You are on page 1of 7
Chun Lee Engineering Co., Ltd. West Rail Nam Cheong Station Property Development Kowloon Lot NKIL6333 (P&D installation ~ Package 1b) Equipment / Material Submission To: SBC Ref. NCSISMSISBCIPOIPK1B/059 Attn. : Mr. $.C. Lau Date 09/05/2015 Subcontract: _ Plumbing & Drainage Subcontract No. Equipments / Materials : Cl. Trap Remark: Equipment Ref NIA 1) ToBsaa7. | 2) size 100mm & 0150mm used for S/F foor Manufacturer CHF Grain outlet connection inside double slab, Country of origin PRC ‘Area to be used Inside SIF double slab Attachments Delivery Period: @ 1. Catalogue/Technical deta 2. Test Reports (No. DP241113-1413 DIM &0241113-1413 HYD) 3 weeks 1D 3. BSIECMSO Certiicates ‘Schedule Arrival Date on Site : 4. FSDAVSD Approval letter @ 5. Job Reference Lists O 6. 19/08/2015 Signature Name: Huang Kei pRTIOAPLURP’s Reply; Reviewed O Reviewed as modified (1 Review and resubmit No comment on appearance only ‘Signature : Name Date Encl. cc, Joinyield = Mr. Danial Wong /Mr. Jeffrey Sy ¥) Joinyield E/N) - Mr. Rayson Ng /Ms. Frances Wong (_) MRC = Me. Ben Wong / Ms. Dorothy Chan (SITP) Pat ~ Mr. Desmond Wu (7) AP = Mr. Michael Ku (>) AP (RE) ~ Mr Dixon Wong Ca JRP ~ Mr. Joseph Leung / Mr. P.K. Yip cv) IRP(RBSE) = MCP Wong/Mr DominicChan — ( ¥ ) cy ‘Aurecon —- ‘Mr. Nelson Tam / Ms. Peggy Tang Eco-Grey / Cast lron Fittings with Flexible Joint Nominal Bore: 75-450mm CHEUNG HING FOUNDRY LIMITED HR ATR | 11-18 Yung Yuen Road, Ping Shan, Yuen Long, Hong Kong. BA TAB PRL ROBES 11-13 8 ess Tel: (852) 26-488.088 Fax : (852) 26-488-773 itp: hwmw.cht.comhk email: ch@chf.com.nk 8/2000 INTRODUCTION ~ sreyiCast Iron Spigot And Socket Fittings With Flexible Joint This catalog gives dimensional information and method of jointing for the standard range of Cheung Hing Foundry Limited's grey/cast iron fittings with push-in flexible joint for discharge of surface and underground sewage. YA Adaptability to Market Demand Please noted that this range of fittings with flexible joint | differs in some respects from that contained in the relevant British Standard namely BS4622 Modifications have been made and new specifications have been introduced to suit the general market demands of Hong Kong and the complex requirements of the local plumbing and drainage industries. Therefore, this factor should be taken into consideration when designing pipeline systems. Characteristics of Push-in Flexible Joint Push-in flexible joint is labor-saving and time-saving, thus more economical than the traditional lead-caulked or mechanical joint. It also allows flexibility to each joint of the entire pipeline systems after full installation. This greatly reduces some of the possible damages done to the pipeline systems as a result of the settlement of top soil and foundations of building structures, which were commonly found on newly-reclaimed land. fai or CHF® Asmat + A AB Be AAS SMART CSMRBARHASAHKIOGA > LABORMR BRL LAKAORTRAARM A LMR ADA HR ODS Gi bo ROASREATHER ALSACE OBS RE BGS AM ARAB ITE ARE RK? AD KD me Rik — KF AB DM i Ob 1S BAH > HARE BSAB7 A BSAG22E A BAR DAR ERA © AR BOF IRR A RECT RUG AMAR RRS tt AMR DRS EES Ra OF SFM MIM + RAH BB ORME ad Sy Eo GEIR AT BRAK HARD RRM TG TRASH RE MIE ee yor extract h CHEUNG HING. part of the materials from this INDRY LIME SIDS 38 OT BR oe UT WD JUS www //: 99, eLceer-se (esa) xv sscssrsctesaar CISLIWITAMHONMNOA ONIH DNNAHS. 08/2008 CHE- YY EE | Grey/Cast Iron Fi TRAP 6. TRAP, High Invert “P” with Flexible Joint ings with Flexible Joint IBA RR 2k "P" BS Code No, | Nominal Diametor Dimension % PSE (mn) Ae (mm) A |B c s x xi e RGIO0A 100 335 232 295 80 100 | 140 85° __RGISOA 150 420 310 | 350 | 80 150 191 a5 RG225A 225 560425 | 445 | 80 | 225 | 266 | 85° RG300A 300 680 546 | 527 | 90 | 300 | 344 85° Note: All drawings are for eference ony. (NOT TO SCALE) ‘Users must refer to individual products for actual design and dimension, BE LEBRARS RIS AE AE RT A ARIBSLITA HER © All cighs reserved is unlnfl fo copy or extract the whole or part of he materials from thi ‘log without the writen consent of CHEUNG HING FOUNDRY LIMITED, e2c-88r-92 Sa) xv ssoseresesanar CISLIVWIT ADONMOA ONIH DNMAHO. 08/2008 SDD A Dt BS ee BR UY WOSsYO"MwwWw //:d994 ASIA DEVELOPMENT (HK) LIMITED BA ARAL MEIKLE E1323 HE MAL: LAPP LILLIA, Mailing Address: P . 0 . Box 1323, Yuen Long Delivery Office, Yuen Long, Hong Kong Tel : (852 ) 2541-7511 Fax : ( 852 )2815-3224 erry ake CARA HE CASTCO TESTING CENTRE LTD. R S ‘BAH RDMT HLS MAM 204. On Chuon Stool, On Lok Taven, Fanling, N-T., Hong Kong. Torta avrsie muta r utcaermanc hea nse cues ‘Test Cortneate Dimension and Mass Check on Cast Iron Spigot and Socket Drain Pipes and Fittings Gre on B07: Ts Ce) Date ofissue : 18-04-2006 Bue 1B of 1 pares Casco LRN DED1113-1419 DIM. etal as supplied by client ‘leat; Cheung King Foundry Lined Cheat reno: Couretn0.: ~ Job tie: = Suapl escrito; 10 BS437 High Inver P Trap with exible joint ‘Manuficrurer : Cheung Hing Foundry Limited Bred: CHF Ren: Sample Subited by: Asa Development (1950) Li Laboratory tes rele Dace sampl received 13-11-2004 Dave of test: 29-11-2008 inesins Check Specimen no. DP24I115-1413 rene Boa] POSE elemenr Dineaios| PS erent fet} "om code 0. | Mesnined men ai zea RGIO0A a = 335mm 335 3 = oy Pt c S ian 239.5 3 a tom oy x __| win) em 700m 100.6aan @ = 3s" Bs rao ew Remarks: 1. Test result relates only to the specimen tested. 2. This page of repor supersedes page 1A of previous test cericate of Casco LRN:DP241113+1413DIM. cuetedy Approved sentry: toot co, ot GE mane recta alas Cine, MEE MICE "ng Kong Aceon Seri (HAS) as cede is bony ude he ng Kong Libr eritar Stee CREA spe bony scintet itedi be HOKLAS Dein of Acc Labrte. The vl Sow hee a me ty bone in erase wt ‘ems ofseraan Ti eet sl ob rouse ih oe risen nyo am aly, Website www 20!1950,com.nk Email: adl_ne@yahoo.com.hk ASIA DEVELOPMENT (HK) LIMITED Be uk : BA APR MLS HH 1323 Me: ARAMA E31 193 FR 1244 SE Mailing Address: P 0 Box 1823, Yuen Long Delivery Ofice, Yuen Long, Hong Kong Tel : (852 ) 2541-7511 Fax : (852 )2815-3224 bah Rie po HRA A CASTCO ‘CASTCO TESTING CENTRE LTD. ne AM Rte MATS HIIAGE 204 On Chusn Sea On Lk TSueNFalng, NT, Hong Kong. ‘WODAS ox “et 26772082, 2577 2:38 Fa 26770951 Emel