You are on page 1of 69

3

1
LINE DESIGNATION

PIPING AND COMPONENTS SYMBOLS


MAIN LINE PROCESS
& UTILITY

LINE NUMBER SHALL BE ASSIGNED TO ALL PIPING AND


LDT (LINE DESIGNATION TABLES) AS FOLLOWS:
3=WAY VALVE
F=FAIL POSITION
(VA3WY)

END CAP SCREWED OR


SOCKETWELD (ENDSCR)
F

X - GR - ###YYY - ZZZ
X - NOMINAL LINE SIZE
GR - COMMODITY
### - PLANT UNIT NUMBER
(V) - VACUUM SERVICE

ELEVATED FIRE MONITOR


(SELF SUPPORTED)

LINE BREAK
F

SECONDARY PROCESS LINE


& SERVICE LINE

HOSE CONNECTION
(HC)

4=WAY VALVE
(VA4WY)

D
FUTURE LINE

245

CW RETURN
UNDERGROUND LINE

TO HEADER

TRACED LINE

AREA XXX
B/L

BATTERY LIMIT
(XXX=MATCHING AREA
CODE NUMBER)

INITIAL FEED TO THE


UNIT (ARROW 3)

CONTROL VALVE
AND DIAPHRAGM ACTUATOR
(CV)

CONTINUATION ARROW
TO ANOTHER DRAWING
(ARROW 1)

CONTROL VALVE
AND DIAPHRAGM ACTUATOR
[WITH HANDLEWHEEL]
(CV1)

CONTINUATION ARROW
TO/FROM ANOTHER DRAWING

CONTROL SELF ACTUATED


REGULATOR.
POINTS TO CONTROLLED
PRESSURE SIDE
(CVINTER)

DUPLEX TYPE STRAINER


(DUPLEX)

PACKAGE UNIT BOUNDARY

GATE VALVE
(VGA)

MOTOR OPERATED VALVE


(MV)

SPECTACLE BLIND (CLOSED)


(BLDC)

LINES CONNECTED
(ARROWS AS REQUIRED)

GLOBE VALVE
(VGL 1)

SINGLE ACTION
CYLINDER ACTUATOR
(AIR (PISTON) OPERATED VALVE)
(AIRV)

SPECTACLE BLIND (OPEN)


(BLDO)

SOLENOID VALVE
MANUAL RESET
(SOLEMANR)

SPADE BLIND
(BLD)

SLIDE VALVE [MANUAL]


(SLDE)

SPACER
(SPACER)

LINES CROSSING
NOT CONNECTED

Y TYPE GLOBE
(VGLY)

PNEUMATIC SIGNAL
[INSTAIR]

CONVAL VALVE
W/HILTAP COUPLING

ELECTRICAL SIGNAL
[ELECTRICAL]

NEEDLE VALVE
(VND)

FIRE ISOLATION VALVE


[GREENWOOD TYPE]
(FIV)

CONCENTRIC REDUCER
(RED)

PROCESS MEASUREMENT
OR MECHANICAL LINKAGE
[PROCESS]

POST INDICATOR VALVE

DRAIN OR VENT WITH PLUG


OR BLIND FLANGE
(DRORVT)

ECCENTRIC REDUCER
(ECCFOT)
(ECCFOB)

INSTRUMENT CAPILLARY
TUBING (CAPILL)

PLUG VALVE
(VPLG)

SILENCER
(SIL)

FLAME ARRESTOR
(FLAME)

SOFTWARE LINK
(SOFTWARE)

CHECK VALVE
(VCHK)

XX

INTERMITTENT PURGE
REFER TO COMMODITY
DESIGNATIONS FOR XX
(PURGEINT)

DETONATION ARRESTOR

FOUNDATION FIELDBUS
SIGNAL (FF)

STOP CHECK VALVE


(VCHK_STOP)

XX

CONTINUOUS PURGE
REFER TO COMMODITY
DESIGNATIONS FOR XX
(PURGECON)

HYDRAULIC
(HYDRA)

MIN. FLOW CHECK VALVE


(VCHKMIN)

TRAP STATION
(TRAP)

XXX
001
TIE POINT SYMBOL (TP).
SEE NOTES

NOTE NUMBER
SP
001

ELECTROMAGNECTIC,
SONIC OR NUCLEAR
SIGNAL (ELECMAG)

BALL VALVE
(VBA)

ELECTROMAGNECTIC,
SONIC SIGNAL (NOT GUIDED)

BALL VALVE
HIGH PRESSURE
SIDE SHADED

DIAPHRAGM SEAL
(SEAL)

SPECIALTY TAG
(SPTAG)

HUB JOINT

SEWER DRAIN
(SEWEROP)
REFER TO SEWER
DESIGNATIONS FOR XX

XX
P&ID NO.
JACKETED PIPE
((JACKET)

DOUBLE BLOCK & BLEED


GAUGE VALVE

HUB JOINT
WITH BLIND

XX

SS
001

P&ID NO.
FLOW ARROW
(ARRFLW)

MULTI PORT VALVE


(VMULTI)

LINE SIZE ORIFICE (ORIF)


ANNOTATE RO DIAMETER

S-4

CLOSED SEWER DRAIN


(SEWERCL)
REFER TO SEWER
DESIGNATIONS FOR XX

SAMPLE POINT
- MP - 001

PP
50

ET 20
50

INSTRUMENT ARROW
(ARRINT)

RELIEF VALVE
(RV)

GRADE
(GRADE)

INSULATED LINE ANNOTATE


H-HEAT OR C-COLD CONSERVATION,
A-ACOUSTIC, PP-PERSONNEL PROTECTION
SYMBOLS CAN BE COMBINED AS REQUIRED
(INSUL). SHOW INSULATION THICKNESS

VACUUM RELIEF VALVE

SEAL LEG
(SLEG)

UT

UTILITY STATION
(USTN)

TRACED LINE ANNOTATE


ET [ELECTRICAL], GT[GLYCOL] & ST[STEAM]
SHOW TRACING MAINTENANCE TEMP.
(INSULTRCD)

PRESSURE / VACUUM
(RVPRES)

TEMPORARY STRAINER
(TS)

XX

UTILITY CONNECTION (UTCON).


REFER TO COMMODITY
DESIGNATION FOR XX

EXPANSION JOINT
(EXJ)

DIAPHRAGM VALVE
(VDIA)

T.S.

MIXING OR INJECTION POINT

DAB(U) CAB

RS

P & ID No.
GR

Y-TYPE PERMANENT
STRAINERS
(YTP)

BASKET TYPE STRAINER


(BASKET)

FOR EACH SPECIFIC UNIT AND FOR EACH SPECIFIC FLUID


DESIGNATION WITHIN THAT UNIT THE LINE NUMBERING WILL
BEGIN AT 001.

COMMODITY DESIGNATIONS

CONTROL VALVE
AND MANUAL ACTUATOR
(HV)

TO / FROM HEADER

HAND OPERATED VALVES


NO - NORMALLY OPEN
NC - NORMALLY CLOSED
LO - LOCKED OPEN
LC - LOCKED CLOSED
LN - LOCKED NEUTRAL
CSO - CAR SEALED OPEN
CSC - CAR SEALED CLOSED

YYY - LINE NUMBER (1 THRU 999)


ZZZ - PIPE MATERIAL CLASS

T-TYPE PERMANENT
STRAINERS
(TTP)

LINE CONTINUED ON THE


SAME DRAWING
(ARROW 2)

LP STEAM

VALVE POSITIONS DESIGNATIONS

SPEC BREAK
(SPECBRK)

REMOVABLE SPOOL

AA
AC
AI
AP
AR
AU
BA
BD
BO
CA
CL
CT
CWS
CWR
DM
DO
DT
ET
FL
GC
GF
GH
GHH
GHL
GI
GN
GO
GP
GR
GS
GW
GX
HS
HT
IN
KA
KC
KP
KS
KW
OF
OH
OL
OS
OP
OPH
OPL
OM
P
PA
PC
PT
RA
RE
RP
SCH
SC
SCL
SE
SH
SI
SL
SM
SS
SN
SO
ST
SV
TT
VA
VT
WA
WB
WC
WD
WF
WH
WI
WK
WL
WM
WP
WR
WS
WT
WU
WW
WX
WF
WZ
XT

UTILITY

FOR GR, USE THESE SYMBOLS


- AERATION AIR
- COMBUSTION AIR
- INSTRUMENT AIR
- PROCESS AIR
- REGENERATION AIR
- UTILITY AIR
- BREATHING AIR
- BLOWDOWN & RELIEF
- BOILER BLOWDOWN
- CATALYST
- CHLORINE
- COMPRESSOR TRIM
- COOLING WATER SUPPLY
- COOLING WATER RETURN
- AMINE DRAIN
- OILY DRAIN
- DUCT TRIM
- EXCHANGER TRIM
- FLARE HEADER (UNDETERMINED)
- CARBON DIOXIDE GAS
- FUEL GAS
- HYDROGEN GAS
- HIGH PRESSURE H2
- LOW PRESSURE H2
- INERT GAS (NITROGEN)
- NATURAL GAS
- OXYGEN GAS
- PURGE GAS
- REFORMED GAS
- SYNTHESIS GAS
- WASTE GAS
- HYDROGEN SULPHIDE GAS
- SULPHURIC ACID
- HEATER TRIM
- INHIBITOR
- AMMONIA, ANHYDROUS
- CAUSTIC
- PROCESS CHEMICALS
- SULPHUR
- AMMONIA, AQUEOUS
- FUEL OIL
- HOT OIL
- LUBE OIL & SEAL OIL
- SLOP OIL
- PURGE/FLUSHING OIL
- HIGH PRESSURE OIL
- LOW PRESSURE OIL
- OIL MIST
- PROCESS PIPING
- PROCESS AMMONIA
- PROCESS CONDENSATE
- PUMP TRIM
- AMMONIA REFRIGERANT
- ETHYLENE REFRIGERANT
- PROPYLENE REFRIGERANT
- HIGH PRESSURE CONDENSATE
- STEAM CONDENSATE
- LOW PRESSURE CONDENSATE
- EXHAUST STEAM
- HIGH-PRESSURE STEAM (2500 kPa(ga) SAT.)
- HIGH-PRESSURE SULPHUR PLANT STEAM (4200 kPa(ga))
- LOW - PRESSURE STEAM (350 kPa(ga))
- SATURATED STEAM
- HIGH-PRESSURE STEAM (4500 kPa(ga) SUPERHEATED)
- MEDIUM-PRESSURE STEAM (900kPa(ga) SUPERHEATED)
- STEAM OUT
- STEAM TRACING
- VACUUM STEAM
- TANK TRIM
- ATMOSPHERIC VENT
- VESSEL TRIM
- RAW WATER
- BOILER FEED WATER
- TEMPERED WATER SUPPLY
- DOMESTIC WATER
- FIRE WATER
- HOT WATER SUPPLY
- DEMINERALIZED WATER
- HOT WATER RETURN
- CHILLED WATER SUPPLY
- CHILLED WATER RETURN
- PROCESS WATER
-TEMPERED COOLING WATER RETURN
- SOUR WATER
- TREATED WATER
- UTILITY WATER
- WASTE WATER
- CIRCULATING WATER
- FILTERED WATER
- CLARIFIED WATER
- MISCELLANEOUS TRIM, SAMPLE POINTS

CONTROL VALVES
FO - FAIL OPEN
FC - FAIL CLOSED
FL
- FAIL LOCK LAST POSITION
FL(O) - FAIL LOCK (ULTIMATE OPEN)
FL(C) - FAIL LOCK (ULTIMATE CLOSE)
FX(C) - FAIL INTERMEDIATE (ULTIMATE CLOSE)
FX(O) - FAIL INTERMEDIATE (ULTIMATE OPEN)
TSO - TIGHT SHUTOFF

C
TIE-IN POINTS SHALL BE DESIGNATED AS FOLLOWS
PLT. UNIT NO.
###
--SEQUENCE NO.

A 05/08/10 ISSUED FOR REVIEW


REV

ISSUED
DATE

DESCRIPTION

OTHER_DESIGNATIONS
AE
NNF
HV
FP

ADDITIONS / MODIFICATIONS

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

SHELL CANADA

- ANALYZER
- NORMALLY NO FLOW
- HAND CONTROL VALVE
- FULL PORT

QUEST CCS PROJECT

SEWER_DESIGNATIONS
FOR XX, USE THESE SYMBOLS

FLEXIBLE HOSE
(FH)

BUTTERFLY VALVE
(VBFY)

END CAP BUTTWELD


(ENDCAP)

ANGLE VALVE
(VANG)

END FLANGED
(ENDFLG)

VALVE WITH BLEED


OR PURGE CONNECTION
(VBLEED)

FIRE HYDRANT

UP 1:500 LEVEL
CHANGE OF SLOPE
(SLOPE)

FIRE HYDRANT
WITH MONITOR

DISSIMILAR MATERIAL
WELDING

FREE DRAINING

FREE DRAINING

DA
DB
DC
DF
DK
DM
DO
DP
DR
DS
EF
OS

- ACID SEWER
- BENZENE DRAIN
- CAUSTIC SEWER
- DRAIN FLUSH (CLOSED HYDROCARBON DRAIN)
- CHEMICAL SEWER
- AMINE SEWER
- OILY WATER SEWER (OPEN)
- PROCESS DRAIN
- STORM SEWER
- SANITARY SEWER
- POND EFFLUENT
- OILY SEWER (CLOSED - ABOVE GROUND)

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

UNIT 200 - COMMON


LEGENDS AND SYMBOLS
SCALE: NONE
SHELL DWG NO.:

200.0000.000.041.007

REV.

200.007

FUTURE

ELEVATED FIRE MONITOR


(SUPPORTED)

1. AUTOCAD BLOCK NAMES ARE SHOWN IN ROUND BRACKETS UNDER THE


SYMBOL DESCRIPTION.

FILE:\\F:\1025\DRAWINGS\UTILITIES\200\200.007.pid MODEL DATE:2/1/2011 5:34:34 PM BY:ahm14887

2
LEGEND FOR
FUNCTIONAL LOGIC DIAGRAMS

INSTRUMENT IDENTIFICATION LETTERS


APPLICATION OF INSTRUMENT IDENTIFICATION TO P.&I.D.'S

WEIGHT

MISCELLANEOUS

POSITION

P PD Q
PA PDA QA
PAL PDAL QAL
PC PDC QC
PCV PDCV PE
QE
PG PDG PI PDI QI
PIC PDIC QIC
PIK PDIK QIK
PIS PDIS QIS
PIT PDIT QIT
PR PDR QR
PRC PDRC QRC
PRS PDRS QRS
PRT PDRT QRT
PS PDS QS
PSL PDSL QSL
PT PDT QT
PV PDV QV
PX PDX QX
PY PDY QY
PZ PDZ QZ

VISCOSITY

M
MA
MAL
MC
ME
MI
MIC
MIK
MIS
MIT
MR
MRC
MRS
MRT
MS
MSL
MT
MV
MX
MY
MZ

MULTI VARIABLE

L
LA
LAL
LC
LCV
LE
LG
LI
LIC
LIK
LIS
LIT
LR
LRC
LRS
LRT
LS
LSL
LT
LV
LX
LY
LZ

TEMPERATURE
DIFFERENCE

K
KA
KAL
KC
KE
KG
KI
KIC
KIK
KIS
KIT
KR
KRC
KRS
KRT
KS
KSL
KT
KV
KX
KY
KZ

TEMPERATURE

MOISTURE OR
HUMIDITY

J
JA
JAL
JC
JI
JIC
JIK
JIS
JIT
JR
JRC
JRS
JRT
JS
JSL
JT
JV
JX
JIY
JZ

SPEED

LEVEL

I
IA
IAL
IC
II
IIC
IIK
IIS
IIT
IR
IRC
IRS
IRT
IS
ISL
IT
IV
IX
IY
IZ

PRESSURE
DIFFERENCE
QUANTITY
OR EVENT

TIME OR TIME
SCHEDULE

H
HA
HAL
HC
HI
HIC
HIK
HIS
HR
HRC
HRS
HS
HSL
HV
HX
HY
HZ

PRESSURE

POWER

S
SA
SAL
SC
SE
SI
SIC
SIK
SIS
SIT
SR
SRC
SRS
SRT
SS
SSL
ST
SV
SX
SY
SZ

T
TA
TAL
TC
TCV
TE
TG
TI
TIC
TIK
TIS
TIT
TR
TRC
TRS
TRT
TS
TSL
TT
TV
TX
TY
TZ

TD
TDA
TDAL
TDC
TDCV
TDIC
TDIK
TDIS
TDIT
TDR
TDRC
TDRS
TDRT
TDS
TDSL
TDT
TDV
TDX
TDY
TDZ

U
UA
UAL
UC
UCV
UI
UIC
UIK
UIS
UIT
UR
URC
URS
URT
US
USL
UT
UV
UX
UY
UZ

V
VA
VAL
VC
VE
VG
VI
VIC
VIK
VIS
VIT
VR
VRC
VRS
VRT
VS
VSL
VT
VV
VX
VY
VZ

W
WA
WAL
WC
WCV
WI
WIC
WIK
WIS
WIT
WR
WRC
WRS
WRT
WS
WSL
WT
WV
WX
WY
WZ

X
XA
XAL
XC
XCV
XE
XG
XI
XIC
XIK
XIS
XIT
XR
XRC
XRS
XRT
XS
XSL
XT
XV
XX
XY
XZ

Z
ZA
ZAL
ZC
ZE
ZI
ZIC
ZIK
ZIS
ZIT
ZR
ZRC
ZRS
ZRT
ZS
ZSL
ZT
ZV
ZX
ZY
ZZ

THE COMBINATION OF LETTERS SHOWN INCLUDE THOSE MOST FREQUENTLY ENCOUNTERED. OTHER COMBINATIONS MAY BE DERIVED FROM TABLE 1 ISA-S-5.1
STANDARD. IF AN INSTRUMENT HAS ADDITIONAL FUNCTIONS, IT SHOULD BE SHOWN BY TWO GROUPS OF LETTERS RATHER THAN EXCEEDING THREE LETTERS
(E.G. FQI AND FRC NOT FQIRC).
XIS USED TO IDENTIFY COMPUTING TYPE RELAYS, FUNCTION CAN BE
ANALYZERS MAY BE FURTHER IDENTIFIED BY DESCRIPTIVE LETTERS OR
ASHOWN OUTSIDE BALLOON.
WORDS WRITTEN OUTSIDE THE TAGGING BALLOON.
YIS USED TO SHOW ON/OFF TYPE NON ADJUSTABLE RELAYS IN A LOOP.
CIS USED WITH ZSC TO GIVE CLOSED POSITION.
- I.E.- SOLENOIDS, PNEUMATIC 3-WAY VALVES ETC.
ARE MODIFYING LETTERS FOR DIFFERENCE (D), FRACTION OR RATIO (F),
THE SUFFIX LETTER "E" IS TO BE USED TO IDENTIFY COMPONENTS OF
EAND QUALITY OR TOTAL (Q). THEY MAY BE USED WITH OTHER FIRST
D, F, Q,A SAFETY SYSTEM - I.E.- SHUTDOWN, DEPRESSURING, LOCK UP, ETC.,
LETTERS THAN THOSE SHOWN IN THE TABLE , E.G. KQ-TOTAL TIME,
(PALE - ALARM ON LOW PRESSURE SHUTDOWN).
SD-SPEED DIFFERENCE, DF DENSITY RATIO.
VWILL BE USED OUTSIDE BALLOON TO IDENTIFY VENDOR SUPPLIED INSTRUMENTS.
JIS USED FOR SCANNING - I.E.- FOR TEMPERATURE TJI OR TJR.
TWO STAGE VABIABLE ALARMS SHALL BE IDENTIFIED BY H AND HH,
H/L IS USED FOR PILOT LGHT. THE LETTER "L" MAY BE USED ALONE
OR L AND LL, - I.E.- H- HIGH LEVEL ALARM
LOR IF PART OF A LOOP, IT CAN TAKE THE LOOP LETTERS AS A PREFIX.
- HH- VERY HIGH LEVEL ALARM
E.G.F. , ETC.
NOTE: SAFETY SYSTEM WILL BE GENERALLY BE HE NOT HHE.
NIS USER'S CHOICE - EITHER AS A MEASUREMENT OR OUTPUT FUNCTION.
WILL BE USED OUTSIDE BALLOON TO IDENTIFY INSTRUMENTS AT LOCAL PANELS.
LP IS USED WITH F TO GIVE FO, FLOW ORIFICE RESTRICTION.
IF MORE THAN ONE PANEL, THEN IDENTIFY THEM NUMERICALLY AND
OIS USED WITH ZSO TO GIVE OPEN POSITION.
REFERENCE IN GENERAL NOTES.
R-

IS USED AS A MEASURED VARIABLE FOR RADIOACTIVITY MEASUREMENT.


IS ALSO USED TO MEAN SAFETY AS IN PSE RUPTURE DISC.

U-

IS USED TO SHOW A MULTIFUNCTION INSTRUMENT. - I.E.- COMBINATION


RECORDING SCANNING, TOTALIZING, ETC. OR MULTIFUNCTION SYSTEM
THAT MAY BE DETAILED SEPARATELY.

W-

2.
XHS

O/C

OPEN CLOSED HAND SWITCH MOUNTED ON A LOCAL PANEL FOR ACTUATING


A "XV" ON/OFF VALVE.

NUMBER DISPLAYED IN A SQUARE


REPRESENTS THE STEP NUMBER
SHOWN ON THE SQUENCE STEP INDICATOR.

LETTER DISPLAYED IN A DIAMOND


REPRESENTS AN EXTERNAL CONNECTION
BETWEEN THE LOAD SIDE OF AN OUTPUT
MODULE AND THE LINE SIDE OF AN
INPUT MODULE FOR TRIAC FAILURE
DETECTION.

LP

XHIS

O/C

DCS COMPOSITE POINT SELECTOR SWITCH WITH OPEN/CLOSED INDICATION


FROM "XV" LIMIT SWITCHES OR POSITION TRANSMITTER.

SOLENOID VALVE COIL

LC-

WILL BE USED OUTSIDE BALLOON TO IDENTIFY INSTRUMENT AT LOCAL CONSOLES.

CB-

CUT BACK CONTROL

PILOT LIGHT
R = RED
G = GREEN

R
3.

ALL CONTROLLERS COMING INTO DCS DO NOT NEED TO BE MARKED AS AN IC OR


RC AS I AND R ARE IMPLICIT FOR EVERY POINT.
ALARM PRESENTATION (MINIMIZE NUMBER OF BALLOONS)
THE OPERATOR HAS THE ABILITY TO SET AN H OR L FOR ANY POINT.
THESE OPERATOR ALERTS WILL NOT BE SHOWN ON P&ID ALARMS UNDER ENGINEERING CHANGE
H
CONTROL WILL BE SHOWN AS:
PI
FI

RELAY
KR

RELAY COIL

IF MEASUREMENT POINT HAS A LOGIC INTERLOCK; THE INDICATED VALUE WILL BE AVAILABLE
IN THE DCS. THE LL OR HH SIGNIFIES THE TRIP ACTION UNDER ENGINEERING CONTROL,
WHICH THE OPERATOR CANNOT ADJUST.

5.
6.

SOLENOID VALVES ON NON- EMERGENCY SYSTEMS SHOULD BE TAGGED AS UYI- XXX.

8.

SOLENOID VALVES ON EMERGENCY SYSTEMS SHOULD BE TAGGED AS *YE-XXX, I.E. XYE-001.


SOLENOID VALVES ON NON-EMERGENCY SYSTEMS SHOULD BE TAGGED AS *YI-XXX, I.E. LYI-001.

9.

CB
147 B

UE
197

FIC

113

113

BACK OF PANEL
OR RACK MOUNTED
INSTRUMENT

FRONT PANEL
INSTRUMENT

PSHE
005

*YE
197

FR

TXE

113

147

HIGH PRESSURE
SHUTDOWN
SWITCH

SOLENOID VALVE
ON EMERGENCY
SYSTEMS

INSTRUMENT
ON LOCAL
PANEL

RELAY
FUNCTION
=SUMMING

MULTIFUNCTION
LOGIC FOR
EMERGENCY
SYSTEMS

LP

002
SIS INTERLOCK
NO.002

I
001

FT
004

AND

"NAND" LOGIC GATE

SIGNAL INVERTER

PUSHBUTTON, MOMENTARY TYPE


NORMALLY CLOSED CONTACT BLOCK

3. LOGIC SYMBOLS REPRESENT FUNCTIONAL AND


OPERATIONAL SEQUENCE OF EVENTS AND DO NOT
NECESSARILY REFLECT ACTUAL LOGIC GATES.

4. STATE OF LOGIC IS SHOWN AT LOGIC "0" WITH POWER OFF


AND ALL INPUTS AND OUTPUTS IN THE FAIL SAFE CONDITION.
5. ALL CONTACTS THAT REQUIRE ANNUNCIATOR POINTS
AND/OR VALVE STATUS LIGHTS SHALL BE EITHER
DOUBLE-POLE FOR INTERLOCK AND THE OTHER FOR
ANNUNCIATOR OR STATUS LIGHT, OR DIRECT INPUT TO
PLC WITH REPEATED OUTPUT TO AUXILIARY DEVICE.

ANNUNCIATOR [FIRST OUT]


S
ANNUCIATOR [STANDARD]

DCS INTERLOCK
NO.001

*E
HEAT TRACED
TRANSMITTER

SNAP ACTING
RELAY ON TEMP.
TRIP SYSTEM

* - E SYMBOL USED WHEN TRACING POWER COMES FROM


EMERGENCY SYSTEM.

GENERAL_INSTRUMENTS_SYSTEMS
FUNCTION IN DCS SYSTEM
DISPLAY TO OPERATE

INSTRUMENT ABBREVIATION
DCS STATUS LIGHT
A/S - INSTRUMENT AIR SUPPLY

SP - REMOTE SET POINT

FE - FLOW ELEMENT

RTD - RESISTANCE TEMPERATURE DETECTOR

FO - FLOW RESTRICTION ORIFICE

SIS - SAFETY INSTRUMENTED SYSTEM

INSTRUMENT IDENTIFICATION_NUMBERS

- WITH VENDOR SUPPLIED EQUIPMENT

THE IDENTIFICATION NUMBER FOR LOOPS WILL HAVE SIX DIGITS, THE FIRST THREE BEING UPGRADER COMPLEX UNIT NUMBER.
THE FOLLOWING THREE DIGITS WILL PROVIDE A SINGLE SEQUENCE OF LOOP NUMBERS FOR EACH PROCESS VARIABLE
IDENTIFICATION OF EACH LOOP.
THE LOOP NUMBERING SEQUENCE WILL BEGIN WITH THE NUMBER 001 FOR EACH PROCESS VARIABLE IDENTIFICATION FOR
EACH UNIT, INCLUSIVE OF THE FOLLOWING LOCAL INSTRUMENTS.
PG - PRESSURE GAUGES

IDENTIFICATION LETTERS:

TG - DIAL THERMOMETER

HS - HAND SWITCH OR PUSH BUTTON


L - INDICATING LIGHT, IF ASSOCIATED WITH HAND SWITCHES
OR PUSH BUTTONS OR ALARM IF USED FOR ALARM AL, ALH

TXE
147

NOTES

TW - TEMPERATURE TEST WELL


LG - LEVEL GAUGES
FI

- PURGEMETERS

NOTES

FG - SIGHT FLOW GLASS

1. THE SWITCH/LIGHT FUNCTION SHALL BE SHOWN OUTSIDE OF CIRCLE

FO - FLOW ORIFICE

START
HAND
MANUAL
STOP
OFF
TRIP
2. SOME TYPICAL FUNCTIONS ARE:
RUN
AUTO
RESET
READY
JOG
ARMED
FUNCTIONAL ABBREVIATIONS MAYBE USED:
-S/S - START/STOP
-HOA - HAND-OFF-AUTO
3. NUMBERING SHALL FOLLOW THE SAME PROCEDURE AS INSTRUMENTS.

PSE - RUPTURE DISC


RV - PRESSURE SAFETY VALVE
FSV - EXCESS FLOW VALVE
RV - RELIEF VALVE (SYMBOL REF. DWG. 245.0000.000.041.001)

4. FOR MOTOR CONTROL SWITCHES AND LIGHTS, ONLY PANEL MOUNTED ITEMS ARE SHOWN
ON P&ID'S EXCEPT WHERE LOCAL DEVICES ARE OTHER THAN START/STOP.
ALL LOCAL DEVICES ARE THE RESPONSIBILITY OF THE ELECTRICAL DEPT.

R/S

HIS
110

HARDWIRED INTERLOCK SYSTEM

DESCRIPTION

UNIT NO.

HOA
HS
110

CKD

PRS

HIS
111

TO PUMP
P-100A MOTOR

SIS INTERLOCK

HEXAGON DENOTES COMPUTER OR RTU FUNCTION

APE

PEM CLIENT
APP

SHELL CANADA
QUEST CCS PROJECT

HOA

HS
111

INTERLOCK NUMBERS ARE SIX DIGITS AND ARE ASSIGNED BY THE INSTRUMENT DEPARTMENT. THE FIRST THREE DIGITS DESIGNATE
THE UNIT AND THE LATTER THREE ARE SEQUENTIAL, COMMENCING AT 001 IN EACH UNIT. THE FIRST THREE DIGITS ARE OMITTED ON
THE P&ID.
R

EXAMPLE
DCS OR PLC INTERLOCK

MC

PDP

WITH THE EXCEPTION OF HAND SWITCHES, FOR INSTRUMENTS THAT ARE LOCATED ON IDENTICAL PARALLEL EQUIPMENT,
THE IDENTICAL INSTRUMENTS ON EACH PIECE OF EQUIPMENT SHALL BE NUMBERED XXXA, XXXB, XXXC ETC. EXAMPLE: PARALLEL
INSTRUMENTS SHALL BE NUMBERED 017A, 017B & 017C.

R/S

DUAL FUNCTION (FOR SERVICES) INSTRUMENT

CS

LOOP NO.

THE FIRST THREE DIGITS (UNIT NUMBER) WILL BE OMITTED FROM THE BALLOONS FOR IMPROVED READABILITY OF LOOP
IDENTIFICATION NUMBERS. A GENERAL NOTE ON THE P&ID WILL REFERENCE THIS AND IDENTIFY THE OMITTED PLANT NUMBER.
THE INSTRUMENT LOOP NUMBERS WILL THEN BE THREE DIGITS, I.E. 017.

HARDWIRED SHUTDOWN INTERLOCK SYSTEM

BY

FC-245 017

SEL

HS
112

ISSUED
DATE

EXAMPLE

LETTER CODE PER TABLE


6.

A 05/08/10 ISSUED FOR REVIEW


REV

5. INDICATING LIGHTS SHALL BE COLOR CODED AS FOLLOWS:


RUNNING/OPEN
- BLUE
STOPPED/CLOSED - YELLOW

FUNCTION IN DCS SYSTEM


NOT REQUIRED TO BE
DISPLAYED TO OPERATE

"NOR" LOGIC GATE

2. ALL ELECTRICALLY AND ELECTRONIC CONTROLLED


DEVICES ARE SHOWN IN THE DE - ENERGIZED
CONDITION PRIOR TO START-UP POSITION, UNLESS
OTHERWISE SPECIFICALLY NOTED.

MOTOR CONTROL DISPLAYS IN THE DCS ARE DESIGNATED AS BELOW:


- SOFT HAND SWITCH OR
R/S
HIS
PUSH BUTTON WITH
401
RUN/STOP ACTION
AND RUN STOPPED STATUS DISPLAY
MOTOR CONTROL ITEMS ON LOCAL PANEL OR FIELD MOUNTED ARE DESIGNATED AS BELOW:
STOP - ILLUMINATED PUSH BUTTON
RUN - INDICATING LIGHT
HS
L
WITH STOP ACTION
LOCAL PANEL MOUNTED
402
403
LP
LP
HOA - LOCAL HAND-OFF-AUTO
HS
TO MOTOR
404
(ONE BALLOON CAN REPRESENT MORE
THAN ONE FUNCTION)

SNAP

AUXILIARY LOCATION
NORMALLY INACCESSIBLE
TO AN OPERATOR

OR

1. GRAPHICS LOGIC SHOWN ON DWGS. CONFORM TO ISA


GRAPHIC SYMBOLS.

RESISTOR

MOTOR CONTROL

FX

DCS ALARM

INSTRUMENTS SYMBOLS

"AND" LOGIC GATE

LEVEL SWITCH, SPST


OPENS ON DECREASING
LEVEL
FLOW SWITCH, SPST
OPENS ON DECREASING
FLOW

PUSHBUTTON, MOMENTARY TYPE


NORMALLY OPEN CONTACT BLOCK

TYPICAL CUTBACK CONTROL REPRESENTATION SEE APPLICABLE


P&ID FOR COMPLETE INTERACTION.

IS USED WITH T AS TW FOR TEMPERATURE WELL.

INSTRUMENT
FUNCTION
PI
113
LOOP NO.
FIELD OR LOCAL
INSTRUMENT

AND

GENERAL NOTES FOR


FUNCTIONAL LOGIC
DIAGRAMS

PRESSURE SWITCH, SPST


OPENS ON DECREASING
PRESSURE

ELECTRICAL ACCESSORIES, COIL RELAYS, AMPLIFIERS AND I/P TRANSDUCERS AT


CONTROL VALVES, ARE NORMALLY OMITTED ON THE P&ID. THE LATTER MAY
BE SHOWN FOR THE LOOPS, WITH TWO OR MORE VALVES OR SEPARATE DEVICES, OR
WITH THE AIR SIGNAL GOING TO AN INSTRUMENT PRIOR TO THE VALVE.
THE BALLOONS MAY BE DRAWN TANGENTIALLY TO SHOW A COMMON INSTRUMENT WHERE PRACTICAL.
FAILURE ACTION FOR SOLENOID AND PNEUMATIC 3-WAY INSTRUMENT VALVES
WILL BE SHOWN WITH AND ARROW AND FO, FC, NOMENCLATURE- SIMILAR TO THAT
USED FOR CONTROL VALVES.

7.

"OR" LOGIC GATE

CONTACTS

LIMIT SWITCH
SINGLE - POLE
SINGLE - THROW [SPST]

E
LL

4.

OR

ELECTRONIC ALARM RELAY CONTACT


OPEN ON POWER FAILURE AND ABOVE
HI OR BELOW LO SET POINTS. CLOSED
DURING NORMAL OPERATING LIMITS.

LTE

1. ALL REDUNDANT TRANSMITTERS HAVE DEVIATION ALARMS IN THE DCS.


THE DEVIATION ALARMS ARE NOT SHOWN ON THE P&ID.

Y = AMBER
B = BLUE
KR

WILL BE USED FOR DIGITAL INPUT/OUTPUT TO MICROPROCESSOR BASED SYSTEMS.


- I.E.- MECHANICAL EQUIPMENT ON/OFF MANUAL CONTROL OR EQUIPMENT STATUSRUN/STOP.

N-

S-

FOR ELABORATE CONTROL SYSTEMS A SEPARATE DRAWING (EITHER VENDOR OR CONTRACTOR) MAY BE REQUIRED.
IN SUCH A CASE, A BLOCK WILL BE DRAWN ON THE P&ID WITH A DRAWING NUMBER IDENTIFICATION AND SHOWING
ALL THE INPUT AND OUTPUT SIGNALS.

NUMBER DISPLAYED IN OR NEXT TO


A SYMBOL REPRESENTS THE LOGIC
GATE NUMBER.

TO PUMP
P-100B MOTOR

START/STOP AND H-O-A HAND SWITCHES FOR PUMP "A" WILL HAVE A
SEQUENTIAL NUMBER. A DIFFERENT SEQUENTIAL NUMBER IS USED FOR PUMP "B".
THE DCS SOFT DEVICE BLOCK TAG WILL NOT HAVE A SUFFIX (I.E. HS-110) THE
LOCAL HAND SWITCHES FOR H-O-A AND LOCAL START/STOP WILL HAVE SUFFIX
STARTING WITH A (I.E. HS-110A). COMMON HAND SWITCH FOR BOTH PUMPS
(I.E. SELECTOR SWITCH) WILL HAVE ITS OWN SEQUENTIAL NUMBER.

001

002

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

UNIT 200 - COMMON


INSTR ID LETTERS SYMBOLS AND LOOP NO
SCALE: NONE
SHELL DWG NO.:

200.0000.000.041.008

REV.

FILE:\\F:\1025\DRAWINGS\UTILITIES\200\200.008.pid MODEL DATE:2/1/2011 4:22:31 PM BY:ahm14887

BV
BX
BY
BZ

CURRENT

BS

F FF FQ G
FA FFA FQA GA
FAL FFAL FQAL GAL
FC FFC FQC GC
FCV FE
GE
FG
FI FFI FQI GI
FIC FFIC FQIC GIC
FIK FFIK FQIK GIK
FIS FFIS FQIS GIS
FIT FFIT FQIT GIT
FR FFR FQR GR
FRC FFRCFQRC GRC
FRS FFRS FQRS GRS
FRT FFRT FQRT GRT
FS FFS FQS GS
FSL FFSL FQSL GSL
FT FFT FQT GT
FV FFV FQV GV
FX FFX FQX GX
FY FFY FQY GY
FZ FFZ FQZ GZ

HAND

BE
BG

GAUGING

E
EA
EAL
EC
EI
EIC
EIK
EIS
EIT
ER
ERC
ERS
ERT
ES
ESL
ET
EV
EX
EY
EZ

FLOW TOTAL

D
DA
DAL
DC
DE
DI
DIC
DIK
DIS
DIT
DR
DRC
DRS
DRT
DS
DSL
DT
DV
DX
DY
DZ

FLOW RATIO

C
CA
CAL
CC
CE
CI
CIC
CIK
CIS
CIT
CR
CRC
CRS
CRT
CS
CSL
CT
CV
CX
CY
CZ

FLOW

VOLTAGE (EMF)

B
BA
-C

1. AS A GENERAL GUIDE, THE EXTENT OF INSTUMENTATION SHOWN ON THE P&ID SHOULD BE SUFFICIENT TO PERMIT
THE OBSERVER TO IDENTIFY THE MAIN COMPONENTS AND THE FINAL READOUT CONTROL AND/OR ALARM ACTION
AND TO UNDERSTAND THE FULL FUNCTION OF THE INSTRUMENT SYSTEM. IDENTIFICATION OF ALL COMPONENTS
AND THE FULL SCHEMATIC RELATIONSHIP ARE SHOWN ON THE INSTRUMENT HARD WIRED LOOP DWGS.

LEGEND FOR
FUNCTIONAL LOGIC DIAGRAMS

200.008

DENSITY

A
AA
AAL
AC
AE
AI
AIC
AIK
AIS
AIT
AR
ARC
ARS
ART
AS
ASL
AT
AV
AX
AY
AZ

CONDUCTIVITY

INSTRUMENT FUNCTION
ALARM
ALARM LOW (L), MEDIUM (M), HI (H)
CONTROL
CONTROL VALVE (SELF OPERATING)
ELEMENT
GAUGE GLASS (TUBE)
INDICATOR
INDICATING CONTROLLER
INDICATING CONTROL STATION
INDICATING SWITCH
INDICATING TRANSMITTER
RECORDER
RECORDING CONTROLLER
RECORDING SWITCH
RECORDING TRANSMITTER
SWITCH
SWITCH LOW (L), MEDIUM (M), HI (H)
TRANSMITTER
CONTROL VALVE OR DAMPER
MISCELLANEOUS
RELAY TRANSDUCER ETC
DRIVE OR ACTUATOR

BURNER FLARE

ANALYZER

MEASURED VARIABLES

IN LINE AND TANK MOUNTED INSTRUMENTS


PNEUMATIC OR ELECTRONIC PER PROJECT REQUIREMENT

FLOW

LEVEL

PRESSURE

TEMPERATURE

CONT.

1. INSTRUMENT TAG REQUIRED FOR INTEGRAL DESUPERHEATING VALVE.


2. AUTOCAD BLOCK NAMES ARE SHOWN IN ROUND BRACKETS UNDER THE SYMBOL
DESCRIPTION.

FE
169
ORIFICE PLATE WITH
FLANGE TAPS

SOLENOID
OPERATED
DIAPHRAGM VALVE
WITH SMART
POSITIONER
FAILS CLOSED

FE
169

GAUGE GLASS
EXTERNALLY
CONNECTED

LG
018

ORIFICE PLATE
COMPLETE WITH LOCAL
FLOW INDICATOR

TE
577

PRESSURE GAUGE
DIRECT CONNECTED

TE
578

TE
579

TANK
PSE
046
TANK

FC
FE
172

FO
DIAPHRAGM GLOBE
WITH SMART POSITIONER
WITHOUT HANDWHEEL
FAILS OPEN

RUPTURE
DISC

ORIFICE PLATE
WITH VENA
CONTRACTA
RADIUS OR
PIPE TAPS

LG
020

MAG

FE
173

FL

WATER
SLIDE VALVE

HP
STEAM

TANK

FV
001

PP
045
LT
020

TYPICAL FLOW LOOP

WINTERIZED
LEVEL TRANSMITTER
EXTERNAL FLOAT

TANK

TEMPERATURE
FC
006

VENTURI TUBE
OR FLOW NOZZLE
MOTOR OPERATED
(MOV) VALVE
WITH HANDWHEEL

LEVEL TRANSMITTER
DP TYPE

TANK

FT
179

PCV
420

LT
324
LEVEL TRANSMITTER
DP TYPE WITH
BUBBLER SYSTEM &
DIP TUBE

FLUME

PCV
421

LY
324
WITH EXTERNAL
PRESSURE TAP

FI
087

ROTAMETER OR
PURGEMETER
WITH NEEDLE
VALVE ON INLET

TI
067

087

FT
184
TSE
536

TANK

LEVEL

TANK

LCV
314

LEVEL REGULATOR
WITH MECHANICAL
LINKAGE

FT
001

TG
069

LEVEL INDICATOR
FLOAT WITH WIRE
AND PULLEY

LI
325

A 05/08/10 ISSUED FOR REVIEW


TEMPERATURE TRANSMITTER
WITH TW & TE
TT
070

LS
327

FLOW SIGHT
GLASS

STRAIGHTING VANES
(STVANES)

CORIOLIS
(CORIO)
M

CAPACITANCE,
DIELECTRIC OR
CONDUCTIVITY
TYPE SWITCH

TANK

SP

ISSUED
DATE

DESCRIPTION

101

101

TTE
311

TTE
311

P&ID ABBREV.

