"PD=

90
Tn
ingresar
PL=
30
Tn
ingresar
sigma terreno= 3
Kg/cm^2 ingresar
fc=
210
Kg/cm^2 ingresar
fy=
4200
Kg/cm^2 ingresar
Df=
1.7
m NTN ingresar
hf=
2
m NPT ingresar
S/C=
500
Kg
ingresar
PeEsp Suelo= 1.8
Tn/m^3 ingresar
PeEsp Concr= 2.4
Tn/m^3 ingresar
Col t1= 0.8
Col t2= 0.35

mt
mt

ingresar
ingresar

o neto= =(B3*10)-B7*((B9+B10)/2)-B8/1000
Tn/m^2
Azap= =(B1+B2)/B15
m^2
T=
=B16^0.5+((B12-B13)/2) m redonde=
2.4
m
ingresar
S=
=B16^0.5-((B12-B13)/2) m redonde=
2
m
ingresar
Azap= =D17*D18
m^2
Pu=
=1.4*B1+1.7*B2 Tn/m^2
WNU=
=B20/B19
Tn/m^2
d=
0.4
m
ingresar
hz=
0.5
m
ingresar
LV=
=(D17-B12)/2
m
VERIFICACION POR CORTANTE
VU=
=(B24-B22)*D18*B21
Tn
VC=
=0.85*0.53*B4^0.5*D18*B22*10
Tn
VERIFICAR CONDICION SI ES SI O NO
hz nuevo=
0.55
m CRITERIO
ingresar
d=
=B29-0.1
m
Mu=
=B21*D18*(B24^2)/2
Tn-m
w=
=0.8475-(0.7182-(1.695*B31*10^5)/(0.9*B4*D18*100*(B30*100)^2))^0.5
cuantia=
=B32*(B4/B5)
As=
=B33*D18*100*B30*100
cm^2
As min= =0.0018*D18*100*B30*100 cm^2
As usar=
As TABLA =
Dia TABLA =

16.2
1.99
1.588

cm^2
cm^2
cm^2

ingresar
ingresar
ingresar

ACERO LONGITUDINAL
N Varillas=
=B37/B38
=
8
s=
=(D18*100-2*7.5+B66-B39)/(D42-1)
ACERO TRANSVERSAL
Ast=
=B35*(D17/D18) cm^2
As min= =B35*1 cm^2
As TABLA =
1.99
Dia TABLA = 1.588

cm^2
cm^2

redondear

ingresar
ingresar

ACERO LONGITUDINAL
N Varillas=
=B47/B48
=
s=
=(D17*100-2*7.5-B49)/(D52-1)

8