You are on page 1of 1

ExxonMobil Proprietary

CONFIDENTIAL
DESIGN PRACTICES

Section

INDEX AND INTRODUCTION

Page
1 of 1

DESIGN PRACTICES

OVERALL INDEX FOR DESIGN PRACTICES


SECTION

TITLE

MAIN (ONSITE) DESIGN PRACTICES


I

INDEX & INTRODUCTION

II

DESIGN TEMPERATURE, DESIGN PRESSURE AND FLANGE RATING

III

FRACTIONATING TOWERS

IV

EXTRACTION TOWERS

DRUMS

VI

FLUID SOLIDS

VII

FIXED-BED REACTORS

VIII

FIRED HEATERS

IX

HEAT EXCHANGE EQUIPMENT

PUMPS

XI

COMPRESSORS

XII

INSTRUMENTATION

XIII

MIXING EQUIPMENT

XIV

FLUID FLOW

XV

SAFETY IN PLANT DESIGN

XVI

THERMAL INSULATION

ENVIRONMENTAL DESIGN PRACTICES


XVII

PLANT ENVIRONMENTAL CONSIDERATIONS

XVIII

AIR POLLUTION CONTROL, INDUSTRIAL HYGIENE, AND NOISE CONTROL

XIX

WATER POLLUTION CONTROL

XX

SOLID WASTE MANAGEMENT AND SITE REMEDIATION

OFFSITES DESIGN PRACTICES


XXII

STORAGE FACILITIES/SYSTEMS

XXIII

PRODUCT LOADING FACILITIES/SYSTEMS

XXIV

PRODUCT BLENDING FACILITIES

XXV

FUEL SYSTEMS

XXVI

STEAM FACILITIES

XXVII

COOLING WATER SYSTEMS

XXVIII

COMPRESSED AIR SYSTEMS

XXIX

CIVIL WORKS

XXX

ELECTRICAL POWER FACILITIES

MARINE TERMINAL DESIGN PRACTICES


XXXI

MARINE TERMINAL

This information is considered CONFIDENTIAL and shall not be released to or discussed with any persons except (a) employees of
ExxonMobil Affiliates who have an appropriate research agreement with ExxonMobil Research and Engineering Company (EMRE), and (b)
consultants, contractors, or employees of third parties with whom proper secrecy agreements have been executed with EMRE or such
ExxonMobil Affiliates. ExxonMobil Research and Engineering Company Fairfax, VA

You might also like