Professional Documents
Culture Documents
Criterionc Creatingthesolutionworkplan
Criterionc Creatingthesolutionworkplan
Class:
Instructions:
1. Using the table below, describe the steps that you will follow to create your project. Your procedure should be clear, detailed and logical.
See an example of a work plan here: http://goo.gl/k3j0iS
Step
#
Procedure:
Resources / Materials/
Programs/Websites Needed
(Be specific)
Hours/Mins
Needed
(hrs/mins)
1.
Camera.
20 minutes.
15 minutes.
We are going to write a caption on each sports we are going to talk about and show
pictures.
Computer (Photoshop)
45 minutes - 1
hour.
After the short descriptions of the sports we will paste all descriptions with pictures
on slides.
5 - 10 minutes
Computer. (Powerpoint)
10 - 20 minutes
Computer. (Powerpoint)
5 minutes.
Computer. (Powerpoint)
15 minutes.
Computer. (Powerpoint
5 minutes.
Bibliography.
5 minutes.
10
10 minutes
06 Oct
(M)
09 Oct
(Th)
Home
work:
10 Oct
(F)
13 Oct
(M)
Homew
ork:
14 Oct
(T)
16 Oct
(Th)
Homew
ork:
17 Oct
(F)
Deadline
27 Oct
(M)
Instructions:
Create an evaluation survey that you will use later for your final work.
Use Google forms and save in your Google Drive folder.
Be sure to use your Design Specification (from your Criterion B design) for your survey.
Heres an example of an evaluation survey: http://goo.gl/QhPHm0
When done, paste the link/URL of your survey below: