Professional Documents
Culture Documents
Owner
Location
ITEMS
Cement
Sand
Gravel
Chb
Steelbar
Tie wire
B. Carpentry
Good lumber
2x2x8
Hardiflex
x4x8
1x4x2x
Door jamb
2.10
Door panel type mahoganay
Polyvinyl flash
Plastic door
type
Door knob
Standard
Hingles
36mm x 90mm
Coco lumber
2x3
Coco lumber
2x4
Coco lumber
2x2
Marine flywood thick
Common nails
#4
#3
#1
#2
Concrete nails
#4
#3
Electrical Works & Accessories
CFL
5 Flash type
Housing
4 0
Switch
1 gang
2 gang
3 gang
Outlet
1 gang
2 gang
Flexible hose
2
QUANTI
TY
350
28
18
4250
160
50
484
Bags
Cu. m
Cu. m
Pcs.
Pcs.
Pcs.
Pcs.
U
COST
230
450
600
8
340
188
145
266
40
Bd. ft.
Pcs.
28
410
7,448
16,400
Set
2500
12,500
Set
5,000
25,000
Set
12,000
6,000
10
12
300
450
100
30
15
15
3
5
3
3
Set
54
Bd. ft.
Bd. ft.
Bd. ft.
Pcs.
Kls.
Kls.
Kls.
Kls.
Kls.
Kls.
750
170
14
14
14
280
60
60
70
60
80
80
7,500
2,040
4,200
6,300
1,400
8,400
900
900
210
300
320
240
100,058
23
23
10
4
1
4
8
2
Pcs.
Set
Pcs.
Pcs.
Pc.
Pcs.
Pcs.
Roll
100
180
125
135
135
135
135
750
2,300
4,140
1,250
540
135
540
1,080
1,500
UNIT
TOTAL
80,500
12,600
10,000
34, 000
57,460
9,400
70,180
274,940
PVC pipe
TWCW wire
THHN wire
Electrical tape
Utility box
Junction
Panel Box
CB
CB
CB
Service drop
Bonded Electrical
2 orange
# 14
# 12
Big
2x4
4x4
10holes
# 60
# 30
# 20
Elbow
PVC TEE
PVC elbow
PVC Pipe
4 ss 500
PVC elbow
4
PVC WYEE
4
PVC End Cup
Bended elbow
4
PVC 2 pipe
2
PVC TEE
2
PVC P TRAF
2
PVC WYEE
2
PVC elbow
2
PVC pipe SS
4
PVC elbow
3
PVC coupling
3
Pvc solvent
quarts
Roofing Materials
Angle bar
1.2x 1.5 x 1.5 x 6
10 mm plain
Sog row
round
Angle bar
1.2 x 1 x 1 x 6
4
1
2
5
20
19
1
1
6
5
10
1
Pcs.
Box
Box
Pcs.
Pcs.
Pcs.
Set
Set
Set
Set
Mtrs
Pc
90
3210
2800
35
35
38
600
400
300
250
42
85
360
3210
5,600
700
700
7
600
400
1800
1,250
420
85
26,882
Sets
5200
26,000
5
10
Pcs.
Pcs.
35
225
Pcs.
40
20
17
20
9
2
6
5
2
12
10
5
5
10
7
4
5
Pcs.
Pc.
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
125
15
16
295
110
175
85
112
190
28
86
35
27
210
65
58
Qrts.
98
50
Pcs.
460
12
Pcs.
150
Lengt
220
Accritex White
Accri Reducer
Acrri Thinner
Flat Latex
Sand Paper
# 100
Spatula
Body Filler
Paint Brush
#2
With hardener
#4
#2
Big
Paint Roller
Baby Roller
20
h
Kls.
140
.60
Lm
264
Pcs.
328
9
500
1
3
2
Pcs.
Pcs.
Box
Pcs.
Can
328
2.75
350
198
60
Pcs.
328
18
Pcs.
480
8
2
2
5
Gal.
Gal.
Gal.
Gal.
Pcs.
cut
Pc.
Gal.
Pcs.
Pcs.
Pcs.
Pcs.
840
680
620
640
10
2
2
2
2
2
2
Sub Total
35
15
580
38
17
85
68
Project
Owner
Location
A. Excavation
B. Concrete and masonry
work
C. Wood Works and
Penetration
2,200
274,940
100,058
D. Electrical Works
26,882
4,979
63,383
G. Painting Works
14,476
Material Cost
389,645
183,371.3
B. Contingency
35,364.465
Grand Total
742,653.76