Professional Documents
Culture Documents
Well Intervention
Overview
Intervention Today
Vessel
Monohull
Semi
Smaller
SIL
Well
Intervention
Smaller
Cat A
Wireline
Well
Services
Larger
SIL/IRS
Intervention System
IRS
IRS
18 3/4 BOP
<7"
>7"
>7"
21" IRS
Cat A+
Cat A++
Cat B
Cat C
Wireline
<7" riser
Coiled tubing
Wireline
<7" riser
Coiled tubing
Wireline
<7" riser
Coiled tubing
Pull tubing
Drilling
Wireline
E-line reservoir/annulus
Well perforating-tubing/casing
DHSV repair
SSSV/sleeve insets/storm chokes
Fishing
Guage cutting
P/T/F gauges
Gas lift valves
Sand screen repair
Tubing/seal failure-mechanical
plugs/patches (well integrity)
Downhole video/camera surveillance
Perforating
E-line plug setting/removal/sand removal
Pressure/temp flow monitoring
Downhole seismic calliper survey
Well logging
Coiled Tubing
Cement plug placement-reservoir/
intermediate/shallow
Fishing
Gas lift valves
Sand screen repair
Tubing/seal failure-mechanical
plugs/patches (well integrity)
Zone isolation/re-perforating
Scale squeeze/hydrates soak
Scale mill-out
Well stimulation
Straddles or patches to
repair tubing
Wellbore unloading
with nitrogen
Formulation matrix or
fracture stimulation
Growing Market
As the number of subsea wells increase and they age, the demand and
frequency of required servicing through intervention grows.
607
600
500
400
497
396
344
407
361
262
300
285
340
200
100
0
2007A 2008A 2009A 2010A 2011E 2012E 2013E 2014E 2015E
361
361
321
336
348
379
396
412
429
300
200
100
0
2007A 2008A 2009A 2010A 2011E 2012E 2013E 2014E 2015E
The global subsea intervention market is expected to expand as the focus of offshore drilling shifts
to more challenging environments
Source: Spears & Associates, Quest Offshore Resources
5,000
production
Scaling in wells
3,500
Other factors
3,000
1,000
3,000
4,000
2,000
6,500
1,700
1,800
1,200
+94%
3,500
+200
%
1,800
600
2002A
2007A
2012E
Note: Total installed base includes all subsea well completions from 1990, not adjusted for wells decommissioned 2007-2012
Source: Quest Offshore Resources
$3,100
$3,000
2009A
2010A
$3,752
$2,630
$1,786
$2,000
$1,000
$2,230
$2,305
$3,446
$1,043
$0
2007A
2008A
2011E
2012E
2013E
2014E
10
Norway
SS Intervention spend:
Offshore rigs:
Offshore wells drilled:
$303mm
19
188
United Kingdom
SS Intervention spend:
Offshore rigs:
Offshore wells drilled:
North America
SS Intervention spend:
Offshore rigs:
Offshore wells drilled:
$272mm
16
157
$470mm
31
260
Asia Pacific
SS Intervention spend:
Offshore rigs:
Offshore wells drilled:
$375mm
80
1,072
Latin America
SS Intervention spend:
Offshore rigs:
Offshore wells drilled:
$427mm
88
572
Africa
SS Intervention spend:
Offshore rigs:
Offshore wells drilled:
$746mm
37
531
11
Regulatory Limitations
Vessel Class Many independent classing societies
Most Prominent DNV (Det Norske Veritas),
ABS (American Bureau of Shipping)
MODU Notation Specific requirements for a vessel used in intervention
including zoning for handling hydrocarbons.
Government No international standard. All strictly enforced by each country.
Prescription vs. Safety Case
Client Every client and sometimes every engineer has a different set of
compliance standards. Now driven by SEMS.
Industry Many depositories of guidance principles.
Voluntary Compliance
Generally accepted by Industry but different clients will look at different
sets of guidance.
APL Most generally accepted.
12
13
Mode Screens
ROV controls
14
15
Moonpool Joint
Stress Joint
17
18
Has full bore capability with coiled tubing through full 7 bore of the
well.
May have limited capability of pulling tubing.
Size of the vessel increases deck space required for equipment and
riser handling.
Larger size vessels handle sea motion better.
System required to compensate for motions is still relatively complex.
Overall cost is now getting high.
19
20
Industry Considerations
21
Conclusion
22
Well Intervention
Fleet Overview
23
Vessel of opportunity
24
Gulf of Mexico
North Sea Collaboration Multi client
Helix Well Containment Group
Marine vessels,
Crewing
Subsea systems
25
26
27
28
29
18 man saturation
1 x WROV
1 x Obs ROV
Accommodation (122)
& project offices
114m
Main deck
(Client supplied)
Below deck
Accommodation (120)
& project offices
132m
18 man saturation
1 x WROV
1 x Obs ROV
Well Services
spread:
Slickline
E-line
Pumping
Well test
Coiled Tubing
Main deck
33
Slickline
E-line
Pumping
Well test
Coiled Tubing
Riser Centraliser
Moonpool Joint
Stress Joint
Accommodation (133)
& project offices
36
Future Vessels
Well Intervention
Methodologies
39
Vessel Functions
Adequate usable Deck space
Adequate Accommodation
Certified and classed for
hydrocarbons on deck
Lifting Capacity and Stability
Heavy weather dynamic positioning
Fluid storage and handling
IRS tubular handling and tensioning
Mechanical repair/well
maintenance/integrity
Production logging
Mechanical repair/well
maintenance; tree change-out;
well integrity
Well suspension operations
(temporary abandonment)
3 x well P&A and wellhead
removal
Pumping scale-squeeze
operations
In field 16 days
In field 16 days
In field 14 days
In field 17 days
In field 9 days
Highlander Field
Tartan Field
Enoch / South Wood
Claymore
Tweedsmuir
0 days
9.5 days
58.1 days
Well-work completed:
All procedures developed and work supported by in-house WOUK project engineers
Dynamic Kill
Arrived
in staging area within
SIMOPS
3 days of call-off
Multi functional and ease of
adaptability between operating
modes
Containment
Dynamic Kill
Flaring
Static Kill
Recovery
Control platform for
LMRP/BOP yellow pod
Summary