casea@netigao-com Webs: www.cascacon hk “Teo Conticate “Hydrostatic Test of Cast Iron Spigot and Socket Dram Pipes and Fittings (85437 1978 Clause 7) Date of ise: 15-12-2006 Page 1A of I page Casco LRN: DP2$1113-1413 HYD ‘Dasails os supplied by client Client: Cheang Hing Foundry Limited Client's ret no: = (Contract no. seb tte: = Desesinion pipe ‘Nominal bore: 100mm ‘Length: ~ “Type: High Invert P Trap with flexible joint Bankmane: CHE WY Diamine) Delivery date: ~-Maafactuer: Cheung Hing Foundry Limited Semple Submited by: Asa Development (1950) Ltd Laboratory Test Result Date received 13-11-2004 Dat of test: 17-11-2004 {specimen no DP2siiis-t4i3 [Actual internal hydrostatic pressze apply 170% [susan pesiod ‘im os [rest result Passed ‘Remasks : 1. Test results relate only othe specimen tested 2, This report supersedes previous test certificate of Casto LRN DP241113-1413HYD. WK, Leung, Checked by: fe Ferg Kong Acrdton Svc EAS) ar cd is rues ag Kong aber Asn Scheme HOKLAG) fr opie ey ‘sel t iedee HOKLAS Dirty of ccteied ators Th elt tvs nhieu ee Gtermie y s bbraynweraie wie ‘ermofsecreiasn, Theepn tal stb roadie wih per writes ppv ft bry. Weosite- www adi1959.com.nk Email: adl_hk@yahoo.com.hk yf ®k DR BR AR Aa Su eff ASIA DEVELOPMENT (HK) LIMITED SP HLL: BR APT MB a AE A 1323 SE Mailing Address: P.O. Box 1323, Yuen Long Delivery Office, Yuen Long, Hong Kong Tel: (852) 2541-7511 Fax: (852 )2815-3224 List of approved Job Reference 2009 - Present Project Name Residential Development at Austin Station Site C, K.LL. No.11126, Kowloon Island Line - MTR 705 Kennedy Town Station Windsor Arch, Macau One Oasis Cotai South, Macau No.54-60 Portland Street No.56C-84 Belcher's Street No. 50 Wong Chuk Hang Road Area 66A, Tseung Kwan O iUniQ Residence at 295-305 Shau Kei Wan Road ‘The Woodsviville at No.18'Hung Shun Road, Yuen Long Lot No. 1927 in D107, Sha Po, Kam Tin No. 372-380 Castle Peak Road, Casam Beach Tung Chung Town Lot No.37 ‘The Warren at Warren Street, Tai Hang Area 86 Site E Development, Tseung Kwan O. ‘Ocean Park Redevelopment Project Contract No.C107, Joint-User Complex and Wholesale Fish Market in Area 44, Tuen Mun, Recreational Development at North Ap Lei Chau Reclamation Island Crest at First Street & Second Street Proposed Hotel Development at Ivy Street, Tai Kok Tsui, Kowloon. STTL 539, Tai Wai, Shatin 39 Conduit Road at No.39 Conduit Road, Hong Kong. ‘The Babington, 6D-6E Babington Path, Hong Kong. Primrose Hill, 152-160 Kwok Shui Road, Tsuen Wan. 590-600 Canton Road, Yau Ma Tei. Proposed Hotel Development at 84 Hung To Road, Kwun Tong Proposed Residential Development at TPTL 186, Pak Shek Kok, Tai Po, N.T. Kwun Lung Lau (Phase I!) Rehabilition, Kennedy Town, La Grove at Lot 4042 in DD120, Kung Um Road, Lung Tin Tsuen, Yuen Long. Fung Lin Hse, 9 Sui Wo Road, Fo Tan, N.T. Proposed Hotel Development at 138, Connaught Road West, H.K. 2-4 Luen Cheong Street, Fanling DD $1 Lots 5078-5079 GIF., Oi Hei House, Yau Oi Estate, Tuen Mun, N.T. Harbour Grand Hotel, 15-17, Oil Street, North Point, Hong Kong Website: www.adl1950.com Email: adl_hk@yahoo.com.hk

You might also like