel(CE11B084)
Outline
1. Abstract
2. Data and constraints
3. Methodology
4. Outcome
5. Conclusion
Abstract
Constraints:
The Proposed alignment should not cross the irrigation lines at skew.
The Temple cannot be demolished.
The two walls are to be avoided.
Methodology
Data Import
Editing CAD Data
Surface Analysis
Triangulation
Horizontal alignment
Vertical alignment
Super elevation Correction
Four lane Highway editing
Earthwork Calculations
Pavement thickness
Data Import
Surface Analysis
Triangulation
Vertical Alignment
Pavement thickness
As per IRC-37 pavement cross-section has four layers
1. Base Course- 50 mm
2. DBM- 145 mm
3. Granular Base- 250mm
4. Granular Sub Base- 300 mm
Outcome
Conclusion
The national highway 13 is upgraded to a 4 lane
highway with the required design speed of 80 Kmph
Without demolishing the Temple, Walls. There are 3
curves in the new alignment. One reverse curve and
the rest two normal curves. The vertical alignment is
done such that cut fill ratio is equal making the
design economical.