Professional Documents
Culture Documents
Mounting
Frame
89D Bracket
36
INSTALLATION GUIDE
50-Pair Termination Block Wall or Frame Mount (Cont.)
STEP 4:
Install block label holder in center of block and
label as required or install hinged dust cover with
provided labeling on interior surface.
89D
Bracket
37
INSTALLATION GUIDE
50-Pair Termination Block Rack/Wall Mount
STEP 1:
Secure 89D bracket to wall.
STEP 2:
Dress cable through bracket and center of block
and snap block into place.
STEP 3:
Cut cables 12" from front edge of 50-Pair termination block, then strip back 6" of sheath to front
edge of 50-pair termination block and split pairs
back 4".
12.0
0"
6.00
"
4.50
"
38
INSTALLATION GUIDE
50-Pair Block Termination Procedure
STEP 1:
Dress pairs through contact openings and across
contact face (maintain twist up to point of the
contact opening). Maintain sheath up to back of
the block. Repeat for second cable, skipping fifth
pair after each 4-pair cable terminated.
50-Pair Termination Block
STEP 2:
Terminate conductors with KRONE tool.
STEP 3:
Repeat steps 1 and 2 for remaining modules.
KRONE Tool
39