You are on page 1of 17
PART - C TUNNEL PLUG WORKS 1 Tunnel plug works Work flow Work Start y Lining concrete t Back fill grouting I Consolidation grouting — Metal works | steel drain pipe by others | for Lor il Chipping for all section of the conerete surface Plug concrete J Plug concrete cooling : Back fill grouting -}—— Contact grouting Back fill air vent pipes $e oniing pipes enbeded contact grout pipes Cooling shall be continued until estimated temperature is obtained hall be cool down to the surrounding ground rock temperature minus 2° C) ! End 2. Procedure of plug works Purpose is protection for headrace tunnel lining concrete and a water tighteness for drain tunnel © Lining concrete ® Back fill grouting ® Consolidation grouting ® Chipping for all of © Metal works © Pipe system installation ‘concrete joint surface (Drain pipe install by others) Soe deta sketch ig-A ~ fig. @ Plug concrete (1 ~3 1) © Back fill grouting ® Contact grouting cooling