Key project issues / Lesson learnt for

Lean amine pump:


NPSH a of lean amine pump: Special consideration needed for this
pump considering predominant dissolved gases in lean amine. Vendors
minimum requirement was 7.4 m. Technip increased column structure
at later stage to meet NPSH requirement.

System curve checking with vendor pump curve: System curve


generated and checked with pump vendor curve for parallel operation
of lean amine pump. NPSH requirement for single pump and both
pump operation checked.