ACTUAL

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

SHELL CANADA
QUEST CCS PROJECT
FC
011

FX
011

CKD

FV
004

FE
004

FLOW COMP
HH

BY

FC
004

TYPICAL LEVEL - FLOW CASCADE LOOP. WINTERIZED

TI
311

WEDGE
(WEDGE)

FT
004

INLINE FLOWMETER
WITH INTEGRAL
TRANSMITTER

POSITIVE DISPLACEMENT
(POSDISPL)

LC
002

LT
002

A
R

LX
329

TANK

TANK

LT
329

RADIOACTIVE OR
SONIC SOURCE

TAHH
311

TI
009

TT
009

PI
010

FE
011

FT
011

PT
010

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

UNIT 200 - COMMON


ID LETTERS SYMBOLS AND LOOP NO.

FV
010

MAGNETIC
TEMPERATURE AND PRESSURE COMPENSATION

ADDITIONS / MODIFICATIONS

REV

FIXED
RESTRICTION
ORIFICE

VORTEX

I
003

TYPICAL FLOW LOOP INCLUDING DCS INTERLOCK

TANK

FO
185

FUSIBLE PLUG
OR DISC

FYI
001

FO

TEMPERATURE
(REFER TO PROJECT
DWG. 245.0000.000.041.002)

THERMOMETER

POSITIVE
DISPLACEMENT
METER

FG

FV
001

FQI
182

PVSV
025

TYPICAL FLOW LOOP INCLUDING SIS


INTERLOCK & SOLENOID VALVE

AI

TANK

TURBINE OR
PROPELLER
FLOW METER

VAC

FO

FILLED SYSTEM
WITH WELL

FT
180

RV
024

FV
006

FC
001

PRESSURE RELIEF VALVES


RV
023

TE
066

FE
186

SELF-CONTAINED

PRESSURE/VACUUM
SAFETY VALVE
SIZE AND SET
PRESSURES

FT
006

TEMPERATURE ELEMENT
WITH OR WITHOUT WELL
(NOT CONNECTED TO
SECONDARY INSTRUMENT)

ULTRASONIC
FLOW METER

FYE
006

002

LT
323

SELF-ACTUATED REGULATORS

VACUUM RELIEF
SAFETY VALVE
SIZE AND SET
PRESSURE

TW
064

WEDGE

SIZE AND SET


PRESSURE

TEMPERATURE
TEST CONNECTION
WITH WELL

FE
178

(REFER TO PROJECT
DWG. 245.0000.000.041.002)

FC

PRESSURE POINT

FE
177

FT
001

EXCESS FLOW
VALVE

BUTTERFLY VALVE WITH SMART


POSITIONER WITH HANDWHEEL
FAILS CLOSED

FC
001

PRESSURE GAUGE
DIAPHRAGM SEAL
LINE MOUNTED

FSV
099

LP
STEAM

FC

LEVEL TRANSMITTER
INTERNAL FLOAT
SIDE CONNECTION

LT
322

PITOT OR
PITOT VENTURI
OR ANNUBAR

DESUPERHEATER
(DESUPER)

MICROPROCESSOR (DCS/PLC) BASED SYSTEM

PURGEMETER
OR ROTAMETER

TYPICAL LOOPS

PG
044

FE
176

PCV
999

THERMAL RADIATION
TYPE TEMPERATURE
ELEMENT

REMOTE PRESSURE
GAUGE WITH CAPILLARY
& LINE MOUNTED
DIAPHRAGM SEAL

ORIFICE PLATE
CONNECTED TO
DIFFERENTIAL
PRESSURE
FLOW TRANSMITTER
FI
081

TE
581

PG
043

FT
173

DOUBLE ACTING
CYLINDER
THREE WAY VALVE
FAILS LOCKED
IN LAST POSITION

SINGLE ACTING
CYLINDER
ANGLE VALVE
FAILS CLOSED

SIZE AND SET


PRESSURE

FURNACE

LEVEL INDICATOR
MAGNETIC TYPE

TANK

FC

MULTI-ELEMENT
THERMOCOUPLE FOR
DIFFERENT ELEVATIONS
WITH WELL IN TANK

FO

SCALE: NONE
SHELL DWG NO.:

200.0000.000.041.009

REV.

FILE:\\F:\1025\DRAWINGS\UTILITIES\200\200.009.pid MODEL DATE:2/1/2011 4:21:15 PM BY:ahm14887

PG
042

200.009

CONTROL VALVE

1. AUTOCAD BLOCK NAMES ARE SHOWN IN ROUND BRACKETS UNDER THE SYMBOL
DESCRIPTION.

PIPING AND INSTRUMENT DIAGRAM (P&ID) SYMBOLS

D
TXT
NO.

FIELD INSTRUMENT
(INSTR1)

I
I

CURRENT
TO CURRENT
TRANSDUCER
(FDR1)

FUNCTION DESIGNATIONS FOR RELAYS

(ISA S5.1)

THE FUNCTION DESIGNATIONS ASSOCIATED WITH RELAYS SHALL BE USED AS FOLLOWS, INDIVIDUALLY OR IN COMBINATION

NO.

TXT
NO.

LP

INSTRUMENT ON LOCAL PANEL


(INSTR3)

BACK OF PANEL OR
RACK MOUNTED INSTRUMENT
(INSTR4)
PROGRAMMABLE LOGIC TYPE
INTERLOCK SYSTEM
(INTLOCK4)

WINTERIZED

NO.

PROPORTIONAL
(FDR5)

A
D

E
I

d
dt

C
f(x)

f(t)

REV

A
M

1.

EXPONENTIAL
(FDR6)

SYMBOL
1-0 or ON - OFF

FUNCTION
AUTOMATICALLY CONNECT, DISCONNECT, OR TRANSFER ONE OR MORE CIRCUITS
PROVIDED THAT IS NOT THE FIRST SUCH DEVICE IN A LOOP

2.

or ADD

ADD OR TOTALIZE (ADD AND SUBTRACT)

3.

or DIFF

SUBTRACT * *

ANALOG TO
DIGITAL
(FDR7)

4.
5.

AVG.

AVERAGE

VOLT TO
CURRENT
TRANSDUCER

6.

% or 1:3 or 2:1 [TYPICAL]

GAIN OR ATTENUATE (INPUT : OUTPUT) *

DERIVATIVE
(FDR10)

BIAS *

7.

MULTIPLY * *

8.

DIVIDE * *

9.

SQ. RT.

EXTRACT SQUARE ROOT

EXTRACT
SQUARE ROOT
(FDR11)

10.

n
1/n
X or X

RAISE TO POWER

11.

f(x)

CHARACTERIZE

NONLINEAR OR
UNSPECIFIED
FUNCTION
(FDR12)

12.

1:1

BOOST

13.

or HIGHEST (MEASURED
VARIABLE)

HIGH- SELECT. SELECT HIGHEST (HIGHER) MEASURED VARIABLE (NOT SIGNAL,


UNLESS SO NOTED).

FUNCTION
OF TIME
(FDR13)

14.

or LOWEST (MEASURED
VARIABLE)

LOW- SELECT. SELECT LOWEST (LOWER) MEASURED VARIABLE (NOT SIGNAL,


UNLESS SO NOTED).

15.

REV.

REVERSE

16.

A/D or D/A

FOR INPUT / OUTPUT SEQUENCES OF THE FOLLOWING:


A - ANALOG, D - DIGITAL

REVERSE
(FOR14)

17.

INTEGRATED (TIME INTEGRAL)

AUTO
MANUAL
(FDR15)

18.

D or d/dt

DERIVATIVE OR RATE

19.

I/D

INVERSE DERIVATE

RESET FOR
LATCH TYPE
SOLENOID
(FDR16)

20.

AS REQUIRED

UNCLASSIFIED

USED FOR SINGLE - INPUT RELAY.

**

USED FOR RELAY TWO OR MORE INPUTS.

SUMMATION
(FDR17)

MULTIPLY
(FDR18)

1:1

BOOST
(FDR19)

HIGH
SELECTION
(FDR20)

I
P

P
I

CURRENT TO
PNEUMATIC
TRANSDUCER
(FDR21)
PNEUMATIC
TO CURRENT
TRANSDUCER
(FDR22)

A 05/08/10 ISSUED FOR REVIEW


REV

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

LOW
SELECTION
(FDR24)

SHELL CANADA
QUEST CCS PROJECT

A
R

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

UNIT 200 - COMMON


FUNCTION DESIGNATIONS
SCALE: NONE
SHELL DWG NO.:

200.0000.000.041.010

REV.

FILE:\\F:\1025\DRAWINGS\UTILITIES\200\200.010.pid MODEL DATE:1/5/2011 10:21:29 AM BY:ahm14887

TXT

FRONT PANEL INSTRUMENT


(INSTR2)

200.010

TXT
NO.

1
NOTES:

DEMISTER
CENTRIFUGAL
COMPRESSOR
WITH GUIDE VANES
(COMPC)

RECIPROCATING PUMP
(PMPRECIP)

STEAM TURBINE
(STMTUR)

DISTRIBUTOR
TROUGH & TRAY
LIQUID SPRAY
(PERFORATED)

VERTICAL
VESSEL
BASIC SYMBOL
(VES)

LIQUID SPRAY
(NOZZLE)

TOTAL DRAW-OFF
VACUUM PUMP
(PMPVAC)

PARTIAL DRAW-OFF

TURBINE WITH
PNEUMATIC
SPEED CONTROL
(STMTURPN)

SPHERE
(SPHERE)

CHIMNEY

TOP SUCTION/DISCH. PUMP


(PMPTT)

HALF PIPE
MANWAY
(MANWAY)

CENTRIFUGAL FAN
OR BLOWER
(CFB)

HIGH SPEED
CENTRIFUGAL
PUMP
(PMPHSC)

VANE TYPE INLET


(HORIZONTAL)
VESSEL
SWAGED
(VESSWG)

VANE TYPE INLET


(VERTICAL)

RECIPROCATING
COMPRESSOR
(RCOMP)

DIFFUSER

OPEN TANK
(TKOPEN)

CONICAL ROOF TANK


(TK)

CYCLONE

CENTRIFUGAL CANNED PUMP


(PMPCCAN)

TRAYS

SHELL & TUBE


(HORIZONTAL)
(STHORIZ)

PACKED SECTION

REDISTRIBUTION
(LIQUID/LIQUID)

TRAY WITH
DOWNCOMERS

REDISTRIBUTION
(GAS/LIQUID)

1) SINGLE PASS

BAFFLE WITH
PARTITION

OPEN TOP FLGATER


(TKOPF)

INTERNAL FLGATER
(TKGF)

CETRIFUGAL SIDE
IN/OUT BETWEEN
BEARING PUMP

DOLLAR PLATE

GENERAL
GRID
SIEVE
VALVE
BUBBLE CAP

ROTARY LOBE
BLOWER (RLB)

VERTICAL IN-LINE
CANNED PUMP
(PMPICAN)

VORTEX BREAKER

DOUBLE PIPE
(DPIPE)
INTERNALS WHEN DRAWN TO BE DASHED

EXAMPLES:
METERING PUMP
(PMPMETER)

2) TWO PASSES

INDICATION OF
POINT OF CHANGE

NON-INTEGAL
GEAR BOX
(GEARBOX)
VENDOR

INJECTION PUMP
(PMPINJEC)

KETTLE REBOILER
(REBOIL)

FIRED HEATER DEPICTION


(HTRFIRE)

M
ELEVATION FROM
FINISHED SURFACE
AT GRADE

VERTICAL SUMP PUMP


(PMPSUMP)

1. ALL EQUIPMENT SHALL BE REPRESENTED BY A TAG NUMBER. COMPOSED OF A


LETTER PLUS A NUMBER. THE FIRST THREE DIGITS OF WHICH ARE THE PLANT
NUMBER AND THE FINAL TWO DIGITS ARE A NUMBER RUNNING CONSECUTIVELY
FROM 01 FOR EACH GROUP OF EQUIPMENT.
2. WHERE A CHOICE BETWEEN TWO OR MORE LETTERS HAS TO BE MADE THE MORE
IMPORTANT FUNCTION SHOULD PREVAIL FOR EXAMPLE, IF A JET IS USED FOR
MIXING PUPPOSES, Mx IS USED OVER I.
3. DRIVERS ARE NUMBERED BY THE DRIVER EQUIPMENT AND TYPE OF DRIVER.
E.G. EM-MOTOR FOR AIR COOLER, CT-TURBINE MOTOR FOR AIR COOLER,
CT -TURBINE FOR COMPRESSOR, PM-PUMP MOTOR, EF-AIR COOLER FAN.

LETTER OF
GROUP

DECSRIPTION

FIRED BOILERS

COMPRESSORS & BLOWERS


LIQ RING VAC PUMP

CG

COMPRESSOR GEARS

CT

COMPRESSOR TURBINE

CM

COMPRESSOR MOTOR

EXCHANGERS, HEAT TRANSFER EQUIPMENT

EG

EMERGENCY GENERATOR

EM

EXCHANGER MOTOR

ER

EMERGENCY EQUIPMENT.

AIR COOLER FANS AND


COOLING TOWER FANS

GENERATORS

GT

GAS TURBINE GENERATOR

FIRED HEATERS, INCINERATORS

JETS (INJECTORS & EJECTORS)

MOTORS

ME

ELECTRIC MOTORS

MF

FAN MOTOR

MM

MIXER MOTORS

Mx

MIXERS, AGITATORS

PUMPS

PG

PUMP GEARS

PM

PUMP MOTORS

PT

PUMP TURBINE

SPECIAL (SILENCERS, STACKS, PACKAGE UNITS


DETONATION ARRSTOR FLAME ARRSTOR, STATIC
MIXER STRAINER, SUMP)

3) CALMING
SECTION
CHANGE IN
RESPONSIBILITY

PACKED COLUMN
BASIC SYMBOL

ST

STEAM TURBINE

PLATE & FRAME


(PLATEEXCH)

TURBINE

Tk

TANKS (ATMOSPHERIC)

VESSELS INCLUDING COLUMNS, PRESSURE


STORAGE & FILTERS

HIC

STATIONARY TRANSPORT EQUIPMENT

XM

STATIONARY TRANSPORT EQUIPMENT MOTOR

XZ

BULK LOADING ARM MOTOR

BULK LOADING ARMS

FORCED DRAFT SINGLE (COOLER)


BAY AIR COOLER

SEPARATE
CONVECTION COIL

(LOUVERS AS REQUIRED)

LOADING ARM
(LOADARM)

TRUCK LOADING
STATION
(TRKLOAD)

FILTER (FLT)

15
14

VFD

VERTICAL CYLINDRICAL NATURAL


DRAFT FURNACE WITH SEPARATE
(HORIZONTAL OR CROSS FLOW)
CONVECTION SECTION

VARIABLE/SINGLE SPEED
MOTOR SHOWN AS REQUIRED
VFD_VARIABLE FREQUENCY
DRIVE

TYPICAL ARRANGEMENT SHOWN


ACTUAL SYMBOL TO CONFIRM TO
CORRECT CONFIGURATION

TYPICAL ARRANGEMENT SHOWN


ACTUAL SYMBOL TO CONFIRM TO
CORRECT CONFIGURATION

TRAYED COLUMN
BASIC SYMBOL
TRAY NUMBERS
FROM BOTTOM

EJECTOR/INJECTOR
EDUCTOR
BASIC SYMBOL
(EJECTOR)
OIL MIST
DISTRIBUTION
BLOCK WITH 2
RECLASSIFIERS.
ADD RECLASSIFIERS
AS REQUIRED.
(OILMIST)

IN-LINE STATIC MIXER


(INMIX)
TANK MIXER
(TKMIX)
ELECTRIC MOTORS
AC MOTOR
*VFD FOR VARIABLE
FREQUENCY DRIVE
(EM)

AIR
ELIMINATOR
(AIREL)

4. EQUIPMENT NUMBERING ON FLOW DAIGRAMS SHOULD PREFERABLY BE DONE


FROM LEFT TO RIGHT.
EXAMPLE OF EQUIPMENT NUMBERING: V-41101.
V-EQUIPMENT DESIGNATION (REFER TO PARAGRAPH 1) 41101- VESSEL
No. 01 IN PROCESS UNIT 411.
EQUIPMENT SPARING WILL BE SHOWN AS FOLLOWS:
EXAMPLE: (PUMP) P-41112A, B, C, ETC.
ANY EXISTING EQUIPMENT WHICH IS TO BE REPLACED WITH NEW
EQUIPMENT IN THE SAME SERVICE WILL RETAIN ITS OLD EQUIPMENT
NUMBER WITH THE EXCEPTION THAT A "R" WILL BE ADDED TO THE
END. IE) E-42011 WILL BECOME E-42011R.
ANY EQUIPMENT THAT IS BEING COMPLETELY REMOVED FROM SERVICE
WILL HAVE ITS NUMBER RETIRED AND NOT REUSED FOR OTHER EQUIPMENT.
FOR REUSED EQUIPMENT IN THE SAME UNIT, THE EQUIPMENT NUMBER
WILL STAY THE SAME AND THE SERVICE DESCRIPTION WILL CHANGE.
REUSED EQUIPMENT TO BE USED IN A DIFFERENT UNIT WILL RECEIVE A
NEW EQUIPMENT NUMBER AND SERVICE DESCRIPTION, THAT IS
CONSISTENT WITH THE UNIT THAT IT IS BEING INSTALLED IN.

REV

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

SHELL CANADA
QUEST CCS PROJECT

STEAM DRUM

ROTATING DISC
CONTACTOR

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

MUD DRUM
SHELL & TUBE
VERTICAL
(OVHD_EXCH)

SYNCHRONOUS MOTOR
*DC FOR DC MOTORS
(EMDC)

ADDITIONS / MODIFICATIONS

A 05/08/10 ISSUED FOR REVIEW

TIC

MAP
AV

ROTARY SCREW
COMPRESSOR (COMPROTS)

T.L. ELEV. (TYP.)

24
ROTARY SCREW
PUMP (PMPROTS)

SWIRL DECK

VORTEX BREAKER
(VORTEX)

MULTISTAGE
PUMP
(PMPMULTI)

1. AUTOCAD BLOCK NAMES ARE SHOWN IN ROUND BRACKETS UNDER THE SYMBOL
DESCRIPTION.

UNIT 200 - COMMON


FLOW DIAGRAM SYMBOLS FOR EQUIPMENT

SHELL & TUBE


VERTICAL THERMOSYPHON
(VERT_THER)

SCALE: NONE
SHELL DWG NO.:

200.0000.000.041.011

REV.

FILE:\\F:\1025\DRAWINGS\UTILITIES\200\200.011.pid MODEL DATE:2/1/2011 5:51:43 PM BY:ahm14887

CENTRIFUGAL PUMP
(PMPCENT)

SCHOEPENTOETER
HORIZONTAL
VESSEL
WITH BOOT
(VESBOOT)

IDENTIFICATION OF EQUIPMENT

200.011

VERTICAL IN-LINE PUMP


(PMPINL)

3
P

PIPING
INSTR.

PIPING
INSTR.

3/4"

PI
7

3/4"

SAMPLE BOMB
(BY SHELL)

S-3

3/4"

3/4"

3/4"

3/4"

3/4"

3/4"

3/4"

SOUR LIQUIDS (SOUR WATER AMINE)


BELOW 45C

17

S-2

S-3

S-4

S-2

S-3

S-4

S-4A

FL

S-8

S-4A

SWEET/SOUR HYDROCARBON GAS/LIQUID


BELOW 45C

HYDROCARBONS
45C AND ABOVE

LIQUID HYDROCARBONS
BELOW 45C

SWEET/SOUR HYDROCARBON GAS/LIQUID


BELOW 45C

S-1

LIQUID HYDROCARBONS AND WATER


BELOW 45C

S-8

17

3/4"

S-1

SAMPLE BOTTLE
(BY SHELL)

S-4A

SWEET/SOUR HYDROCARBON GAS/LIQUID


BELOW 45C

17

FL

MAIN LINE CLASS

S-4

HYDROCARBONS
45C AND ABOVE

17

3/4"

MIN.
3/4"

3/4"
CWS

3/4"

FL
MAIN LINE CLASS

AU

16

13

SAMPLE BOMB
(BY SHELL)
3/4"

16

LIQUID HYDROCARBONS
BELOW 45C

3/4"

7
PI

S-2

PI

CWR

13

LIQUID HYDROCARBONS AND WATER


BELOW 45C

PIPING
INSTR.

3/4"

5
3/4"

3/4"

10

PIPING
INSTR.

SHORT NIPPLE AND CAP

S-1

PIPING
INSTR.

3/4"

3/4"

TG

P&ID WILL SHOW

PIPING
INSTR.

PI

16

LOWER PRESSURE
SIDE CLASS
MAIN LINE
CLASS

PIPING
INSTR.

1. SEE DRAWING 200.0000.000.041.007, 008, 009, 010, & 011 FOR SYMBOL
IDENTIFICATION AND GENERAL NOTES.
2. ARRANGEMENT S-1 TO BE USED ONLY WHERE THE SAMPLING VALVE CAN BE
WELDED DIRECTLY TO A NORMALLY FLOWING LINE IN AN ACCESSIBLE LOCATION.
TO BE CONFIRMED IN EPC.
3. BRIDGE WELD ALL ROOT VALVES TO THE MAIN LINE EXCEPT IN ARRANGEMENT
LOCATION. TO BE CONFIRMED IN EPC.
4. SEWER CHOICE PER AVAILABILITY.
5. SAMPLE COOLER MODEL NO. LATER.
6. ALL SAMPLE POINTS TO BE LOCATED AT GRADE. WHERE POSSIBLE, INCORPORATE
SAMPLE POINT WITH ANALYZER CONDITIONING TO REDUCE ADDITIONAL COOLING,
ETC. WHERE POSSIBLE, SAMPLES TO BE COOLED BELOW 45C FOR PERSONNEL
PROTECTION.
7. PRESSURE LIMIT FOR SNAP- ON SAMPLE BOMB FITTINGS IS 45 MPa AT 65C. FOR
HIGHER PRESSURES USE DIRECT SCREWED BOMB CONNECTIONS.
8. SAMPLE CONNECTION ON TOP OF HORIZONTAL LINE FOR GAS. SAMPLE
CONNECTION ON SIDE OF HORIZONTAL LINE FOR LIQUID SAMPLE.
9. DELETE SECOND VALVE WHEN ROOT VALVE IS ACCESSIBLE FROM THE SAMPLE
VALVE.
10. THE TYPE OF FITTING (SOCKOLET OR WELDOLET WITH FLANGE) AND THE FIRST
VALVE OR VALVES AT THE MAIN LINE SHALL BE AS PER VENT (OR DRAIN)
REQUIREMENTS FOR THE MAIN LINE PIPING CLASS. SEE SPECIFICATION
245.0311.035.005.
11. THE STEEL CABINET IS TO BE COMPLETE WITH AN INTEGRALLY MOUNTED AIR
EJECTOR. THE FRONT WALL TO BE A CLEAR PLASTIC DOOR. PROVIDE SLOTS IN
THE FLOOR FOR VENTILATION. SEVERAL SAMPLING CONNECTIONS CAN BE BROUGHT INTO THE SAME CABINET. HOWEVER EACH CONNECTION MUST HAVE ITS
OWN SPIGOT TO PREVENT CONTAMINATION.
12. ISOKINETIC SAMPLE PROBE (JONAS) REQUIRED FOR STEAM SAMPLE.
13. SAMPLE LINE PIPING CLASS SHALL CORRESPOND TO THE PIPING CLASS OF THE
MAIN LINE.
14. DO NOT MANIFOLD MORE THAN ONE SAMPLE LINE TO ONE COOLER TO PREVENT
CONTAMINATION.
15. ADD APPROPRIATE WINTERIZATION AND PERSONNEL PROTECTION.
16. SAMPLING VALVES MUST BE CLOSE CONNECTED TO FAST LOOP (SAMPLING
BYPASS).
17.
ANY DEVICE OR INSTRUMENT THAT CREATES A PRESSURE DROP
P
TO ASSURE OF SUFFICIENT FLOW THROUGH THE FAST LOOP.
P&ID SYMBOL MAY VARY ACCORDING TO DEVICE BEING USED.

MIN. 8m
ABOVE GRADE

NC

13

(TYPICAL FOR ALL TYPES)

VA

NO

NO

PIPING
INSTR.

NO

NO

PIPING
INSTR.

PIPING
INSTR.

3/4"

S-8

SWEET/SOUR HYDROCARBON GAS/LIQUID


BELOW 45C

SOUR LIQUIDS (SOUR WATER AMINE)


BELOW 45C

75
8

3/4"

3/4"

3" BLIND
FLANGE

3/4" PIPE

PIPING
INSTR.

3/4" VALVE

3/4"

CWR

CWS

PIPING
INSTR.

5
CWR

CWR
3/4"

2" AND SMALLER


45

IG

PI
PI

3/4"

FLOW

16

3/4"

TG

LOWER PRESSURE
SIDE CLASS
MAIN LINE
CLASS

PIPING
INSTR.

3/4"

3/4"

MIN. 8m
ABOVE GRADE
AND AWAY FROM
OPERATING
PLATFORM

TO SAMPLE COOLER

3/4"

VA

3/4"

PIPING
INSTR.

PIPING INSTR.

NO

PIPING
INSTR.

NO

3/4"

MIN. DISTANCE
FOR ACCESS

TG

AU
16

13

3/4"

APPLICATION AND DESCRIPTION

SAMPLE POINT
ACTUAL DETAIL ARRANGEMENT

SEE DETAIL
TO RIGHT

NO

FLOW

12

3/4"

13

7
3/4"
FL

3/4"

3/4"

11
SAMPLE BOTTLE
(BY SHELL)

CWS
3/4" VALVE

SAMPLE BOMB
(BY SHELL)

CWS

MAIN LINE CLASS

MIN.

B
S-9

S-12

SOUR LIQUIDS (SOUR WATER AMINE)


45C AND ABOVE

17

17

SWEET/SOUR HYDROCARBON GAS/LIQUID


45C AND ABOVE

17

A 05/08/10 ISSUED FOR REVIEW

S-5

S-9

S-5

S-9

STEAM AND CONDENSATE


ABOVE 45C

SOUR LIQUIDS (SOUR WATER AMINE)


45C AND ABOVE

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

3/4"

3/4"

3/4"

3/4"

REV

3/4"

S-12

S-12
SWEET/SOUR HYDROCARBON GAS/LIQUID
45C AND ABOVE

SHELL CANADA
QUEST CCS PROJECT

A
R

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

UNIT 200 - COMMON


STANDARD DETAIL - SAMPLING SYSTEMS
SCALE: NONE
SHELL DWG NO.:

200.0000.000.041.012

REV.

200.012

P&ID WILL SHOW

STEAM AND CONDENSATE AND HOT WATER


ABOVE 45C

FILE:\\F:\1025\DRAWINGS\UTILITIES\200\200.012.pid MODEL DATE:2/1/2011 4:15:06 PM BY:ahm14887

S-5

12

3/4"

SAMPLE POINT
ACTUAL DETAIL ARRANGEMENT
APPLICATION AND DESCRIPTION

NO

NO

FIELD MOUNTED PRESSURE INSTRUMENT (PG, PT, PS, PP)


EACH PRESSURE DIFFERENTIAL TAP IS AS SHOWN.

INST.
PIPING

PIPING SPECS
(UAB, UAZ, UAY, UJB, ULB)

ALL PIPING CLASSES

X"

3/4"

X"

3/4"
X"

3/4"

3/4"

INST.
PIPING

INST.
PIPING

PIPING CLASSES
(150#, 300#, 600#)

PIPING CLASSES
(900#, 1500#, 2500#)

INST.
PIPING

3/4"

PURGE

ALL PIPING CLASSES

BLEED

X"

1/2"

X"

3/4"

BLEED

X"

3/4"

INST.
PIPING

INST.
PIPING

X"

1/2"
PURGE

BLEED

1/2"

X"

INST.
PIPING

BLEED

1/2"

1. FOR GENERAL NOTES AND DETAILS SEE DWGS. 245.0311.000.053.005, 006, 007,
008, 009, 010, 011, 012, 013, 018 AND 019.
2. LEGEND:
3/4"
- 3/4" 'PHOENIX' DOUBLE BLOCK & BLEED GAUGE VALVE.
1/2"
- 1/2" 'SWAGELOK' DOUBLE BLOCK & BLEED GAUGE VALVE.
3. EXCEPT PIPING SPECS, UAB, UAZ, UAY, UJB, ULB.
4. PIPING/INSTRUMENTATION SCOPE BREAKS ARE NOT TO BE SHOWN ON THE P&ID'S.
DETAILS ON THESE CONNECTIONS SHOW IMPLIED BREAKS.

PURGE

PIPING CLASSES
(150#, 300#, 600#)

PIPING CLASSES
(900#, 1500#, 2500#)

FIELD MOUNTED TEMPERATURE INSTRUMENT (TG, TT)


INST.
PIPING

1"

1"

INST.
PIPING
3/4"

3/4"

TT

2"

2"

TT

PIPING CLASSES
(150#, 300#, 600#)

1-1/2"

PIPING CLASSES
(900#, 1500#, 2500#)

TT

INST.
PIPING

PIPING SPECS
(150#, 300#, 600#, 1500#)

PIPING SPECS WITH


THREADED CONNECTION

INST.
PIPING

PIPING SPECS
(1500#, 2500#)

ANALYZER CONNECTIONS
AT

3/4"

PIPING
INST.

X"x3/4"

PIPING
INST.

X"x3/4" 3/4"

PIPING SPECS
(UAB, UAZ, UAY, UJB, ULB)
(FOR VESSEL CONNECTION)

AT

2"

PIPING CLASSES
3
(150#, 300#, 600#, 900#, 1500#)
(FOR VESSEL CONNECTION)

2"

INST.
PIPING

PIPING SPECS
(150# TO 2500#)

INST.
PIPING

PIPING SPECS
(900# TO 2500#)

A 05/08/10 ISSUED FOR REVIEW


3/4"

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

PIPING
INST.

X"x3/4"

REV

PIPING CLASSES
(150#, 300#, 600#, 900#, 1500#)
(FOR VESSEL CONNECTION)

SHELL CANADA
QUEST CCS PROJECT

A
PURGE
IF REQUIRED
3/4"

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

PIPING
INST.

UNIT 200 - COMMON


PRESSURE INSTRUMENT CONNECTION DETAILS

PIPING CLASSES
(1500#, 2500#)
(FOR VESSEL CONNECTION)

SCALE: NONE
SHELL DWG NO.:

200.0000.000.041.013

REV.

200.013

X"x3/4"

FILE:\\F:\1025\DRAWINGS\UTILITIES\200\200.013.pid MODEL DATE:2/1/2011 4:13:45 PM BY:ahm14887

PURGE

LEVEL OR D/P INSTRUMENT ON VESSEL (PDT, LT,LTE)

D
X"

3/4"

3/4"

INST.
PIPING

1/2"

PIPING
INST.

ALL PIPING CLASSES


(150#, 300#, 600#, 900#, 1500#)

1/2"

3"

3"

3. EXCEPT PIPING SPECS, UAB, UAZ, UAY, UJB, ULB.


4. PIPING/INSTRUMENTATION SCOPE BREAKS ARE NOT TO BE SHOWN ON THE P&ID'S.
DETAILS ON THESE CONNECTIONS SHOW IMPLIED BREAKS.

INST.
PIPING

BLEED

PIPING CLASSES
(150#, 300#, 600#)

3"

- 1/2" "SWAGELOK" DOUBLE BLOCK & BLEED GAUGE VALVE.

3"

BLEED
PIPING SPECS
(UAB, UAZ, UAY, UJB, ULB)

3"

1/2"

3"

PIPING
INST.

X"x3/4" 3/4"

3/4"

3"

3"

PIPING
INST.

1/2"

3/4"

3/4"

X"

3/4"

X"x3/4" 3/4"

BLEED
PIPING
INST.

1/2"

PIPING
INST.

PIPING
INST.

BLEED

1. FOR GENERAL NOTES AND DETAILS SEE DWGS 245.0311.000.053.005, 006, 007,
008, 009, 010, 011, 012, 013, 018 AND 019.
2. LEGEND:
3/4"
- 3/4" "PHOENIX" DOUBLE BLOCK & BLEED GAUGE VALVE.

PIPING CLASSES
(600# H2 SERVICE, 900#, 1500#)

3/4"

3"

3"

3"

3"

1/2"

X"

PIPING
INST.

PIPING
INST.

1/2"

PURGE

3/4"

BLEED

INST.
PIPING

4
X"

3/4"

3/4"

INST.
PIPING

PURGE

BLEED
PIPING CLASSES
(150#, 300#, 600#, 900#, 1500#)

PIPING CLASSES
(1500# , 2500#)

PIPING
INST.

3/4"

3"

3"

3"

3"

1/2"

3/4"

PURGE

PIPING
INST.

1/2"

BLEED

PURGE
IF REQUIRED
X"

INST.
PIPING

4
X"

3/4"

3/4"

INST.
PIPING

PURGE
IF REQUIRED

PURGE

BLEED
PIPING CLASSES
(1500#, 2500#)

PIPING CLASSES
(1500#, 2500#)

(1500#, 2500#)
WITH UTILITY CONNECTION

PIPING
INST.
3/4"

3/4"
2"

2"

MAG/
CAPACITANCE/
GUIDED WAVE

PIPING
INST.
3/4"

PIPING
INST.
3/4"

3/4"

PIPING CLASSES
(600# H2 SERVICE, 900#, 1500#)

REV

ISSUED
DATE

DESCRIPTION

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

PURGE

1/2"

3/4"
V

2"

3/4"

2"

SHELL CANADA
V

QUEST CCS PROJECT

INST.
PIPING

2"

BLEED

PIPING
INST.

INST.
PIPING

3/4"

2"

PIPING CLASSES
(600# H2 SERVICE, 900#, 1500#)

2"

2"

PIPING CLASSES
(150#, 300#, 600#)

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

UNIT 200 - COMMON


LEVEL INSTRUMENT CONNECTION DETAILS
SCALE: NONE
SHELL DWG NO.:

200.0000.000.041.014

REV.

200.014

3"

GWR

3/4"

3"

GWR
PIPING
INSTR.

3"

PIPING SPECS
(UAB, UAZ, UAY, UJB, ULB)

BY

FILE:\\F:\1025\DRAWINGS\UTILITIES\200\200.014.pid MODEL DATE:2/1/2011 4:13:08 PM BY:ahm14887

PIPING CLASSES
(150#, 300#, 600#)

PIPING
INST.

3"

3/4"

1/2"

3/4"

3"

PIPING CLASSES
(150#, 300#, 600#)

2"

PIPING
INST.

BLEED

PIPING
INSTR.

PURGE

1/2"

PIPING
INST.

PURGE

2"

BLEED

3"

3"

2"

PIPING SPECS
(UAB, UAZ, UAY, UJB, ULB)

3/4"

1/2"

3/4"
3"

2"

MAG/
CAPACITANCE/
GUIDED WAVE

A 05/08/10 ISSUED FOR REVIEW

BLEED
PURGE

2"

3/4"

INST.
PIPING

3/4"

PURGE
IF REQUIRED

2"

3/4"

2"

PIPING
INST.

2"

2"x3/4"

MAG/
CAPACITANCE/
GUIDED WAVE

PIPING
INST.
3/4"

2"

3/4"

X"x2"

3/4"

X"x3/4"

PIPING
INST.

3/4"

IF REQUIRED
PURGE

PIPING
INST.

LEVEL INSTRUMENT (LG/LT, LS)

ORIFICE FLANGE - MOUNTED FLOW MEASUREMENT (FT)


FT

FT
1. FOR GENERAL NOTES AND DETAILS SEE DWGS. 245.0311.000.053.005, 006, 007
008, 009, 010, 011, 012, 013, 018 AND 019.
2. LEGEND:
3/4"
- 3/4" "PHOENIX" DOUBLE BLOCK & BLEED GAUGE VALVE.
1/2"
- 1/2" "SWAGELOK" DOUBLE BLOCK & BLEED GAUGE VALVE.
3. PIPING/INSTRUMENTATION SCOPE BREAKS ARE NOT TO BE SHOWN ON THE P&ID'S.
DETAILS ON THESE CONNECTIONS SHOW IMPLIED BREAKS.

3/4"

INST.
PIPING

PIPING
INST.

INST.
PIPING

3/4"

PIPING
INST.

INST.
PIPING

3/4"

3/4"

3/4"

INST.
PIPING
PIPING
INST.

1/2" OR 3/4"

1/2" OR 3/4"

INST.
PIPING

3/4"

FT

PIPING
INST.

FE

FT

PIPING CLASSES
(150#, 300#, 600#, 900#)

PIPING CLASSES
(1500#, 2500#)

VENTURI - MOUNTED FLOW MEASUREMENT (FT)


FT
FT
PURGE
IF REQUIRED

FE

1/2" OR 3/4"

1/2" OR 3/4"

INST.
PIPING

PIPING
INST.

INST.
PIPING

PIPING
INST.

PIPING
INST.

3/4"

PURGE
IF REQUIRED

3/4"

INST.
PIPING

PIPING
INST.

FE

PIPING CLASSES
(1500#, 2500#)

PIPING CLASSES

FT

FT

3/4"

PIPING
INST.

FE

PIPING
INST.

PURGE
IF REQUIRED
PIPING
INST.

3/4"

1/2" OR 3/4"

INST.
PIPING

3/4"

PURGE
IF REQUIRED

INST.
PIPING

3/4"

1/2" OR 3/4"

INST.
PIPING

WEDGE - MOUNTED FLOW MEASUREMENT (FT)

PIPING
INST.
FE
FT

PIPING CLASSES
PIPING CLASSES
(150#, 300#, 600#, 900#, 1500#)
FT

FT

FT

PIPING
INST.

X"

PIPING
INST.

2"

1/2"

2"

3/4"

INST.
PIPING

2"

1/2"

2"

2"
PIPING
INST.

INST.
PIPING

BLEED

3/4"

3/4"

FE

BLEED

X"

BLEED

3/4"

PIPING
INST.

3/4"

3/4"

PIPING
INST.

INST.
PIPING

1/2"

2"

INST.
PIPING

2"

PIPING
INST.

1/2"

2"

BLEED

3/4"

3/4"

INST.
PIPING

A 05/08/10 ISSUED FOR REVIEW

PIPING
INST.

FE

REV

FE

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

PIPING CLASSES
(150#, 300#, 600#)

INST.
PIPING

PIPING
INST.
3/4"

3/4"

PURGE

X"

BLEED

BLEED

3/4"

INST.
PIPING

3/4"
PURGE

PIPING
INST.

1/2"

PURGE

BLEED

QUEST CCS PROJECT

A
PURGE

PIPING
INST.

X"

FE

FE

PIPING CLASSES
(150#, 300#, 600#)

PIPING CLASSES
(900#, 1500#)

FT

SHELL CANADA

3/4"

PIPING
INST.

PIPING CLASSES
(150#, 300#, 600#, 900#, 1500#)

1/2"

PIPING
INST.

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

UNIT 200 - COMMON


FLOW ELEMENT CONNECTION DETAILS
SCALE: NONE
SHELL DWG NO.:

200.0000.000.041.015

REV.

200.015

3/4"

PIPING CLASSES
(900#, 1500#)

1/2"

2"

BLEED

PIPING
INST.

INST.
PIPING

2"

PIPING
INST.

FE

1/2"

2"

INST.
PIPING

2"

INST.
PIPING

3/4"

FT

3/4"

FT

3/4"

3/4"

PIPING CLASSES
(1500#, 2500#)

FILE:\\F:\1025\DRAWINGS\UTILITIES\200\200.015.pid MODEL DATE:2/1/2011 4:12:18 PM BY:ahm14887

FT

WEDGE - MOUNTED FLOW MEASUREMENT (FT)


1. FOR GENERAL NOTES AND DETAILS SEE DWGS 245.0311.000.053.005, 006, 007,
008, 009, 010, 011, 012, 013, 018 AND 019.
2. LEGEND:
3/4"
- 3/4" "PHOENIX" DOUBLE BLOCK & BLEED GAUGE VALVE.

FT

1/2"
INST.
PIPING

BLEED

2"

BLEED

3. PIPING/INSTRUMENTATION SCOPE BREAKS ARE NOT TO BE SHOWN ON THE P&ID'S.


DETAILS ON THESE CONNECTIONS SHOW IMPLIED BREAKS.

1/2"
2"

1/2"

PURGE
IF REQUIRED
2"

2"

PURGE
IF REQUIRED

- 1/2" "SWAGELOK" DOUBLE BLOCK & BLEED GAUGE VALVE.

PIPING
INST.

X"

FE

PIPING CLASSES
(1500#, 2500#)

FT

FT

BLEED

BLEED

BLEED

BLEED

INST.
PIPING

1/2"

1/2"

1/2"

1/2"

BLEED

BLEED

BLEED

BLEED

3/4"

3/4"

2"

3/4"

3/4"

3/4"

3/4"
2"

2"

3/4"

INST.
PIPING
2"

1/2"

3/4"
2"

1/2"

2"

1/2"

2"

1/2"

FT

2"

FT

X"

PIPING
INST.

PIPING
INST.

FE

FE

PIPING CLASSES
(150#, 300#, 600#)

FT

PIPING CLASSES
(900#, 1500#)

FT

1/2"

1/2"

1/2"

1/2"

BLEED

BLEED

BLEED

BLEED

3/4"

3/4"

FT

INST.
PIPING

PURGE

PURGE

FT

1/2"

1/2"

1/2"

1/2"

BLEED

BLEED

BLEED

BLEED

3/4"

3/4"

3/4"

3/4"

PURGE

PURGE

X"

PIPING
INST.

PURGE

3/4"

PURGE

INST.
PIPING
3/4"

PURGE

PURGE

X"

PIPING
INST.

PIPING
INST.

