You are on page 1of 4

Event 4

Budget 12,000
Ian lodge 14003434
Event 4 is a Gig where i have 12,000 to find suitable equipment for the
event.My brief is
1) interpret the specific requirements of the venue and the performers
2) correctly specify, giving reasons, a reinforcement system for the events
3) provide an Operational Guide in the form of a document indicating the step-by-step
procedure for rigging, testing, using and de-rigging including connection diagrams
4) summarise the key health and safety requirements for the event

Equipment
2 kick mics EV RE = 320

AKG = 315

2 Snare Mics- Sm 57 LC b-stock = 144


1 high hat mic Shure sm137 Lc = 155.50
3 tom mics = Sm 57 LC b stock = 216
2 overhead mics = Shure K8M 141 = 597.25
1 Bass di = D120 Behinger = 22.15
1Bass mic = sm 57 LC b-stock = 72
3 electric mics = sm 57 = 216
2 Key di D120 Behringer = 45.30
4 vocal mics sm 58 LC B-Stock = 306.24
SPEAKERS HK AUDIO LINEAR 5 Big venue Pack 5,389.33
Desk Behringer x32
Price -2,089. - Reason for picking it it has the suitable inputs for my event and
has multiple layers so you can save all your work and come back to it when the
event starts, it also has fx built in.
Monitor - The box pro Mon A10 Price = 993.50 (quantity of 5)
Mutlicore Behringer digital snake S16 price - 1386 (quantity of 2)
Millenium MS -2002 Mic stand price = 65.16 (quantity of 6)
Millenuim Ms -2003 mic stand price 130.32 (quantity of 12)

The t bone microphone holder price =40.5 (quantity of 18)


Cabling
xlr the ssnake sm10 rd price 175 = (quantity of 35)
Pro snake cat 5 -146 (quantity of 2)
Total 12,783

Diagram

power

Operational
guide
1. Find
a
suitable
place for
desk
2. Plug in desk with everything muted
3. Plug the S16s into the desk
4 plug the instruments in the stage box and DI
5. Plug the speakers into the stage box
6. Plug the stage box in the speaker s
7 Plug monitors into the stage boxes
8 Unmute desks to check for sound
Health and safety

I know to have all cables in a safe area where no one will trip
over them.
I know the fire exits must be cleared of any wires or debris
I know I must not exceed the buildings amp limit
I know to check for any cracked or damage cables to prevent injury

I know not to exceed volume levels

You might also like