You are on page 1of 2

What kind of quality check is performed for

design documentation of construction projects?


Quality check is essential part of project execution when it comes to the development of
buildings, highways, factories and hospitals etc. A very systematic Quality Control
Program is facilitated by Building Information Modeling, wherein the entire building data
is represented digitally by design and construction professionals. Since the time design
documentation for construction projects have been digitalized by Architecture,
Engineering and Construction professionals, checking the quality of building design
against errors and design discrepancies have really become suitable for them. There is
absolutely no scope of carrying out Quality Control Program manually as high end
software such as Revit and Navisworks etc are largely utilized for this purpose.

The kind of quality check is required for construction projects


When it comes to checking out the quality of design documentation of construction
projects, basically AEC professionals are required to indentify the quality of 2D
drawings and 3D models.

For example fabrication drawings which are created for fabricators with utilization of
high-end detailing tools like Tekla and AutoCAD must be checked many times by
architects and engineers before they are actually used by fabricators.

Appropriate quality check performed for fabrication and erection drawings can lead
to the precise manufacturing of building components and their high-end erection
within structural framework. In context of MEP, instead of erection drawings,
installation drawings are developed.

The collaboration procedure, wherein coordination and communication between


diverse construction teams is important should also be checked for its ineffectiveness.

When it comes to visual checks, it means checking 2D CAD drawings and 3D BIM
models for unnecessary components in them, which can reduce the productivity of
AEC professionals in terms of design interpretation.

Interference check between model elements is also an important part of Quality


Check Program, wherein design and construction professionals try to figure out
interference between architectural, structural and MEP elements.

Checking the standards utilized for drafting and modeling is also important for
architects, engineers, modelers and CAD drafters, as maintaining industry recognized
standards for developing drawings and models is necessary for AEC professionals.

You might also like