FE

FE

PIPING CLASSES
(150#, 300#, 600#)

FT

A 05/08/10 ISSUED FOR REVIEW

PIPING CLASSES
(900#, 1500#)

REV

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

FT

1/2"

1/2"

1/2"

1/2"

BLEED

BLEED

BLEED

BLEED

3/4"

3/4"

PURGE
IF REQUIRED

X"

PIPING
INST.

3/4"

PURGE
IF REQUIRED

PURGE
IF REQUIRED

INST.
PIPING
3/4"

SHELL CANADA

PURGE
IF REQUIRED

QUEST CCS PROJECT

A
R

X"

PIPING
INST.

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

UNIT 200 - COMMON


FLOW ELEMENT CONNECTION DETAILS

FE

SCALE: NONE
SHELL DWG NO.:

PIPING CLASSES
(1500#, 2500#)

200.0000.000.041.016

REV.

200.016

PIPING
INST.

FILE:\\F:\1025\DRAWINGS\UTILITIES\200\200.016.pid MODEL DATE:2/1/2011 4:06:58 PM BY:ahm14887

PIPING
INST.

1. SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.

HOA(TOA)

HIS

HOA(TOA)

SIS

ES

WINDING TEMP

SIS

VIB

VIB

VIB

TEMP

TEMP

TEMP

MCC

HOA(TOA)

VIB

TEMP

NON DCS STARTER CONTROL

DCS VFD CONTROL

HOA(TOA)

HIS

HS

HSZ

A/B

HIS

HOA(TOA)

HOA(TOA)

HOA(TOA)
HS

SIS

SIS
CONTROL

CONTROL

MONITORING

MONITORING

B
MCC

ES

WINDING TEMP

MCC
WINDING TEMP

ES

HS

VIB

VIB

VIB

VIB

TEMP

TEMP

TEMP

TEMP

REV

'A' MOTOR

12/02/10

ISSUED FOR CLIENT REVIEW


ISSUED FOR PRELIMINARY REVIEW

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

'B' MOTOR

DCS STARTER CONTROL

SHELL CANADA
QUEST CCS PROJECT

A
R

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

SCALE: NONE
SHELL DWG NO.:

200.0000.000.041.XX1

REV.

200.XX1

UNIT 200 - COMMON

FILE:\\F:\1025\DRAWINGS\UTILITIES\200\200.XX1.pid MODEL DATE:2/2/2011 2:35:55 AM BY:bes29451

VFD

WINDING TEMP

MONITORING

CONTROL
ES

MOTOR RUN STATUS

HS

3/4"

3/4"

ANTI-FOAM

ET 10
38

3/4"-KP-246005-PJG(0.4)

246.014

12286

ET 10 FREE DRAINING
38

ET 10
38

TO V-24218

FROM P-24606
10

LEAN AMINE FLOW SIGNAL


246.011

FREE DRAINING
CSO

12039

3/4" 3/4"

3/4"-KP-241001-PJG(0.4)

240.030
FL

6"-FL-241020-PAC

PAC
HJE(0.4)

S-4

12967

6"x3"

2"-P-241057-HJE(0.4)

SP
001

3/4" 3/4"

242.021

12981

TO UC-246002

I
104

HH

TT
030

16"-P-246080-DAG
LEAN AMINE

12"-P-241061-DAG
1-1/2"

16"x12" ET 10
50

246.011

12642

ET 10
50

241.022

TO V-24119

12 . VALVES ARE FOR BATTERY LIMIT ISOLATION OF UNIT.


13 . TOP CONNECTION.

12"

4"

PJG(0.4)
DAG

MP-001

DETAIL 'A'
SP
007

FV
075

12"x8"

HOLDS:

12"-P-241062-DAE

MIN
12"-P-241063-DJE(0.4) 16"x12"

36"
MW

16"

12"x8" FC
D

3"

PDT
064

8"

V-24118

3"

NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.


INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
DETAILS FOR INJECTION QUILL TO BE FINALIZED.
SAMPLE STATION SPECIALITY ITEM NUMBERS.
CONFIRM AVAILABILITY OF DCS AND SIS INTERLOCK SEQUENCE NUMBERS ADDED
FOR QUEST.

25

LEAN AMINE
242.021

CSC

12633

14 . 316 STAINLESS STEEL INJECTION QUILL. OUTLET OF INJECTION QUILL TO BE


CENTERED IN PROCESS LINE.

8"

FO

3/4"

FROM P-24602A/B/C

FT
075
12

12055

FYE
075

3/4"

TI
030

H2 RAW GAS

3/4"

3/4"

FROM LX-246001

12"-P-241056-HJE(0.4)

DAE
DJE(0.4)

FC
075

246.002

E
451

DAG
DAE

SET POINT
12206

H
38

FREE DRAINING
10

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES AND CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "241" UNLESS OTHERWISE
STATED.
3 . BOTTOM OF COLUMN IS PACKED WITH 600 mm OF #2 RASCHIG RINGS.
4 . H2 RAW GAS BYPASS REQUIRED FOR SYSTEM PURGE AND PRESSURIZATION AT
START-UP.
5 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012.
6 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE.
7 . ELECTRIC TRACE TO HLL (ET 10).
8 . LOCALIZED DEGASSING OF CO2 MAY OCCUR AT RESTRICTIONS, BENDS, TEES,
ETC. RESULTING IN LOCALIZED TWO-PHASE FLOW AND VIBRATION.
9 . 316 SS HARDFACED TRIM MATERIAL IS REQUIRED FOR THIS CHECK VALVE.
10 . TWO CHECK VALVES IN SERIES, ONE IN THE HORIZONTAL AND ONE IN THE VERTICAL
POSITION, SEPARATED BY AT LEAST 500 mm.
11 . INADVERTANT SIMULTANEOUS CLOSING OF BOTH HV-014 AND HV-015 PREVENTED
BY INTERLOCK I-102

RV
023

CSO

ANTI-FOAM

3350 mm ID x 23400 mm T/T


3500 kPa-g @ 95 C / HV @ 150 C
CS + 3 mm 304L SS CLAD / 316L SS
H/
7
P-241080-HJE(0.4) (TOP)
P-241084-DJE(0.4) (BTM)

CSC

V-24118
AMINE ABSORBER 1
SIZE:
DESIGN PR. & TEMP:
MATERIAL(VESSEL/INTERNALS):
INSULATION TYPE/THK:
TRIM:

FIRE
1-1/2H3
SET@
3500 kPa-g

2"x1-1/2"

PDI
064

TO V-24218
12"-P-241074-DAG

DETAIL "A"
INJECTION QUILL

E
450
E
453

HZTE
015

I
104

FO
ET 38
75

I
102

12"x8" FO 12"x8"14"x12"

E
453

HIC
014

HZTE
014

TO HMU 1 PSA

HV
015

3"

3/4"

2"

SWING
ELBOW

2"

HHLL=4400 mm

NLL=2800 mm

24"
MW

2"

3"

LG
155

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

ISSUED
DATE

DESCRIPTION

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

2"-P-241065-DJE(0.4)

4"

12"x8"
3/4"

TT
031

XV
020

16"x12" 8"-P-241064-DJE(0.4)

16"

3/4"

FO

8"

6"

FC

LV
155

12

8"x6"

8"x6"

1-1/2"

FC
D

SHELL CANADA

8"-P-241064-DJE(0.4)
ET 10
50
8

QUEST CCS PROJECT

RICH AMINE
12635

242.021

TO E-24602A/B
TWO PHASE FLOW
R

VACUUM TRUCK

SP
004

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

UNIT 241 - HYDROGEN MANUFACTURING UNIT TRAIN 1


AMINE ABSORBER 1
SCALE: NONE
SHELL DWG NO.:

241.0000.000.041.021

REV.

241.021

S-9

4"-P-241066-DJE(0.4)
SP
003

BY

ISSUED FOR HAZOP

3/4"

4000 mm

3/4"

1"

XZTE
020

1"-SL-241XXX-SAB

TI
031

3/4"

3/4"

XYE
020

4"

12716

1"-SCL-241XXX-SAB

04/20/11

XZI
020

E
450

REV

A/S

3/4"

240.029
SCL

N/A
ET 10

ISSUED FOR PHA III

LLLL=300 mm

3"

12715

LI
155B

LT
155B

2"x3/4"
3"-SL-240020-SAB

LC
155

06/13/11

2"

SO

240.029
SL

LHS
155

MAG

3"

3/4"

3"

SWING
ELBOW

LI
155A

LT
155A

HLL=3500 mm

LLL=1900 mm

2"
3/4"

2"

DP

FILE:\\F:\1025\DRAWINGS\HMU\241\241.021.pid MODEL DATE:6/14/2011 1:17:48 PM BY:bes29451

2"

3/4"

2"

3/4"

3"

3"

3/4"

LL

GWR

3/4"

2"

HJE(0.4)
ULB

LTE
154

3/4" 3/4"

2"-GI-240022-ULB
START-UP

E
450

3/4"
D

CSC

E
451

PP

MIN

HH

3/4"

MIN
4

2"

18"

3/4"

FC

18"x14"

MIN

HV
014

SP
002

13

2"

FROM HMU 1

12717

241.022

3/4"

14"

ET 38
14"-P-241054-HJE(0.4)
75

240.028
GI

12054

24"
MW

3/4"

I
102

3/4"

241.009

BYPASS

H2 RAW GAS

HYE
014
FO

H2 RAW GAS

HIC
015

E
450

3"

11

FLOW

14"-P-241055-HJE(0.4)

14"x12"
8"

14

I
103

HYE
015
11

14"-P-241055-HJE(0.4)

PJG(0.4)
DAG

V-24119
ABSORBER 1 WASH WATER VESSEL
SIZE:
DESIGN PR. & TEMP:
MATERIAL(VESSEL/INTERNALS):
INSULATION TYPE/THK:
TRIM:

1
7

FI
074A

f(x)

FI
074B

HOLDS:

BYPASS
H

PC
067

AI
016

CO2

I
101

HJE(0.4)
PAC

HOLD
PV
067

10"-FL-241021-PAC

6" 10"x6"

3/4"

FC
TSO

FREE DRAINING

FT
076

246.022

2"-SCH-246003-SAG

2"x1"

ET 10
38

FV
076

2"x1"

1"

12"

AP
016B

14"x12"

3/4"

3/4" 3/4"

3/4" 3/4"

FREE DRAINING

INST
PIPING

AP
016A

INST
PIPING

TT
032

FT
074

C
1-1/2"

H2 RAW GAS
ET 38
14"-P-241058-HJE(0.4)
75
TO HMU 1 PSA

DETAIL "B"

2"
3"

3"

CSC

2"x1"

MIN
8

3"

3"x2"

1"

PDI
066

PDT
066

24"
MW

V-24119
9

2"-SCH-241XXX-SAD

7
CSC

4"

SAG
SAD

24"
MW

4"x3"

ET 10
38

3"-P-241XXX-HJE(0.4)

3"-P-241073-PJE(0.4)

CIRCULATING WATER
241.023

L
H

E
453
E
452

DP

HH

LL

3/4" 3/4"

HHLL=2450 mm

2"

LTE
159
6

3"

2"

2"

MAG
LG
157

24"
MW

HLL=2300 mm

2"
NLL=1050 mm

3"

3"

LLL=870 mm

2"

LLLL=300 mm

2"

3"

3"

LT
157A

LI
157A

DP
LT
157B

3/4"

3"

2"

3"

3/4"

3"

2"

3/4"

LI
159

2"

3/4"

LI
157B

06/13/11

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

LC SIGNAL

LHS
157A

12409

241.023

REV

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

TO LC-157

3/4"

LI
156

3"

14"
3/4"

FREE DRAINING

3"

3/4" 3/4"

14"x12"

3/4"

FROM V-24118

3/4"

241.021

H
38

12"-P-241056-HJE(0.4)

PP

3/4"

12055

GWR

3/4"

LTE
156

12408

FROM E-24129

H2 RAW GAS

241.009

24"
MW

FC

3/4"

FROM P-24609A/B

2"x1"

13045

PJE(0.4)

12968

FO

WASH WATER

PT
065

XV
019

HJE(0.4)

TO V-24219

AP
016C

3/4" 3/4"

240.030
FL

FYE
076

SAD
HJE(0.4)

12969

3/4"

242.022

2"-SCH-242XXX-SAG

2"-SCH-241XXX-SAG

WASH WATER

FC
076

DETAIL "B"
SAMPLE QUILL

3/4" 3/4"

FO

12"

V
3"

TO FX-246076

AE
016

A/S

3/4"

E
453

13030

XYE
019

FC

CO2 RICH

FLOW

FREE DRAINING

246.022

PI
065

E
453

XZTE
019

INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.


INTERLOCK I-101 ACTIONS, IF ANY, TO BE CONFIRMED.
CONFIRM AVAILABILITY OF DCS AND SIS INTERLOCK SEQUENCE NUMBERS
ADDED FOR QUEST.

CO2 LEAN

12061

E
450

PT
067

TI
032

AIT
016

240.030
FL

ET 10
50

ET 38
63
6"-P-241059-HJE(0.4)

FLOW SIGNAL

SO

7860 mm

6"
ET 10
50

6"-P-241067-PJE(0.4)

SHELL CANADA

CIRCULATING WATER
12407

QUEST CCS PROJECT

241.023

TO P-24108A/B
3"

D
R

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT
ISSUED FOR HAZOP

UNIT 241 - HYDROGEN MANUFACTURING UNIT TRAIN 1


ABSORBER 1 WASH WATER VESSEL
SCALE: NONE
SHELL DWG NO.:

241.0000.000.041.022

REV.

FILE:\\F:\1025\DRAWINGS\HMU\241\241.022.pid MODEL DATE:6/14/2011 1:17:50 PM BY:bes29451

FROM HMU 1

FROM FC-377

FX
074A

ET 38
75

14"-P-241055-HJE(0.4)

241.009

241.022

241.021

12054

FC SIGNAL

FX
074B

H2 RAW GAS

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "241" UNLESS OTHERWISE
STATED.
3 . CALCULATE AMOUNT OF CO2 REMOVED FROM RAW H2 GAS.
4 . H2 RAW GAS BYPASS REQUIRED FOR SYSTEM PURGE AND PRESSURIZATION AT
START-UP.
5 . ELECTRIC TRACE TO HLL (ET 10).
6 . EITHER LTE-241156 OR LTE-241159 SHALL BE SELECTABLE AS THE INPUT TO
SAFETY INTERLOCKS E-452 AND E-453. A DEVIATION ALARM TO MONITOR THE
TWO INSTRUMENTS SHALL BE PROVIDED AT THE DCS.
7 . HAND SWITCH TO SEND FLOW SETPOINT FROM FC-377 TO PSA WHEN QUEST IS
ISOLATED.
8 . TWO CHECK VALVES IN SERIES, ONE IN THE HORIZONTAL AND ONE IN THE
VERTICAL POSITION, SEPARATED BY AT LEAST 500 mm.
9 . VALVES ARE FOR BATTERY LIMIT ISOLATION OF UN IT.

FHS
074

SET POINT
TO PSA LOGIC

1800 mm ID x 10900 mm T/T


3500 kPa-g @ 60 C / HV @ 150 C
CS + 3 mm 304L SS CLAD / 316L SS
H/
5
P-241081-HJE(0.4)

E-24129
ABSORBER 1 CIRCULATING WATER COOLER
RATED DUTY:
SURFACE AREA:
TEMA TYPE:
DESIGN PRESS:
DESIGN TEMP:
MATERIAL:
INSULATION TYPE/THK:
TRIM:
LC SIGNAL

12409

LC
157

241.022

FROM LHS-157A

0.2 MW
37.9 m^2
BEU
SHELL
3900 kPa-g / HV
60 C / 150 C
CS + 3 mm 304L SS CLAD
/
6
P-241082-PJE(0.4)

TUBE
3010 kPa-g /
58 C /
SUPER DUPLEX 2507 + 0.38 mm CA
/
6
CWR-241004-PJE(0.4)

LHS
157B

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "242" UNLESS OTHERWISE
STATED.
3 . FOR PIPING DETAILS OF SAMPLE STATION SEE DRAWING 200.0000.000.041.012.
4 . CV OF CONTROL VALVE TO BE MINIMUM.
5 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE.
6 . ELECTRIC TRACE (ET 10).
7 . AUTO-START STAND-BY PUMP ON RUN FAILURE OF PRIMARY PUMP.
8 . VALVES ARE FOR BATTERY LIMIT ISOLATION OF UNIT.

2"-P-242076-PJE(0.4)

PURGE WATER
242.023

12638

FROM E-24229

HOLDS:

LV
157A

2"x1" 1"

12407

241.022

TW
035

XV
018

ET 10
50

6"-P-241067-PJE(0.4)

PT
070

S-8

3/4" 3/4"

CIRCULATING WATER

3/4"

SP
005

FO

XZTE
018

6"x4"

246.006

1-1/2"

V
6"x4"

ET 10
38

4"-CWR-241003-UAB

3"-P-241072-PJE(0.4)

COOLING WATER RETURN


12619

242.023

TO HEADER
CSO

FC

FROM V-24119

12637

PI
070

3/4" 3/4"

3/4"

A/S

PURGE WATER

2"x1"
FC

3/4" 3/4"

3"-P-241076-PJE(0.4)

TO V-24602

3/4"

NC

RS

LV
157B

3"x2"

ET 10
38

2"-P-241076-PJE(0.4)

2"

3/4"

XYE
018

FC

2"x1" 1"

2"-P-241075-PJE(0.4)

E
452

INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.


COMFIRM AVAILABILITY OF DCS AND SIS INTERLOCK SEQUENCE NUMBERS
ADDED FOR QUEST.

2"x1"

XZI
018

3/4"

UAB
PJE(0.4)

TG
033

3"x2"

ET 10
38

3"-P-241073-PJE(0.4)
3"

3/4"

TO V-24119

3"x2"

4"-CWS-242003-UAB

COOLING WATER SUPPLY


242.023

12618

FROM HEADER

6"x3"

D
BACK FLUSH

1-1/2"
6"x3"

TG
034
ET 10
50

SEL

LOCAL/
REMOTE

SI
016

VFD

3/4"

3/4"

TO
GRADE
PP

SP
006A

3/4"

P-24108A

VFD
FAULT

XL
017

LOCAL/
REMOTE

SI
017

PP

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

B
REV

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

3/4"

TO
GRADE
PP

SP
006B

3/4"

3/4
"
D

D
D

3/4"

3"x2"

6"x3"

3/4"

3/4"
3/4"

XA
017

06/13/11

3"x2"

6"x3"

VFD

D
PP

E
452

HOA

ET 10
N/A

XL
016

HS
017 A

MIN.

VFD
FAULT

I
100

3/4"

XA
016

R/S

3"-P-241071-PJE(0.4)

HIS
017

ET 10
50

HOA

6"-P-241069-PJE(0.4)

E
452

HS
016A

N/A10
ET

3/4"

I
100

ET 10
50

R/S

MIN.

HIS
016

P-24108B

SHELL CANADA

3/4
"
D

QUEST CCS PROJECT

A
R

P-24108A /B 7
ABSORBER 1 CIRCULATING WATER WASH PUMPS

MATERIAL:
INSULATION TYPE/THK:
TRIM:

39.1 m^3/hr
322 kPa
5.6 kW
CASING
INTERNALS
316 SS
316 SS
/
6
P-241083-PJE(0.4)

ISSUED FOR HAZOP

UNIT 241 - HYDROGEN MANUFACTURING UNIT TRAIN 1


ABSORBER 1 WASH WATER COOLER
SCALE: NONE
SHELL DWG NO.:

241.0000.000.041.023

REV.

241.023

RATED FLOW:
DIFF. PR.:
DRIVER:

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

FILE:\\F:\1025\DRAWINGS\HMU\241\241.023.pid MODEL DATE:6/14/2011 1:17:52 PM BY:bes29451

HS
XXX

3"-P-241070-PJE(0.4)

12408

3"-P-241073-PJE(0.4)

1-1/2"
6"x3"

6"x3"

6"-P-241068-PJE(0.4)

241.022

ET 10
38

UAB

FT
077

3/4"

CIRCULATING WATER

LL

PJE(0.4)

RS

I
103

3"-P-241077-PJE(0.4)

FC
077

3"-P-241072-PJE(0.4)

E-24129

2
FIRE
1-1/2H3
SET@
3500 kPa-g

2"x1-1/2"

ET 10
38

10

12982

2"-P-242057-HJE(0.4)

SP
001

TO UC-246002

H
38

FREE DRAINING

246.002

12403

FROM LX-246001

3/4"

FROM P-24602A/B/C

PJG(0.4)
DAG

12"-P-241074-DAG

DETAIL 'A'
SP
007

12"

12"x8"
D

MIN
12"-P-242062-DAE

12"x8"
3/4"

241.021

12633

12

ET 10
50

3/4"

LEAN AMINE

12 . VALVES ARE FOR BATTERY LIMIT ISOLATION OF UNIT.


13. TOP CONNECTION.
14. 316 STAINLESS STEEL INJECTION QUILL. OUTLET OF INJECTION QUILL TO BE
CENTERED IN PROCESS LINE.

TO V-24219

HOLDS:

8" FV
075

FO
MP-001

242.022

12064

FYE
075

FT
075

11 . INADVERTANT SIMULTANEOUS CLOSING OF BOTH HV-014 AND HV-015 PREVENTED


BY INTERLOCK I-102

H2 RAW GAS

4"

FC
075

E
451

12"-P-242063-DJE(0.4)

16"x12"

36"
MW

16"

FC
DAE DJE(0.4)

PDT
064

8"
CSC
DAG DAE

3/4"

SET POINT

12"-P-242056-HJE(0.4)

PDI
064

NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.


INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
DETAILS FOR INJECTION QUILL TO BE FINALIZED.
CONFIRM AVAILABILITY OF DCS AND SIS INTERLOCK SEQUENCE NUMBERS ADDED
FOR QUEST.

V-24218

3"

25

DETAIL "A"
INJECTION QUILL

E
450

PJG(0.4)
DAG

E
453

HZTE
015

I
104

11
FO
ET 38
75

14"-P-242055-HJE(0.4)

HZTE
014

TO HMU 2 PSA

HV
015

3"
9

14"-P-242054-HJE(0.4)
FC

2"

3/4"

2"

LL

GWR

3"

2"

2"

2"

3/4" 3/4"

LTE
154

3/4"

HJE(0.4)
ULB

HH

2"

HHLL=4400 mm

SWING
ELBOW

DP
HLL=3500 mm

NLL=2800 mm
2"

2"

2"

3"

LG
155

3"

3/4"

XYE
020

12712

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

REV

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

ISSUED FOR HAZOP


2"-P-242065-DJE(0.4)

8"

8"-P-242064-DJE(0.4)

4"-P-242066-DJE(0.4)

TT
031

6"

FC

8"x6" FC 8"x6"

10"x8"

4"

SP
004

246.001

12634

FROM V-24118

TWO PHASE FLOW

241.021

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT
12635

FROM V-24118
TWO PHASE FLOW

RICH AMINE

RICH AMINE

SP
003

VACUUM TRUCK

ET 10
50

8"-P-241064-DJE(0.4)

S-9

QUEST CCS PROJECT

10"-P-242064-DJE(0.4)

12

3/4"

SHELL CANADA

LV
155

1-1/2"
3/4"

12"x8"

XV
020

3/4"

4"

16"

16"x12"

3/4"

FO

XZTE
020

4000 mm

3/4"

1"-SL-242XXX-SAB

1"-SCL-242XXX-SAB

04/20/11

TI
031

3/4"

240.029
SCL

3"
N/A
ET 10

LLLL=300 mm
SO

A/S

12711

ISSUED FOR PHA III

XZI
020

E
450

2"

2"x3/4"
3"-SL-240018-SAB

06/13/11

MAG

240.029
SL

LI
155B

LT
155B

3/4"

3/4"

SWING
ELBOW

LC
155

LHS
155

24"
MW

3/4"

LLL=1900 mm

LI
155A

LT
155A

3/4"

2"-GI-240020-ULB
START-UP

PP

3/4"

E
450

CSC
V

18"

3/4"

E
451

MIN

2"

18"x14"
MIN

MIN

15

ET 38
75

3/4"

13

SP
002

3/4"

HV
014

3/4"

FO
14"

242.022

12065

24"
MW

3/4"

3/4"

I
102

12713

H2 RAW GAS

HYE
014

3"

11

240.028
GI

14"-P-242055-HJE(0.4)
BYPASS

E
450

HIC
014

FROM HMU 2

HIC
015

I
102

12"x8" FO 12"x8" 14"x12"

E
453

242.009

FLOW

14"x12"
8"

14

I
103

HYE
015

H2 RAW GAS

UNIT 242 - HYDROGEN MANUFACTURING UNIT TRAIN 2


AMINE ABSORBER 2
SCALE: NONE
SHELL DWG NO.:

242.0000.000.041.021

REV.

FILE:\\F:\1025\DRAWINGS\HMU\242\242.021.pid MODEL DATE:6/14/2011 2:02:39 PM BY:bes29451

246.011

PAC
HJE(0.4)

ET 10
38

10

LEAN AMINE FLOW SIGNAL

CSO

3/4"

12063

242.021

FREE DRAINING

S-4

FROM P-24606

240.030
FL

6"-FL-242020-PAC

CSC

3/4"-KP-241001-PJG(0.4)

6"x3"

CSO

241.021

12967

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES AND CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "242" UNLESS OTHERWISE
STATED.
3 . BOTTOM OF COLUMN IS PACKED WITH 600 mm OF #2 RASCHIG RINGS.
4 . H2 RAW GAS BYPASS REQUIRED FOR SYSTEM PURGE AND PRESSURIZATION AT
START-UP.
5 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012.
6 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE.
7 . ELECTRIC TRACE TO HLL (ET 10).
8 . LOCALIZED DEGASSING OF CO2 MAY OCCUR AT RESTRICTIONS, BENDS, TEES,
ETC. RESULTING IN LOCALIZED TWO-PHASE FLOW AND VIBRATION.
9 . 316 SS HARDFACED TRIM MATERIAL IS REQUIRED FOR THIS CHECK VALVE.
10 . TWO CHECK VALVES IN SERIES, ONE IN THE HORIZONTAL AND ONE IN THE VERTICAL
POSITION. SEPARATED BY AT LEAST 500 mm.

FREE DRAINING

ANTI FOAM

RV
023

3/4" 3/4"

SIZE: 3350 mm ID x 23400 mm T/T


DESIGN PR. & TEMP: 3500 kPa-g @ 95 C / HV @ 150 C
MATERIAL(VESSEL/INTERNALS): CS + 3 mm 304L SS CLAD / 316L SS
INSULATION TYPE/THK: H /
7
TRIM: P-242080-HJE(0.4) (TOP)
P-242084-DJE(0.4) (BTM)

3/4" 3/4"

V-24218
AMINE ABSORBER 2

3/4"

V-24219
ABSORBER 2 WASH WATER VESSEL
SIZE:
DESIGN PR. & TEMP:
MATERIAL(VESSEL/INTERNALS):
INSULATION TYPE/THK:
TRIM:

1800 mm ID x 10900 mm T/T


3500 kPa-g @ 60 C / HV @ 150 C
CS + 3 mm 304L SS CLAD / 316L SS
H/
5
P-242081-HJE(0.4)

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "242" UNLESS OTHERWISE
STATED.
3 . CALCULATE AMOUNT OF CO2 REMOVED FROM RAW H2 GAS.
4 . H2 RAW GAS BYPASS REQUIRED FOR SYSTEM PURGE AND PRESSURIZATION AT
START-UP.
5 . ELECTRIC TRACE TO HLL (ET 10).

FHS
074

SET POINT TO
PSA LOGIC

FI
074B
3

FI
074A

6 . EITHER LTE-242156 OR LTE-242159 SHALL BE SELECTABLE AS THE INPUT TO SAFETY


INTERLOCKS E-452 AND E-453. A DEVIATION ALARM TO MONITOR THE TWO
INSTRUMENTS SHALL BE PROVIDED AT THE DCS.
7 . HAND SWITCH TO SEND FLOW SETPOINT FROM FC-377 TO PSA WHEN QUEST
IS ISOLATED.
8 . TWO CHECK VALVES IN SERIES, ONE IN THE HORIZONTAL AND ONE IN THE VERTICAL
POSITION, SEPARATED BY AT LEAST 500 mm.
9 . VALVES ARE FOR BATTERY LIMIT ISOLATION OF UNIT.

FC SIGNAL

FX
074B

242.009
FROM FC-377

f(x)

FROM HMU 2

ET 38
75

14"-P-242055-HJE(0.4)
BYPASS

AI
016

PC
067

6" 10"x6"

ET 10
50

3/4"

FC
TSO

10"-FL-242021-PAC

FREE DRAINING

240.030
FL

ET 38
75

AP
016B

3/4" 3/4"

PT
065

14"x12"

INSTR
PIPING

12707

3/4" 3/4"

AP
016A

TT
032

FT
074

C
1-1/2"

H2 RAW GAS
ET 38
14"-P-242058-HJE(0.4)
75

TO HMU 2 PSA

DETAIL 'B'

3/4"

2"
3"

3"

FYE
076
24"
MW

2"x1"

ET 10
38

2"x1"

2"-SCH-242XXX-SAD
8

3"

3"x2"

FC
D

2"x1"

1"

3/4"

FROM P-24609A/B

2"x1"

3/4"

2"-SCH-241XXX-SAG

FV
076

1"
SAD HJE(0.4)

DETAIL 'B'
SAMPLE QUILL

24"
MW

V-24219

MIN

CSC
SAG SAD

PDI
066

PDT
066

HJE(0.4)

FT
076

4"

24"
MW

4"x3"

ET 10
38

3"-P-242XXX-HJE(0.4)

3"-P-242073-PJE(0.4)

CIRCULATING WATER
242.023

14"x12"

3"

3/4"

HHLL=2450 mm

2"

2"

E
452

HH
6

LL

2"

LTE
159
D

24"
MW

2"
NLL=1050 mm
5

3"

3"

2"

LLL=870 mm
3"

2"

LG
157
2"
3/4"

E
453

3/4"

MAG

HLL=2300 mm

DP

3/4"

LI
159

3"

3"

3"

LT
157A
LT
157B

LI
157B

06/13/11

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

LI
157A

DP

REV

LC SIGNAL

LHS
157A

12413

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

242.023

TO LC-157

LLLL=300 mm
3/4"

LI
156

3"

2"

3/4"

3"

3/4"

2"

3/4"

3/4"

FREE DRAINING

3"

14"

3/4"

FROM V-24218

3/4"

242.021

H
38

12"-P-242056-HJE(0.4)

FLOW

PP

3/4"

12064

GWR

3/4" 3/4"

LTE
156

INST.
PIPING

12411

FROM E-24229

H2 RAW GAS

242.009

CSC

FO

241.022

12"

AP
016C

240.030
FL

3/4" 3/4"

PJE(0.4)

TO FX-246076

12969

XZTE
019

PI
065

FC

12"

3"

FC
076

13031

WASH WATER

INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.


INTERLOCK I-101 ACTIONS, IF ANY, TO BE CONFIRMED.
CONFIRM AVAILABILITY OF DCS AND SIS INTERLOCK SEQUENCE NUMBERS
ADDED FOR QUEST.

FLOW SIGNAL
246.022

FO

FREE DRAINING

E
453

019
XV

HOLDS:

CO2 RICH

12146

A/S
3/4" 3/4"

FREE DRAINING

6"-P-242059-HJE(0.4)

XYE
019

CO2 LEAN

AE
016
E
450

PT
067

TI
032

AIT
016

HJE(0.4) PAC

E
453

I
101
HOLD

PV
067

CO2

SO

7860 mm

6"
ET 10
50

6"-P-242067-PJE(0.4)

SHELL CANADA

CIRCULATING WATER
12412

QUEST CCS PROJECT

242.023

TO P-24208A/B
3"

D
R

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT
ISSUED FOR HAZOP

UNIT 242 - HYDROGEN MANUFACTURING UNIT TRAIN 2


ABSORBER 2 WASH WATER VESSEL
SCALE: NONE
SHELL DWG NO.:

242.0000.000.041.022

REV.

FILE:\\F:\1025\DRAWINGS\HMU\242\242.022.pid MODEL DATE:6/14/2011 1:50:47 PM BY:bes29451

242.021

242.022

12065

3/4" 3/4"

H2 RAW GAS

FX
074 A

E-24229
ABSORBER 2 CIRCULATING WATER COOLER
RATED DUTY:
SURFACE AREA:
TEMA TYPE:
DESIGN PRESS:
DESIGN TEMP:
MATERIAL:
INSULATION TYPE/THK:
TRIM:

LC SIGNAL
12413

LC
157

242.022

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "242" UNLESS OTHERWISE
STATED.
3 . FOR PIPING DETAILS OF SAMPLE STATION SEE DRAWING 200.0000.000.041.012.
4 . CV OF CONTROL VALVE TO BE MINIMUM.
5 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE.
6 . ELECTRIC TRACE (ET 10).
7 . AUTO-START STAND-BY PUMP ON RUN FAILURE OF PRIMARY PUMP.

TUBE
3010 kPa-g /
58 C /
SUPER DUPLEX 2507 + 0.38 mm CA
/
6
WR-242004-PJE(0.4)

LHS
157B

HOLDS:
INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
CONFIRM AVAILABILITY OF DCS AND SIS INTERLOCK SEQUENCE NUMBERS
ADDED FOR QUEST.

LV
157A

FROM LHS-157A

0.2 MW
37.9 m^2
BEU
SHELL
3900 kPa-g / HV
60 C / 150 C
CS + 3 mm 304L SS CLAD
/
6
P-242082-PJE(0.4)

1"
FC

3/4"

2"x1"

2"x1"
ET 10
38

D
LV
157B

2"-P-242076-PJE(0.4)

PURGE WATER
12638

241.023

TO V-24602

1"

3/4" 3/4"

SP
005
3/4" 3/4"

PI
070

FC

3"-P-242073-PJE(0.4)

6"x3"

1-1/2"

3"x2"

6"x3"

RS

3"-P-242077-PJE(0.4)

3"x2"

FROM HEADER
4"-CWS-240XXX-UAB
ET 10
38

4"-CWS-242003-UAB

COOLING WATER SUPPLY


12618

241.023

TO E-24129

6"x3"
6"x3"

HS

E
452
ET 10
50

HIS
017

XA
016

VFD
FAULT

XL
016

LOCAL/
REMOTE

SI
016

VFD

3/4"

PP

3/4"

3/4"

E
452

SP
006B

XA
017

VFD
FAULT

XL
017

LOCAL/
REMOTE

SI
017

06/13/11

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

B
REV

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

3/4"

D
TO
GRADE

PP

3/4"

3"x2"

SHELL CANADA

3/4"

3/4
"
D

D
D

P-24208A

HOA

PP

3/4"

3/4"

6"x3"

3/4
"
D

HS
017A

VFD

3"x2"

6"x3"

I
100

3/4"

TO
GRADE
PP

SP
006A

R/S

3/4"

3/4"

HOA

ET 10
50

HS
016A

6"-P-242069-PJE(0.4)

I
100

N/A

R/S

SEL

ET 10

HIS
016

3/4"

240.003

1-1/2"

TG
034

ET 10
50

COOLING WATER SUPPLY

3"-P-242073-PJE(0.4)

6"-P-242068-PJE(0.4)

PJE(0.4)
UAB

6"-CWS-240015-UAB

D
BACK FLUSH

3/4"

TO V-24219

ET 10
50

FT
077

MIN.

12411

ET 10
38

LL

3"-P-242070-PJE(0.4)

CIRCULATING WATER

PJE(0.4)

3"

TG
033

UAB

E-24229

I
103

242.022

D
6

FC
077

CSO

NC

FROM V-24219

12619

QUEST CCS PROJECT

P-24208B

A
R

P-24208A /B 7
ABSORBER 2 CIRCULATING WATER WASH PUMPS
RATED FLOW:
DIFF. PR.:
DRIVER:
MATERIAL:
INSULATION TYPE/THK:
TRIM:

39.1 m^3/hr
322 kPa
5.6 kW
CASING
INTERNALS
316 SS
316 SS
/
6
P-242083-PJE(0.4)

ISSUED FOR HAZOP

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

UNIT 242 - HYDROGEN MANUFACTURING UNIT TRAIN 2


ABSORBER 2 WASH WATER COOLER
SCALE: NONE
SHELL DWG NO.:

242.0000.000.041.023

REV.

FILE:\\F:\1025\DRAWINGS\HMU\242\242.023.pid MODEL DATE:6/14/2011 1:52:05 PM BY:bes29451

6"-P-242067-PJE(0.4)

241.023

242.023

242.022

3/4"

ET 10
50

COOLING WATER RETURN

ET 10
N/A

12412

4"-CWR-241003-UAB

FROM E-24129

MIN.

CIRCULATING WATER

XV
018

ET 10
50

6"x4"

3"-P-242072-PJE(0.4)

3"-P-242071-PJE(0.4)

3/4" 3/4"

FO

240.003

4"-CWR-242XXX-UAB
1-1/2"
6"x4"

COOLING WATER RETURN


TO HEADER

TW
035

PT
070

6"-CWR-242003-UAB

2"

A/S
XZTE
018

ET 10
50

S-8

XYE
018

2"x1"

RS

E
452

FC

2"x1"

3/4"

2"-P-242075-PJE(0.4)

XZI
018

E-24602A/B
LEAN / RICH AMINE EXCHANGER
64.5 MW (TOTAL)
1521.0 m^2
HOT
2700 kPa-g / HV
130 C / 150 C
PLATES: 316L SS / GRAPHITE
FRAME: CS
/
9
P-246121-DJE(0.4)
P-246122-DJE(0.4)
COMPABLOC

RATED DUTY:
SURFACE AREA:
DESIGN PRESS:
DESIGN TEMP:
MATERIAL:
INSULATION TYPE/THK:
TRIM:
TEMA TYPE:

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
3 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE.
4 . SYMMETRICAL PIPING.
5 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012.
6 . EXCHANGER TO BE DRAINED IF ISOLATED FOR MAINTENANCE.
7 . LOCALIZED DEGASSING OF C02 MAY OCCUR AT RESTRICTIONS, BENDS, TEES, ETC.
RESULTING IN LOCALIZED TWO-PHASE FLOW AND VIBRATION.
8 . A PERMANENT SELF VENTING CONNECTION IS REQUIRED TO PREVENT
ACCUMULATION AND TRAPPING OF GASES.
9 . ELECTRIC TRACE (ET 10).
10. VALVES ARE FOR BATTERY LIMIT ISOLATION.

COLD
3500 kPa-g / HV
120 C / 150 C
/

HOLDS:
INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

FC SIGNAL
246.003

12225

TO FFX-001A
TI
004
PI
003

PT
003

3/4" 3/4"

TT
004
1-1/2"

ET 10
63

16"-P-246051-DAB

LEAN AMINE
246.008

12181

TO E-24604A
H

ET 10
38

S-9
3

ET 10
38

PI
028

2"-P-246105-DJE(0.4)

2"
D

2"-P-246106-DJE(0.4)

13145

DAB DJE(0.4)
2"

DJE(0.4) DAB

RS

20"

3"

V 2"

TI
002

2"

ET 10
63

246.033
DM
12227

2"-DM-246001-DAB

DO NOT POCKET

RS

E-24602B

2"

CSO

3"

14"-P-246007-DJE(0.4)
RICH AMINE

TWO PHASE FLOW

246.002

12212

TO V-24601

PI
004

06/13/11

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

REV

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

ET 10
50

20"
PT
004

TI
005

TT
005
002

2"
D
ET 10
63

1-1/2"

20"

2"

TT
002

ET 10
63

RS

RS

20"

2"

12230

10"-P-246006-DJE(0.4)

8
2"

246.007

NC

3/4"

START-UP

PT
002

3/4" 3/4"

14"x10"

10"

13144

2"-DM-246004-DAB

246.033
DM

2"-DM-246002-DAB

246.033
DM

LEAN AMINE
FROM P-24601A/B/C

8"

D
2"

2"
CSO

16"-P-246048-DJE(0.4)

1-1/2"

16"-P-246054-DAB

LEAN AMINE

SHELL CANADA

246.009

12252

TO E-24604B

QUEST CCS PROJECT

A
R

8"-P-246085-DAE
START-UP / MINIMUM FLOW

LEAN AMINE
246.011

FROM P-24602A/B/C

ISSUED FOR HAZOP

12281

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

UNIT 246 - REGENERATION/COMMON


LEAN / RICH AMINE EXCHANGER
SCALE: NONE
SHELL DWG NO.:

246.0000.000.041.001

REV.

246.001

ET 10
50

FILE:\\F:\1025\DRAWINGS\CO2\246\246.001.pid MODEL DATE:6/14/2011 10:40:12 AM BY:bes29451

2"

3"

ET 10
63

1-1/2"

3/4" 3/4"

PI
002

12"-P-246050-DJE(0.4)

2"

TT
003

CSO

10"

CSO

3"

3/4"

TWO PHASE FLOW


2"

FROM V-44118

ET 10
50

10

10"-P-246002-DJE(0.4)

13143

DJE(0.4) DAB

10"-P-246004-DJE(0.4)

7
246.101

1-1/2"

246.033
DM

2"-DM-246003-DAB

14"x10"

2"

12686

ET 10
63

TWO PHASE FLOW

FROM V-24118 / V-24218

RICH AMINE

14"-P-246001-DJE(0.4)

2"

20"

12"

14"x10"

14"x10"

DAE DJE(0.4)

242.021

ET 10
50

MIN

12634

10"-P-242064-DJE(0.4)

MIN

RICH AMINE

242 246

E-24602A

2"

10"

3"
10"

TT
001

FT
001

PT
001

3/4" 3/4"

PI
001

2"

14"x10"

TI
001

3/4" 3/4"

FC
001

10"-P-246003-DJE(0.4)

20"

3"

ET 10
50

3/4" 3/4"

RS

16"x12"

RS

PT
028

12"-P-246049-DJE(0.4)

16"x12"

20"

V
2"

20"

RS

12"

RS

8
2"

CSO

ET 10
63

TI
003

10"-P-246005-DJE(0.4)

DAB DJE(0.4)
2"

8"

SP
001

3/4" 3/4"

PDI
002

PI
013

PT
013

PJB(0.4)
DJB(0.4)

CSO

14"x10"

14"x8"

PDI
013

3/4"-KP-246001-PJE(0.4)

246.014

12283

TT
013

1-1/2"
FREE DRAINING

MIN

OVERHEAD VAPOURS
246.005

12275

TO E-24601A/B

FC
003

8"

ANTI-FOAM

TO FFX-001B

42"-P-246015-PJB(0.4)
42"

246.003

12211

10"-P-246100-DJB(0.4)

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
3 . ANTI-FOAM IS ADDED INTERMITTENTLY BY THE OPERATOR BASED ON HIGH DP
ACROSS THE TRAYED SECTION OF THE AMINE STRIPPER.
4 . TOP OF WEIR IN REBOILERS E-24603A/B TO BE AT SAME ELEVATION AS HLL IN
AMINE STRIPPER.
5 . SYMMETRICAL PIPING TO/FROM E-24603A AND E-24603B.
6 . CV OF CONTROL VALVES PV-010A/B TO BE MINIMUM. CV AFFECTS RV-005 SIZING
FOR VAPOUR BLOWTHROUGH CASE.
7 . SYMMETRICAL PIPING ON INLET AND OUTLET OF CONTROL VALVE.
8 . PV-010A/B ARE 2x50% VALVES. SPARE VALVE TO BE MAINTAINED ON SITE.
9 . PIPING FROM CONTROL VALVE TO VESSEL NOZZLE TO HAVE 1.5 mm CORROSION
ALLOWANCE.
10. SLUG FLOW DURING TURNDOWN.
11. ELECTRIC TRACE TO HLL (ET 10).
12. LOCATE RV-001 MINIMUM DISTANCE FROM PV-010A/B INLET.
13. TWO CHECK VALVES IN SERIES, ONE IN THE HORIZONTAL AND ONE IN THE VERTICAL
POSITION, SEPARATED BY AT LEAST 500 mm.
14. 316 STAINLESS STEEL INJECTION QUILL. OUTLET OF INJECTION QUILL TO BE
CENTERED IN PROCESS PIPE.
15. 304SS PIPING FROM CONTROL VALVE TO V-24601 TO HAVE 1.5 mm CORROSION
ALLOWANCE.

TC SIGNAL

TC
013

RV
005A

3/4"

CSO

CSO

10"-P-246107-DJB(0.4)

6300 mm ID x 30400 mm T/T


385 kPa-g @ 150 C / FV @ 150 C
CS + 3 mm 304L SS CLAD / 316L SS
H / 50 mm
11
P-246123-DJB(0.4) (TOP)
P-246124-DJB(0.4) (BTM)

3/4"

3/4"

BLOCKED
DISCHARGE
8T10
SET@
375 kPa-g

12"x10"

1/2" WEEP HOLE

8"-P-246100-DJB(0.4)

N/A
ET 10

SIZE:
DESIGN PR. & TEMP:
MATERIAL(VESSEL/INTERNALS):
INSULATION TYPE/THK:
TRIM:

10"x8"

12"x10"

1/2" WEEP HOLE


3/4"

RV
005B

12"-VA-246001-PJB(0.4)

PJB(0.4)
DJB(0.4)

PJB(0.4)
DJB(0.4)

1/2" WEEP HOLE

N/A
ET 10

BLOCKED
DISCHARGE
8T10
SET@
375 kPa-g

10"x8"

RV
005C

8"x6"

N/A
ET 10

BLOCKED
DISCHARGE
6Q8
SET@
385 kPa-g

V-24601
AMINE STRIPPER

TO ATMOSPHERE
AT SAFE LOCATION

12"-VA-246002-PJB(0.4)

TO ATMOSPHERE
AT SAFE LOCATION

8"-VA-246003-PJB(0.4)

TO ATMOSPHERE
AT SAFE LOCATION

TO ATM

TO ATM

TO ATM

FROM P-24606

FREE DRAINING

3/4"

REBOILER FEED
12213

FL(C)
3/4"
D

30"-P-246029-DJB(0.4)

TO E-24603A

20"-P-246012-DJE(0.4)

3/4" 3/4"

H
75

15

20"x10"

TWO PHASE FLOW


DO NOT POCKET

DJE(0.4)
DJB(0.4)

DAB

10"

14"x10"

4"-P-246026-PJB(0.4)

WATER REFLUX
246.006

12282
SP

FROM P-24603A/B

002

14

TI
010

TT
010

FLOW

20"

10

10

36"

MW
36"

20"-P-246013-DJB(0.4)
10

TWO PHASE FLOW


DO NOT POCKET

TI
011

TT
011

2"

DAB

PDI
012

24"
MW

2"-DM-246045-DAB

FREE DRAINING

NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.


INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
DETAILS FOR CHEMICAL INJECTION QUILL TO BE FINALIZED.

24"x20"

20

9
DJB(0.4)

36"x24"

HOLDS:

36"x24"

36"

24"x20"

20"-P-246011-DJB(0.4)

2"

DJB(0.4)

SEE DETAIL "A"

2"

DJE(0.4)

15

PV
010B
D

4"x3"

3/4" 3/4" 2"x3/4" 2"

3/4"

MIN

DJB(0.4)

DJE(0.4)

DJB(0.4)

DJE(0.4) PJE(0.4)

CSO
FREE DRAINING

14"-P-246007-DJE(0.4)
TWO PHASE FLOW
12 DO NOT POCKET

FROM E-24602A/B

3/4"

ET 10
63

FO

MIN

4"x3"

4"x2"

2"

2"

7
8

14

24

4"x2"

DETAIL "A"
INJECTION QUILL

20"

FL(C)
3/4"
D

14"x10"

4"x3"

246.001

3/4"

MP-001

20"x10"

PT
010

4"

21
20"-P-246010-DJE(0.4)

24"
MW

PT
011

2"

8
PV
010A

ET 10
38

FREE DRAINING

PHS
010

13

CSC

4"-P-246008-DJE(0.4)
RICH AMINE

PC
010

CSO

PI
011

4"-P-246009-DJB(0.4)

B 3/4"

246.003

DJB(0.4) PJB(0.4)

RV
001

12212

14"

14"-P-246100-DJB(0.4)

FT
003

FV
003

3/4"

BLOCKED DISCHARGE
3L4
SET@
3500 kPa-g

30"

30"

H
75

30"-P-246035-DJB(0.4)
FREE DRAINING

REBOILER FEED
246.004

12210

TO E-24603B

PI
012

FREE DRAINING

2"

LT
002

LL
V

HHLL=7590 mm

HLL=6175 mm

12695

242.021

TO FC-242075

f(x)

1"-SCL-246010-SAB

11

24"
3"

SWING
ELBOW

24"

SET POINT

LX
001
H
50

241.021

12206

TO FC-241075
24"-P-246083-DJB(0.4)

FREE DRAINING

LLL=2175 mm

246.004

4"

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

REV

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

FROM E-24603B

ET 10
38

LLLL=475 mm

4"-P-246093-DAB

AMINE INVENTORY/MAKE-UP
246.012

SHELL CANADA

D
DJB(0.4)
DAB

ET 10
38
30"

3/4"

12696

FROM P-24605/24604

2"

30"x24"

TT
014
1-1/2"

TI
014

QUEST CCS PROJECT


ET 10
75

24"-P-246041-DJB(0.4)

LEAN AMINE
12182

246.007

TO P-24601A/B/C

DJB(0.4)
DAB

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

ISSUED FOR HAZOP

2"-DM-246005-DAB

UNIT 246 - REGENERATION/COMMON


AMINE STRIPPER

6"

ET 10
50

6"-DM-246005-DAB

AMINE DRAIN
13125

TO V-24606

06/13/11

12207

REBOILER LIQUID RETURN

MIN.

2"
SO

LC
001

LT
001

SPLIT

3/4"

N/A
ET 10

LG
001

MIN.

3/4"
12694

NLL=4175 mm

2"

3"

3"-SL-246004-SAB

2"

2"

DJB(0.4)
DAB

246.029
SCL

DAB

24"

FREE DRAINING

246.029
SL

TO FC-441075

12403

MW

FROM E-24603A

441.029

12405

12697

SET POINT

MAG

NNF

24"-P-246082-DJB(0.4)

SET POINT

246.030
GI

2"

3/4"

246.003

ET 10
38

2"-P-246098-DAB

2"

6"

12215

2"

DJB(0.4)

REBOILER LIQUID RETURN

2"

8600 mm

FROM V-24605

3/4"

FROM E-24603B

GWR

3/4"

246.013

2"-GI-246003-ULB
START-UP

12288

2"

1"-SL-246XXX-SAB

12401

V-24601

3/4"

RECOVERED AMINE

2"
PP

LL

246.004

246.007

SCALE: NONE
SHELL DWG NO.:

246.0000.000.041.002

REV.

FILE:\\F:\1025\DRAWINGS\CO2\246\246.002.pid MODEL DATE:6/14/2011 10:40:14 AM BY:bes29451

I
001

FREE DRAINING

REBOILER VAPOUR RETURN

246.002

LI
002

2"x3/4"
2"

36"-P-246040-DJB(0.4)

3/4" 3/4"

I
002

HH

H
50

SWING
ELBOW
3/4"

3/4"

I
020

3/4"

PT
012

3/4"

FROM E-24603A

36"

36"

246.003

36"-P-246034-DJB(0.4)

3/4"

12214

H
50

2"x3/4"

REBOILER VAPOUR RETURN

E-24603A
STRIPPER REBOILER

V-24603A
STRIPPER REBOILER CONDENSATE POT

50.4 MW (PER SHELL)


1755.5 m^2 (PER SHELL)
BKU
SHELL
385 kPa-g / FV
150 C / 150 C
CS + 3 mm 304L SS CLAD
H/
P-246125-DJB(0.4)

RATED DUTY:
SURFACE AREA:
TEMA TYPE:
DESIGN PRESS:
DESIGN TEMP:
MATERIAL:
INSULATION TYPE/THK:
TRIM:

TUBE
500 kPa-g / FV
250 C / 250 C
316L SS + 0.6 mm CA
NONE /

FFX
001A

246.001

FROM FC-001

FFX
001B

FLOW SET POINT

FC
005

TC SIGNAL
246.002

246.004

12234

TO FC-006

SPLIT

SP

251

PI
002 C

FROM TC-013

HOLDS:
L
LL
251.110
FROM PX-251022

LL

REBOILER FEED
12213

246.002

H
75

30"-P-246029-DJB(0.4)

PC
014

FREE DRAINING

FROM V-24601

FX
005

10

CB
101 A

CB
101 B

CB
101 C

I
020

CUTBACK SIGNAL

SP LIMIT

36"-P-246034-DJB(0.4)

FREE DRAINING

TO V-24601

FV
005

3/4"

24"x20"

24"-SL-246009-SAB

1-1/2"

10"

30"

2"

E-24603A

24"

N/A
ET 10
B

4"x2"

RV
010

24"
24"-P-246031-DJB(0.4)

24"-P-246030-DJB(0.4)
5

30"x24"

12215

N/A
ET 10
1/2" WEEP HOLE

PP

10"

HLL=4200 mm

ET 10
N/A

2"

FREE DRAINING

24"
MW

MAG

V-24603A

LG
005

2920 mm

FREE DRAINING

LT
005

LC
005

LX
005

NLL=1020 mm

LC SIGNAL
H

24"-P-246082-DJB(0.4)

FREE DRAINING

TO V-24601

13139

2"

LLL=250 mm

10"-SCL-246001-SAB

246.020

TO LV-005

10"
4
8"

06/13/11

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW

REV

ET 10
50

8"-SCL-246002-SAB
TWO PHASE FLOW

ISSUED FOR PRELIMINARY REVIEW

3/4"

2"

246.002

4"-VA-246005-SAB

4"

2"-P-246108-DJB(0.4)

REBOILER LIQUID RETURN

246.029
SCL

1"-SCL-246003-SAB

2"

ET 10
N/A

2"

2"

30"x24"

10"

RS

24"

2"

2"

4"x3"

3/4"

3"-SL-246005-SAB

12685

12228

3"x2"

30"

246.029

3/4"

24" MW

TO ATMOSPHERE AT
SAFE LOCATION

FIRE
2J3
SET@
500 kPa-g

LP STEAM

24"-SL-246009-SAB

CSO

TO ATM

DO NOT POCKET

30"-P-246033-DJB(0.4)

36"x30"

2"-SL-246010-SAB

30"-P-246032-DJB(0.4)

24"

N/A
ET 10

2"
36"x30"

FE
005

FROM DISTRIBUTION
D

RS

TT
015

H
50

24"x20"

20"
FC

2"

TI
015

FT
005

1"-SL-246009-SAB

12214

246.004

13128

TO FX-006

3/4"

246.002

PT
014

H
50

3/4"

REBOILER VAPOUR RETURN

NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.


INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
NUMBER AND LOCATION OF STEAM TRAPS TO BE DETERMINED BASED ON
PIPING LAYOUT.

STM HDR PRESSURE

I
021

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

CONDENSATE
12454

246.020

TO E-24606

SHELL CANADA
QUEST CCS PROJECT

A
R

ISSUED FOR HAZOP

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

UNIT 246 - REGENERATION/COMMON


STRIPPER REBOILER "A" AND CONDENSATE POT
SCALE: NONE
SHELL DWG NO.:

246.0000.000.041.003

REV.

FILE:\\F:\1025\DRAWINGS\CO2\246\246.003.pid MODEL DATE:6/14/2011 10:40:16 AM BY:bes29451

12211

1500 mm ID x 4200 mm T/T


500 kPa-g @ 250 C / FV @ 250 C
CS + 3 mm CA
H/
8
SL-246030-SAB

FFX
001C

TRIM

RATIO

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
3 . CONTROL VALVE BYPASS TO BE INSTALLED SO FREE DRAINING.
4 . BOTTOM TAN LINE OF V-24603A TO BE SET 2920 mm BELOW BOTTOM TUBE SHEET OF
REBOILER.
5 . ALL REBOILER PIPING TO BE SYMMETRICAL.
6 . WEIR TO BE SET AT SAME ELEVATION AS HLL IN AMINE STRIPPER.
7 . ELECTRIC TRACE PIPE TO ELEVATION OF WEIR IN REBOILER
8 . ELECTRIC TRACE (ET 10).
9 . HIGH HIGH AMINE STRIPPER LEVEL TO FORCE FX-005 INTO MANUAL WITH 0%
OUTPUT, CLOSING FV-005.
10 . STAGED CUTBACK SCHEME FOR REDUCTION OF LP STEAM FLOW TO REBOILERS
IN THE EVENT OF LOW UTILITY PLANT HEADER PRESSURE. FOR DETAILS. REFER
TO CONTROL NARRATIVE 246.1611.000.012.xxx.

246.003

12225

SIZE:
DESIGN PR. & TEMP:
MATERIAL(VESSEL/INTERNALS):
INSULATION TYPE/THK:
TRIM:

FFIC
001

FC SIGNAL

E-24603B
STRIPPER REBOILER
RATED DUTY:
SURFACE AREA:
TEMA TYPE:
DESIGN PRESS:
DESIGN TEMP:
MATERIAL:
INSULATION TYPE/THK:
TRIM:

50.4 MW (PER SHELL)


1755.5 m^2 (PER SHELL)
BKU
SHELL
385 kPa-g / FV
150 C / 150 C
CS + 3 mm 304L SS CLAD
H/
P-246126-DJB(0.4)

V-24603B
STRIPPER REBOILER CONDENSATE POT

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
3 . CONTROL VALVE BYPASS TO BE INSTALLED SO FREE DRAINING.
4 . BOTTOM TAN LINE OF V-24603B TO BE SET 2920 mm BELOW BOTTOM TUBE SHEET
OF REBOILER.
5 . ALL REBOILER PIPING TO BE SYMMETRICAL.

SIZE: 1500 mm ID x 4200 mm T/T


DESIGN PR. & TEMP: 500 kPa-g @ 250 C / FV @ 250 C
MATERIAL(VESSEL/INTERNALS): CS + 3 mm CA
8
INSULATION TYPE/THK: H /
TRIM: SL-246031-SAB

TUBE
500 kPa-g / FV
250 C / 250 C
316L SS + 0.6 mm CA
NONE /

6 . WEIR TO BE SET AT SAME ELEVATION AS HLL IN AMINE STRIPPER.


7 . ELECTRIC TRACE PIPE TO ELEVATION OF WEIR IN REBOILER.
8 . ELECTRIC TRACE (ET 10).
9 . HIGH HIGH AMINE STRIPPER LEVEL TO FORCE FX-006 INTO MANUAL WITH 0%
OUTPUT, CLOSING FV-006.
10. STAGED CUTBACK FOR REDUCTION OF LP STEAM FLOW TO REBOILERS IN THE
EVENT OF LOW UTILITY PLANT HEADER PRESSURE FOR DETAILS. REFER TO
CONTROL NARRATIVE 246.1611.000.012.xxx.

FLOW SET POINT


12234

SP

246.003

FC
006

FROM FFX-001C

REBOILER FEED
12210

246.002

H
75

30"-P-246035-DJB(0.4)

HOLDS:

NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.


INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
NUMBER AND LOCATION OF STEAM TRAPS TO BE DETERMINED BASED ON PIPING
LAYOUT.

FREE DRAINING

FROM V-24601

9
REBOILER VAPOUR RETURN
246.002

12288

H
50

36"-P-246040-DJB(0.4)

PC
016

FREE DRAINING

TO V-24601

FX
006

I
020
10

SP LIMIT

24"x20"

24"-SL-246002-SAB

24" MW

FC

E-24603B

24"

N/A
ET 10

3
FIRE
2J3
SET@
500 kPa-g

N/A
ET 10

TO ATMOSPHERE AT
SAFE LOCATION

246.029

12665

1"-SCL-246006-SAB

246.029
SCL
12400

4"x3"

N/A
ET 10

4"-VA-246006-SAB

1/2" WEEP HOLE

3"x2"

LP STEAM

3/4"
CSO

24"-P-246037-DJB(0.4)

30"x24"

3"-SL-246004-SAB

FREE DRAINING

2"

ET 10
N/A

2"

ET 10
N/A

2"

30"x24"

3/4"

4
24"-P-246036-DJB(0.4)

10"

2"

24"

4"x2"

24"

RS

2"

24"-SL-246002-SAB

RV
011
PP

24"

3/4"

2" V

FE
006

FROM DISTRIBUTION

2"

10"

30"

H
50

DO NOT POCKET

30"

24"x20"

20"

1"-SL-246002-SAB

30"-P-246039-DJB(0.4)

36"x30"

2"-SL-246003-SAB

30"-P-246038-DJB(0.4)

3/4"

36"x30"

FV
006

3/4"

FT
006

3/4"

1-1/2"

13128

FROM CB-101A/B/C

RS

TT
016

246.003

PT
016

2"

TI
016

CUTBACK SIGNAL

2"-P-246109-DJB(0.4)
2"

V
FREE DRAINING

4"

ISSUED FOR PHA III

HLL=4200 mm

04/20/11

ISSUED FOR ESTIMATE

V-24603B

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW

LG
006

NLL=1020 mm

24"
MW
10"-SCL-246004-SAB

LT
006

LC
006

LX
006

ISSUED FOR PRELIMINARY REVIEW

B
REV

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

LLL=250 mm

10"

LC SIGNAL

2"

13140

FREE DRAINING

246.020

TO LV-0006
4
8"

D
ET 10
50

8"-SCL-246005-SAB
TWO PHASE FLOW

CONDENSATE
12680

246.020

SHELL CANADA

TO E-24606

QUEST CCS PROJECT

A
R

ISSUED FOR HAZOP

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

SCALE: NONE
SHELL DWG NO.:

246.0000.000.041.004

REV.

246.004

UNIT 246 - REGENERATION/COMMON


STRIPPER REBOILER "B" AND CONDENSATE POT

FILE:\\F:\1025\DRAWINGS\CO2\246\246.004.pid MODEL DATE:6/14/2011 10:40:18 AM BY:bes29451

TO V-24601

06/13/11

3/4"

12207

2"

246.002

H
50

24"-P-246083-DJB(0.4)

2920 mm

REBOILER LIQUID RETURN

10"

E-24601A
STRIPPER OVERHEAD CONDENSER
RATED DUTY:
SURFACE AREA:
TEMA TYPE:

DESIGN PRESS:
DESIGN TEMP:
MATERIAL:
INSULATION TYPE/THIK:
HEAT TRACE MEDIA/TEMP:
TRIM:

26.60 MW (TOTAL)
2272.0 m^2
BHU
SHELL
385.00 kPa-g /FV
150 C/150 C
CS + 3 mm 304L SS CLAD
PP/

TUBE
1100.00 kPa-g/
58 C/
DUPLEX 2205 + 0.38 mm CA
NONE/

P-246127-PJB(0.4)
P-246128-PJB(0.4)

CWR-246030-UAB
CWR-246031-UAB

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
3 . SYMMETRICAL PIPING.

TW
018

V
2"

N/A ET 10

30"-P-246016-PJB(0.4)

10"-CWR-246011-UAB

1-1/2"

10"-CWR-246011-UAB

FREE DRAINING

12274

CSO

14"x10"

CSO

2"

TW
017
1-1/2"

14"x10"

10"-CWR-246012-UAB

FREE DRAINING

28"

28"

14"

TT
019

6" BACK
FLUSH

42"x30"

2"

RS

30"x28"

1-1/2"
FREE DRAINING

42"x30"

E-24601B

14"

RS

30"x28"

30"x28"

OVERHEAD VAPOUR/LIQUID
12246

246.006

TO V-24602

ET 10
12"-CWS-246029-UAB

246.025
CWS
13146

10"-CWS-246030-UAB

N/A ET 10

14"x10"

10"-CWS-246030-UAB

246.025
CWS

12271

6"

30"-P-246019-PJB(0.4)
FREE DRAINING

42"-P-246020-PJB(0.4)
TWO PHASE FLOW

N/A

2"

28"

28"

PP

BACK
FLUSH
G

06/13/11

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

B
REV

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

SHELL CANADA
QUEST CCS PROJECT

A
R

ISSUED FOR HAZOP

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

SCALE: NONE
SHELL DWG NO.:

246.0000.000.041.005

REV.

246.005

UNIT 246 - REGENERATION/COMMON


STRIPPER OVERHEAD CONDENSER

FILE:\\F:\1025\DRAWINGS\CO2\246\246.005.pid MODEL DATE:6/14/2011 10:41:48 AM BY:bes29451

30"-P-246017-PJB(0.4)

TI
019

3/4"

30"-P-246018-PJB(0.4)
FREE DRAINING

NC

4"
14"x12" 12"-CWS-246029-UAB

30"x28"

ET 10

D
4"

30"x28"

42"x30"

30"x28"

4"-CWS-246028-UAB

FREE DRAINING

FROM V-24601

14"

2"

42"-P-246015-PJB(0.4)

28"

RS

246.002

28"
3

12275

42"x30"

OVERHEAD VAPOURS

ET 10
38

E-24601A

NC

14"

4"-CWR-246014-UAB

28"

246.025
CWR
13147

N/A ET 10

28"

10"-CWR-246012-UAB

2"

30"x28"

RS

30"x28"

246.025
CWR

V-24602
STRIPPER REFLUX DRUM
SIZE:
DESIGN PR. & TEMP:
MATERIAL(VESSEL/INTERNALS):
INSULATION TYPE/THK:
TRIM:

36"-GC-246001-PJB(0.4)

FREE DRAINIING

36"

FREE DRAINIING

TO ATMOSPHERE
AT SAFE LOCATION

TWO PHASE FLOW

N/A
ET 10

2"-P-247004-PJB(0.4)
TWO PHASE FLOW

4"x3"

4"

4"-VA-246004-PJB(0.4)
ET 10
38

1/2" WEEP HOLE

10"

CSO

ET 10
38

247.002

12244

FROM V-24702

PURGE WATER
241.023

12636

C
2"x1" 2"-SC-246020-SAB
NNF

WATER MAKE-UP
246.021

12131

FROM E-24607

SO

2"x1"

2"-P-246027-PJB(0.4)

2"x1"

1"

MINIMUM FLOW

FO

6"

FI
009

FT
009

PI
015

FC
007

PT
015

3"x1-1/2"

ET 10
38

3"x2"

FT
007

3"x1-1/2"

1-1/2"
FC

WASTE WATER
ET 10
3"-P-246028-PJB(0.4)
38
12653
246.027
TO WWTP 271

SP
003
S-8

3/4"

ET 10
50

4"

6"-P-246021-PJB(0.4)

3"x2"

LV
010

3/4" 3/4"

3/4"

2"

FV
007

3/4"

3/4"

KO LIQUIDS

3/4" 3/4"

LLLL=300 mm

FROM V-24704

LC
010A

2"

LLL=400 mm
2"

LT
010

FC

3/4"

2"

LG
010

LC
010B

2"x1" 2"x1"

1"
3/4"

MAG

NLL=675 mm

13032

FT
008

FV
008

2"x1"

ET 10
38

247.004

FC
008

SAB

HLL=3075 mm

3"-P-241076-PJE(0.4)

PJB(0.4)

H
24"
MW

K.O. LIQUID

2"

MIN

2"

4"x3"

4"x3"

ET 10
38

4"-P-246026-PJB(0.4)

WATER REFLUX
12282

246.002

TO V-24601
SEL
ET 10
38

3/4"

3/4"

HS
008A

3/4"

R/S

HIS
008

I
003

2"

3/4"
2"
MIN

MIN

HOA

D
D

P-24603A

PJB(0.4)
DAB

3/4"-DM-246007-DAB

ET 10
38

D
D

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

ISSUED
DATE

DESCRIPTION

3/4"

P-24603B

3/4
"

PJB(0.4)
DAB

3/4"-DM-246009-DAB

ET 10
38

3/4"

CS

MC

PDP

APE

PEM CLIENT
APP

A
2"-DM-246011-DAB

246.033
DM

12391

3/4"

P-24603A/B 8
STRIPPER REFLUX PUMPS

MATERIAL:
INSULATION TYPE/THK:
TRIM:

PRS

QUEST CCS PROJECT

3/4"
D

50.3 m^3/hr
559 kPa
15.0 kW
CASING
316 SS
/

CKD

SHELL CANADA

ET 10
38

RATED FLOW:
DIFF. PR.:
DRIVER:

BY

4"-P-246025-PJB(0.4)

3/4"

3/4
"

PP

3/4"

3/4"

3/4"

3/4"

4"-P-246024-PJB(0.4)

REV

PP
SP
004B

ISSUED FOR PHA III

ET 10
38

3/4"

PP

06/13/11

4"

4"
PP
SP
004A

PJB(0.4) DAB

3/4"

PJB(0.4) DAB

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

ISSUED FOR HAZOP

INTERNALS
316 SS
7

UNIT 246 - REGENERATION/COMMON


STRIPPER REFLUX DRUM & REFLUX PUMPS
SCALE: NONE
SHELL DWG NO.:

246.0000.000.041.006

REV.

FILE:\\F:\1025\DRAWINGS\CO2\246\246.006.pid MODEL DATE:6/14/2011 10:42:30 AM BY:bes29451

HIS
007

I
003

R/S

2"-DM-246010-DAB

HS
007A

HOA

246.006

HS
109

6"-P-246022-PJB(0.4)

LI
011

ET 10
38

MIN

3/4"

2"

3/4"

4800 mm

LL

FROM V-24703

FROM E-24129/24229

V-24602

LT
011

NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.


INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

13033

3"

PP

GWR

247.003

PJE(0.4)

MIN

42"
3"-P-241113-PJB(0.4)

I
003

PJB(0.4)

FREE DRAINING

3"

FREE DRAINING

6"-P-246023-PJB(0.4)

FROM E-24601A/B

2"-P-247002-PJB(0.4)

K.O. LIQUID

3/4"

2"-DM-246008-DAB

246.005

3"x2"

TWO PHASE FLOW

4"-P-246074-PJB(0.4)
12246

3/4"

42"-P-246020-PJB(0.4)
TWO PHASE FLOW

247.001

12368

HOLDS:

RV
013

CO2
TO V-24701

2"-P-247003-PJB(0.4)

BLOWTHROUGH
3K4
SET@
385 kPa-g

OVERHEAD VAPOUR/LIQUID

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS
OTHERWISE STATED.
3 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012.
4 . MAKE-UP WATER REQUIREMENTS TO THE AMINE SYSTEM ARE NORMALLY SATISFIED
BY THE PURGE WATER FLOW FROM HMU 1 AND 2.
5 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE.
6 . ELECTRIC TRACE TO HLL (ET 10).
7 . ELECTRIC TRACE (ET 10).
8 . AUTO-START BY PUMP ON RUN FAILURE OF PRIMARY PUMP.

3300 mm ID x 7300 mm T/T


385 kPa-g @ 150 C / FV @ 150 C
CS + 3 mm 304L SS CLAD / 316L SS
H/
6
P-246129-PJB(0.4)

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
3 . SUCTION PIPING TO BE AS SYMMETRICAL AS POSSIBLE.
4 . 3 x 50% PUMPS FOR TOTAL DESIGN FLOW RATE OF 1510.6 m3/h.
5 . AUTO-START LOGIC FOR P-24601A/B/C SHALL TAKE INTO CONSIDERATION
THE NUMBER OF LEAN AMINE CHARGE PUMPS COMMANDED TO RUN
SIMULTANEOUSLY. REFER TO DRAWING 246.011.
6 . ELECTRIC TRACE (ET 10).
7 . AUTO-START STAND-BY PUMP ON RUN FAILURE OF EITHER PRIMARY PUMP.
8 . VALVE AND SPACER TO BE ORIENTED IN THE HORIZONTAL PLANE.

HOLDS:
INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

FI
010

FT
010
LEAN AMINE
246.002

12182

14"

ET 10
75

24"-P-246041-DJB(0.4)

16"x14"

FROM V-24601

ET 10
63

16"-P-246048-DJE(0.4)

16"x14"

LEAN AMINE
246.001

12230

TO E-24602A/B

12"-P-246048-DJE(0.4)

C
ET 10
63
DJB(0.4)
DJE(0.4)

P-24601A

I
001

DAB

R/S

HIS
001

13130

12"-P-246047-DJE(0.4)

7
I
001

R/S

HS HOA
001A

HIS
002

DAB

3/4" 3/4"

2"

DAB
DJE(0.4)
DAB

LOCAL/
REMOTE
VFD
FAULT

16"x12"

DJE(0.4)

SI
003

"
3/4

2"-DM-246023-DAB

ET 10
63

2"-DM-246019-DAB

I
002

3/4" 3/4"
SP
005C

DJE(0.4)

MIN

MIN

VFD

P-24601B

XL
003
XA
003

VFD

I
002

P-24601C

I
001

R/S

HS HOA
002A

3/4"-DM-246018-DAB

3/4"-DM-246014-DAB

246.013

12"x8"

16"x12"
"
3/4

1"

1"

DJE(0.4)

VFD
FAULT

PP

HIS
003

06/13/11

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

HS HOA
003A

REV

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

3/4"-DM-246022-DAB

6"-DM-246006-DAB

TO V-24606

AMINE DRAIN
13125

246.002

SEL

SHELL CANADA

6"-DM-246005-DAB

QUEST CCS PROJECT

VFD SET POINT

FROM V-24601

246.011
4

MATERIAL:
INSULATION TYPE/THK:
TRIM:

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

755.3 m^3/hr
909 kPa
261.0 kW (EACH)
CASING
INTERNALS
316 SS
316 SS
H/
6
P-246132-DJE(0.4)
P-246133-DJE(0.4)
P-246134-DJE(0.4)

FROM PC-041

P-24601A /B /C
LEAN AMINE PUMPS
RATED FLOW:
DIFF. PR.:
DRIVER:

12904

ISSUED FOR HAZOP

UNIT 246 - REGENERATION/COMMON


LEAN AMINE PUMPS
SCALE: NONE
SHELL DWG NO.:

246.0000.000.041.007

REV.

246.007

HS
104

FILE:\\F:\1025\DRAWINGS\CO2\246\246.007.pid MODEL DATE:6/14/2011 1:17:29 PM BY:bes29451

DAB

LOCAL/
REMOTE

2"-DM-246021-DAB

XL
002

3/4"-DM-246020-DAB 3/4"

SI
002

XA
002

AMINE DRAIN

16"-P-246044-DJE(0.4)
MIN

MIN

VFD

DAB

DJE(0.4)

3/4" 3/4"

2"

DJE(0.4)
I
002

3/4" 3/4"

ET 10
63

VFD
FAULT

SP
005B

2"-DM-246017-DAB

DAB

"
3/4

LOCAL/
REMOTE

12"x8"

16"x12"

DJE(0.4)

2"

PP
PP

3/4"-DM-246016-DAB 3/4"

XL
001
XA
001

2"

2"-DM-246013-DAB

3/4"-DM-246012-DAB 3/4"

DJE(0.4)
DAB

PP

SI
001

2"-DM-246015-DAB

3/4" 3/4"

3/4" 3/4"

DJE(0.4)
DAB

2"

MIN

MIN
1"

ET 10
63

PP

SP
005A

DJE(0.4)
DAB

16"-P-246043-DJE(0.4)

DAB

DJE(0.4)

12"-P-246046-DJE(0.4)

ET 10
50
12"-P-246045-DJE(0.4)

16"-P-246042-DJE(0.4)

2"

PP

2"

DJE(0.4)
DAB

12"x8"

2"

ET 10
50

ET 10
50

MIN

2"

MIN

DJB(0.4)
DJE(0.4)
MIN

DJB(0.4)
DJE(0.4)

E-24604A
LEAN AMINE COOLER
RATED DUTY:
SURFACE AREA:
TEMA TYPE:
DESIGN PRESS:
DESIGN TEMP:
MATERIAL:
INSULATION TYPE/THK:
TRIM:

E-24605A
LEAN AMINE TRIM COOLER

20.8 MW
829.0 m^2
BEU
SHELL
1500 kPa-g / HV
130 C / 150 C
CS + 3mm 304L SS CLAD
/
5
P-246135-DAB

RATED DUTY:
SURFACE AREA:
TUBE
1155 kPa-g /
58 C /
DUPLEX 2205 + 0.38 mm CA
/
CWR-246032-UAB

DESIGN PRESS:
DESIGN TEMP:
MATERIAL:
INSULATION TYPE/THK:
TRIM:
TEMA TYPE:

FIRE
1-1/2G3
SET@
1500 kPa-g

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
3 . PIPING BETWEEN TRAIN "A" AND TRAIN "B" TO BE AS SYMMETRICAL AS POSSIBLE.
4 . LOCATE TT-027 MINIMUM 10 PIPE DIAMETERS DOWNSTREAM OF BYPASS MIXING
POINT.
5 . ELECTRIC TRACE (ET 10).

COLD
1155 kPa-g /
58 C /
/

NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.


INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

V
3"-DM-246062-DAB

TW
029

DM
246.033

CSO

1-1/2"

3/4"

12"

ET 10
N/A

ET 10
38

N/A
ET 10

3"x1-1/2"

3/4"

RV
002

15.5 MW
676.0 m^2
HOT
1500 kPa-g / HV
105 C / 150 C
PLATES: 316L SS / GRAPHITE
FRAME: CS
/
5
P-246136-DAB
PLATE & FRAME

HOLDS:

2"

246.025
CWR

12"-CWR-246001-UAB

ET 10
38

ET 10
63

FROM E-24602A/B
16"

2"

16"

16"
2"
D

RS

16"

4"-CWS-246019-UAB

4"

E-24604A

C
16"x12"

MIN.

16"-P-246057-DAB

BACK FLUSH

246.025
CWS

12"-CWS-246018-UAB

12958

ET 10
N/A

N/A
ET 10

6"

12"

16"-P-246105-DAB

LEAN AMINE
246.009

12949

FROM E-24605B
ET 10
63

16"-P-246051-DAB

4"-CWR-246002-UAB

TI
026

PP

TC
027

1-1/2"

RS

2"

2"

RS

RS

RS
2"

TT
026

ET 10
63

24"x16"

1-1/2"

2"

1-1/2"

24"-P-246059-DAB

LEAN AMINE
246.010

12253

TO FILTRATION/P-24602A/B/C

3
D

2"-DM-246063-DAB

ET 10
50

E-24605A

TT
027

24"x16"

ET 10
63

2"

3/4" 3/4"

TW
025

ET 10
50

3/4"

TW
028

12"-P-246104-DAB
12"x8"

8"-P-246052-DAB

3
12"x8"

6"

4"-CWR-246007-UAB

4"

10"-CWR-246006-UAB

NC

246.009

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

B
REV

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

12251

FROM E-24604B

ET 10

ET 10
N/A

4"-CWS-246024-UAB

SHELL CANADA

10"-CWS-246023-UAB

ET 10
38

ET 10
N/A

BACK FLUSH

ET 10
50

LEAN AMINE

06/13/11

N/A
10"

MIN.

N/A
ET 10

CSO
MIN.

2"

8"-P-246055-DAB

QUEST CCS PROJECT

12960

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT
ISSUED FOR HAZOP

UNIT 246 - REGENERATION/COMMON


LEAN AMINE COOLING TRAIN "A"
SCALE: NONE
SHELL DWG NO.:

246.0000.000.041.008

REV.

246.008

246.025
CWS

12959

246.025
CWR

FILE:\\F:\1025\DRAWINGS\CO2\246\246.008.pid MODEL DATE:6/14/2011 1:17:30 PM BY:bes29451

8"

TV
027

12"x8"FC12"x8"

12596

246.033
DM
1-1/2"

10"

246.001

RS

12181

CSO
MIN.

NC

LEAN AMINE

CSO

3"-P-246053-DAB

16"x12"

12957

2
E-24605B
LEAN AMINE TRIM COOLER

E-24604B
LEAN AMINE COOLER
RATED DUTY:
SURFACE AREA:
TEMA TYPE:
DESIGN PRESS:
DESIGN TEMP:
MATERIAL:
INSULATION TYPE/THK:
TRIM:

RATED DUTY:
SURFACE AREA:

20.8 MW
829.0 m^2
BEU
SHELL
1500 kPa-g / HV
130 C / 150 C
CS + 3 mm 304L SS CLAD
/
4
P-246137-DAB

12251

3"-DM-246064-DAB

DM
246.033

1-1/2"

12"

CSO

3/4"

CWR
13026

16"

2"

16"

16"

4"-CWS-246021-UAB

4"

E-24604B

16"-P-246058-DAB

RS

16"

NC

2"

4"-CWR-246004-UAB

FROM E-24602A/B

ET 10
38

16"x12"

ET 10
63

RS

N/A
ET 10

16"x12"

MIN.

12"

12"-CWS-246020-UAB

CWS

6"

13027

BACK
FLUSH
PP

2"

2"

RS

RS

2"

2"

E-24605B

1-1/2"

ET 10
63

RS

3
16"-P-246110-DAB

LEAN AMINE
12949

246.008

TO FILTRATION /
P-24602A/B/C

TW
038

2"-DM-246065-DAB

CSO
MIN.

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

REV

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

APE

PEM CLIENT
APP

12262

246.033
DM

4"-CWS-246026-UAB

MIN.

10"
R

6"

N/A

ET 10

N/A

BACK
FLUSH

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT
ISSUED FOR HAZOP

UNIT 246 - REGENERATION/COMMON


LEAN AMINE COOLING TRAIN "B"
SCALE: NONE
SHELL DWG NO.:

MC

PDP

QUEST CCS PROJECT

13029

CS

SHELL CANADA

10"-CWS-246025-UAB

CWS

ISSUED FOR PHA III

ET 10
38

4"

4"-CWR-246009-UAB

13028

06/13/11

246.0000.000.041.009

REV.

246.009

CWR

ET 10
38

10"-CWR-246008-UAB

ET 10 N/A
10"

2"

N/A

FILE:\\F:\1025\DRAWINGS\CO2\246\246.009.pid MODEL DATE:6/14/2011 2:59:13 PM BY:bes29451

RS

ET 10
63

1-1/2"

2"

3/4" 3/4"

TW
035

NC

16"-P-246054-DAB

CSO

3
246.001

NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

MIN.
3"-P-246056-DAB

12252

12"-CWR-246003-UAB

CSO

TO BYPASS

LEAN AMINE

HOLDS:

ET 10
N/A

ET 10
38

2"

3/4"
3"x1-1/2"

ET 10
50

ET 10
N/A

246.008

8"-P-246055-DAB

COLD
1155 kPa-g /
58 C /

TW
039

RV
003

INSULATION TYPE/THK:
TRIM:
TEMA TYPE:

15.5 MW
676.0 m^2
HOT
1500 kPa-g / HV
105 C / 150 C
PLATES: 316L SS / GRAPHITE
FRAME: CS
4
/
P-246138-DAB
PLATE & FRAME

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
3 . PIPING BETWEEN TRAIN "A" AND TRAIN "B" TO BE AS SYMMETRICAL AS POSSIBLE.
4 . ELECTRIC TRACE (ET 10).

FIRE
1-1/2G3
SET@
1500 kPa-g

LEAN AMINE

DESIGN PRESS:
DESIGN TEMP:
MATERIAL:

TUBE
1155 kPa-g /
58 C /
DUPLEX 2205 + 0.38 mm CA
/
CWR-246034-UAB

N/A
ET 10

V-24604
LEAN AMINE FILTER

246.012

12140

FROM P-24604

SIZE:
RATED FLOW:
DESIGN PR. &TEMP:
PRESSURE DROP (CLEAN/DIRTY):
MATERIAL:
INSULATION TYPE/THK:
TRIM:

3200 mm ID x 6000 mmT/T


71 m^3/hr
1500 kPa-g @ 90 C / HV @ 150 C
35 kPa / 70 kPa
CS + 3 mm CA + PWHT / 316L SS INTERNAL
/
5
P-246140-DAB

SIZE:
RATED FLOW:
DESIGN PR. &TEMP:
PRESSURE DROP (CLEAN/DIRTY):
MATERIAL:
INSULATION TYPE/THK:
TRIM:
PARTICLE RETENTION SIZE:

4"-P-246088-DAB
START-UP

NC

FX
015
FV
015

MIN
246.008

3/4"

FROM E-24605A/B

24"-P-246059-DAB

16"

SP
006

6"-P-246XXX-DAB

PP

6"x4"

S8

ET 10
50
2"-P-246084-DAB

FILTERED LEAN AMINE


12142

246.012

2"-DM-246030-DAB

246.033
DM

10"x6"

3/4"

246.033
DM

ET 10
3"-DM-246027-DAB 38

CSO

3/4"

1"

2"-P-246069-DAB
D

CSC

3/4" 3/4"

ET 10
38

RS

3"

4"

3/4"

MIN

13142

ET 10
50

13135

6"-P-246068-DAB

PP

3/4" 3/4"

RV
021

3/4"

10"-P-246066-DAB

6"x4"

246.011

3/4" 3/4"

FT
016

H
3/4" 3/4"

3"

2"

PDC
035

FIRE
1-1/2H3
SET@
1500 kPa-g
3/4"

SP
007
4

PDT
035

10"-P-246066-DAB

FX
016

CSO

13134

CSC

1"

CSO

FC
016

3/4" 3/4"

38
ET 10

ET 10
50

10"x8"

2"x1-1/2"

3/4"

3/4"

2"-DM-246025-DAB

FO
8"

246.033
DM

PP

10"-P-246063-DAB

2"x1"
2"-GI-246013-ULB

246.030
GI

3/4"

3/4"
V
RS

DAB ET 10
ULB N/A

DAB
SAB

2"-P-246065-DAB

10"x8"

ET 10
50

3/4"

FT
015

10"x8"

ET 10
50

CSO

10"x8"
MIN

MIN

12235

TO TK-24601

SHUT DOWN

FIRE
1D2
SET@
1500 kPa-g
RV
020

6"-P-246075-DAB
FC

FV
016

2"x1"

1"-P-246064-DAB
ET 10
38

FC
015

FILTERED LEAN AMINE

HZI
040

HZT
040

HV
040

S8
3

TO P-24602A/B/C
3/4"

3/4" 3/4"

3/4"

FO

ET 10
75

24"x16" FO 24"x16"
D

NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.


INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

A/S

3/4" 3/4"

12253

16"

ET 10
75

HOLDS:

HYI
040

24"-P-246059-DAB
LEAN AMINE

O/C

HIS
040

ET 10
38

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
3 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012.
4 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE.
5 . ELECTRIC TRACE (ET 10).
6 . MECHANICAL MINIMUM FLOW STOP TO BE PROVIDED.

ID x F/T
71 m^3/hr
1500 kPa-g @ 90 C / HV @ 150 C
35 kPa / 103 kPa
CS + 3 mm CA + PWHT / 316L SS INTERNAL
/
5
P-246141-DAB
10 microns ABSOLUTE

13136

START-UP AMINE

ID x F/T
355 m^3/hr
1500 kPa-g @ 90 C / HV @ 150 C
35 kPa / 103 kPa
CS + 3 mm CA + PWHT / 316L SS INTERNAL
/
5
P-246139-DAB
10 microns ABSOLUTE

V-24609
LEAN AMINE POST FILTER

2"

SIZE:
RATED FLOW:
DESIGN PR. &TEMP:
PRESSURE DROP (CLEAN/DIRTY):
MATERIAL:
INSULATION TYPE/THK:
TRIM:
PARTICLE RETENTION SIZE:

V-24608
LEAN AMINE CARBON FILTER

V-24604
V-24608

3"

3/4" 3/4"

2"-SC-246015-SAB

B
PDC
036

PDT
036

PDC
037

SP
008

24"
MW

3/4" 3/4"

3
3"

V
3/4"

PP

PDT
037

S8

12690

246.030
GI

2"-GI-246014-ULB

DAB
SAB

12387

246.033
DM

ET 10
38

ET 10
2"-DM-246024-DAB
38

ET 10 DAB
N/A ULB

06/13/11

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

3"

2"

REV

6"-P-246072-DAB

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

SP
009

3"

S8

3"
3

246.034
SC

2"-SC-246012-SAB

ULB DAB
N/A ET 10
ET 10
38

ET 10
38

D
DAB

ISSUED FOR HAZOP

SAB

ET 10
38

UNIT 246 - REGENERATION/COMMON


LEAN AMINE FILTRATION
SCALE: NONE
SHELL DWG NO.:

12462

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

12390

2"x1"

2"-DM-246029-DAB

ET 10
38

246.0000.000.041.010

REV.

246.010

2"-SC-246XXX-SAB

MIN
1"-P-246076-DAB

QUEST CCS PROJECT

246.033
DM

GI
246.030

2"-GI-246012-ULB

DM
246.033

3/4"

13141

12687

SHELL CANADA

3/4" 3/4"

3"-DM-246026-DAB

MIN

ET 10
38

ET 10
38

V-24609

FILE:\\F:\1025\DRAWINGS\CO2\246\246.010.pid MODEL DATE:6/14/2011 3:04:21 PM BY:bes29451

3/4" 3/4"

3/4"

ET 10
50

3/4"

3/4" 3/4"

6"-P-246070-DAB

MIN

2"-SC-246014-SAB

PP

LEAN AMINE FLOW SIGNAL

UC
002

FROM FC-241075
LEAN AMINE FLOW SIGNAL

FC
020

I
002

441.029

FV
020

FROM FC-441075
DAE DAG

8"x6" FO 8"x6"

START-UP / MINIMUM FLOW

DM

DAG
DAB

24"-P-246059-DAB

10 . TWO CHECK VALVES IN SERIES, ONE IN THE HORIZONTAL AND ONE IN THE
VERTICAL POSITION, SEPARATED BY AT LEAST 500 mm.
I
002

PT
042

LL

11 . VALVE AND SPACER TO BE ORIENTED IN THE HORIZONTAL PLANE.

PI
042

12 . VALVES ARE FOR BATTERY LIMIT ISOLATION OF UNIT.


13 . 316 SS INJECTION QUILL AND 304 SS HEADER TEE. OUTLET OF INJECTION QUILL
TO BE CENTERED IN PROCESS PIPE.

FT
020
ET 10
75

ET 10
63

24"x16"

24"-P-246080-DAG

16"-P-246080-DAG

DETAIL "A"
INJECTION QUILL

LEAN AMINE
241.021

12644

TO V-24118/V-24218

ET 10
75

SP

FROM E-24605A/B &


FILTRATION
VFD SET POINT

3/4"

12

PC
041

12904

TO P-24601A/B//C

I
001

I
002

13

PJG(0.4)

3/4" 3/4"

PT
041

LL

010

DAG
FLOW

SEE DETAIL "A"

MP-002

LL
24"x16"

13

24"x16"

ET 10
63

14"-P-246081-DAG

246.101

12238

HOLDS:

TO V-44118

DAG
PJG(0.4)

LEAN AMINE

3/4"

MIN.

INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.


DETAILS FOR INJECTION QUILL TO BE FINALIZED.
SAFETY SYSTEM PUMP TRIP REQUIREMENTS TO BE CONFIRMED DURING DETAILED
ENGINEERING.

5
ET 10
38

3/4"-KP-246003-PJG(0.4)

ANTI-FOAM
246.014

12239

FROM P-24606A/B
24"x18"

10

2"

ET 10
63

ET 10
63

16"-P-246077-DAG

PP

P-24602A
I
002

I
001

MIN

MIN
1"

P-24602B
4

HS
005A

HOA

I
002

I
001

3/4"-DM-246037-DAG
D

HIS
005

DAB

R/S

16"x8"

18"x12"

3/4
"

I
D

P-24602C
4

7
HS
006A

HOA

I
002

06/13/11

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

I
001

REV

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

3/4"-DM-246041-DAG
3/4"

DAG

3/4"

2"

D
3/4"

16"x8"

18"x12"

3/4
"

I
D

3/4"-DM-246033-DAG

HIS
004

PP

HIS
006

R/S

2"

3"x2"

3"-DM-246043-DAB

3/4"

2"-DM-246043-DAB

R/S

3/4"

D
DAB DAG

HOA

3/4" 3/4"

2"-DM-246040-DAG

7
HS
004A

SP
011C

3/4"-P-246039-DAG

D
2"-DM-246036-DAG

3/4"-DM-246035-DAG 3/4"

2"

16"x8"

18"x12"

PP

3/4
"

2"

2"-DM-246032-DAG

3/4"-DM-246031-DAG 3/4"

FO
108

3/4" 3/4"

SP
011B

2"

18"-P-246062-DAG

MIN

1"

MIN

18"-P-246061-DAG

3/4" 3/4"

3/4" 3/4"

3/4" 3/4"

PP

FO
107
PP

ET 10
63

2"-DM-246034-DAG

1"

MIN

MIN

18"-P-246060-DAG
SP
011A

16"-P-246079-DAG

2"

PP
3/4" 3/4"

11

16"-P-246078-DAG

2"

FO
106

2"

ET 10
63

2"

ET 10
63

11

MIN

MIN

11

DAB
DAG

11

ET 10
63

DAB
DAG

MIN

11

2"-DM-246038-DAG

DAB
DAG

11

10

HS
107

SHELL CANADA

SEL

QUEST CCS PROJECT

A
ISSUED FOR HAZOP

P-24602A /B /C
LEAN AMINE CHARGE PUMPS
4

RATED FLOW:
DIFF. PR.:
DRIVER:
MATERIAL:
INSULATION TYPE/THK:
TRIM:

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

709.0 m^3/hr (EACH)


3603 kPa
1119.0 kW (EACH)
CASING
INTERNALS
316 SS
316 SS
9
/
P-246142-DAG
P-246143-DAG
P-246144-DAG

UNIT 246 - REGENERATION/COMMON


LEAN AMINE CHARGE PUMPS
SCALE: NONE
SHELL DWG NO.:

246.0000.000.041.011

REV.

FILE:\\F:\1025\DRAWINGS\CO2\246\246.011.pid MODEL DATE:6/14/2011 1:17:35 PM BY:bes29451

24"x18"

246.011

246.007

9 . ELECTRIC TRACE (ET 10).

DAB DAG

246.010

12235

8"-P-246XXX-DAG

2"-DM-246042-DAG

FILTERED LEAN AMINE

ET 10
50

6"

8 . UC-002 SHALL MONITOR LEAN AMINE FLOWS TO EACH HMU PLANT AND THE
TOTAL LEAN AMINE FLOW INCLUDING THE MINIMUM FLOW RECYCLE. UC-002
WILL PROVIDE A SET POINT TO FC-020 BASED ON THE NUMBER OF RUNNING
PUMPS AND WILL AUTOMATICALLY PREVENT EXCESSIVE PUMPING BY STOPPING
ONE OF THE RUNNING PUMPS VIA I-002.

3/4" 3/4"

TO E-24602A/B

ET 10
50

8"-P-246085-DAE

12985

12281

2"

246.001

2"-DM-246057-DAB

LEAN AMINE

3/4"

12983

SP

FROM FC-242075
LEAN AMINE FLOW SIGNAL

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
3 . CLOSES FV-020 IF NO LEAN AMINE CHARGE PUMPS ARE RUNNING.
4 . 3 x 50% PUMPS FOR A TOTAL FLOW OF 1418 m3/h.
5 . ANTI-FOAM IS ADDED INTERMITTENTLY BY THE OPERATOR ON HIGH DP ACROSS
THE AMINE ABSORBERS. ON HIGH DP IN EITHER V-24118 OR V-24218, ANTI-FOAM WILL
BE SENT TO BOTH ABSORBERS.
6 . PUMP SUCTION PIPING TO BE AS SYMMETRICAL AS POSSIBLE.
7 . AUTO-START LOGIC FOR P-24602A/B/C SHALL ALSO CONSIDER THE NEED TO
RAMP UP AND/OR AUTOSTART P-24601A/B/C. REFER TO DRAWING 246.007.

PV

242.021

12982

f(x)

PV

241.021

12981

3
TK-24601
AMINE MAKE-UP TANK
SIZE:
WORKING CAPACITY:
DESIGN PR. & TEMP.:
MATERIAL (SHELL/COIL):
INSULATION TYPE/THK:
TRIM:

PC
048A

CSO
?
?

2"x1-1/2"

?
?

?
?

LT
015

2"x1-1/2"

XHIS O/C SET@ kPa(g) Vacuum


005
kPa(g) Positive Press
PVSV
047

FROM V-24605

5063357
?

TK-24601

?
?
5163612
ET 10
N/A
5156168

MAKE-UP AMINE

1-1/2"

H
25

3/4"

?
?
2"-SCL-246015-SAB

ET 10
38

TK-24602

14

NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.


INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

3/4"
D

4" ?
?

NLL=2600 mm

2"

ET 10
38

2"x1-1/2"

ET 10
63

NLL=2600 mm

2"
?
?

FO
N/A ET 10

24"

15

10
ET 10
38

?
?

3"

LT
017

5156893

3"

ET 10
38

ET 10
63

2"

3"
?

38
ET 10

0.75 M

FROM P-24608A/B

2"-SL-246020-SAB

2"x1-1/2"

0.75 M

246.029
SL

H
25

2"

6"

12125

1-1/2"

TV
041

ET 10 N/A

246.021

START-UP

FO
?
?

CONDENSATE

2"x1-1/2"

?
?

10

027

8
2"

LI
017

ET 10
63

FG

NC 5163480
5156168 C-1
C-1

LLL=1500 mm

ET 10

24"-P-246112-DAB

4"-SC-246009-SAB

4"

TT
041

2"

ET 10
63

2"-P-246111-DAB

DAB SAB
MIN

2"

TT
040

4"-P-246092-DAB

HLL=11500 mm

(TYPICAL OF 2)

TC
041

HHLL=12000 mm
24"
MW

?
?

12143

HORN
SILENCE

STORAGE FACILITY TO BE VERTICAL TANK (API 650) OR HORIZONTAL DRUM


(ASME SECT VIII). MECHANICAL TO ADVISE LEAST COST ALTERNATIVE.

MIN. 2 m

LLL=1500 mm

2"x1-1/2"

2"

12144

246.029
SCL

HORN
TEST

LI
016

HLL=11500 mm

(TYPICAL OF 2)

TV
040

5115227
?

2"-SL-246009-SAB

LHS
016

HHLL=12000 mm

24"
MW

5115227
?

246.029
SL

TC
040

5156168
?

2"

4"

SP
019

5163612
C-1

?
?
2"-SCL-246007-SAB
ET 10
2"

13167

246.029
SCL

?
?

13168

6" 6"
SP

12
BERM

BERM
ET 10
63

2"-P-246091-DAB

4" 4"
NC 5163612
5156168 C-1
C-1

2"

ET 10
50

3/4"-DM-246047-DAB

3/4
"

INTERMITTENT

?
C-1

TO V-24601

246.023
DM

246.023
DM

13175

13176

2"-DM-246044-DAB

NC
?
C-1

?
?

07/11/11

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW

REV

R/S

PP

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

?
C-2

2"x3"

3"x2"

ISSUED FOR PRELIMINARY REVIEW

3/4"

SP
022B

2"-DM-246055-DAB

?
C-1

HIS
010

3/4"-DM-246052-DAB

3/4"-DM-246048-DAB

I
005

PP

2"

5156893
C-1

5063357
C-1

2"-P-246091-DAB
HS
010A

3/4"-DM-246051-DAB

5061864
?

3"-P-246087-DAB

2"-DM-246050-DAB

3/4"
C- ?
1

246.002

ET 10
50

2"

5063357
C-1
ET 10
50

ET 10
50

ET 10
38

HOA

3/4"

4"x3"

3/4"-DM-246049-DAB

?
C-2

PP

ET 10
50

2"-DM-246056-DAB

3/4"
V
5061864
?

3/4"

P-24604

3/4"

ET 10
38

?
C-1

3/4"
D
?
C-1

3/4"

ET 10
38

C-2

3/4
"

P-24605

C- ?
1

SHELL CANADA
3/4"-DM-246054-DAB

2"-DM-246053-DAB

QUEST CCS PROJECT

ET 10
50

13174

P-24605
AMINE MAKE-UP PUMP

RATED FLOW:
DIFF. PR.:
DRIVER:

RATED FLOW:
DIFF. PR.:
DRIVER:

60.0 m^3/hr
758 kPa
12.6 kW
CASING
INTERNALS
MATERIAL: 316 SS
316 SS
11
INSULATION TYPE/THK:
/
TRIM: P-246149-DAB

MATERIAL:
INSULATION TYPE/THK:
TRIM:

15.0 m^3/hr
3
300 kPa
1.3 kW
CASING
INTERNALS
316 SS
316 SS
11
/
P-246150-DAB

12620

P-24604
AMINE RE-INVENTORY PUMP

246.033
DM

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

UNIT 246 - REGENERATION/COMMON


AMINE MAKE-UP TANK & PUMPS
SCALE: NONE
SHELL DWG NO.:

246.0000.000.041.012

REV.

246.012

246.023
DM

R/S

6"x4"

3/4"-DM-246046-DAB

FO
110

?
C-2

3/4"

SP
022A

NC
?
C-2

NC
5156168
C-1

3/4"

5061864
?

HIS
009

12696

2"-P-246090-DAB

FT
025

4"-P-246088-DAB

PP

5063357 ?
C-1
C-1

?
C-2

2"x1-1/2"

3/4"

FO
C-1

ET 10
38
I
004

FV
025
2"x1-1/2"

2"

1-1/2"

?
C-1
D

FC
025

?
C-1

HOA

TO V-24604

AMINE INVENTORY/MAKE-UP
4"-P-246093-DAB
START-UP

NC
?
C-2

NC
?
C-1

2"-P-246089-DAB

HS
009A

246.010

ISSUED FOR ESTIMATE

?
C-1

3/4"
V
5061864
?

12140

6"x3"

5156168
C-1

SP
020

START-UP AMINE
4"-P-246088-DAB
START-UP

5163612
C-1

12

ET 10
50

FILE:\\F:\1025\DRAWINGS\CO2\246\246.012.pid MODEL DATE:7/8/2011 2:57:20 PM BY:ahm14887

6"-P-246086-DAB

3/4"

FC

C-1 C-1

4"

12
5156168
C-1

HS
116

HOLDS:

6"
5163612
?

4"

14

XZT
005

ET 10
63

FROM V-24609

SP
021

FO

?
?

6"-P-246075-DAB

246.010

12142

1/2" WEEP HOLE

6"

24" MW

XV
005

FO

24" MW

A/S

FILTERED LEAN AMINE

GWR

N/A
ET 10

6"x4"

GAUGE
HATCH
8"

I
007

006

XYI
005

ET 10
38

6"

LT
016

PVSV
046

13

PV
048B

2"

2"-P-246099-DAB
NNF

246.013

LAH
016A

6"x4"

?
?

SET@ kPa(g) Vacuum


kPa(g) Positive Press

LI
016 A
GAUGE
HATCH
8"

6"

6"-P-246071-ULB

?
?

FC

12139

4"

RADAR

13

RECOVERED AMINE

3"

12145

LI
015

PIT
048

PV
048A

TO ATMOSPHERE AT
SAFE LOCATION

?
?

2"-GI-246010-ULB

1-1/2"

3/4"

246.030
GI

HH

I
006

5119160
?

PCV
045

3/4"

2"-GI-246011-ULB 2"

SET@
75 kPa-g

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
3 . PUMP WILL HAVE A WAREHOUSE SPARE.
4 . TRUCK CONNECTION NEAR TANK. LOCAL CONTAINMENT FOR TRUCK UNLOADING.
TEMPORARY / RENTAL TANKS TO BE PLACED ON PAVED, CURBED AREA BESIDE
AMINE STORAGE FACILITY. PAVED AREA TO BE PART OF THE CAPTURE AREA
STORMWATER DRAINAGE FACILITIES.
5 . AMINE MAKE-UP TANK CONTAINS UNDILUTED AMINE.
6 . START-UP PIPING REQUIRED FOR INITIAL AMINE FILL AND DILUTION WITH
CONDENSATE.
7 . LEVEL INDICATION AT GRADE TO BE VISIBLE AT TRUCK UNLOADING LOCATION.
8 . FG-027 TO BE VISIBLE FROM VALVE. FLOW GAUGE AND VALVE TO BE AT GRADE
NEAR TANK.
9 . ALL AMINE PUMPS ARE CONTAINED WITHIN CURBED CONTAINMENT AREA.
10. STEAM COIL AND ALL TANK APPURTENANCES LOCATED BELOW LLL.
11. ELECTRIC TRACE (ET 10), PIPING,PUMPS & NOZZLES.
12. RENTAL TANK CONNECTION.
13. TANK VENDOR TO SUPPLY PVSV.
14. PLATFORM BETWEEN ROOF AREAS OF EACH TANK.
15. TANKS TO BE NO FURTHER THAN 2m APART, 24 NPS TIE LINE TO BE MINIMUM
LENGTH AND TANK NOZZLES TO BE LOCATED AS CLOSE TO GRADE AS POSSIBLE,
NO POCKET.

PC
048B

5119160
?

5000 mm ID x 12600 mm HEIGHT


196 m^3
1 kPa-g @ -0.25 kPag @ 60C
LEAN DUPLEX 2101 + 0.4 mm CA / DUPLEX 2205 + 0.4 mm CA
IH / SHELL __mm ROOF __mm
P-24639039-DAB

3/4"

3/4"

SIZE:
WORKING CAPACITY:
DESIGN PR. & TEMP.:
MATERIAL (SHELL/COIL):
INSULATION TYPE/THK:
TRIM:

?
?

5000 mm ID x 12600 mm HEIGHT


196 m^3
1 kPa-g @ -0.25 kPag @ 60C
LEAN DUPLEX 2101 + 0.4 mm CA / DUPLEX 2205 + 0.4 mm CA
IH / SHELL __mm ROOF __mm
P-246148-DAB

3/4"

4"x3"

4"-VA-246010-ULB

TK-24602 3
AMINE MAKE-UP TANK

?
C-2

RV
046

6"-VA-246011-ULB

CV FAILURE
2J3
SET@
90 kPa-g

TO ATMOSPHERE
AT SAFE LOCATION

V-24606
AMINE DRAIN DRUM

V-24605
DRAINED AMINE FILTER
SIZE:
RATED FLOW:
DESIGN PR. &TEMP:
PRESSURE DROP (CLEAN/DIRTY):
MATERIAL:
INSULATION TYPE/THK:
TRIM:
PARTICLE RETENTION SIZE:

2600 mm ID x 8100 mm T/T


350 kPa-g @ 150 C / HV @ 150 C
CS + 6 mm CA + PWHT / 316 SS + 0.4 mm CA
H/
6
P-246145-DAB

D
V

TO ATMOSPERE
AT SAFE
LOCATION

3/4"

LHS
021A

FREE DRAINING

TO V-24601

246.034
SC

12463

ET 10
38

RS
3"

3/4"
ET 10
38
2"-P-246094-DAB

S8

4"-P-246101-DAB

SP
013

HORN
SILENCE
36"
MW
2"

3/4"

ET 10
38

I
019

TI
045

LIT
021

TT
045
GWR
2"

I
008

NNF

WASTE WATER
12294

GWR
2"

TO WWTP 271

NC

36"

4"

2"

RS
CSO

6"
6"

RS

4
4"

6"
HHLL=2405 mm
HLL=2255 mm

6"-DM-246060-DAB

AMINE DRAINS
13037

246.033

FROM COLLECTION HEADER

13
3/4"

ET 10
50

6"-DM-246061-DAB

06/13/11

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW

REV

6"

ISSUED FOR PRELIMINARY REVIEW


ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

LLL=200 mm

CSO

FREE DRAINING

CSO

FREE DRAINING

FROM COLLECTION HEADER

V-24606

6"

13

246.033

13036

ET 10
50

3/4"

AMINE DRAINS

246.027

LT
020
2"

2"-WP-246003-DAB

P-24607

S-24601

2"

SHELL CANADA
QUEST CCS PROJECT

A
R

P-24607
AMINE DRAIN PUMP
RATED FLOW:
DIFF. PR.:
DRIVER:

S-24601
AMINE DRAIN DRUM SUMP

MATERIAL:
INSULATION TYPE/THK:
TRIM:

ISSUED FOR HAZOP

25.0 m^3/hr
641 kPa
7.5 kW
CASING
INTERNALS
316 SS
316 SS
/
12
P-246147-DAB

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

UNIT 246 - REGENERATION/COMMON


AMINE DRAIN DRUM
SCALE: NONE
SHELL DWG NO.:

246.0000.000.041.013

REV.

246.013

FROM COLLECTION HEADER

246.002

FILE:\\F:\1025\DRAWINGS\CO2\246\246.013.pid MODEL DATE:6/14/2011 3:13:43 PM BY:bes29451

6"

ET 10
50

RS

RS
246.033

12477

12401

13

AMINE DRAINS

1m x 1m

HOLD

3/4"

6"-DM-246006-DAB

3/4"

ET 10
38
2"

11

PP

2"

4"x2"

LI
020

RS

2"-SC-246013-SAB

3"x2"

SP
012B

2"

HH

RS

4"x2"

LI
021

HS
011A

LAH
021A

CSO

SP
012A

LHS
021

I
008

HOA

RS

3/4"
SO

FROM V-24701

2"

247.001

12626

HS
121

R/S

HIS
011

HORN HORN
TEST SILENCE

ET 10
38

2"-DM-247002-PJB(0.4)
NNF
TWO PHASE FLOW

PDI
052

RECOVERED AMINE

2"

SO

ET 10
50

FROM COLLECTION HEADER


KO LIQUIDS

PDT
052

ET 10
38

2"-P-246102-DAB

3/4"

6"-DM-246006-DAB

V-24605

NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.


INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

2"-P-246098-DAB

RS

246.007

13130

ET 10
38

RS

AMINE DRAINS

HOLDS:

NC

FC

3/4"

12461

ULB DAB
1" 2"x1"

2"x1"

2"-GI-246007-ULB

TO TK-24601

3/4"

PCV
049

N/A ET 10

246.030
GI

PV
050A

2"-P-246097-DAB

DAB
SAB

FREE DRAINING

PT
050

246.012

2"-P-246096-DAB

2"-DM-246058-DAB

SET@
100 kPa-g

CSC

12139

NNF

3"

NC

8"-VA-246009-DAB

10

RECOVERED AMINE

2"

3"

CSC

4"-P-246103-DAB
CSO

3/4"

FO

1/2" WEEP HOLE

3"x1-1/2"

3"

1-1/2"

3"x1-1/2"

4"x3"

PC
050A

PV
050B

FREE DRAINING

PC
050B

VAPOUR BLOWTHROUGH
4M6
SET@
350 kPa-g
6"-VA-246007-DAB
RV
025

2"-P-246099-DAB

2"

2"-P-246095-DAB

2"

3"-VA-246008-DAB

3/4"

CSO

CSO

ET 10
38

2"x1"

2"-DM-246059-DAB

FIRE
1D2
SET@
1050 kPa-g

RV
026

3/4"

ET 10
38

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
3 . VACUUM TRUCK CONNECTION.
4 . CHECKER PLATE ON TOP OF SUMP.
5 . PUMP WILL HAVE A WAREHOUSE SPARE.
6 . ELECTRIC TRACING TO HLL (ET 10).
7 . EXTEND BELOW LLL.
8 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE.
9 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012.
10. DISCHARGE PIPE FOR RELIEF VALVE TO BE DIRECTED INTO BOTTOM OF AMINE
DRAIN DRUM SUMP. ENTRY PROCEDURES INTO SUMP ARE REQUIRED FOR
OPERATION / MAINTENANCE TO ENSURE THERE IS NO RELIEF OR OVERFILL OF
AMINE INTO THE SUMP.
11. ACCESS HATCH.
12. ELECTRIC TRACE (ET 10).
13. VALVE STEM TO EXTEND ABOVE GRADE.
14. PUMP P-24607 TO BE MANUALLY STARTED ON HIGH LEVEL ALARM.

ID x
25 m^3/hr
1050 kPa-g @ 150 C / HV @ 150 C
35 kPa / 150 kPa
CS + 3 mm CA + PWHT / 316 SS INTERNAL
/
12
P-246146-DAB
10 microns ABSOLUTE

3/4"

SIZE:
DESIGN PR. & TEMP:
MATERIAL(VESSEL/INTERNALS):
INSULATION TYPE/THK:
TRIM:

S- 02NULL
ANTI-FOAM INJECTION PACKAGE

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
3 . POSITIVE DISPLACEMENT PUMP WITH ADJUSTABLE STROKE.
4 . GRADUATED GLASS COLUMN FOR CONTINUOUS TOTE TANK LEVEL INDICATION
AND INJECTION PUMP CALIBRATION.
5 . SS TUBING TO PIPE CONNECTOR.
6 . VERTICAL ORIENTATION REQUIRED FOR ROTAMETER WITH INLET FLOW INTO
THE BOTTOM OF THE INSTRUMENT.
7 . WAREHOUSE SPARE PUMP TO BE PROVIDED AND STORED IN THE ANTI-FOAM
INJECTION SHELTER.
8 . ANTI-FOAM INJECTION PUMP TO AUTOMATICALLY STOP 5 MINUTES AFTER
BEING STARTED.

HOLDS:
NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

PI
055

S- 02NULL

OUTSIDE
INSIDE

1"-VA-246017-PAB
VENDOR

SP
017

1" HOSE

1" HOSE

SP
016

SET@
3500 kPa-g

3/4" 3/4"

1"

(BY SHELL)
2"x1"

3/4"

FI
111

VENDOR

3/4"
1" HOSE

2"x1"

1-1/2"x1"

6" FILL CAP


2"
2"

LHS
023A

2"

LG
024

LL

LT
023

LG
023

1000 L
TOTE TANK
(OPERATING)

MAG

I
010

2"

HORN
SILENCE

3/4" HOSE

3/4"

3/4"
3/4"

2"

P-24606

ET 10
38

N/A
INSIDE

SS TUBING PJE(0.4)
INSTR. PIPING

ANTI-FOAM
12286

241.021

ET 10
38
ET 10
OUTSIDE

ANTI-FOAM
12283

246.002

TO V-24601

HOA

I
010

D
3/4"

LI
023

3/4"-SS TUBING

TO V-24118/24218

3/4"-KP-246001-PJE(0.4)

HS
015A

3/4"

2"

2"x3/4"

246.011

PIPING SP
014B

SS TUBING PJG(0.4)
INSTR. PIPING SP
015
5

PP

1-1/2"x1"

I
009

LHS
023

2"x1"
4

LAH
023A

12239

PULSATION
DAMPENER

3/4"

3/4"

HORN
SILENCE

3/4"-SS TUBING

ANTI-FOAM

VENDOR

3/4" 3/4"

VENDOR

SP
018

3/4"-SS TUBING

2"
D

ET 10
38

TO V-44118

3/4"-KP-246005-PJG(0.4)

FI
112

3/4"

PG
057

INSTR.

6
PT
055

2"

3/4"-KP-246003-PJG(0.4)
SS TUBING PJG(0.4)

RV
030
1000 L
TOTE TANK
(REMOVABLE)

SP
014A

FI
110

2"

1"-VA-246016-PAB

6" FILL CAP

CSC

1"-VA-246018-PAB
2"x1"

HS
015

R/S

I
009

06/13/11

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

HS
023

REV

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

CURB

CURB

SHELL CANADA
QUEST CCS PROJECT

A
7

P-24606 3
ANTI-FOAM INJECTION PUMP

MATERIAL:
INSULATION TYPE/THK:
TRIM:

160 L/hr
3850 kPa
0.75 kW
CASING
316 SS
NONE /

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

UNIT 246 - REGENERATION/COMMON


ANTI-FOAM INJECTION PACKAGE

INTERNALS
316 SS

SCALE: NONE
SHELL DWG NO.:

246.0000.000.041.014

REV.

246.014

RATED FLOW:
DIFF. PR.:
DRIVER:

ISSUED FOR HAZOP

FILE:\\F:\1025\DRAWINGS\CO2\246\246.014.pid MODEL DATE:6/14/2011 1:17:40 PM BY:bes29451

HORN
TEST

V-24607
CONDENSATE FLASH DRUM
SIZE:
DESIGN PR. & TEMP:
MATERIAL(VESSEL/INTERNALS):
INSULATION TYPE/THK:
TRIM:

E-24606A /B
LP COND. / DEMIN WATER EXCHANGER
RATED DUTY:
SURFACE AREA:

3000 mm ID x 6300 mm T/T


500 kPa-g @ 150 C / FV @ 150 C
CS + 3 mm CA
5
IH /
SCL-246XXX-SAG

DESIGN PRESS:
DESIGN TEMP:
MATERIAL:
INSULATION TYPE/THK:
TRIM:

CONDENSATE

HOT
1150 kPa-g / FV
150 C / 150 C
PLATES: 304 SS
FRAME: CS
/
SCL-246030-SAB
WI-246020-UJB(0.4)

ET 10
100

8"-SCL-246002-SAB

246.003

COLD
1450 kPa-g / HV
125 C / 125 C
/

8"
5156140
C-2

FROM E-24603A / V-24603A


CONDENSATE
12680

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
3 . HP CONDENSATE AND FLASHING LP CONDENSATE LINES TO ENTER V-24607
BELOW LLL.
4 . START-UP PIPING REQUIRED FOR INITIAL AMINE FILL AND DILUTION WITH
CONDENSATE.
5 . ELECTRIC TRACE TO HHLL (ET 10) AND EXCHANGERS.
6 . REQUIRE HEIGHT TO BE AS LOW AS POSSIBLE (MINIMUM 2.6m) FOR PROCESS
HYDRAULICS.
7 . VESSEL SUPPORTED BY MODULE STRUCTURE AND IS LOCATED ABOVE
EXCHANGERS E-24606A/B.

13.5 MW (TOTAL)

ET 10
100

8"-SCL-246005-SAB

246.004

6"

5156140
C-2

5242525
C-2

6"

FROM E-24603B / V-24603B

ET 10
75

8"

1-1/2"

1-1/2"

D
?
C-2
TW
055

1-1/2"

1-1/2"

?
C-2
TW
057

1-1/2"

TW
051

246.101

12681

NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.


INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
RELIEF LINE (INLET AND OUTLET) SIZING.

TO V-25102

1-1/2"
D
?
C-2

?
C-2

HOLDS:

HOT DEMIN WATER


6"-WI-246007-UJB(0.4)

CSO
5242525
C-2

12454

1-1/2"

TW
054

1-1/2"

6"-WI-246011-UJB(0.4)

E-24606B
1-1/2"
TW
053
DEMIN WATER
246.023

1-1/2"

ET 10
50

1-1/2"

1-1/2"

?
C-2

?
C-2

1-1/2"

TW
056
D

?
C-2

?
C-2

5245480
C-2
ET 10
50

6"-WI-246010-UJB(0.4)

6"
CSO
5245480
C-2

C
246.003

4"

LV
005

FC

LV
006

FC

4"

6"x4"

FROM LX-005

13140

1-1/2"

6"

FROM P-24610A/B

13139

1-1/2"
D

TW
052

6"x4"

12270

6"-WI-246006-UJB(0.4)

E-24606A

246.004

FC
C-1

4"x3"

3/4" B
5115227
C-2

CSO
5156140
C-1

2"

4"-VA-246014-SAB

5156862
C-1

5070551
C-2

2"

C-1

ULB SAB

10"

5156140
?

TC
050

12"
PP
8"

8"-SC-246016-SAB

ET 10
75

TX
050

3"

5156140
C-1
5115277
C-3

3/4"

5156140
C-1

MINIMUM FLOW SIGNAL


246.021

FROM FT-030

ET 10
50

4"x3"
FO
C-1

RECYCLED CONDENSATE
4"-SC-246016-SAB

246.021

5156140
C-1

12127

FROM E-24607

V-24607

5158143
2" C-2

HHLL=3800 mm

5158143
C-2
LG
025

HLL=2900 mm

ET 10
38

3"
5156863
C-1

FROM COLLECTION

5158143
2" C-1

LLLL=250 mm

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

ISSUED
DATE

DESCRIPTION

248.002

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

12427

FROM V-24805

SHELL CANADA

5158143
2" C-1
5158143
C-2

QUEST CCS PROJECT


D

A
TT
050

04/20/11

HP CONDENSATE
2"-SCH-248002-SAG
TWO PHASE FLOW

5115277
C-3

SLOPE

1-1/2"

ET 10
88

RECOVERED CONDENSATE
10"-SC-246002-SAB

12128

TO P-24608A/B

246.021

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

UNIT 246 - REGENERATION/COMMON


CONDENSATE RECOVERY EXCHANGER & FLASH DRUM
SCALE: NONE
SHELL DWG NO.:

246.0000.000.041.020

REV.

246.020

3"-SCL-246012-SAB

ET 10
38

3/4"

246.029

TO LC-025

5300 mm

12457

ISSUED FOR PHA III

246.021

12129

2"

LLL=1150 mm

07/11/11

LEVEL SIGNAL

LT
025

24"
MW
5

REV

MAG

2"

LP CONDENSATE

ISSUED FOR ESTIMATE

12130

TV
050
4"x3"

8"x4"

FC
030

FILE:\\F:\1025\DRAWINGS\CO2\246\246.020.pid MODEL DATE:7/10/2011 9:29:49 PM BY:muk22296

2"x1-1/2"

12126

FROM TK-25101

1/2" WEEP HOLE

C-1

4"

246.027

5115227
C-2

2"x1-1/2"

6"x4"
8"x6"

FO 12"x10"
C-1

ET 10
88
V

5115277
C-2

CONDENSATE
6"-SC-246011-SAB

START-UP

3/4"

?
C-2

12664

PV
061A

ET 10
75

6"-SC-246XXX-SAB

ET 10
75

246.030
2"-GI-246005-ULB
GI

1-1/2"

5119160
C-2

PCV
060

ET 10
75

6"x4"

033

3/4"

PT
061

3/4"

2"-GI-246006-ULB

SET@
75 kPa-g

CSO
?
C-1

2"

5119160
C-2

TO ATMOSPHERE
CV FAILURE
AT SAFE LOCATION
3L4
SET@
500 kPa-g
6"-VA-246015-SAB
RV

8"-SC-246001-SAB

PV
061B

5156140
C-1

PC
061

C-1
3/4"

10"

SPLIT

12" 12"x10"

4"x3"

RV
034

?
C-1

4"-VA-246019-ULB

12"-VA-246020-SAB

6"

CV FAILURE
2J3
SET@
90 kPa-g

5156140
?

TO ATMOSPHERE
AT SAFE LOCATION

6"

TO ATMOSPHERE
AT SAFE LOCATION

6"x4"

FROM LX-006

E-24607A /B
CONDENSATE COOLER
RATED DUTY: 0.7 MW (TOTAL)
SURFACE AREA: TBD
TEMA TYPE: BEU
SHELL
DESIGN PRESS: 1200 kPa-g / FV
DESIGN TEMP: 150 C / 150 C
MATERIAL:
/
INSULATION TYPE/THK:
5
TRIM: SC-246040-SAB
CWR-246035-UAB
RECYCLED CONDENSATE

246.020

12127

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
3 . 2x100% PUMPS FOR TOTAL FLOW RATE OF 183 m3/h.
4 . START-UP PIPING REQUIRED FOR INITIAL AMINE FILL AND DILUTION WITH
CONDENSATE.
5 . ELECTRIC TRACE (ET 10).

TUBE
1200 kPa-g /
/ 58 C
/

ET 10
38

4"-SC-246016-SAB

ET 10
38

NNF

TO V-24607
ET 10
38

6"x4"

TT
062

3"

D
5115227
C-2

5115273
C-2

5156140
C-2

BACK
FLUSH

ET 10
50

6"x4"

246.006

INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

TO V-24602
COOLED CONDENSATE

2"-SC-246017-SAB

12123

246.022

246.025
CWS

6"-CWS-246031-UAB

5307521
C-2

1-1/2"

12120

RS

6"x4"

TI
062

12131

TO P-24609A/B

3/4"

HOLDS:

WATER MAKE-UP
2"-SC-246020-SAB

E-24607B

RS

E-24607A

TW
064

6"x4"

1-1/2"

246.025
CWR

6"-CWR-246014-UAB

CSO
5307521
C-2

12119

5156140
C-2

6"x4"

5115273
C-2

1-1/2"

LC
025

4"-SC-246007-SAB

LL

ET 10
50

6"

5115227
C-2

FC
C-1

12129

FROM LT-025

RECOVERED CLEAN
CONDENSATE
6"-SC-246008-SAB

5156140
C-1

12654

246.027

TO TK-25101

ET 10
38

FLUSHING CONDENSATE
2"-SC-246010-SAB

12579

246.034

TO DISTRIBUTION

LL

HOA

MATERIAL:
INSULATION TYPE/THK:
TRIM:

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

3/4"

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

PP

SHELL CANADA

?
C-1

QUEST CCS PROJECT

3/4
"

P-24608B

D
5115227
C-1

P-24608A /B 3
RECOVERED CLEAN CONDENSATE PUMP
RATED FLOW:
DIFF. PR.:
DRIVER:

ISSUED FOR PHA III

5163480
C-1

?
C-1

3/4"

?
C-1

5115227
C-1

D
5115227
C-1

5115227
C-1
3/4"

5156140
C-1

07/11/11

D
5115227
C-1

8"-SC-246004-SAB

3/4
"

P-24608A

SP
023B

3/4"

5115227
C-1

3/4"
D

3/4"

R/S

PP

?
C-1

246.012

PP

3/4"

6"-SC-246005-SAB

?
C-1

3/4"
D

5115227
C-1

5156140
C-1

8"-SC-246003-SAB

3/4"

5115227
C-1

3"

FROM V-24607

10"x8"

SP
023A

5115227
C-1

ET 10
50

HIS
018

5163480
C-1

ET 10
50

V
10"-SC-246002-SAB

I
012

D
5115227
C-1

3/4"

12125

REV

SEL

3/4"

PP

5156140
C-1

5156140
C-1

HS
119

I
012

RECOVERED CONDENSATE

HS
018A

6"-SC-246006-SAB

HIS
017

R/S

CONDENSATE
4"-SC-246009-SAB

TO TK-24601 / Tk-24602
4

HOA
HS
017A

ET 10
38

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

183.0 m^3/hr
602 kPa
30.5 kW
CASING
INTERNALS
CS
CS
5
/
SC-246041-SAB
SC-246042-SAB

UNIT 246 - REGENERATION/COMMON


CONDENSATE RECOVERY PUMPS & COOLER
SCALE: NONE
SHELL DWG NO.:

246.0000.000.041.021

REV.

FILE:\\F:\1025\DRAWINGS\CO2\246\246.021.pid MODEL DATE:7/10/2011 9:38:48 PM BY:muk22296

012

START-UP

246.021

PT
065

?
C-2

246.020

246.020

ISSUED FOR ESTIMATE


3/4"

12128

NC
5156140
C-2

4"

TO FC-030

PI
065

C-2

FT
030

12130

011

6"

5156140
C-1

246.020

LEVEL SIGNAL

LV
025
6"

MINIMUM FLOW SIGNAL

3/4"

3/4"
D
5115227
C-2

ET 10
50

6"x4"
3/4"

TW
061

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
3 . 2x100% PUMPS. ONE OPERATING, ONE SPARE.
4 . ELECTRIC TRACE (ET 10).
5 . TOTAL WASH WATER MAKE-UP FLOW TO V-24119 AND V-24219.

D
FLOW SIGNAL
241.022

13030

FROM FC-241076

FI
076

I
018

LL

FX
076

FLOW SIGNAL
242.022

13031

FROM FC-242076

ET 10
38

WASH WATER
2"-SCH-246003-SAG

12133

241.022

TO V-24119 / V-24219

3/4"
?
C-2

I
014

PT
070

PI
070

LL

HOA

HOA

HS
020A

HS
021A
I
018
SEL

HS
122

I
011

I
011

HIS
021

I
014

R/S

?
C-1

3/4"

3/4"

SAB

2"-SCH-246002-SAG

?
C-1

3/4"

2"-SC-246019-SAG

3/4
"

P-24609A

?
C-1

D
5115277
C-1

C-1
SAB SAG

?
C-1

?
C-1
SAG

?
C-1

FROM E-24607

?
C-1

3/4"

2"-SC-246018-SAG

PP

C-1?

?
C-1

?
C-1

3/4"

ET 10
38

3/4"

3/4"

ISSUED FOR ESTIMATE

PP

?
C-1

3/4
"

P-24609B

D
5115277
C-1

07/11/11

ISSURD FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

B
REV

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

SHELL CANADA
QUEST CCS PROJECT

A
R

P-24609A /B
WATER MAKE-UP PUMPS
3

RATED FLOW:
DIFF. PR.:
DRIVER:
MATERIAL:
INSULATION TYPE/THK:
TRIM:

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

9.9 m^3/hr
2741 kPa
7.5 kW
CASING
INTERNALS
CS
CS
/
4
SCH-246XXX-SAG
SCH-246XXX-SAG

UNIT 246 - REGENERATION/COMMON


WASH WATER MAKE-UP PUMPS
SCALE: NONE
SHELL DWG NO.:

246.0000.000.041.022

REV.

246.022

246.021

2"-SC-246017-SAB

?
C-1

12123

3/4"

COOLED CONDENSATE

PP
3/4"

3/4"

ET 10
38

PP

?
C-1

5063246
C-1

2"-SCH-246001-SAG

?
C-1

FILE:\\F:\1025\DRAWINGS\CO2\246\246.022.pid MODEL DATE:7/4/2011 1:16:19 PM BY:ahm14887

I
014

5063246
C-1

R/S

?
C-1

HIS
020

I
018

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE STATED.
3 . 2x50% PUMPS FOR TOTAL DESIGN FLOW RATE OF 185 m3/h.
4 . TRIP ONE PUMP ON HIGH LEVEL(3234 mm) AND BOTH PUMPS ON HIGH HIGH LEVEL
(4801 mm) IN V-25102. REFER TO P&ID 251.0000.000.041.103.
5 . ELECTRIC TRACE (ET 10).
6 . INTERLOCK I-015 TO FORCE HV-027 OPEN WHEN BOTH DEMIN WATER SUPPLY
PUMPS ARE STOPPED.

HOLDS:

NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.


INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

DEMIN WATER

ET 10
50

6"-WI-246006-UJB(0.4)

12270

246.020

TO E-24606

C-2

RV
032

FROM LC-251001D

PI
075
ET 10
50

O/C

HIS
027

I
015

FC
035

HV
027

3/4"

PT
075

6"x4"

HOA

SI
025

HS
025A

XL
025

6"x4"

CSO
5242525
C-1

LOCAL/ VFD
REMOTE FAULT

XA
025

B
5134289
C-2

4"

5242525 5248450
C-1 C-1

FO
C-1

3/4"

?
C-1

5242525
C-1

?
C-2

6"

6"-WI-246021-UJB(0.4)

3/4"

C
TO GRADE

LOCAL/ VFD
REMOTE FAULT

HOA

SI
026

HS
026A

XL
026

XA
026

3/4"

3/4"

VFD

HIS
026

R/S

I
015

4"-WI-246005-UJB(0.4)

PP

?
C-1

3/4"

4"-WI-246004-UJB(0.4)

PP
3/4"

ISSUED FOR ESTIMATE


3/4"

PP

?
C-1

D
5134289
C-1

?
C-1

P-24610A

5242525
C-1

3/4"

3/4
"

3/4"

6"-WI-246003-UJB(0.4)

6"-WI-246002-UJB(0.4)
5242525
C-1

FROM FV-251001

?
C-1

3/4"

ET 10
50

?
C-1

3/4
"

P-24610B

D
5134289
C-1

07/11/11

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

B
REV

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

SHELL CANADA
QUEST CCS PROJECT

A
R

P-24610A /B 3
DEMIN WATER SUPPLY PUMPS
RATED FLOW:
DIFF. PR.:
DRIVER:
MATERIAL:
INSULATION TYPE/THK:
TRIM:

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

92.5 m^3/hr
503 kPa
26.0 kW
CASING
INTERNALS
316 SS
316 SS
/
5
WI-246031-UJB(0.4)
WI-246032-UJB(0.4)

UNIT 246 - REGENERATION/COMMON


DEMIN WATER PUMPS
SCALE: NONE
SHELL DWG NO.:

246.0000.000.041.023

REV.

246.023

6"-WI-246001-UJB(0.4)

5134289
C-1
3/4"

246.101

3/4"

12137

4
PP

DEMIN WATER

VFD

5248450
C-1

I
015

?
C-2

?
C-1

R/S

5134289
C-1

HIS
025

?
C-2

5248450
C-1

ET 10
50

FILE:\\F:\1025\DRAWINGS\CO2\246\246.023.pid MODEL DATE:7/6/2011 10:42:58 PM BY:muk22296

ET 10
50

4"-WI-246009-UJB(0.4)

C-1

CSO
5242525
C-1

251.103

4"x3"

4"x3"

SP

4"-WI-246008-UJB(0.4)

SET POINT

CSO
5242525
C-1

FT
035

BLOCKED DISCHARGE
3L4
SET@
1450 kPa-g

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
3 . 2x50% PUMPS FOR TOTAL DESIGN FLOW RATE OF 6236 m3/h. HOLD
4 . DESIGN CONDITIONS ARE 1200 kPag @ 58 C AND ARE SUBJECT
TO CHANGE BASED ON COOLING WATER BOOSTER PUMP DATA (P-24611).
5 . ELECTRIC TRACE (ET 10) PUMPS AND INDIVIDUAL SUCTION & DISCHARGE PIPING
WITHIN BLOCK VALVES.
6 . HIGH POINT VENT. HOLD
7 . PROVIDE 30NPS FLANGES TO ALLOW PROVISION OF 3RD FUTURE PUMP. HOLD
8 . IF POSSIBLE, LEAVE SPACE IN PLOT PLAN FOR FUTURE 3RD CW PUMP. HOLD

HOLDS:
INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
PUMP SIZING TO BE CONFIRMED PENDING SHELL COOLING WATER SURVEY &
FINAL HEAT EXCHANGER COOLING WATER FLOWRATES.
DESIGN CONDITIONS TO BE CONFIRMED.
PUMP SELECTION, SIZING, TYPE, NUMBER AND LAYOUT FOR COOLING WATER
PUMPS.
TOTAL REQUIRED FLOW WILL NOT CHANGE.

XHIS
006

I
016

XYI
006

O/C

COOLING WATER SUPPLY


30"-CWS-246007-UAB
HOLD
4

12135

246.025

TO DISTRIBUTION

s
A/S

XZT
006

XV
006
24"

24"-CWS-246002-UAB

UG

AG

COOLING WATER SUPPLY


282.001

TW
070
30"-CWS-246001-UAB

30"-CWS-282015-UAB

N/A

5280764 30"x24"
C-1

FO
C-1

ET 10

24"

D
5115273
C-1

1-1/2"

5307853
C-1

N/A
ET 10

030

ET 10
88
5307853
C-1
N/A ET 10

"
3/4
D
5115273
C-1

HIS
030

ET 10
88
"
3/4
D
5115273
C-1

016

P-24611A

5115273
C-1

HS
030A

2"

JSLL

?
C-1

5115273
C-1

HOA

6
3/4"

SP
024B

R/S

5280764
C-1

5280764
C-1

2"

30"-CWS-246004-UAB

2"

5115273
C-1

JSLL
031

HOA
HS
031A

ISSUED FOR ESTIMATE

5115273
C-1

?
C-1

PP

5115273
C-1

ET 10

5115273
C-1
3/4"

5307853
C-1
N/A

3/4"

ET 10
88

5115273
C-1

6
?
C-1
2"

SP
024A

3/4"

30"-CWS-246003-UAB

D
5115273
C-2

3/4"

PP

ET 10
88

?
C-1

3/4"

D
5115273
C-2

3/4"

PP

24"-CWS-246006-UAB

3/4"

24"-CWS-246005-UAB

PP

N/A
ET 10

30"-CWS-246001-UAB

016

P-24611B

HIS
031

R/S
G

07/11/11

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

B
REV

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

SHELL CANADA
QUEST CCS PROJECT

A
R

HOLD

P-24611A/B 3
COOLING WATER BOOSTER PUMP

MATERIAL:
INSULATION TYPE/THK:
TRIM:

3118.0 m^3/hr
260 kPa
225.0 kW
CASING
INTERNALS
CS
CS
/
5
CWS-246036-UAB
CWS-246037-UAB

UNIT 246 - REGENERATION/COMMON


COOLING WATER BOOSTER PUMPS
SCALE: NONE
SHELL DWG NO.:

246.0000.000.041.024

REV.

246.024

RATED FLOW:
DIFF. PR.:
DRIVER:

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

FILE:\\F:\1025\DRAWINGS\CO2\246\246.024.pid MODEL DATE:7/6/2011 10:49:25 PM BY:muk22296

30"-CWS-246001-UAB

5307853
C-1

HOLD
4

5115273
C-1 3/4"

ET 10
N/A

3/4"

1200 kPag UAB


DESIGN PRESSURE

5307853
C-1

800 kPag UAB


DESIGN PRESSURE

24"

FROM HEADER

1
ET 10
50

E-24703
COMPRESSOR 12321
3RD STAGE
247.003
COOLER
CWS

6"-CWR-247004-UAB

ET 10
63

6"-CWS-246013-UAB

ET 10
63

6"-CWR-247005-UAB

ET 10
63

6"-CWS-246014-UAB

ET 10
63

N/A
ET 10

ET 10
N/A

N/A
ET 10

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
3 . DESIGN CONDITIONS ARE 1200 kPa-g @ 58 C FOR ABOVE GROUND PIPING. DESIGN
CONDITIONS ARE SUBJECT TO CHANGE BASED ON COOLING WATER BOOSTER PUMP
(P-24611).

6"x4"
10"x6"

247.003
CWR

12895

CWR

12894

CWS

C-24701
LUBE OIL
COOLING

ET 10
N/A

10"x6"

ET 10
N/A

ET 10
N/A

N/A
ET 10

10"x6"

12352

5156140
C-3

ET 10
N/A

10"x6"

ET 10
63

10"x6"

6"-CWS-246015-UAB

10"x6"

ET 10
63

10"x6"

E-24705
COMPRESSOR 12351
5TH STAGE
247.005
COOLER
CWS

6"-CWR-247006-UAB

10"x6"

247.005
CWR

12"x6"

6"x4"

4"

12"x6"

N/A
ET 10

HOLDS:

ET 10
N/A

NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.


INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
ELECTRIC HEAT TRACING AND INSULATION REQUIREMENTS WILL BE EVALUATED
BASED ON COMPRESSOR INTERSTAGE COOLER LOCATION.
CW DESIGN CONDITIONS TO BE CONFIRMED WHEN P-24611A/B IS FINALIZED.
CW LINE SIZES TO BE CONFIRMED WHEN EXCHANGER CW FLOWS ARE FINALIZED.

4"

6"-CWR-246014-UAB

ET 10
63

246.021
CWR

247.004
CWR

E-24704
COMPRESSOR 12344
4TH STAGE
247.004
COOLER
CWS

2"-CWR-247003-UAB

ET 10
63

2"-CWS-246012-UAB

HOLD
16"x12"

HOLD
16"x12"

12322

12345

E-24607
CONDENSATE
246.021
COOLER
CWS
12119

?
C-3
6"-CWS-246031-UAB

12120

ET 10
38

2"-CWS-246032-UAB

ET 10
38

246.028
CWS

LCP-XXX
CONDENSATE
RECOVERY
246.028
SAMPLING
CWR

ET 10
38

2"-CWR-246015-UAB

ET 10
38

12434

12433

247.002
CWR

ET 10
63

6"-CWS-246011-UAB

ET 10
63

13047

12311

247.001
CWR

10"-CWS-246025-UAB

E-24701
COMPRESSOR 12364
1ST STAGE
247.001
COOLER
CWS

6"-CWR-247001-UAB

ET 10
63

6"-CWS-246010-UAB

ET 10
63

3"-CWR-248001-UAB

ET 10
50

12363

248.001
CWR

ISSUED FOR ESTIMATE

12918

248.001
CWS

3"-CWS-246009-UAB

ET 10
50

12919

2"
?
C-2

ET 10
63

18"x6"

ET 10

30"x24"

24"x18"

30"-CWS-246016-UAB

30"x16"

16"-CWS-246008-UAB

N/A

pH
AE
001

AIT
001

AI
001

L
G

07/11/11

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

ET 10
63

18"x6"

24"x18"

30"x24"

ET 10 N/A

TO UTILITY/COGEN CWS

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

16"-CWR-246017-UAB

30"-CWR-282015-UAB

282.001

REV

TW
075

UG AG
282 246

COOLING WATER RETURN

30"-CWR-246016-UAB

30"x16"

3/4"
S-1

SHELL CANADA

COOLING WATER SUPPLY


246.024

30"-CWS-246007-UAB

QUEST CCS PROJECT

FROM P-24611A/B

A
R

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

UNIT 246 - REGENERATION/COMMON


COOLING WATER DISTRIBUTION
SCALE: NONE
SHELL DWG NO.:

246.0000.000.041.025

REV.

246.025

12135

FILE:\\F:\1025\DRAWINGS\CO2\246\246.025.pid MODEL DATE:7/6/2011 11:03:09 PM BY:muk22296

E-24701
TEG COOLER

PIPING
INST

CWR
246.009
246.009
CWS

12271

13046

E-24605B
LEAN AMINE
TRIM COOLER

10"-CWS-246008-UAB

12"-CWS-246030-UAB

246.005
CWS

12274

246.005
CWR
12"-CWR-246012-UAB

12898

10"-CWS-246023-UAB

12899

CWR
246.008
246.008
CWS

10"-CWR-246006-UAB

13146

246.005
CWS
12"-CWS-246029-UAB

246.005
CWR
12"-CWR-246011-UAB

13049

12"-CWS-246020-UAB

E-24601B
STRIPPER
OVERHEAD
CONDENSER

E-24605A
LEAN AMINE
TRIM COOLER

18"x12"

12896

13048

CWS
246.008
246.009
CWS

12"-CWS-246018-UAB
18"x12"

12"-CWR-246003-UAB
18"x12"

12957

CWR
246.008
246.009
CWR

12"-CWR-246001-UAB
18"x12"

13147

E-24601A
STRIPPER
OVERHEAD
CONDENSER

E-24604A/B
LEAN AMINE
COOLER

E-24702
COMPRESSOR 12300
2ND STAGE
247.002
COOLER
CWS

6"-CWR-247002-UAB

S-24603
CO2 VENT STACK

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
3 . VENT STOCK FLOW MEASUREMENT REQUIRED TO EVALUATE UNIT CAPACITY DURING
INITIAL START-UP, AS PROPOSED TO THE GOVERMENT OF ALBERTA. TO BE LOCATED
NEAR GRADE.
4 . COSTING BASED ON FLOW MEASUREMENT REQUIRED FOR REGULATORY (CEMS).
5 . INSULATION AND EHT TO HLL.
6 . INSULATION AND EHT (ET10) TO 1000mm ABOVE BOTTOM TAN LINE OF 900 mm DIA
VENT BASE.
7 . INTERNAL 12 MPS PROJECTION WITH 45 LR ELBOW. PROVIDE 13 mm WEEP HOLE
AT LOW POINT MINIMUM DISTANCE TO NOZZLE.
8 . ROUTE DRAIN LINE TO NEAREST POSWS MANHOLE.

SIZE: TIP- 500 mm DIA x 2440 mm H


RISER- 600 mm DIA x 3000 mm H
BASE- 900 mm DIA x 13830 mm H
BOOT- 250 mm DIA x 500 mm H
DESIGN: 100C/50 kPag
MATERIAL: VENT- 304 SS
DERRICK- CS
6
INSULATION/THK:
MDMT: -80C
TRIM: VA-246030-PJB(C)

HOLDS:

INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.


PRELIMINARY DESIGN IS FOR VENT AT HIGH POINT STRUCTURE.
VENT SIZE LINE REQUIREMENTS FROM PIPELINE.
VENT STACK DISPERSION MODELLING.

FE
080B
2"
4

TI
080

2"

TT
080

4"

AP
005

S-24603

2"

4
FE
080A

VENT GAS
13011

246.032

FQI
080

FT
080

8"

8"x6"

6"-VA-247009-PJB(C)

ISSUED FOR ESTIMATE

FREE DRAINING

DERRICK SUPPORT
STRUCTURE

VENT GAS
24"-VA-247001-PJB(0.4)
FREE DRAINING

24"
MW

6"
PJB(C)

?
3"

C-2
?
2"

LIT
030

LI
030

ET 10
50

2"-WP-246004-PJB

07/11/11

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

NC
?

REV

C-1

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

8
POSWS

SHELL CANADA
QUEST CCS PROJECT

A
R

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

SCALE: NONE
SHELL DWG NO.:

246.0000.000.041.026

REV.

246.026

UNIT 246 - REGENERATION/COMMON


CO2 VENT STACK

FILE:\\F:\1025\DRAWINGS\CO2\246\246.026.pid MODEL DATE:7/6/2011 11:09:45 PM BY:muk22296

PJB(C)
PJB

246.032

PJB(0.4)

12474

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
3 . CONNECTION FOR UTILITY WATER TO QUENCH POC IF REQUIRED BY WWTU.
4 . START-UP PIPING REQUIRED FOR INITIAL AMINE FILL AND DILUTION WITH
CONDENSATE.

HOLDS:
INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

FI
085

CONDENSATE

ET 10
50

6"-SC-246011-SAB
START-UP

RECOVERED CLEAN
CONDENSATE

ET 10
50

6"-SC-246008-SAB

PROM P-24608A/B

RECOVERED CLEAN
CONDENSATE

ET 10
50

6"-SC-246008-SAB

AP
003

2"

246.101

12615

TO TK-25101

C-2
PIPING
INSTR.

ET 10
38

3"-P-246026-PJB(0.4)

FROM P-24603A/B
246.006

12653

WASTE WATER

WASTE WATER

ET 10
38

?
C-2

2"

?
C-1

HOLD

12614

246.101

TO WWTP 271

3
S-1

PJB(0.4)
DAB

4"-WP-246002-PJB(0.4)

3/4"

4"x3"

?
C-2

ET 10
38

SP
025

WASTE WATER
2"-WP-246003-DAB

246.013

NNF

12294

FROM P-24607

ISSUED FOR ESTIMATE

INDOOR TUBING
PP 25

PP
25

316 SS TUBING

RECOVERED CLEAN
CONDENSATE
12430

TO AE-003

246.028

07/11/11

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

B
REV

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

SHELL CANADA
QUEST CCS PROJECT

A
R

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

UNIT 246 - REGENERATION/COMMON


RECOVERED CLEAN CONDENSATE & WW COLLECTION
SCALE: NONE
SHELL DWG NO.:

246.0000.000.041.027

REV.

FILE:\\F:\1025\DRAWINGS\CO2\246\246.027.pid MODEL DATE:7/4/2011 3:00:46 PM BY:ahm14887

OUTDOOR TUBING
ET 10

246.027

246.021

5097550
C-2

12654

MIN

TO V-24607

NC
5156140
?

FT
085

246.020

12126

RECOVERED CLEAN
CONDENSATE
12430

246.027

FROM P-24608A/B

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE STATED.
3 . SELF CONTAINED MECHANICAL THERMAL SHUT OFF VALVE.

PP
25

316 SS TUBING

?
?

4.

FLUOR

5 . FOR CONTAMINATED CONDENSATE SWITCHING VALVES. REFER TO DRAWING


251.0000.000.041.XXX.

RC

INSTRUMENT SYMBOL DENOTES REAGENT ADDITION AND CONDITIONING.

VENDOR

HOLDS:
TO SINK (TYP.)

1"

5115273
?

FLUOR

VENDOR

NC

INDOOR OUTDOOR
ET 10
38

2"-CWR-246015-UAB

NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.


INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
VENDOR PACKAGE DETAILS TO BE CONFIRMED.
ANALYZER INDICATION DESTINATION DRAWING NUMBERS TO BE CONFIRMED.

246.025
CWR
12433

1"

5115273
?

FLUOR

VENDOR

TO SINK (TYP.)

INDOOR OUTDOOR
ET 10
38

2"-CWS-246032-UAB

246.025
CWS
12434

SET@
69 kPa-g

TCV
090

PCV
085

SET@
79 kPa-g
RV
035

TG
091

FI
093

FI
091

FI
092

PG
086

ISSUED FOR ESTIMATE


pH
AIT
002

AE
002

RC

HOLD

AE
003

TO SINK (TYP.)

PCV
087

SET@
61 kPa-g

AI
003

AIT
003

5
TO SINK (TYP.)

I
017

ANALYZER INDICATION

07/11/11

ISSUED FOR PHA III

251.XXX

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW

TO UNIT 251

HH

REV

pH

AI
002

ISSUED FOR PRELIMINARY REVIEW

LL

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

ANALYZER INDICATION
251.XXX

TO UNIT 251

GRAB SAMPLE

SHELL CANADA

SAMPLE SINK

QUEST CCS PROJECT

A
VENDOR
FLUOR

1"-DO-246XXX-SAB

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

SCALE: NONE
SHELL DWG NO.:

246.0000.000.041.028

REV.

246.028

UNIT 246 - REGENERATION/COMMON


CONDENSATE RECOVERY SAMPLING SYSTEM,LCP-XXX

GRADE

FILE:\\F:\1025\DRAWINGS\CO2\246\246.028.pid MODEL DATE:7/4/2011 1:28:28 PM BY:ahm14887

CC

CC

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
3 . DEP 31.38.01.11 PIPING DESIGN GENERAL REQUIREMENTS SECTION 5.8 AND
FIGURE 18-2 TO 18-5 FOR UTILITY STATION DETAILS.
4 . PIPING HEADER BRANCH CONNECTIONS SHALL BE MADE ON TOP OF PIPE AND
BE VALVED.

LP STEAM
36"-SL-246001-SAB

246.101

12438

H
50

FROM HEADER

D
ET 10
38

U/S #2

2"x1"

H
38

2"-SL-246002-SAB

3"x2"

2"x1"

LP STEAM

H 38
H 50
LP STEAM

H
50

1"-SCL-246010-SAB

ET 10
38

246.002

2"x1"

2"-SCL-246019-SAB

2"x1"

STEAM OUT
246.002

12694

2"-SL-246015-SAB

LP STEAM

H
38

2"-SL-246016-SAB

H
50

3"-SL-246004-SAB

247.011

12610

TO E-24709A/B

36"x10"

FROM V-24601

LP STEAM

H
38

3"x2"

CONDENSATE

3"x2"

TO E-24603A

12695

2"-SL-246018-SAB

H
38

246.003

24"-SL-246009-SAB

12685

3"-SCL-246009-SAB

TO E-24603B

U/S #9

H
38

24"-SL-246002-SAB

36"x24"

12665

36"x24"

246.004

247.012

12449

TO E-24709C/D

C
10"x8"

TO V-24601
CONDENSATE

ET 10
38

2"-SCL-247008-SAB

247.012

12456

2"-SCL-246011-SAB

ET 10
38

3"-SCL-246012-SAB

ET 10
38

LP CONDENSATE

H
38

TO V-24607

2"-SCL-246013-SAB

H
38

2"-SL-246014-SAB

ET 10
38

2"-SCL-246018-SAB

2"x1"

2"x1"

ET 10
38

ET 10
38

ISSUED FOR ESTIMATE

ET 10
38

2"-SL-246020-SAB

ET 10

H
50

2"-SCL-246022-SAB

07/11/11

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

U/S #5

U/S #6

2"-SL-246021-SAB

2"x1"

2"x1"

2"x1"

2"x1"

H
50

2"x1"

B
REV

U/S #7

ET 10

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

2"-SCL-246023-SAB

2"-SL-246022-SAB

2"-SCL-246024-SAB

SHELL CANADA

2"-SCL-247002-SAB

2"-SL-246011-SAB

3"-SL-246009-SAB

2"-SCL-246015-SAB

ET 10

QUEST CCS PROJECT

SCALE: NONE
SHELL DWG NO.:

246.0000.000.041.029

REV.

246.029

247.007
12455

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT
UNIT 246 - REGENERATION/COMMON
LP STEAM DISTRIBUTION AND COND. COLLECTION

FROM E-24708A/B

TO E-24708A/B

CONDENSATE

247.007

12447

LP STEAM
FROM TK-24601

12661

246.012

TO TK-24601
CONDENSATE

246.012

12884

LP STEAM

FILE:\\F:\1025\DRAWINGS\CO2\246\246.029.pid MODEL DATE:7/10/2011 9:41:04 PM BY:muk22296

2"-SL-246013-SAB

2"-SCL-246017-SAB

H
38

H
38

H
38

ET 10
38
2"-SCL-246016-SAB

2"-SL-246010-SAB

H
38

ET 10

H
50

ET 10
38

3"-SL-246014-SAB

ET 10
38
2"-SCL-246014-SAB

H
38

8"x3"

2"-SL-246008-SAB

2"x1"

2"-SL-246007-SAB

2"x1"

2"x1"

12611

FROM E-24709A/B

U/S #10

12457

U/S #4

246.020

247.011

U/S #8

H
38

2"-SCL-247005-SAB

U/S #11

2"x1"

2"-SL-246006-SAB

CONDENSATE

ET 10
38

U/S #12

U/S #3

2"x1"

ET 10
38

H
50

FROM E-24709C/D

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY"246' UNLESS OTHERWISE STATED.
3 . DEP 31.38.01.11 PIPING DESIGN GENERAL REQUIREMENTS SECTION 5.8 AND
FIGURE 18-2 TO 18-5 FOR UTILITY STATIONDETAILS.
4 . PIPING HEADER BRANCH CONNECTIONS SHALL BE MADE ON TOP OF PIPE AND
BE VALVED.
5 . CONNECTION FOR TEMPORARY SUPPLY.

3"

? 5178780
C-2 C-2

INSTRUMENT AIR
12459

246.101

2"

3"-AI-246001-ULB

?
?

2"-AI-246001-ULB

FROM HEADER

2"
UTILITY AIR
12458

246.101

? ?
C-2 C-2

2"-AU-246001-ULB

FROM HEADER

FI
094

2"
?
?

2"
NITROGEN
12460

246.101

? ?
C-2 C-2

FT
094

2"-GI-246001-ULB

FROM HEADER

2"

1"-GI-246002-ULB
U/S #2

?
?
1"-AU-246002-ULB

C
NITROGEN
12697

2"

2"-GI-246003-ULB

1"-AU-246009-ULB

?
?

TO V-24601

U/S #9

246.002

1"-GI-246022-ULB

U/S #3

1"-GI-246004-ULB

1"-AU-246003-ULB

2"

2"

?
?

?
?

1"-AU-246008-ULB

246.020

12664

U/S #8

NITROGEN
2"-GI-246005-ULB

TO V-24607

?
?

2"

?
?

2"

1"-GI-246021-ULB

NITROGEN
246.013

12461

2"-GI-246007-ULB
NITROGEN

TO V-24606

2"-GI-246020-ULB

12808

247.001

TO V-24701

1"-GI-246008-ULB
U/S #4

ISSUED FOR ESTIMATE


NITROGEN
2"-GI-246019-ULB

1"-AU-246004-ULB

12995

247.010

TO E-24707

NITROGEN
2"-GI-246018-ULB

12425

TO V-24806

07/11/11

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

248.002

REV

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

U/S #10
1"-AU-246011-ULB

U/S #5

U/S #6

U/S #7

NITROGEN
246.010

13159

SHELL CANADA

2"-GI-246014-ULB

QUEST CCS PROJECT

1"-GI-246024-ULB

NITROGEN
13141

2"-GI-246012-ULB

1"-AU-246012-ULB
U/S #12

246.010

1"-GI-246025-ULB

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

UNIT 246 - REGENERATION/COMMON


INST. AIR, UTILITY AIR & NITROGEN DISTRIBUTION
SCALE: NONE
SHELL DWG NO.:

246.0000.000.041.030

REV.

FILE:\\F:\1025\DRAWINGS\CO2\246\246.030.pid MODEL DATE:7/10/2011 9:44:03 PM BY:muk22296

2"-GI-246010-ULB

246.030

12729

1"-GI-246023-ULB

U/S #11

246.012

2"-GI-246026-ULB

NITROGEN

2"-AU-246013-ULB

1"-GI-246017-ULB

2"-GI-246013-ULB

1"-AU-246007-ULB

13142

1"-GI-246016-ULB

246.010

1"-AU-246006-ULB

NITROGEN

1"-GI-246009-ULB

1"-AU-246005-ULB

1"-AU-246010-ULB

SP
026

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
3 . STANDALONE SAFETY SHOWER WITH INTEGRAL DELUGE TANK. ALARMED FOR LOW
LEVEL.
4 . DEP 31.38.01.11 PIPING DESIGN GENERAL REQUIREMENTS SECTION 5.8 AND FIGURE
18-2 TO 18-5 FOR UTILITY STATION DETAILS.
5 . PIPING HEADER BRANCH CONNECTIONS SHALL BE MADE ON TOP OF PIPE AND BE
VALVED.

SP
027

HOLDS:

FAH
095

FSH
095

FAH
096

FSH
096

LAL
095

LSL
095

LAL
096

LSL
096

UA

UA

UA

UTILITY WATER
12470

246.101

INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.


SOURCE OF POTABLE WATER.
NUMBER AND LOCATIONS OF EYEWASH STATIONS & SAFETY SHOWERS TO BE
DETERMINED.

UA

ET 10
38

2"-WU-246001-UAB

FROM HEADER

ANTI-FOAM INJECTION AREA/


AMINE REGENERATION AREA

COMPRESSION AREA/
TEG DEHYDRATION AREA

U/S #2

1"-WU-246003-UAB

1"-WU-246004-UAB

2"x1"

U/S #3

1"-WU-246010-UAB

U/S #9

U/S #4

1"-WU-246009-UAB

1"-WU-246005-UAB

U/S #8

ISSUED FOR ESTIMATE

07/11/11

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

1"-WU-246008-UAB

1"-WU-246007-UAB

1"-WU-246006-UAB

REV

1"-WU-246011-UAB

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

U/S #10

SHELL CANADA
QUEST CCS PROJECT
1"-WU-246012-UAB

U/S #5

U/S #6

U/S #11

U/S #7

U/S #12

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT
UNIT 246 - REGENERATION/COMMON
UTILITY WATER & SAFETY SHOWERS
SCALE: NONE
SHELL DWG NO.:

246.0000.000.041.031

REV.

246.031

1"-WU-246013-UAB

FILE:\\F:\1025\DRAWINGS\CO2\246\246.031.pid MODEL DATE:7/7/2011 12:51:28 AM BY:muk22296

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
3 . LOW POINTS + DRAINS REQUIRE EHT AND INSULATION.

CO2 RELIEF / VENT


12809

247.001

FROM RV-247013

20"-VA-247002-PJB(0.4)
DO NOT POCKET
3

CO2 VENT
247.001

FROM PV-247001

FREE DRAINING
3

246.026

TO S-24603

CO2

VENT GAS
247.010

6"-VA-247009-PJB(C)

6"-VA-247009-PJB(C)
FREE DRAINING

FROM RV-247012 & PIPELINE


VENT

13011

246.026

TO S-24603

ISSUED FOR ESTIMATE

07/11/11

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

B
REV

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

SHELL CANADA
QUEST CCS PROJECT

A
R

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT
UNIT 246 - REGENERATION/COMMON
VENT GAS COLLECTION
SCALE: NONE
SHELL DWG NO.:

246.0000.000.041.032

REV.

FILE:\\F:\1025\DRAWINGS\CO2\246\246.032.pid MODEL DATE:7/4/2011 5:33:19 PM BY:ahm14887

12327

12474

246.032

12471

VENT GAS
24"-VA-247001-PJB(0.4)

24"-VA-247001-PJB(0.4)
DO NOT POCKET

FROM P-24603A/B
246.006
2"-DM-246011-DAB
DM

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE STATED.
ET 10
50

12391

FROM E-24605A
246.008
DM

2"-DM-246063-DAB

ET 10
50

2"-DM-246065-DAB

ET 10
50

12596

FROM P-24605B
246.009
DM

12262

FROM FV-246020
246.011
DM

AMINE DRAINS

ET 10
75
2"-DM-246057-DAB

ET 10
50

2"-DM-246043-DAB

ET 10
50

6"-DM-246061-DAB
FREE DRAINING

13037

246.013

TO V-24606

13152

FROM P-24602A/B/C
246.011
DM
13151

AMINE DRAINS

ET 10
75

6"-DM-246060-DAB
FREE DRAINING

13036

246.013

TO V-24606

C
FROM E-24602A
246.001
DM

2"-DM-246004-DAB

ET 10
50

2"-DM-246001-DAB

ET 10
50

2"-DM-246026-DAB

ET 10
50

2"-DM-246024-DAB

ET 10
50

2"-DM-246029-DAB

ET 10
50

13144

FROM E-24602B
246.001
DM
12227

FROM V-24608
246.010
DM
12687

FROM V-24604
246.010
DM
12387

FROM V-24609
246.010
DM
12390

FROM HV-246040
246.010
2"-DM-246030-DAB
DM

ET 10
50

ISSUED FOR ESTIMATE

13136

FROM P-24605
246.012
DM

2"-DM-246055-DAB

13155

FROM P-24605
246.012
2"-DM-246XXX-DAB
DM
12620

FROM P-24604
246.012
2"-DM-246056-DAB
DM
13153

FROM P-24604
246.012
2"-DM-246050-DAB
DM

07/11/11

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

B
REV

13154

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

AMINE DRAINS
6"-DM-246006-DAB
FREE DRAINING

12477

246.013

TO V-24606

SHELL CANADA
FROM RV-246020
246.010
DM

2"-DM-246064-DAB

2"-DM-246025-DAB

13134

FROM RV-246003
246.009
DM

QUEST CCS PROJECT

13150

FROM RV-246021
246.010
DM

2"-DM-246022-DAB

2"-DM-246062-DAB

12240

FROM RV-246002
246.008
DM

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

13132

SCALE: NONE
SHELL DWG NO.:

246.0000.000.041.033

REV.

246.033

UNIT 246 - REGENERATION/COMMON


AMINE DRAIN SYSTEM

FILE:\\F:\1025\DRAWINGS\CO2\246\246.033.pid MODEL DATE:7/7/2011 4:25:02 PM BY:ahm14887

ET 10
75

1. SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.

FLUSHING CONDENSATE
2"-SC-246012-SAB

12462

246.010

TO V-24604/V-24608/V-24609

CONDENSATE
12579

246.021

ET 10
38

2"-SC-246010-SAB

FROM P-24608A/B

FLUSHING CONDENSATE
2"-SC-246013-SAB

12463

246.013

TO V-24605

ISSUED FOR ESTIMATE

07/11/11

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

REV

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

SHELL CANADA
QUEST CCS PROJECT

A
R

SCALE: NONE
SHELL DWG NO.:

246.0000.000.041.034

REV.

246.034

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT
UNIT 246 - REGENERATION/COMMON
FLUSHING CONDENSATE

FILE:\\F:\1025\DRAWINGS\CO2\246\246.034.pid MODEL DATE:7/4/2011 1:27:35 PM BY:ahm14887

1. SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2. ELECTRIC TRACE 10C.

MH-246004

MH-246003

AMINE STRIPPING CATCHMENT

C
HS

R/S

HS

PP

P-246012
ET 10

2"-WW-246001-UAB

MH-246005

MH-246002

3/4"

TO HMU1/2 MH-006

MH-246001

AMINE PUMP CATCHMENT

TEG/DEHYDRATION CATCHMENT

ISSUED FOR ESTIMATE

MH-246006

07/11/11

REV

ISSUED
DATE

ISSUED FOR PHA III


DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

AMINE STORAGE CATCHMENT

SHELL CANADA
QUEST CCS PROJECT

A
P-246012
STORM WATER PUMP
RATED FLOW:
DIFF. PR.:
DRIVER:
INSULATION TYPE/THK:
HEAT TRACE MEDIA/TEMP:

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

10.00 m^3/hr
112.00 kPa
0.30 kW @
/
2.

CASING

UNIT 246 - REGENERATION/COMMON


STORMWATER DRAINAGE & POTENTIALLY OILY SWS

INTERNALS

MATERIAL:
TRIM:

SCALE: NONE
SHELL DWG NO.:

246.0000.000.041.035

REV.

FILE:\\F:\1025\DRAWINGS\CO2\246\246.035.pid MODEL DATE:7/10/2011 9:57:36 PM BY:muk22296

240.031

LI

246.035

STORMWATER

H
I

LT

4
3
TO E-24802

2
246.011

FROM P-24602A/B/C

12238

LEAN AMINE

TO E-24602A/B

12686

14"-P-246081-DAG

5242525
C-1

3/4"

1"-SCL-285003-SAB

2"x1"

2"-SCL-285001-SAB

6"-SC-285210-SAB

6"-WI-285003-UJB(0.4)

10"-P-285156-DJE(0.4)

14"-P-285155-DAG

ET 10
50

ET 10
50

ET 10
50

ET 10
63

2"-SS-285058-SAG

H
50

ET 10
38

36"-SL-285145-SAB

H
50

2"-AU-285148-ULB

2"-WU-285041-UAB

3"-AI-285150-ULB

4"-WP-285034-PJB(0.4)

2"-GI-285068-ULB

6"-WI-285002-UJB(0.4)

FROM HEADER

LP STEAM

FROM HEADER

UTILITY AIR

FROM HEADER

UTILITY WATER

FROM HEADER

FROM HEADER

TO V-44118

LEAN AMINE

285.217

TO TK-25102

285.217

FROM V-44118

RICH AMINE

285.217

HOT DEMIN WATER

TO TK-25101

285.217

RECOVERED CLEAN
CONDENSATE

FROM HEADER TRAPS

285.217

LP CONDENSATE

285.217

LOW TEMP HP STEAM

285.217

285.217

285.217

285.217

INSTRUMENT AIR

TO WWTP 271

285.217

FROM HEADER

NITROGEN

FROM HEADER

WASTE WATER

285.217

285.217

DEMIN WATER

VENT LINE SIZING FROM PIPELINE.

2"-AU-285149-ULB

07/11/11
ISSUED FOR PHA III

04/20/11
ISSUED FOR ESTIMATE

03/01/11
ISSUED FOR PHA II

01/10/11
ISSUED FOR CLIENT REVIEW

12/02/10
ISSUED FOR INTERNAL REVIEW

REV
ISSUED
DATE
DESCRIPTION

SCALE: NONE
SHELL DWG NO.:

BY
CKD
PRS

246.0000.000.041.101

CS
PDP
MC
APE

SHELL CANADA
QUEST CCS PROJECT

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

UNIT 246 - REGENERATION/COMMON


NORTH BATTERY LIMITS
REV.

G
FILE:\\F:\1025\DRAWINGS\CO2\246\246.101.pid MODEL DATE:7/7/2011 11:16:46 AM BY:ahm14887

ET 10
75

246.001

?
C-2

ET 10
50

?
C-2

10"-P-246002-DJE(0.4)

2"

RICH AMINE

FROM E-24606

3/4"

246.020

285
246

6"

3/4" 3/4"
D
5115277
?

ET 10
50

5115227
C-3

5115227
C-3

6"-WI-246007-UJB(0.4)

285
248

?
?

12681

ET 10
38
D

5156140
C-1

?
C-3

3/4"

H
ET 10
SAG SAB
?
?

6"

?
?

3/4" 3/4"

?
C-3

HOT DEMIN WATER

ET 10
50

?
C-1

2"

?
?

ET 10
38

FROM P-24608A/B

6"-SC-246008-SAB

?
C-1

2"

1"

246.027

H
50

1"

12615

12545

2"-SS-248001-SAG

C-1

2"

H
ET 10

RECOVERED CLEAN
CONDENSATE

248.002

LOW TEMP HP STEAM

TO DISTRIBUTION

12438

?
C-2

246.029

H
50

?
C-2

36"-SL-246001-SAB

LP STEAM

3/4"

TO DISTRIBUTION

246.030

3/4"

2"-AU-246001-ULB

?
C-3

12458

2"-GI-285069-ULB

UTILITY AIR

C-1

ET 10
38

ET 10
38

ET 10
50

246.101

12470

2"

5178780
C-1

3"

TO DISTRIBUTION

246.031

ET 10
38

?
C-2

2"-WU-246001-UAB

UTILITY WATER

3/4"

TO DISTRIBUTION

12459

246.030

?
C-2

3"-AI-246001-ULB

3/4"

INSTRUMENT AIR

5242525
C-1

4"

C-1

2"

2"

FROM P-24608A/B

246.027

?
C-2

12614

ET 10
38

4"-WP-246002-PJB(0.4)

WASTE WATER

2"-GI-246001-ULB

2"

TO DISTRIBUTION

246.030
12460

NITROGEN

6"
5242525
C-1

285
246

TO P-24610A/B

12137

ET 10
50

6"-WI-246001-UJB(0.4)

246.023

DEMIN WATER

4
1

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
NOTED.
3 . BATTERY LIMIT ACCESS IS ON NORTH SIDE OF 9TH AVE, ACROSS THE ROAD FROM
UNIT 246. ALL LINES ARE DEDICATED TO SERVICING UNIT 246.

HOLDS:

1"-SCL-285002-SAB

U/S #1

2"

?
C-3

2"

?
C-2
D

ISSUED FOR ESTIMATE

ISSUED FOR PRELIMINARY REVIEW


PEM CLIENT
APP

V-24701
COMPRESSOR SUCTION KO DRUM

2.5 MW
317.0 m^2
BXU
SHELL
385 kPa-g / HV
130 C / 150 C
CS + 3 mm 304L SS CLAD
H/
GC-247072-PJB(0.4)

DESIGN PRESS:
DESIGN TEMP:
MATERIAL:
INSULATION TYPE/THK:
TRIM:

UC SIGNAL

TI
002

PI
003

PI
021

UY
001B

HOLDS:

12"x10"

SURGE
COUNTER

ET 10
75

12"

UQI
001

TO UV-001
TT SIGNAL

AUTO/MAN

HC
022

247.010

12331

FROM TT-057
PT SIGNAL

CSO
?
C-1

12"-GC-247003-PJB(0.4)

247.010

12569

FROM PT-021

ET 10
N/A

246.030
GI

247.010

12571

001A

NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.


INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
THE NEED TO TRIP THE COMPRESSOR ON EXCESSIVE SURGE CYCLE WILL BE
DETERMINED IN DETAILED ENGINEERING.

UC SIGNAL

UC
5

TO UV-003

MASS FLOW LIMITER

TI
057

247.010

12578

001B
PDI
029

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE
STATED.
3 . DRIVER POWER AND DIFFERENTIAL PRESSURE DEPICTED ARE THE TOTAL FOR
THE COMPRESSOR.
4 . ELECTRIC TRACE TO HLL (ET 10).
5 . VALVE TO BE LOCATED AT SAFE ACCESSIBLE LOCATION.
6 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE.
7 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012.
8 . MAXIMIZE LENGTH OF PIPING THAT FREE DRAINS TO KO DRUM.
9 . THE ADDITION AL INSTRUMENTS ARE REQUIRED FOR ON-SITE COMPRESSOR
PERFORMANCE TESTING (PTC-10).
10. GTAW ROOT PASS WELD IS MANDATORY ON THIS LINE.

TUBE
1200 kPa-g /
58 C /
DUPLEX 2205 + 0.38 mm CA
/
CWR-247010-UAB

UC

CSC
5242525
C-1

C-1

N/A
ET 10

10"

18"x10"

RATED DUTY:
SURFACE AREA:
TEMA TYPE:

(V)

3/4"
?
C-1

RV
013B

C-1

10"x8"

POWER
FAILURE
8T10
SET@
385 kPa-g

10"x8"

TO S-24603

CSO
?
C-1

10"-GC-247032-PJB(0.4)

FREE DRAINING

RV
013A

18"x10"

N/A
ET 10

20"

20"-VA-247002-PJB(0.4)

12809

20"x18"

18"-VA-247013-PJB(0.4)

246.032

?
C-1

CO2 RELIEF / VENT

3/4"

POWER
FAILURE
8T10
SET@
385 kPa-g

E-24701
COMPRESSOR 1st STAGE COOLER

3500 mm ID x 3500 mm T/T


385 kPa-g @ 150 C / FV @ 150 C
CS + 3 mm 304L SS CLAD/ 316L SS
H/
GC-247070-PJB(0.4)

10"-VA-247012-PJB(0.4)

N/A
ET 10

SIZE:
DESIGN PR. & TEMP:
MATERIAL(VESSEL/INTERNALS):
INSULATION TYPE/THK:
TRIM:

ANTI SURGE SPILL BACK

2"-GI-246020-ULB

24"-GC-247045-PJB(0.4)
DO NOT POCKET

FREE DRAINING

12808

247.010

12326

FROM C-24701H
ANALYZER FAST LOOP

3/4" TUBING (FAST LOOP)


CO2 VENT
TO S-24603

FREE DRAINING
E
001

HH

FROM AX-001

PC

PC
034

023
PERFORMANCE
CONTROLLER

3/4"

3/4"

?
C-2

HLL=700 mm

MAG

LT
001

HHLL=800 mm

5134289
C-2

START/STOP

HIS
001

24"
MW

?
C-2

2"
2"

5115273
C-2

H
38

CO2
30"-GC-247006-PJB(0.4)
TWO PHASE FLOW

3/4"

PT
024

247.002

12305

TO V-24702

?
C-2

3/4"

3/4"

(V)

PI
024

(V)

?
C-2
E
001

6"-CWS-246010-UAB

PZTE
023

E
001

07/11/11

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

L
REV

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

I
MCC

3"x2"

HSE

MIN

3"

?
C-1

C-2

3"

FC
C-1

2"

5134289
C-2

?
C-1

1-1/2"
2"x1-1/2"

3/4"

5097550
C-2

2"x1-1/2"

3"-DM-247001-PJB(0.4)

5134289
C-2

?
C-2

FREE DRAINING

?
C-2
(V)

246.025
CWS

?
PDT
029

001

3/4"

?
C-2

3/4"

ON/OFF

LLL=250 mm

?
C-2

PV
023

?
C-2

C-2

2"

2"

3/4"

PT
003

ISSUED FOR ESTIMATE


ET 10
63

3/4"

LG
001

RS

PT
004

12363

TI
059

TT
059

RS

NNF

2"

001

RS

TO V-24606

TWO PHASE FLOW

ET 10
38

30"-GC-247005-PJB(0.4)

PI
004

3/4"

?
C-2
3"

4"
BACK FLUSH
5156140
C-2

1-1/2"

1-1/2"
2"

2"

30"x24"

OUTSIDE
INSIDE

V-24701

3"

2"

30"x24"

?
C-2

HH

LTE
002

24"

6"

GWR

LV
001

3/4"

5307521
C-2

NC
?
C-2
3"

N/A
H

24"

TI
003

TT
003

?
C-2

2"-DM-247002-PJB(0.4)

LL

PTE
002

5134289
C-2

LC
001

12626

HH

?
C-2

24"

E-24701

PP

E
001

36"

GAP

246.013

DO NOT POCKET

3"

MIN

H
25

KO LIQUIDS

3/4"

?
C-2

?
C-2
3/4"

3/4"

?
C-3

3"

FREE DRAINING

2"

12364

C-24701A

001

?
C-1

FROM V-24803

3/4"

248.003

36"-GC-247004-PJB(0.4)

36"

3/4"
3"-GC-248004-PJB(0.4)
DO NOT POCKET

10

30"x24"

30"x24"

246.025
CWR

6"-CWR-247001-UAB

CSO
5307521
C-2

1-1/2"

RS

NC
?
C-2
5097550
C-2
2"-GC-247002-PJB(0.4)

ET 10
38
2"

24"-GC-247001-PJB(0.4)

5134289
C-2
ET 10
N/A

12367

24"

3/4"

?
C-1

FLASHED CO2

1-1/2"

T.S.

36"

DO NOT POCKET

TW
052

?
C-1

FROM V-24602

SP
001

ET 10
50

6"

3/4"

246.006

36"-GC-246001-PJB(0.4)

PJB(0.4)
3/4"
V
5134289
C-2

ET 40 N/A 1-1/2"
ET 40 OUTSIDE INSIDE
88

36"

5242893
C-2

12368

ET 10
N/A

?
C-1

3/4"

CO2

2"

ULB

DO NOT POCKET
NNF

?
C-2

2"

FO
C-1
3/4"

PT
001

S-4

N/A
ET 10

5242526
C-1

24"

PC
001

N/A
ET 10

ET 10
75

SP
002

TT
002

TTE
001

PV
001

PT
034

?
C-2

PP

?
C-1

EMERGENCY STOP

SHELL CANADA
OUTSIDE INSIDE

QUEST CCS PROJECT

CASING DRAIN
3"-WP-247001-PJB(0.4)

247.002

13160

FROM C-24701B/C/D
TO GRADE AT
SAFE LOCATION

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

C-24701A
CO2 COMPRESSOR 1st STAGE
RATED CAPACITY:
DIFF. PR.:
DRIVER :
MATERIAL :
INSULATION TYPE/THK:
TRIM:

79877 Nm^3/hr
3
9163 kPa
16500 kW
304 SS
PP /
GC-247071-PJB(0.4)

UNIT 247 - COMPRESSION


CO2 COMPRESSOR 1ST STAGE
SCALE: NONE
SHELL DWG NO.:

247.0000.000.041.001

REV.

FILE:\\F:\1025\DRAWINGS\CO2\247\247.001.pid MODEL DATE:7/7/2011 4:33:20 AM BY:muk22296

24"-VA-247001-PJB(0.4)
NNF

12471

13165

247.001

246.032

247.009

V-24702
COMPRESSOR 2nd STAGE KO DRUM
SIZE:
DESIGN PR. & TEMP:
MATERIAL(VESSEL/INTERNALS):
INSULATION TYPE/THK:
TRIM:

E-24702
COMPRESSOR 2nd STAGE COOLER
RATED DUTY:
SURFACE AREA:
TEMA TYPE:

3000 mm ID x 3100 mm T/T


385 kPa-g @ 115 C / HV @ 150 C
CS + 3 mm 304L SS CLAD/ 316L SS
H/
GC-247073-PJB(0.4)

DESIGN PRESS:
DESIGN TEMP:
MATERIAL:
INSULATION TYPE/THK:
TRIM:

3.1 MW
507.0 m^2
BJU
SHELL
530 kPa-g / HV
130 C / 150 C
CS + 3 mm 304L SS CLAD
PP /
GC-247075-PJB(0.4)

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE
STATED.
3 . DRIVER POWER AND DIFFERENTIAL PRESSURE DEPICTED ARE THE TOTAL FOR
THE COMPRESSOR.
4 . ELECTRIC TRACE TO HLL (ET 10).
5 . MAXIMIZE LENGTH OF PIPING THAT FREE DRAINS TO KO DRUM.
6 . GTAW ROOT PASS WELD IS MANDATORY ON THIS LINE.

TUBE
1200 kPa-g /
58 C /
DUPLEX 2205 + 0.38 mm CA
/
CWR-247011-UAB

D
HOLDS:
ET 10
50

6"-CWR-247002-UAB

246.025
CWR

INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

TW
053

CSO
5307521
C-2

6"

12300

1-1/2"
2"

2"

?
C-2

RS

?
C-2

26"x24"

2"

?
C-2

26"

ET 45
88

1-1/2"

4"
BACK FLUSH
5156140
C-2

1-1/2"

6"

30"-GC-247007-PJB(0.4)

PP

?
C-2

?
C-2

ET 10
50

6"-CWS-246011-UAB

3"

TI
006

SP
004

TT
006

246.025
CWS
12311

H
38

OUTSIDE
INSIDE

CO2
24"-GC-247009-PJB(0.4)
TWO PHASE FLOW
FREE DRAINING

T.S.

5242893
C-3

3/4"

PP

3"

FREE DRAINING

30"

30"

OUTSIDE INSIDE
ET 45 N/A

TT
005

20"

5307521
C-2

TTE
004

20"

RS

24"x20"

001

24"x20"

TI
005

24"-GC-247008-PJB(0.4)

HH

2"

E-24702

247.003

12310

TO V-24703

1-1/2"

PI
006

FREE DRAINING

30"
GWR
LTE
004

5134289
C-2

HHLL=800 mm

?
C-1

3/4"

07/11/11

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW

5134289
C-2

REV

3/4"

ISSUED FOR PRELIMINARY REVIEW

B
ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

MIN

?
C-1

3"

C-2

FC
C-1

3"x2"

3" ?
C-2

?
C-2

5242893
3"

2"

2"

5134289
C-2

3/4"
?
C-1

TWO PHASE FLOW

3"-P-247002-PJB(0.4)

2"

C-24701B
2"

2"

5134289
C-2

TO V-24602

ET 10
38

2"-P-247002-PJB(0.4)

5134289
C-2

LG
003

ON/OFF
12244

?
C-2
3"
4

LLL=250 mm

3/4"

246.006

3/4"

24"
MW

LV
003
KO LIQUIDS

HLL=700 mm

2"

RS

LT
003

ISSUED FOR ESTIMATE

?
C-2

RS

2"

MAG

?
C-2

3/4"

B
?
C-2

LC
003

001

3/4"

SHELL CANADA
CASING DRAIN

CASING DRAIN
3"-WP-247001-PJB(0.4)

3"-WP-247001-PJB(0.4)

TO SAFE LOCATION

247.003

QUEST CCS PROJECT

12304

FROM C-24701C/D

C-24701B
CO2 COMPRESSOR 2nd STAGE
RATED CAPACITY:
DIFF. PR.:
DRIVER :
MATERIAL :
INSULATION TYPE/THK:
TRIM:

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

79877 Nm^3/hr
9163 kPa
3
16500 kW
304 SS
PP /
GC-247074-PJB(0.4)

UNIT 247 - COMPRESSION


CO2 COMPRESSOR 2ND STAGE
SCALE: NONE
SHELL DWG NO.:

247.0000.000.041.002

REV.

247.002

247.001

13160

FILE:\\F:\1025\DRAWINGS\CO2\247\247.002.pid MODEL DATE:7/7/2011 3:55:35 AM BY:muk22296

3/4"

V-24702

GAP

PT
005

HH

PT
006

3/4"

FROM E-24701

30"-GC-247006-PJB(0.4)
TWO PHASE FLOW

DO NOT POCKET

247.001

12305

PI
005

H
38

?
C-1

CO2

V-24703
COMPRESSOR 3rd STAGE KO DRUM
SIZE:
DESIGN PR. & TEMP:
MATERIAL(VESSEL/INTERNALS):
INSULATION TYPE/THK:
TRIM:

E-24703
COMPRESSOR 3rd STAGE COOLER
RATED DUTY:
SURFACE AREA:
TEMA TYPE:

2600 mm ID x 2700 mm T/T


530 kPa-g @ 100 C / HV @ 150 C
CS + 3 mm 304L SS CLAD / 316L SS
H/
GC-247076-PJB(0.4)

DESIGN PRESS:
DESIGN TEMP:
MATERIAL:
INSULATION TYPE/THK:
TRIM:

3.0 MW
425.0 m^2
BEU
SHELL
1200 kPa-g / HV
130 C / 150 C
CS + 3 mm 304 L SS CLAD
PP /
GC-247078-PJB(0.4)

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE
STATED.
3 . DRIVER POWER AND DIFFERENTIAL PRESSURE DEPICTED ARE THE TOTAL FOR
THE COMPRESSOR.
4 . ELECTRIC TRACE TO HLL (ET 10).
5 . MAXIMIZE LENGTH OF PIPING THAT FREE DRAINS TO KO DRUM.
6 . GTAW ROOT PASS WELD IS MANDATORY ON THIS LINE.

TUBE
1200 kPa-g /
58 C /
DUPLEX 2205 + 0.38 mm CA
/
CWR-247012-UAB

HOLDS:
NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

ET 10
50

246.025
CWR

6"-CWR-247004-UAB

HH

TI
008

001

TW
054

CSO
5307521
C-2

6"

12321

1-1/2"

FROM E-24702

SP
006

PI
007

24"
GWR

5134289
C-2

3/4"

V-24703

3/4"

HLL=700 mm

?
C-2

5134289
C-2

PI
008

PT
008

3/4"
?
C-2

HH

?
C-2

RS
2"

2"

PP

?
C-2

BACK 4"
FLUSH
5156140
C-2

3/4"
?
C-2

?
C-2

2"

22"

ET 10
50

246.025
CWS

6"-CWS-246013-UAB

12322

CO2
20"-GC-247013-PJB(0.4)
TWO PHASE FLOW

12320

247.004

TO V-24704

RS

?
C-2

HHLL=800 mm

2"

1-1/2"

RS

2"

E
001

LTE
006

PT
007

OUTSIDE
INSIDE

RS

?
C-2

2"

FREE DRAINING

TT
009

E-24703

6"

ET 10
38

3/4"

22"

5307521
C-2

24"-GC-247009-PJB(0.4)
TWO PHASE FLOW

PP

CSO
?
C-1

2"
247.002

12310

H
38

2"

2"-GC-247010-PJB(0.4)
CO2

TI
009

FREE DRAINING

V
5134289
C-1

1-1/2"

?
C-2

22"x20"

24"

1-1/2"

DO NOT POCKET

3/4"

ET 45
88

?
C-3

C-1

1/2" WEEP HOLE

24"-GC-247011-PJB(0.4)

2"

2"-VA-247004-PJB(0.4)

RV
004

ET 10
38

2"x1"

N/A
ET 10

FREE DRAINING

24"

OUTSIDE INSIDE
ET 45 N/A

TT
008

T.S.

FIRE
1D2
SET@
530 kPa-g

TTE
007

22"x20"

TO ATMOSPHERE
AT SAFE LOCATION

20"-GC-247012-PJB(0.4)

2"

ISSUED FOR ESTIMATE

3"

GAP

MAG

LC
005

LT
005

LG
005

24"
MW

C-24701C

3"

LV
005

?
C-1

3/4"

?
C-1

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

D
C-2

REV

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

CASING DRAIN
3"-WP-247001-PJB(0.4)

3"-WP-247001-PJB(0.4)

TO SAFE LOCATION

247.004

13161

FROM C-24701D

SHELL CANADA
QUEST CCS PROJECT

A
R

C-24701C
CO2 COMPRESSOR 3rd STAGE
RATED CAPACITY:
DIFF. PR.:
DRIVER :
MATERIAL :
INSULATION TYPE/THK:
TRIM:

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

79877 Nm^3/hr
9163 kPa
3
16500 kW
304 SS
PP /
GC-247077-PJB(0.4)

UNIT 247 - COMPRESSION


CO2 COMPRESSOR 3RD STAGE
SCALE: NONE
SHELL DWG NO.:

247.0000.000.041.003

REV.

247.003

12304

ISSUED FOR PHA III

CASING DRAIN
247.002

07/11/11

FILE:\\F:\1025\DRAWINGS\CO2\247\247.003.pid MODEL DATE:7/7/2011 3:27:13 PM BY:ahm14887

FC
C-1

MIN

TWO PHASE FLOW

2"

TO V-24602

?
C-1

2"

2"

2"

13033

2"

5134289
C-2

246.006

ET 10
38

2"-P-247003-PJB(0.4)

3/4"

KO LIQUIDS

3/4"

?
C-2

5134289
C-2

LLL=250 mm

?
C-2

3/4"

5134289
C-2

3/4"

ON/OFF

2"

?
C-1

2"

V-24704
COMPRESSOR 4th STAGE KO DRUM
SIZE:
DESIGN PR. & TEMP:
MATERIAL(VESSEL/INTERNALS):
INSULATION TYPE/THK:
TRIM:

E-24704
COMPRESSOR 4th STAGE COOLER
RATED DUTY:
SURFACE AREA:
TEMA TYPE:

2300 mm ID x 3400 mm T/T


1200 kPa-g @ 110 C / HV @ 150 C
CS + 3 mm 304L SS CLAD / 316L SS
H/
GC-247079-PJB(0.4)

DESIGN PRESS:
DESIGN TEMP:
MATERIAL:
INSULATION TYPE/THK:
TRIM:

2.9 MW
343.0 m^2
BEU
SHELL
2200 kPa-g / HV
130 C / 150 C
CS + 3 mm 304L SS CLAD
PP /
GC-247081-PJE(0.4)

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE
STATED.
3 . DRIVER POWER AND DIFFERENTIAL PRESSURE DEPICTED ARE THE TOTAL FOR
THE COMPRESSOR.
4 . ELECTRIC TRACE TO HLL (ET 10).
5 . MAXIMIZE LENGTH OF PIPING THAT FREE DRAINS TO KO DRUM.
6 . GTAW ROOT PASS WELD IS MANDATORY ON THIS LINE.

TUBE
1700 kPa-g /
58 C /
DUPLEX 2205 + 0.38 mm CA
/
CWR-247013-UAB

HOLDS:

NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.


INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

ET 10
50

6"-CWR-247005-UAB

246.025
CWR

TW
055

CSO
5307521
C-2

6"

12344

1-1/2"
2"

6"x4"

?
C-2

SP
007

20"
10"

RS
2"

2"

?
C-2

3"

20"

HHLL=800 mm

LT
007

LG
007

PT
009

HH

3/4"

5134289
C-2

PJB(0.4)
PJE(0.4)

24"
MW

?
C-2

C-24701D
C-1

3/4"

3/4"

3"

ET 10
38

?
C-1 PJE(0.4)
PJB(0.4)

2"-P-247006-PJB(0.4)

247.005

07/11/11

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

KO LIQUIDS

01/10/11

ISSUED FOR CLIENT REVIEW

12346

12/02/10

ISSUED FOR INTERNAL REVIEW

FROM V-24705

ET 10
38

ISSUED FOR PRELIMINARY REVIEW

B
REV

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

KO LIQUID
2"-P-247010-PJB(0.4)

247.009

TWO PHASE FLOW

12372

FROM V-24707

C-2

2"

MIN

2"

?
C-1

5134289
C-2

?
C-2

?
C-2

3/4"

5134289
C-2

3/4"

1-1/2"
2"x1-1/2" 2"

2"x1-1/2" FC
C-1

LLL=250 mm

2"

3/4"

?
C-1

TWO PHASE FLOW

2"

5134289
C-2

ON/OFF
TO V-24602

2"

5307521
C-2

ISSUED FOR ESTIMATE

?
C-2

3/4"

?
C-2
3"

PT
010

2"

ET 10
38

TO V-24705

RS

HLL=700 mm

MAG

GWR

E
001

LTE
008

2"

2"

2"-P-247004-PJB(0.4)

247.005

RS

GAP

13032

12348

D
ET 10
38

KO LIQUID
2"-P-247005-PJB(0.4)
TWO PHASE FLOW

247.006

12353

FROM V-24706

SHELL CANADA
QUEST CCS PROJECT

CASING DRAIN
13161

TO SAFE LOCATION
R

C-24701D
CO2 COMPRESSOR 4th STAGE

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

RATED CAPACITY: 79877 Nm^3/hr


DIFF. PR.: 9163 kPa
3
DRIVER : 16500 kW
MATERIAL : 304 SS
INSULATION TYPE/THK: PP /
TRIM: GC-247080-PJE(0.4)

UNIT 247 - COMPRESSION


CO2 COMPRESSOR 4TH STAGE
SCALE: NONE
SHELL DWG NO.:

247.0000.000.041.004

REV.

247.004

247.003

3"-WP-247001-PJB(0.4)

FILE:\\F:\1025\DRAWINGS\CO2\247\247.004.pid MODEL DATE:7/7/2011 3:08:44 AM BY:muk22296

5134289
C-2

3/4"

V-24704

?
C-2

246.006

RS

FREE DRAINING

1-1/2"

CO2
16"-GC-247017-PJE(0.4)
TWO PHASE FLOW

?
C-2

ET 10
38

2"

KO LIQUIDS

246.025
CWS

PI
010

FREE DRAINING

LC
007

TT
012

PI
009

LV
007

6"-CWS-246014-UAB

3/4"

3/4" 3/4"

FROM E-24703

ET 10
50

TI
012
PP

20"-GC-247013-PJB(0.4)
TWO PHASE FLOW

1-1/2"

2"

CSO
5242893
C-1

3"
3"-GC-247014-PJB(0.4)
247.003

12320

1-1/2"

T.S.

3/4"

V
5134289
C-1

CO2

ET 45
88

BACK 4"
FLUSH
5156140
C-2

12345

C-1

1/2" WEEP HOLE

20"-GC-247015-PJB(0.4)

OUTSIDE
INSIDE

DO NOT POCKET

ET 10
50

OUTSIDE INSIDE
ET 45 N/A

18"

TT
011

?
C-3

ET 10

6"-VA-247005-PJB(0.4)

FREE DRAINING

N/A

RV
006

TTE
010

6"

CONTROL VALVE
FAILURE
3L4
SET@
1200 kPa-g

TI
011

E-24704

PP

TO ATMOSPHERE
AT SAFE LOCATION

HH

18"

18"x16"

E
001

16"-GC-247016-PJE(0.4)

?
C-2

18"x16"

?
C-2

V-24705
COMPRESSOR 5th STAGE KO DRUM
SIZE:
DESIGN PR. & TEMP:
MATERIAL(VESSEL/INTERNALS):
INSULATION TYPE/THK:
TRIM:

E-24705
COMPRESSOR 5th STAGE COOLER

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE
STATED.
3 . DRIVER POWER AND DIFFERENTIAL PRESSURE DEPICTED ARE THE TOTAL FOR
THE COMPRESSOR.
4 . ELECTRIC TRACE TO HLL (ET 25).
5 . MAXIMIZE LENGH OF PIPING THAT FREE DRAINS TO KO DRUM.
6 . GTAW ROOT PASS WELD IS MANDATORY ON THIS LINE.

RATED DUTY:
SURFACE AREA:
TEMA TYPE:

3.0 MW
281.0 m^2
BEU
SHELL
DESIGN PRESS: 4200 kPa-g / HV
DESIGN TEMP: 130 C / 150 C
MATERIAL: CS + 3 mm 304L SS CLAD
INSULATION TYPE/THK: PP /
TRIM: GC-247084-PJG(0.4)

2000 mm ID x 2200 mm T/T


2200 kPa-g @ 100 C / HV @ 150 C
CS + 3 mm 304L SS CLAD / 316L SS
H/
GC-247082-PJE(0.4)

TUBE
3300 kPa-g /
58 C /
DUPLEX 2205 + 0.38 mm CA
/
CWR-247014-PJE(0.4)

HOLDS:
NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

ET 10
50

6"-CWR-247006-UAB

246.025
CWR

TW
056

CSO
5307521
C-2

6"

12351

1-1/2"

PJB(0.4) ET 10
PJE(0.4) ET 25

2"

?
C-2

PI
012

PT
012

001

3/4" 3/4"

2"

?
C-2

?
C-2

HHLL=800 mm
HLL=700 mm

?
C-2

2"

?
C-2

2"

?
C-2

3/4" 3/4"

ISSUED FOR ESTIMATE

?
C-2

?
C-2

3/4"

?
C-2

3/4"

2"

2"

?
C-2
3"

2"

3/4"

?
C-2

5134289
C-2

PJE(0.4)
PJG(0.4)

C-24701E

C-1

3/4"

3/4"

?
C-2

C-2

07/11/11

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

B
REV

PJB(0.4)
3/4"

C-2

?
C-2
3"

?
C-1 PJG(0.4)

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

5134289
C-2

?
C-2

2"

?
C-2

2"

3/4"

2"

3/4"

5134289
C-2

3/4"

LLL=250 mm

2"

2"

?
C-1

D
OUTSIDE INSIDE

CASING DRAIN
3"-WP-247002-PJB(0.4)

247.006

13163

SHELL CANADA

FROM C-24701F/G/H

QUEST CCS PROJECT

TO GRADE AT
SAFE LOCATION
R

C-24701E
CO2 COMPRESSOR 5th STAGE

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

RATED CAPACITY: 79877 Nm^3/hr


DIFF. PR.: 9163 kPa
3
DRIVER : 16500 kW
MATERIAL : 304 SS
INSULATION TYPE/THK: PP /
TRIM: GC-247083-PJG(0.4)

SCALE: NONE
SHELL DWG NO.:

247.0000.000.041.005

REV.

247.005

UNIT 247 - COMPRESSION


CO2 COMPRESSOR 5TH STAGE

FILE:\\F:\1025\DRAWINGS\CO2\247\247.005.pid MODEL DATE:7/7/2011 2:39:48 AM BY:muk22296

ET 25
38

MIN

FC 2"x1-1/2"
C-1

2"

C-2

1-1/2"

2"

2"x1-1/2"

HH

V-24705

?
C-1

TWO PHASE FLOW

PT
013

008

2"

16"

5134289
C-2

3/4"
ET 10
PJB(0.4)
PJE(0.4)
ET 25
2"

TO V-24706

2"-P-247007-PJE(0.4)

5134289
C-2

TO V-24704

ET 10
38

247.006

12350

24"
MW

3/4"

12346

CO2
14"-GC-247021-PJG(0.4)
TWO PHASE FLOW

SP.
ET 25
38

LG
009

ON/OFF
247.004

LV
009

246.025
CWS
12352

RS

2"-P-247006-PJB(0.4)
KO LIQUIDS

6"-CWS-246015-UAB

RS

ET 10
50

3/4"

PP
10"

MAG
LT
009

1-1/2"

FREE DRAINING

LTE
010

LC
009

6"

GWR

GAP
H

TT
015

PI
013

16"

FREE DRAINING

FROM E-24704

1-1/2"

16"-GC-247017-PJE(0.4)
TWO PHASE FLOW

OUTSIDE
INSIDE

PJE(0.4)
UAB
BACK 4"
FLUSH
5156140
C-2

6
FREE DRAINING

CSO
?
C-1

2"
247.004

1-1/2"

3/4"

2"-GC-247018-PJE(0.4)
12348

ET 45
75

16"-GC-247019-PJE(0.4)

V
5134289
C-1

CO2

OUTSIDE INSIDE
ET 45 N/A

TI
015

TT
014

T.S.

1/2" WEEP HOLE

C-1

TTE
013

DO NOT POCKET

ET 10
38

RV
008

?
C-3

2"-VA-247006-PJB(0.4)

14"

2"x1"

N/A
ET 10

TI
014

E-24705

5307521
C-2

FIRE
1D2
SET@
2200 kPa-g

HH

14"

RS

E
001

PP

TO ATMOSPHERE
AT SAFE LOCATION

UAB
PJE(0.4)

?
C-2

RS

14"-GC-247020-PJG(0.4)

2"

V-24706
COMPRESSOR 6th STAGE KO DRUM
SIZE:
DESIGN PR. & TEMP:
MATERIAL(VESSEL/INTERNALS):
INSULATION TYPE/THK:
TRIM:

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE
STATED.
3 . DRIVER POWER AND DIFFERENTIAL PRESSURE DEPICTED ARE THE TOTAL FOR
THE COMPRESSOR.
4 . ELECTRIC TRACE TO HLL (ET 25).
5 . MAXIMIZE LENGTH OF PIPING THAT FREE DRAINS TO KO DRUM.
6 . GTAW ROOT PASS WELD IS MANDATORY ON THIS LINE.

1700 mm ID x 2000 mm T/T


4200 kPa-g @ 105 C / HV @ 150 C
CS + 3 mm 304L SS CLAD / 316L SS
H/
GC-247085-PJG(0.4)

D
HOLDS:
NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

HH

E
001

ET 45
75

C-1

TI
018

2"

PI
015

FREE DRAINING
14"
GWR
E
001

?
C-2

?
C-2

MAG

ISSUED FOR ESTIMATE

?
C-2

C-24701F
3/4"

5134289
C-2

?
C-2

5134289
C-2

3/4"

3/4"

5134289
C-2

3/4"

LLL=250 mm

1" 2"x1"

2"x1"
FC
C-1

2"

?
C-1

ET 25
38

2"

C-1

?
C-1 PJG(0.4)
PJB(0.4)

MIN

?
C-1

?
C-2

2"

?
C-2

TWO PHASE
FLOW

C-2

2"

2"

TO V-24704

2"

5134289
C-2

ET 10
38

12353

24"
MW
2"

2"-P-247009-PJG(0.4)

3/4"

247.004

5134289
C-2

5134289
C-2

3/4"

ON/OFF

ET 10
PJB(0.4)
PJG(0.4)
ET 25

KO LIQUID

LV
011

HH

1-1/2"

HLL=700 mm

LG
011

2"

2"-P-247005-PJB(0.4)

?
C-2

3/4"

?
C-2

?
C-2

TT
018

RS

HHLL=800 mm

2"

3/4" 3/4"

RS

LT
011

2"

5134289
C-2

LC
011

2"

3/4"

GAP

V-24706

5134289
C-2

2"

3/4"

3/4"

5134289
C-2

LTE
012

PT
015

07/11/11

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMARY REVIEW

B
REV

CASING DRAIN
247.005

13163

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

CASING DRAIN
3"-WP-247002-PJB(0.4)

3"-WP-247002-PJB(0.4)

TO SAFE LOCATION

247.009

13162

FROM C-24701G/H

SHELL CANADA
QUEST CCS PROJECT

A
R

C-24701F
CO2 COMPRESSOR 6th STAGE

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

RATED CAPACITY: 79877 Nm^3/hr


DIFF. PR.: 9163 kPa
3
DRIVER : 16500 kW
MATERIAL : 304 SS
INSULATION TYPE/THK: PP /
TRIM: GC-247086-PJG(0.4)

UNIT 247 - COMPRESSION


CO2 COMPRESSOR 6TH STAGE
SCALE: NONE
SHELL DWG NO.:

247.0000.000.041.006

REV.

FILE:\\F:\1025\DRAWINGS\CO2\247\247.006.pid MODEL DATE:7/7/2011 2:57:25 PM BY:ahm14887

FROM E-24705

10"

14"-GC-247021-PJG(0.4)
TWO PHASE FLOW

247.006

247.005

12350

SP
009

3/4"

CO2

TO E-24706

OUTSIDE

?
?

14"

ET 25
38

247.007

12313

3/4" 3/4"

PP

INSIDE

CO2
12"-GC-247024-PJG(0.4)

DO NOT POCKET

2"

2"-GC-247022-PJG(0.4) 2"

CSO
?
C-1

V
5134289
C-1

PP

1-1/2"

PP

3/4"

1-1/2"

?
C-3

PJB(0.4) ET 10
PJG(0.4) ET 25

FREE DRAINING

1/2" WEEP HOLE

OUTSIDE INSIDE
ET 45 N/A
14"-GC-247023-PJG(0.4)

TT
017

3/4" 3/4"

RV
010

ET 10
38

2"-VA-247007-PJB(0.4)

TTE
016

?
C-2

PT
016

FIRE
1D2
SET@
4200 kPa-g

2"x1"

N/A
ET 10

TI
017

T.S.

TO ATMOSPHERE AT
SAFE LOCATION

PI
016

2
E-24708A /B
COMPRESSOR 6th STAGE COOLER SPACE HEATERS

E-24706
COMPRESSOR 6th STAGE COOLER
RATED DUTY:
SURFACE AREA [FINNED]:
TUBE DESIGN PR. & TEMP:
TUBE MATERIAL:
DRIVER & Nos.:
WINTERIZATION:
INSULATION TYPE/THK:
TRIM:

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE
STATED.
3 . SWITCH LOCATED AT PLATFORM LEVEL.
4 . MINIMUM VFD SETTING IS 30% SPEED.

RATED DUTY:
TYPE:
MATERIAL: 304 SS
TRIM: (A) SCL-247020-SAB
(B) SCL-247021-SAB

3.9 MW
9596.0 m^2
6500 kPa-g @ 130 C / HV @ 150 C
304L SS + 0.38 mm CA
22.0 kW & 2
TYPE 3, MODE C
/
GC-247087-PJG(0.4)

HOLDS:

CO2
247.006

12313

NUMBER OF BAYS, CONNECTIONS AND CONNECTION SIZES TO BE CONFIRMED


DURING DETAILED ENGINEERING.

PP

12"-GC-247024-PJG(0.4)

FROM C-24701F

TV
021B

(V)

C-1

TX
021B

FC

E-24706

TV
021A
C-1

TX
021A

8"

8"

8"

8"

FO

1-1/2"

1-1/2"

TW
043

PP

3/4" 3/4"

TW
042

?
C-2

(V)

CO2

H
MIN 10D

12"-GC-247031-PJG(0.4)
FREE DRAINING

TWO PHASE FLOW

12314

247.009

TO V-24707

1-1/2"

C
FAN NO. 1

FAN NO. 2

TT
019

E
001

AVG RTD SENSOR (V)

FROM HEADER

?
C-2

(V)

SI
001

?
C-2

TV
021C

3/4"

2"-SL-246011-SAB

TT
021B

TX
021C

C-1

2"

VFD

XL
002

XA
002

VFD

XA
003

LOCAL/ FAULT
REMOTE

XL
003

SI
002

FAULT LOCAL/
REMOTE

-SL-247001-SAB

FC

2"

FREE DRAINING

TI
021B

5115227
C-2

TX
021

AVG RTD SENSOR (V)

5115227
C-2

TC
021

TT
021A

3/4"

246.029

12447

TI
021A

H
ET 10

LP STEAM

E
001

TC
019

TV
021D
C-1
FC

(V)

TX
021D

FREE DRAINING

HS
005

E-24708B

11 Jul 2011

MANUAL

HIS
002

R/S

I
001

HIS
003

I
001

R/S

07/11/11

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW

-SCL-247001-SAB

REV

CONDENSATE

HS
003A

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

HOA

?
C-2

TWO PHASE FLOW

HOA

ISSUED
DATE

?
C-2

SHELL CANADA
QUEST CCS PROJECT

A
R

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT
UNIT 247 - COMPRESSION
COMPRESSOR 6TH STAGE COOLER
SCALE: NONE
SHELL DWG NO.:

247.0000.000.041.007

REV.

247.007

TO HEADER

ET 10
38

2"-SCL-247002-SAB

5115227
C-2

12455

3/4"

246.029

HS
002A

ISSUED FOR PRELIMINARY REVIEW

FILE:\\F:\1025\DRAWINGS\CO2\247\247.007.pid MODEL DATE:7/7/2011 2:24:26 PM BY:ahm14887

HS
004

ISSUED FOR ESTIMATE

?
C-2

5115227
C-2

3/4"
D

E-24708A

R/S

MANUAL

?
C-2

R/S

-SL-247004-SAB

-SL-247003-SAB

-SL-247002-SAB

V-24707
TEG INLET SCRUBBER
SIZE:
DESIGN PR. & TEMP:
MATERIAL(VESSEL/INTERNALS):
INSULATION TYPE/THK:
TRIM:

V-24708
COMPRESSOR 7th STAGE KO DRUM

900 mm ID x 3400 mm T/T


6500 kPa-g @ 105 C /HV @ 150C
CS + 3 mm 304L SS CLAD / 316L SS
H/
GC-247089-PJG(0.4)

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE
STATED.
3 . DRIVER POWER AND DIFFERENTIAL PRESSURE DEPICTED ARE THE TOTAL FOR
THE COMPRESSOR.
4 . ELASTOMERS SHALL NOT BE USED FOR DENSE PHASE CO2 SERVICE.
5 . ELECTRIC TRACE TO HLL (ET 25).
6 . DEHYDRATION UNIT BYPASS.
7 . SAMPLE TAKE-OFF POINT TO BE ACCESSIBLE.
8 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012.
9 . VALVES ARE FOR BATTERY LIMIT ISOLATION OF UNIT.
10. SAMPLE PROBE INCLUDES A DOUBLE BLOCK AND BLEED VALVE ASSEMBLY.
11. MAXIMIZE LENGTH OF PIPING THAT FREE DRAINS TO KO DRUM.
12. THE FLOW MEASUREMENTS AND ADDITIONAL INSTRUMENTS ARE REQUIRED FOR
ON-SITE COMPRESSOR PERFORMANCE TESTING (PTC-10).
13. GTAW ROOT PASS WELD IS MANDATORY ON THIS LINE.

SIZE: 900 mm ID x 3400 mm T/T


DESIGN PR. & TEMP: 6500 kPa-g @ 105 C/HV @ 150C
MATERIAL(VESSEL/INTERNALS): CS + 3 mm 304L SS CLAD / 316L SS
INSULATION TYPE/THK: H /
TRIM: GC-247090-PJG(0.4)

DO NOT POCKET

3/4"

NO
5242964
C-1

5134289
C-3

12"

12"

12"-GC-248001-PJG(0.4)

NO
5242964
C-1

ET 25
N/A

AI
001A

TO ATMOSPHERE AT
SAFE LOCATION

AI
001B

FI
005

FT
005

FI
006

12

FT
006

ET 10
38

HH

001

TI
026

TTE
025

TT
026

CO2 PURITY
TO ATMOSPHERE AT
SAFE LOCATION

TO ATMOSPHERE AT
SAFE LOCATION

AE
001B

2"x1"

C-1
PJB(0.4) ET 10
PJG(0.4) ET 25
3/4"
V
5134289
C-1
ET 45
75

12

FIRE
1D2
SET@
6500 kPa-g

RV
011

2"-VA-247008-PJB(0.4)

1/2" WEEP HOLE

12375

AX
001

3/4" TUBING (FAST LOOP)

13165

N/A
ET 10

248.001

AT
001B

AE
001A

ANALYZER FAST LOOP


TO C-24701A SUCTION

NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.


INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
FACILITIES ARE TO BE DETERMINED FOR CLEANING AND WATER PURGE FROM THE
COMPRESSOR PIPING DOWNSTREAM OF THE WATER ANALYZER (IN ORDER TO
PREVENT CONTAMINATION OF THE PIPELINE DURING COMMISSIONING AND
START-UP).

FROM V-24801

H2O

TO V-24801

CO2

AT
001A

247.001

248.001

12376

HOLDS:

N/A
ET 25

12"-GC-247038-PJG(0.4)

ET 25
H

CSC
5242963
C-1

10"

CO2

H
75

CSO
5242964
C-1

CSO
5242964
C-1

H
ET 25

12"

5134289
C-3

3/4"

12"

3/4"

5134289
C-3

ET 45 N/A
OUTSIDE
INSIDE
12"-GC-247040-PJG(0.4)

AP
001

1-1/2"

1-1/2"

10

CO2
10"-GC-247041-PJL(C)
2"

247.010

12325

TO C-24701H

13

TO ATMOSPHERE AT
SP
SAFE LOCATION
005
8

3/4" 3/4"
S-4A
?
C-1

5134289
C-2

T.S.

