Flow measurements were taken on September 26th, 27th, and 29th at multiple drain locations. On the 26th, a total of 28.03 cubic seconds of flow was measured at the Farkhabad and Shahdara Drains. On the 27th, 170 cubic seconds of flow was measured at the Cantt. Drain. On the 29th, 70 cubic seconds of flow was measured at both the Shalimar Escape Channel and Lower Chotta Ravi Drain.
Flow measurements were taken on September 26th, 27th, and 29th at multiple drain locations. On the 26th, a total of 28.03 cubic seconds of flow was measured at the Farkhabad and Shahdara Drains. On the 27th, 170 cubic seconds of flow was measured at the Cantt. Drain. On the 29th, 70 cubic seconds of flow was measured at both the Shalimar Escape Channel and Lower Chotta Ravi Drain.
Flow measurements were taken on September 26th, 27th, and 29th at multiple drain locations. On the 26th, a total of 28.03 cubic seconds of flow was measured at the Farkhabad and Shahdara Drains. On the 27th, 170 cubic seconds of flow was measured at the Cantt. Drain. On the 29th, 70 cubic seconds of flow was measured at both the Shalimar Escape Channel and Lower Chotta Ravi Drain.