INSTRUMENT DELIVERABLE OVERVIEW LIST (BY BIDDER)

4.0

In general, BIDDER to submit the following deliverables for OWNER's


REVIEW/approval and incorporates OWNER's comments on the same.
Also BIDDER has to prepare a schedule for progressive monitoring of the
below mentioned deliverables.

4.1 Instrument project execution plan


4.2 Work schedule level 3 preparation
4.3 Status reports
4.4 Instrument Design Basis for the entire project
4.5 Instrument Sizing calculations including, but not limited to
Control valve calculation
Safety/relief device calculation
D/p type flow measurement calculation, incl Restriction Orifices.
D / p t yp e l e v e l m e a s u r e m e n t c a l c u l a t i o n
4.6 Analyzer sample loop calculation
4.7 Ex i loop calculation
4.8 Voltage drop calculation for all instrument signal and power cables
4.9 Segment calculation for various FF devices
4.10 Power and Heat Dissipation Calculations
4.11 Instrument air consumption
4.12 Instrument index, 10 point data base for DCS/ESD and FGS
4.13 Instrument Configuration Index, programming sheets
4.14 Range, alarm, timer and trip setting (RATTS) list
4.15 Requisition (MR and PR)
Plant automation s ystem (DCS/ESD)
Fire Smoke and Gas detectors
Analyzer houses, analyzer systems and local analyzers