Professional Documents
Culture Documents
Itp Eil
Itp Eil
REPAIR H+ HOLD SiC + SURFACE CHECK RT RETAKE CONTRACTOR Format No. 6-00-0001-F1 Rev.0| ‘Cony El. ~All righs reservedf INSPECTION & TEST PLANS _STANOARO SPECIFICATION Wo, eEBSORA Ro “owt, sreucrunace easier Seasceeens et cereteeeees) ARCHITECTURAL WORKS Page 62 of 85 FORMATNO. =: PSREVI PIPING HYDROTESTATIC TEST RELEASE RECORD Project Job No Client Contractor Name of Work Plan Date Loop No: ‘Area REF P & ID No. INCH MTR From To Line No. @) Isometric No. @)_| _ P&ID No. (3) Test Medium = ‘Test Duration Design/Test Pressure ‘Test Pressure Gauge No. | Range |_ Calibration Certificate No. Gauge Calibration Date: Items to check [Accept Witness Contractor | EIL Field Installation Checklist Prior to Hydrostatic test Signed Punch list Prepared Yes No Pre Hydrostatic test Punch items Cleared Accessibility to Inspection/ Witness Locations, “Capacity of pressurizing pump checked Cordon off area for high pressure testing, as required | Pre-hydrostatic test flushing carried out TBR/Others test Witnessing Required Yes No System Released for Pressure Testing Contractor : Hite Sige ‘Name Sign Name = Date Date : Designation ‘Designation: Format No, &-00-0007-F' Rev. 0 ‘Gopyight EL ~All ights reservedENGINEERS, INSPECTION & TEST PLANS STANDARD SPECIFICATION No. wales INDIA UMITED CIVIL, STRUCTURAL & 6-82-1700 Rev1 sans anon nae ARCHITECTURAL WORKS Page 63 of 65 FORMATNO. = P6 REVI PIPING HYDROSTATIC TEST ACCEPTANCE RECORD ACTIVITY - Date ‘Time ‘Water Filling and Venting started at ‘Water Filling Completed Vents Closed Isolation of Pressurizing pump Test compleied at ~ Water drained Tair “emp Blinds Removed [Checked for reinstallation of [oa Valves b,_ Others 77 Cald setting of spring suppors carried out Contractor EL Sign Signi (Date Date _ Name? Designation ‘Name: Designation | | Reviewed by FIL Area Coordinator Sig: Date: ‘Name: Designation Format No, 8:00-0001-F1 Rev. 0| Copyright EL AI ighs reservedPansossy su6u ny ~ 713 1WEUKdoO 0-804 12-L000-00-8 ON 1ewH04 a 1 vouovainon | | | | I % Tarde | sueuay | Sa9K0T | gpuoay | Bane0> | suyaeaiy prea acer wey | seh ode a een 28 | ceteopen on doo1 adetagey % wa apoyo sy soem oO ox aor wot YOON ASIMANIT TAga 190 : ‘ON LVWHOS Sree SaioM aWanLDSLNORY —— y wvunsonis iA‘ BK Ne Bee ow nouvatszaesonvanvis syd 1931 9 NOUOSESNIINSPECTION & TEST PLANS STANDARD SPECIFICATION No. aREEG ONAL —, OMIL, STRUCTURAL & 682-1700 Rov 4 ERIE, ARCHITECTURAL WORKS Page 65.0165 FORMATNO. =: UG2 REVI U/G PIPING SYSTEM TESTING RECORD ACTIVITY Date Time “Air/Water Filling and Venting started at ‘Water Filling Completed/Air pressure achieved ‘Vents Closed (for water testing) a Isolation of Pressurizing pumplcompressor ‘Visual Test/Soap Bubble check completed at _ - = Water drained’ Air depressurized = Drying, if applicable ~Temp Blinds Removed = Checked for reinstallation oF =a 2 a. Valves b, Others Contractor EL Sign Sige Date Date: ‘Name Designation ‘Name: Designation Reviewed by BIL Area Coordinator ‘Sign Date ‘Name! Designation: Format No, -00-0001-F 1 Rev. 0 ‘Copyright Ell. — Al Aighis reserved