PI
026

3/4" 3/4"

?
C-2

?
C-2

PT
019

PJG(0.4)
PJL(C)

13162

07/11/11

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

LZTE
015

3/4"

C-1

?
C-1 PJL(C)
PJB(0.4)

APE

PEM CLIENT
APP

2"x1"

?
C-1

FC 2"x1"
C-1

LV
015

KO TEG

ET 10
38

248.003

12373

SHELL CANADA

TWO PHASE FLOW TO V-24803


NNF

QUEST CCS PROJECT

ET 25 ET 10
PJG(0.4) PJB(0.4)

A
CASING DRAIN
3"-WP-247002-PJB(0.4)

TO SAFE LOCATION

C-24701G
CO2 COMPRESSOR 7th STAGE
RATED CAPACITY: 79877 Nm^3/hr
DIFF. PR.: 9163 kPa
3
DRIVER : 16500 kW
MATERIAL : 304 SS
INSULATION TYPE/THK: PP /
TRIM: GC-247091-PJL(C)

MC

PDP

2"

1"

3"-WP-247002-PJB(0.4)

CS

C-24701G

CASING DRAIN
247.006

2"-KP-247002-PJB(0.4)

2"
?
C-1

5134289
C-2

ET 25
38

ISSUED FOR ESTIMATE

PI
019

2"-KP-247001-PJG(0.4)
2"

12

11 Jul 2011

3/4" 3/4"

3/4"

5134289
C-2

3/4"

3/4"

3"

PT
026

12

REV

ON/OFF

SO
?
C-2

LYE
015

TI
027

3/4"

2"

?
C-2

TT
027

?
C-2

E
003

3/4"

?
C-2

?
C-2

LLL=250 mm

LT
015

2"

2"

5134289
C-2

2"

?
C-2

LC
015

5134289
C-2

?
C-1

?
C-2

5134289
C-2

2"

ET 25
38

2"

2"

3/4"

?
C-2

LG
015

TI
060

GAP
H

MAG

24"
MW

5134289
C-2

?
C-2

2"
?
C-2

?
C-2

2"x1"

?
C-2

HLL=700 mm

2"

FC
C-1

?
C-2

2"

MIN

2"x1"

?
C-2

MIN

?
C-1

2"

1"

5134289
C-2

?
C-2

TO V-24704

TWO PHASE FLOW

2"

?
C-2

HHLL=800 mm

LLL=250 mm

3/4"

2"

5134289
C-2

2"

2"

12372

ET 10
38

5134289
C-2

247.004

2"-P-247010-PJB(0.4)

?
C-2

2"

3"

2"-P-247011-PJG(0.4)

3/4"

KO LIQUID

2"

3/4"

LV
013

ET 10 ET 25

3/4"

PT
018

?
C-2
PJB(0.4) PJG(0.4)

3/4"

24"
MW

3/4"

ON/OFF

3/4"

2"

LG
013

5134289
C-2

LT
013

3/4"
?
C-2

MAG

2"

PI
018

V-24708

RS

LC
013

HLL=800 mm

?
C-2

?
C-2
GAP

2"

5134289
C-2

2"

5134289
C-2

3/4"

5134289
C-2

3/4"

V-24707

LTE
016

3/4"

12"

TT
060

3/4" 3/4"

12"

GWR

5134289
C-2

FREE DRAINING

LL

LT
017

SP
010

5134289
C-2

GWR

?
C-2

2"

3/4"

12"-GC-247031-PJG(0.4)
TWO PHASE FLOW

3/4"

FROM E-24706

E
003

5134289
C-2

247.007

12314

001

1-1/2"

3/4" 3/4"

PP

HH

5134289
C-2

CO2

3/4"

LI
017

1-1/2"

247.010

13166

FROM C-24701H

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

UNIT 247 - COMPRESSION


TEG INLET SCRUBBER & CO2 COMP. 7TH STAGE
SCALE: NONE
SHELL DWG NO.:

247.0000.000.041.009

REV.

FILE:\\F:\1025\DRAWINGS\CO2\247\247.009.pid MODEL DATE:7/7/2011 2:13:03 AM BY:muk22296

ET 25
38

1/2" WEEP HOLE

247.009

10"

DO NOT POCKET

12"
10"

PP

CSO
?
C-1

2"
2"

12"

?
C-3

RS

?
C-3

2"

RS

11

2"-GC-247039-PJG(0.4)

FREE DRAINING

13

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE
STATED.
3 . DRIVER POWER AND DIFFERENTIAL PRESSURE DEPICTED ARE THE TOTAL FOR
THE COMPRESSOR.
4 . ELASTOMERS SHALL NOT BE USED FOR DENSE PHASE CO2 SERVICE.
5 . TWO CHECK VALVES IN SERIES SEPARATED BY AT LEAST 500MM.
6 . NON-SLAM CHECK VALVE.
7 . START-UP BYPASS VALVE TO BE LOCATED AT PIPING HIGH POINT WITH PIPING
FREE DRAINING INTO THE MAIN PIPING.
8 . VALVE TO BE LOCATED AT SAFE ACCESSIBLE LOCATION.
9 . ANTI-SURGE SPILLBACK VALVE UV-247001 TO BE LOCATED AT PIPING HIGH
POINT WITH PIPING FREE DRAINING INTO THE MAIN PIPING.
10. GTAW ROOT PASS WELD IS MANDATORY ON THIS LINE.

CO2 VENT
6"-VA-247010-PJB(C)
DO NOT POCKET
N/A ET 120
PJB(C) PJL(C)

FREE DRAINING

TO S-24603

?
C-1

6"

6"-VA-247009-PJB(C)

C-1

?
C-1

4"x3"

12327

UV
003

3/4"

FO
C-1

UYE
003

V
5136407
C-1

HOLDS:
NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

FO

4"

E
001

RV
012

CSO
5349470
C-1

246.032

3/4"

CO2 RELIEF / VENT

13039

FROM BATTERY LIMIT


PIPIELINE

BLOCKED DISCHARGE
3K6
SET@
14790 kPa-g

247.014

2"

?
C-1

UC SIGNAL

PX
034

247.001

12578

FROM UC-001B

E
002

E
001

FO

MIN

HH

PC
022

001

5
10"

5351323
C-1 INSIDE OUTSIDE

5136407
C-3

XYE
001

?
C-2

NC
?
C-2

VISIBLE

2"-GI-246019-ULB

246.030
GI
12995

8
7

A/S
FO

XZTE
001

10"
FC

2"

PG
028

XV
001

2"

6"
5343525
C-1
10"
5349475
C-1

C-1

ET 120 PP

PP

CO2
10"-GC-247043-PJL(C)

12332

247.011

TO E-24707A/B

ET 120
100

MIN

5351323
C-1

10"

?
C-3

SP
003B

3/4"

SP
003A

3/4"

PT
022

?
C-2

?
C-2

?
C-2

3/4" 3/4"

3/4" 3/4"

TO UC-001A/B

4"-GC-247046-PJL(C)

12569

PTE
020

3/4" 3/4"

247.001

PT
021

8"-GC-247044-PJL(C)

001

PT SIGNAL

5119160
C-2

FREE DRAINING
UV
001

E
002

3/4"

24"x8" C-1 FO
PJB(0.4) PJL(C)
N/A ET 120

3/4" 3/4"

TO V-24701

FREE DRAINING

ET 120
75

ET 120
75

12326

24"-GC-247045-PJB(0.4)
DO NOT POCKET

?
C-2

8"

ANTI SURGE SPILL BACK

? ?
C-2 C-2

FROM UC-001A

247.001

UZTE
001

2" 2"

247.001

12571

TT SIGNAL

1-1/2"

TT
057

12331

TO UC-001A/B

ISSUED FOR ESTIMATE


11 Jul 2011

4
CO2
247.009

PP

10"-GC-247041-PJL(C)

FROM C-24701G

DO NOT POCKET

10

10"-GC-247042-PJL(C)

12325

1-1/2"

TTE
029

E
001

HH

07/11/11

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW

ISSUED FOR PRELIMINARY REVIEW

ISSUED
REV
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

RS

ET 120
PP

C-24701H
?
C-1

3/4"

SHELL CANADA

?
C-1 PJL(C)
PJB(0.4)

QUEST CCS PROJECT

CASING DRAIN
13166

3"-WP-247002-PJB(0.4)

TO SAFE LOCATION

C-24701H
CO2 COMPRESSOR 8th STAGE
RATED CAPACITY:
DIFF. PR.:
DRIVER :
MATERIAL :
INSULATION TYPE/THK:
TRIM:

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

79877 Nm^3/hr
9163 kPa
3
16500 kW
304 SS
PP /
GC-247092-PJL(C)

UNIT 247 - COMPRESSION


CO2 COMPRESSOR 8TH STAGE
SCALE: NONE
SHELL DWG NO.:

REV.

247.0000.000.041.010

247.010

247.009

FILE:\\F:\1025\DRAWINGS\CO2\247\247.010.pid MODEL DATE:7/7/2011 2:20:07 PM BY:ahm14887

247.001

3/4"

UYE
001

UC SIGNAL

2
E-24709A /B
CO2 COMPRESSOR AFTERCOOLER SPACE HEATERS

E-24707A 6
CO2 COMPRESSOR AFTERCOOLER
RATED DUTY:
SURFACE AREA [FINNED]:
TUBE DESIGN PR. & TEMP:
TUBE MATERIAL:
DRIVER & Nos.:
WINTERIZATION:
INSULATION TYPE/THK:
TRIM:

1. SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE
STATED.
3 . COOLER DUTY DEPICTED IS THE TOTAL FOR ALL BAYS.
4 . SWITCH LOCATED AT PLATFORM LEVEL.
5 . MINIMUM VFD SETTING IS 30% SPEED.
6 . ELASTOMERS SHALL NOT BE USED FOR DENSE PHASE CO2 SERVICE.

RATED DUTY:
TYPE:
MATERIAL: 304 SS
TRIM: (A) SCL-247025-SAB
(B) SCL-247024-SAB

10.3 MW 3
1385.0 m^2
14790 kPa-g @ 175 C
304L SS + 0.38 mm CA
22.0 kW & 2
TYPE 3, MODE C
/
GC-247093-PJL(C)

6
CO2
247.010

12332

CO2

PP

10"-GC-247043-PJL(C)

FROM C-24701H

12558

HOLDS:

247.012

TO E-24707B

TV
032B

NUMBER OF BAYS, CONNECTIONS AND CONNECTION SIZES TO BE CONFIRMED


DURING DETAILED ENGINEERING.

(V)

TX
032B

C-1
FC

TV
032A

6"

(V)

TX
032A

E-24707A

6"

BAY A
C-1

6"

FO

6"
1-1/2"

1-1/2"

TW
047

PP

3/4" 3/4"

TW
046

?
C-2

6
CO2
6"-GC-247055-PJL(C)

MIN 10D

12556

247.014

TO CO2 METERING STATION


1-1/2"

C
FAN NO. 1

FAN NO. 2
TT
030

TI
032A

E
001

2"

AVG RTD SENSOR (V)

TT
032A

TC
030

246.029

5115227
C-2

VFD

VFD

(V)

TX
032C

SI
005
V
3/4"

C-1
FC

247.014

12557

FROM TC-031

001

?
C-2

TV
032C

TC SIGNAL

XL
006

XA
006

XA
007

LOCAL/ FAULT
REMOTE

XL
007

FREE DRAINING

FROM HEADER

SP

?
C-2

5115227
C-2

12610

2"-SL-246015-SAB

2"

AVG RTD SENSOR (V)

TT
032B
3/4"

LP STEAM

TI
032B

TX
032

H
ET 10

TC
032

SI
006

FAULT LOCAL/
REMOTE
2"-SL-247010-SAB

-SL-247009-SAB

TV
032D
C-1
FC

(V)

TX
032D

R/S

R/S

E-24709A

HS
012

HS
013

ISSUED FOR ESTIMATE

E-24709B

MANUAL

11 Jul 2011

MANUAL

HIS
010

2"-SCL-247006-SAB

?
C-2

5115227
C-2

3/4"

?
C-2

CONDENSATE
TO HEADER

HS
010A

ET 10
38

2"-SCL-247005-SAB

?
C-2

TWO PHASE FLOW

HIS
011

I
001

R/S

07/11/11

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW

HOA

HS
011A

ISSUED FOR PRELIMINARY REVIEW

B
ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

HOA

-SL-247012-SAB

5115227
C-2

12611

I
001

REV

3/4"

246.029

R/S

?
C-2

SHELL CANADA
QUEST CCS PROJECT

A
R

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

UNIT 247 - COMPRESSION


CO2 COMPRESSOR AFTERCOOLER-BAY A
SCALE: NONE
SHELL DWG NO.:

247.0000.000.041.011

REV.

FILE:\\F:\1025\DRAWINGS\CO2\247\247.011.pid MODEL DATE:7/7/2011 1:54:46 PM BY:ahm14887

-SL-247011-SAB

FREE DRAINING

247.011

PP

10"-GC-247043-PJL(C)

2
E-24709C /D
CO2 COMPRESSOR AFTERCOOLER SPACE HEATERS

E-24707B 6
CO2 COMPRESSOR AFTERCOOLER
RATED DUTY:
SURFACE AREA [FINNED]:
TUBE DESIGN PR. & TEMP:
TUBE MATERIAL:
DRIVER & Nos.:
WINTERIZATION:
INSULATION TYPE/THK:
TRIM:

RATED DUTY:
TYPE:
MATERIAL:
TRIM:

10.3 MW
3
1385.0 m^2
14790 kPa-g @ 175 C
304L SS + 0.38 mm CA
22.0 kW & 2
TYPE 3, MODE C
/
GC-247094-PJL(C)

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE
STATED.
3 . COOLER DUTY DEPICTED IS THE TOTAL FOR ALL BAYS.
4 . SWITCH LOCATED AT PLATFORM LEVEL.
5 . MINIMUM VFD SETTING IS 30% SPEED.
6 . ELASTOMERS SHALL NOT BE USED FOR DENSE PHASE CO2 SERVICE.

304 SS
(C) SCL-247026-SAB
(D) SCL-247027-SAB

6
CO2

12558

247.011

PP

10"-GC-247043-PJL(C)

HOLDS:

NUMBER OF BAYS, CONNECTIONS AND CONNECTION SIZES TO BE CONFIRMED


DURING DETAILED ENGINEERING.

FROM C-24701H

TV
035B

TX
035B

(V)

C-1
FC

E-24707B
TV
035A

6"

(V)

6"

BAY B

TX
035A

C-1

6"

6"

FO

1-1/2"

TW
048

1-1/2"

TW
049

6
CO2
6"-GC-247058-PJL(C)
MIN 10D

12560

247.014

TO CO2 METERING STATION

1-1/2"
FAN NO. 1

2"

AVG RTD SENSOR (V)

TT
035A

TT
033

TC
033

TX
035C

C-1

-SL-247015-SAB

FC

TWO PHASE FLOW

247.014

12561

FROM TC-031

XL
009

SI
008

FAULT LOCAL/
REMOTE

TV
035D
C-1

FREE DRAINING

-SL-247014-SAB

R/S

E-24709C

R/S

HS
016

HS
017

(V)

TX
035D

ISSUED FOR ESTIMATE

E-24709D

11 Jul 2011

MANUAL

I
001

HIS
015

I
001

HOA

HS
015A

HOA

R/S

07/11/11

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

B
REV

-SL-247016-SAB

R/S

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

?
C-2

5115227
C-2

?
C-2

SHELL CANADA
QUEST CCS PROJECT

A
R

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

UNIT 247 - COMPRESSION


CO2 COMPRESSOR AFTERCOOLER-BAY B
SCALE: NONE
SHELL DWG NO.:

247.0000.000.041.012

REV.

247.012

TO HEADER

ET 10
38

2"-SCL-247008-SAB

XA
009

FC

HS
014A

3/4"

12456

TC SIGNAL

E
001

-SL-247013-SAB

-SCL-247007-SAB
246.029

VFD

LOCAL/ FAULT
REMOTE

HIS
014

CONDENSATE

XA
008

?
C-2

5115227
C-2

3/4"
D

XL
008

MANUAL

?
C-2

SI
007

?
C-2

TV
035C

VFD

5115227
C-2

?
C-2

(V)

FREE DRAINING

FROM HEADER

3/4"

H
38

2"-SL-246016-SAB

SP

3/4"

246.029

12449

2"

AVG RTD SENSOR (V)

TT
035B

5115227
C-2

LP STEAM

TI
035B

TX
035

H
ET 10

TC
035

FILE:\\F:\1025\DRAWINGS\CO2\247\247.012.pid MODEL DATE:7/7/2011 5:52:42 AM BY:muk22296

TI
035A

E
001

FAN NO. 2

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE
STATED.
3 . ELASTOMERS SHALL NOT BE USED FOR DENSE PHASE CO2 SERVICE.
4 . CONNECTIONS FOR METER PROVING AT SAFE ACCESSIBLE LOCATION.
5 . SCOPE BREAK WITH PIPELINE FACILITIES.
6 . CHECK VALVE TO REDUCE CONSEQUENCES OF POTENTIAL AIR COOLER TUBE
RUPTURE.
7 . VALVES ARE FOR BATTERY LIMIT ISOLATION OF UNIT.
8 . VALVE TO BE LOCATED AT SAFE ACCESSIBLE LOCATION.

HOLDS:
INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

CO2 VENT
247.010

13039

TO S-24603

6"-VA-247010-PJB(C)
DO NOT POCKET

?
C-1

6"

C-1

PJB(C)
PJL(C)

TO TC-030

NC

12557

247.011

3"

TC SIGNAL

TV
058

6"x3"

C-1
FC

12561

NC
?
C-1

3"

TO TC-033
3"

C
3

PI
025

CO2
12556

247.011

6"-GC-247055-PJL(C)

NC
?
C-1

247.012

3"

TC SIGNAL

FQI
004

MIN 10D
8"-GC-247059-PJL(C)

8"

FP
5349475
C-1

8"x4"

MIN 5D

8"x4"

6
5351323
C-1

TT
058
1-1/2"

7
8"
5349475
C-1

5136407
C-3

?
C-3

FT
004

3/4"

NC
5349470
C-1

4"
3/4"
V
5136407
C-1

3/4"

1-1/2"

3/4"
V
5136407
C-1

TC
058

NC
5349470
C-1

1-1/2"

TTE
041

?
C-2

TT
031

3/4" 3/4"

FROM E-24707B

4"

6"-GC-247058-PJL(C)

FI
004

3"

NC
5349470
C-1

PT
025

4"

7
CO2

8"
5349475
C-1

12993

MIN

TO PIPELINE

PJL(C)

ISSUED FOR ESTIMATE

11 Jul 2011

07/11/11

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

REV

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

SHELL CANADA
QUEST CCS PROJECT

A
R

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

UNIT 247 - COMPRESSION


CO2 METERING STATION
SCALE: NONE
SHELL DWG NO.:

247.0000.000.041.014

REV.

FILE:\\F:\1025\DRAWINGS\CO2\247\247.014.pid MODEL DATE:7/7/2011 11:21:54 AM BY:ahm14887

247.014

247.012

HH

4"

12560

E
002

NC
5349470
C-1

CO2

NC
5349470
C-1

TC
031

3"-GC-247027-PJL(C)

FROM E-24707A

RV
004

3"x2"
C-1

RATED DUTY:
SURFACE AREA:
TEMA TYPE:

1400 mm ID x 9700 mm T/T


6500 kPa-g @ 105 C / HV @ 150 C
CS + 3 mm 304L SS CLAD / 316L SS
H/
GC-248010-PJG(0.4)

DESIGN PRESS:
DESIGN TEMP:
MATERIAL:
INSULATION TYPE/THK:
TRIM:

3/4"

V
5134289
C-1

2"

190 kW
74.0 m^2
DOUBLE PIPE
SHELL
7200 kPa-g / HV
210 C / 150 C
CS
/
KP-248025-PAN

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "248" UNLESS OTHERWISE
STATED.
3 . TWO CHECK VALVES IN SERIES, ONE IN THE HORIZONTAL AND ONE IN THE VERTICAL
POSITION, SEPARATED BY AT LEAST 500 MM.
4 . ELECTRIC TRACE TO HLL (ET10).
5 . FT-003 TO BE INSTALLED VERTICALLY WITH FLOW UPWARD.
6 . SAMPLE TAKE-OFF POINT TO BE ACCESSIBLE.
7 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012.

TUBE
1200 kPa-g /
58 C /
CS
/
CWR-248002-UAB

C-2

NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.


INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

C-1
?

D
C-2

TW
011

2"
12"

2"

FI
003

5242963
C-2
24"
MW

2"

2"

5063244
C-2

6"x2"

2"

1-1/2"
6"x2"

3/4"

3"

246.025
CWR

ET 10
38

CSO
5156863
C-2

12918

2"

2"

RS

L
2" RS

FT
003

5063244
C-2

6"x3"

6"x3"

3"x2"

2" RS

E-24804A

TT
010

3"

3"

5242963
C-2

RS

2"

5134289
C-2

3/4"
3"

TC
010

3"-CWR-248001-UAB

1-1/2"
2"

TO V-24708

HOLDS:

ET 10
38

12"-GC-248001-PJG(0.4)

12616

FROM P-24801A/B

2"
ET 25
N/A

248.004

2"

E-24804B

ET 10
38

12375

?
C-3

247.009

C-1

FC
C-1

2"-KP-248016-PAN

ET 10
38

2"

2"-KP-248024-PAN

CO2

3/4"

2"-GC-248002-PJG(0.4)

1"

2"

2"x1"

LEAN TEG

ET 10
38

3/4"

2"x1"

ET 25
38

TV
010

5115273
C-2

2" 2"

ET 10
PJB(0.4)
PJG(0.4)
ET 25

E-24804A /B /C /D /E
LEAN TEG COOLER

V-24801
TEG ABSORBER
SIZE:
DESIGN PR. & TEMP:
MATERIAL(VESSEL/INTERNALS):
INSULATION TYPE/THK:
TRIM:

CSO
?
C-1

1/2" WEEP HOLE

ET 10
38

2"x1"

3"-VA-248002-PJB(0.4)

CSC CSC
? ?
C-1 C-1

N/A
ET 10

FIRE
1E2
SET@
6500 kPa-g

PJG(0.4)
ET 25

ET 10
PJB(0.4)

TO ATMOSPHERE
AT SAFE LOCATION

2"
2"

RS

ET 10
38

2" RS

2"

ET 10
38

E-24804C
2"
2"

PDI
002

RS

PDT
002
2" RS

2"

ET 10
38

2"
2"

TO ATMOSPHERE
AT SAFE LOCATION

RS

3"x2"

3"
2"

2" RS

6
3/4"-VA-248001-PJG(0.4)

ET 25
38

E-24804E

7
N/A
ET 25

S-4A

V-24801

2"

?
C-2

E-24804D

ET 10
38

3"-CWS-246009-UAB

5156863
C-2

246.025
CWS
12919

BACK
FLUSH

ISSUED FOR ESTIMATE

11 Jul 2011

2"-KP-248021-PAN

2"

SO

2"

5134289
C-2

3/4"

MAG
LG
002

2"

2"

?
C-2

?
C-2

?
C-2

LT
002

LC
002

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

ISSUED
DATE

DESCRIPTION

LYE
002

CS

MC

PDP

APE

PEM CLIENT
APP

QUEST CCS PROJECT

?
C-1

5134289
C-2

?
C-1

1-1/2" 1-1/2"

3/4"

1-1/2"

5134289
C-2

1-1/2"

3/4"

?
C-2

2"

3"x1-1/2"

FC
C-1

1-1/2"

?
C-1

1-1/2"

3"x1-1/2"

?
C-1

ET 10
38

RICH TEG
3"-KP-248002-PJG(0.4)
TWO PHASE FLOW

12379

248.002

TO E-24801

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

ET 10
38

CSC
5096787
C-1

UNIT 248 - DEHYDRATION


TEG ABSORBER
SCALE: NONE
SHELL DWG NO.:

PRS

SHELL CANADA

LV
002
3" 3"-KP-248001-PJG(0.4)

CKD

E
003

BY

5134289
C-2

?
C-2

04/20/11

3/4"

5134289
C-2

2"

REV

?
C-2

LLLL=300 mm

ISSUED FOR PHA III

248.0000.000.041.001

REV.

FILE:\\F:\1025\DRAWINGS\CO2\248\248.001.pid MODEL DATE:7/7/2011 5:14:08 AM BY:muk22296

LLL=700 mm

07/11/11

248.001

?
C-2

2"

5134289
C-2

NLL=880 mm

?
C-2
24"
MW

?
C-2

2"

3/4"

?
C-2

HLL=1050 mm

5134289
C-2

5134289
C-2

2"

5134289
C-2

2"

HHLL=1450 mm

3/4"

3/4"

12"

3/4"

GWR

3/4"

LL

LTE
001

5242963
C-2

5134289
C-2

5134289
C-2

3/4"

E
003

3/4"

12"-GC-247038-PJG(0.4)
DO NOT POCKET

5242963
C-2

MIN

FROM V-24707

247.009

3"

3"

5134289
C-2

12376

H
38

3"

SP
001

3/4"

CO2

ET 25
H

?
C-1

3/4"

1/2" WEEP HOLE

SIZE (COLUMN): 500 mm ID x 3500 mm T/T


SIZE (STRIPPER): 400 mm ID x 2400 mm T/T
DESIGN PRESS. & TEMP.: 350 kPa-g @ 230 C /
MATERIAL (COLUMN / INTERNAL): CS + 3 mm 316L SS CLAD / 316L SS
MATERIAL (STRIPPER): 316L SS + 3 mm CA
INSULATION TYPE/THK: H
TRIM: KP-248026-PJB(0.4)

SIZE:
DESIGN PR. & TEMP:
MATERIAL(VESSEL/INTERNALS):
INSULATION TYPE/THK:
TRIM:

RATED DUTY:
SURFACE AREA:
TEMA TYPE:

1300 mm ID x 3900 mm T/T


350 kPa-g @ 230 C / HV @ 150 C
CS + 3 mm 316L SS CLAD
H/
KP-248027-PJB(0.4)

DESIGN PRESS:
DESIGN TEMP:
MATERIAL:
INSULATION TYPE / THK:
TRIM:
PJG(0.4) PJB(0.4)

TV
002B

3"x1-1/2"

1-1/2"

1-1/2"

?
C-1

FO
C-1
TO ATMOSPHERE
AT SAFE LOCATION

?
C-1

SHELL
350 kPa-g / HV
230C / 150C
CS + 3 mm 316 CLAD
H
KP-248029-PJB(0.4)

DESIGN PRESS:
DESIGN TEMP:
MATERIAL:
INSULATION TYPE / THK:
TRIM:

FO
C-1

3"

E-24801

?
C-1
RICH TEG

ET 10
38

3"-KP-248005-PJB(0.4)
TWO PHASE FLOW

3"
H

TC
002

2"

S-24801
H
ET 10

2"
2"

2"-SS-248002-SAG

?
C-2
LG
008

E-24802

MAG

V
5115277
C-1
1"

?
C-3

2"

1"-SS-248003-SAG

?
C-2

V-24806

2"

5134289
C-2

?
C-2

3/4"

5119160
C-2

3/4"

?
C-1

12425

NC
5069816
C-1

07/11/11

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW

LT
004

LC
004

LC SIGNAL

ISSUED FOR PRELIMINARY REVIEW

12328

248.003

REV

ISSUED
DATE

DESCRIPTION

5115277
C-2

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

TO LV-004

TI
003

?
C-2

5134289
C-2

3/4"

7000 mm MIN.

?
C-2

NLL=690 mm

3/4"

5115277
C-2

1"
C-1

2"

11 Jul 2011

2"

LLL=260 mm

SHELL CANADA

TT
003
1-1/2"
6"x3"

2"

QUEST CCS PROJECT


6"x3"

ET 10
38

LEAN TEG
3"-KP-248008-PJB(0.4)

12386

248.003

TO E-24803

?
C-2

?
C-1

?
C-1

2"x1"

2"x1"

FT
001

246.030
GI

MAG

2"

FC
C-1

?
C-1

2"

?
C-2

?
C-2

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

UNIT 248 - DEHYDRATION


TEG STRIPPER, REBOILER & CONDENSATE POT
SCALE: NONE
SHELL DWG NO.:

248.0000.000.041.002

REV.

248.002

TO V-24607 TWO PHASE FLOW

2"

2"x1"

2"

2"

12427

1"

2"x1"

5115277
C-2

246.020

ET 10
38

3/4"

3
HP CONDENSATE

LV
003

2"

FREE DRAINING
2"

2"

HLL=1120 mm

3/4"
2"-SCH-248002-SAG

2"-SCH-248001-SAG

LG
004

LLLL=150 mm

SO
?
C-2

3/4"

V-24805

8"
HH

LG
003

FC
C-1 1"

?
C-1

2"

ISSUED FOR ESTIMATE

2"-GI-246018-ULB

?
C-2

MIN

LT
003

2"x1"

PCV
009

5115277
C-2

3/4"

5115277
C-2

3/4"
H

HLL=880 mm

1"
2"x1"

LLL=290 mm

?
C-2

MAG

2"

PT
008

FV
001
2"

NLL=700 mm

2"

?
C-2

?
C-2
HHLL=1000 mm

2"

2"

2"

5097550
C-2

2"

V
5134289
C-2

2"
2"

3/4"

CSO
C-1
?

FC
001

5134289
C-2

SAB SAG

LL

TT
001

3/4"

3/4"

2"

PI
008

ULB

001

24" MW

PJB(0.4)

1/2" WEEP HOLE

LTE
010

2"x3/4" 3/4"

PI
016

PT
016

?
C-2

2"

?
C-2

002

C-1
E

PTE
004

2"x3/4" 3/4"

ET 10
38

ET 10
38

RV
001

HH

5134289
C-2

2"

2"

ET 10
38

2"-VA-248004-SAB

FIRE
1D2
SET@
5170 kPa-g

5134289
C-2

2"
?
C-1

2"x1"

2"

LC
003

10"

?
C-2

FROM E-24803

CSC
5062543
C-1

N/A
ET 10

12385

1"

TO ATMOSPHERE
AT SAFE LOCATION

248.003

8"
HH

3/4"

FC
C-1

3"-KP-248023-PJB(0.4)
TWO PHASE FLOW

MIN. 10D

4"

3/4"

?
C-1

FROM HEADER

RICH TEG

ET 10
38

4"x3"

1"

2"x1"

2"

5115277
C-2

H
50

2"-SS-248001-SAG

TYE
001

TV
001

3/4"

246.101

12545

8"
HH

TC
001

TO V-24803

?
C-3

FT
004
LOW TEMP HP STEAM

248.003

12380

2"

TT
002

V-24802

HOLDS:

ET 10
38
PJG(0.4) PJB(0.4)
1-1/2" 1-1/2" 3"x1-1/2"

3"x1-1/2" 1-1/2"

E
002

SCH-248006-SAG

NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.


INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

ET 10
38
TV
002A

?
C-1

FI
004

TUBE
5170 kPa-g / FV
415C / 415C
316L SS

FILE:\\F:\1025\DRAWINGS\CO2\248\248.002.pid MODEL DATE:7/7/2011 2:34:26 PM BY:ahm14887

3"-KP-248002-PJG(0.4)
TWO PHASE FLOW

TUBE
350 kPa-g / HV
230C / 150C
316L SS + 0.38 mm CA

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "248" UNLESS OTHERWISE
STATED.
3 . CONDENSATE LINES SHOULD BE SUPPORTED FOR VIBRATING SLUGGING SERVICE.
4 . ELECTRIC TRACE TO HLL (ET 10).
5 . FT-001 TO BE INSTALLED VERTICALLY WITH FLOW UPWARD.
6 . 316/316L STAINLESS STEEL PIPING COMPONENTS ARE REQUIRED FOR THIS LINE.

396 kW

8"

5134289
C-2

FROM V-24801

ET 10
38

SHELL
1400 kPa-g / FV
105C / 105C
CS + 3 mm 316 CLAD
H
KP-248028-PJB(0.4)

RATED DUTY:
SURFACE AREA:
TEMA TYPE:

8"-VA-248003-PJB(0.4)

3/4"

248.001

12379

3"-KP-248003-PJG(0.4)

RICH TEG

92 kW

3"-KP-248004-PJB(0.4)
TWO PHASE FLOW

ET 10
38

1-1/2" 3"x1-1/2"

E-24802
TEG STRIPPER REBOILER

?
C-2

600 mm ID x 1800 mm T/T


5170 kPa-g @ 415 C/ FV @ 415C
CS +3 mm CA
H/
SCH-248005-SAG

E-24801
TEG STRIPPER CONDENSER

S-24801
TEG REGENERATION PACKAGE

5134289
C-2

SIZE:
DESIGN PR. & TEMP:
MATERIAL(VESSEL/INTERNALS):
INSULATION TYPE/THK:
TRIM:

V-24806
TEG SURGE DRUM

V-24802
TEG STRIPPER

3/4"

V-24805
TEG STRIPPER REBOILER CONDENSATE POT

V-24803
TEG FLASH DRUM
SIZE:
DESIGN PR. & TEMP:
MATERIAL(VESSEL/INTERNALS):
INSULATION TYPE/THK:
TRIM:

E-24803
LEAN/RICH TEG EXCHANGER

1900 mm ID x 4800 mm T/T


480 kPa-g @ 105 C / FV @ 105C
CS +3 mm 304L SS CLAD/ 316L SS
H/
KP-248030-PJB(0.4)

RATED DUTY:
SURFACE AREA:
DESIGN PRESS:
DESIGN TEMP:
MATERIAL:
INSULATION TYPE/THK:
TRIM:
TEMA TYPE:

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "248" UNLESS OTHERWISE
STATED.
3 . ELECTRIC TRACE TO HLL (ET 10).
4 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE.
5 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012.

0.6 MW

HOT
400 kPa-g / HV
230 C / 150 C
PLATES: 304L SS
FRAME: CS
/
KP-248031-PJB(0.4)
COMPABLOC

COLD
520 kPa-g / FV
210 C / 210 C
/

HOLDS:

TI
006

E-24803

LEAN TEG
12386

248.002

3"

FROM V-24806
RICH TEG
248.002

12385

TO V-24802

TT
006

ET 10
38

3"-KP-248008-PJB(0.4)

ET 10
38

3"-KP-248023-PJB(0.4)

6"x3"

TWO PHASE FLOW

NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.


INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

3"

6"x3"

1-1/2"
6"x3"

3"

6"x3"

ET 10
38

LEAN TEG
3"-KP-248009-PAB

3"

1-1/2"

12378

248.004

TO P-24801A/B
PJB(0.4) PAB

TT
005

PC
005

TI
005

PT
005

12367

TO V-24701

3"-GC-248004-PJB(0.4)
DO NOT POCKET

3"
5242893
C-1

3/4"

H
25

3"x1" 1"

TO ATMOSPHERE
AT SAFE LOCATION

2"
FO
C-1

2"x1"

CONTROL VALVE FAILURE


6Q8
SET@
480 kPa-g

?
C-1

D
1"

5134289
C-2

247.001

3/4"

FLASHED CO2

PV
005

?
C-2

RV
002

NC
5096787
C-1

N/A
ET 10

8"-VA-248005-PJB(0.4)

8"x6"

C-1
3/4"

24"
MW

CSO
5242525
C-1

10"

2"
3/4"

8"

2"
2"-KP-247002-PJB(0.4)
TWO PHASE FLOW NNF

FROM V-24708

V-24803

?
2" C-2

HHLL=1100 mm
HLL=750 mm
NLL=710 mm

5063244
C-2

LLL=350 mm

2"-KP-248022-PAB
INTERMITTENT

LG
005

LI
005

LT
005

MAG

LLLL=250 mm

2"

MAKE-UP TEG

ET 10
38

TT
004

?
C-1

FC
C-1

?
C-1

TWO PHASE FLOW

3"-KP-248007-PJB(0.4)

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

B
REV

ISSUED
DATE

DESCRIPTION

S-3

TI
004

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

?
C-1

?
C-1

1-1/2"

07/11/11

ET 10
38

1-1/2" 1-1/2" 3"x1-1/2"

3"x1-1/2" 1-1/2"

3/4" 3/4"

ET 10
38

5134289
C-2

3"-KP-248006-PJB(0.4)

3/4"

6"x3"

6"x3"

3/4" 3/4"

?
C-2

2"

3"

?
C-2

LV
004

3/4" 3/4"

3/4"

248.002

5134289
C-2

?
C-2

3/4"

MIN

LC SIGNAL
FROM LC-004

L
HH

2"

12328

ISSUED FOR ESTIMATE

FROM P-24802 (S-24802)

11 Jul 2011

?
C-2

?
C-2

12831

004

SO

248.005

SHELL CANADA
5

SP
002

QUEST CCS PROJECT

A
R

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

UNIT 248 - DEHYDRATION


TEG FLASH DRUM & LEAN/RICH EXCHANGER
SCALE: NONE
SHELL DWG NO.:

248.0000.000.041.003

REV.

248.003

247.009

PAB

12373

ET 10
38

PJB(0.4)

KO TEG

FILE:\\F:\1025\DRAWINGS\CO2\248\248.003.pid MODEL DATE:7/7/2011 12:08:22 PM BY:ahm14887

MIN 10D

4"

5134289
C-2

TWO PHASE FLOW

FROM E-24801

TO GRADE WITHIN
TEG CONTAINMENT AREA

2"-GC-248003-PJB(0.4)

248.002

4"x3"

ET 10
38

?
C-3

12380

3"-KP-248005-PJB(0.4)

3/4"

2"

RICH TEG

8"-GC-248005-PJB(0.4)

8"

V
5134289
C-1

3
V-24808
LEAN TEG POST FILTER
SIZE:
RATED FLOW:
DESIGN PR. &TEMP:
PRESSURE DROP (CLEAN/DIRTY):
MATERIAL:
INSULATION TYPE/THK:
TRIM:
PARTICLE RETENTION SIZE:

2
V-24804A /B
LEAN TEG FILTER

V-24807
LEAN TEG CARBON FILTER
SIZE:
RATED FLOW:
DESIGN PR. &TEMP:
PRESSURE DROP (CLEAN/DIRTY):
MATERIAL:
INSULATION TYPE/THK:
TRIM:

mm ID x mm T/T x
1 m^3/hr
7200 kPa-g @ 210 C / HV @ 150C
/
304L SS + 0.4 mm CA
/
7
KP-248035-PAN
5 MICRONS

SIZE:
RATED FLOW:
DESIGN PR. &TEMP:
PRESSURE DROP (CLEAN/DIRTY):
MATERIAL:
INSULATION TYPE/THK:
TRIM:

mm ID x mm T/T x
1 m^3/hr
7200 kPa-g @ 210 C / HV @ 150C
/
304L SS + 0.4 mm CA
/
7
KP-248034-PAN

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "248" UNLESS OTHERWISE
STATED.
3 . POSITIVE DISPLACEMENT PUMP.
4 . STANDBY PUMP WILL START AUTOMATICALLY ON MAIN PUMP FAILURE.
5 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE.
6 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012.
7 . ELECTRIC TRACE (ET 10).

mm ID x mm T/T x
6 m^3/hr
7200 kPa-g @ 210 C / HV @ 150C
/
304L SS + 0.4 mm CA
/
7
KP-248032-PAN
KP-248033-PAN
5 MICRONS

PARTICLE RETENTION SIZE:

PDI
007

HOLDS:
PI
003

NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.


INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

PDT
007

2"

2"

?
C-2

NC
?
C-2

3/4" 3/4"

?
C-2

3/4" 3/4"
ET 10
38

2"-KP-248014-PAN

2"-KP-248015-PAN

?
C-1

3/4" 3/4"

3/4"
5115273
C-2
?
C-2

2"

RS

V-24804B

NC
?
C-2

V-24807
?
C-2

RS

2"

1"

5115273
C-2

1"
D

2"

3/4"-KP-248039-PAN

V-24808

5115273
C-2

2"-KP-248019-PAN

TO SAFE LOCATION

3/4"

RS

3/4"

RS

1"-VA-248011-PAB

2"

3/4" 3/4"

5115273
C-2

3/4" 3/4"

?
C-2

3/4" 3/4"

5115273
C-2

?
C-2

3/4"

RS

RV
008
C-1

FT
005

TO SAFE
LOCATION

FIRE
3/4"x1"
3/4
SET@
7200 kPa-g

PAB PAN

5115273
C-2

RS

5115273
C-2

?
C-2

3/4"

2"

5115273
C-2

3/4" 3/4"

FC
005

3/4"

PDT
015

FX
005

2"-KP-248017-PAN

FIRE
3/4
3/4"x1"
SET@
7200 kPa-g
RV
PAN PAB
009

2"

ET 10
38

?
C-2

V-24804A

2"-KP-248018-PAN

PDC
015

C-1

1-1/2"
NC
5062541
C-1

2"

RS
5115273
C-2

5115273
C-2

?
C-2

?
C-1

1"-VA-248009-PAB

ET 10
38

PDT
016

2"-KP-248020-PAN

2"

?
C-2
5115273 3/4"-KP-248044-PAN
C-2

?
C-1

3/4" 3/4"

PDC
016

FO
C-1

2"x1"

TO SAFE LOCATION
3/4"-KP-248038-PAN
2"
RS
3/4"

?
C-1

TO E-24804

1"

2"x1"

3/4" 3/4"

2"

3/4"

ET 10
63

3/4"

248.001

12616

?
C-2

LEAN TEG

5115273
C-2

2"-KP-248016-PAN

?
C-2

C-1

PT
003

?
C-2

1"-VA-248010-PAB
FV
005

FIRE
3/4
3/4"x1"
SET@
7200 kPa-g

RV
007

?
C-2

PAB PAN

SP
004

S-9
6

3/4"

D
5115273
C-1

3/4"

C-1

PG
012

RV
005
C-1

5063244
C-1

BLOCKED
DISCHARGE
1D2
SET@
7200 kPa-g

ISSUED FOR ESTIMATE


11 Jul 2011

PG
013

07/11/11

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

2"-KP-248043-PAN

3/4" 3/4"
?
C-2

HOA
E
01

?
C-2

3/4" 3/4"

PAB
PAN

5115273
C-1

5115273
C-1 3/4"

3/4"

?
C-1

01

HIS
005

R/S

SP
003B

P-24801A

MC

PDP

APE

PEM CLIENT
APP

01

SHELL CANADA
QUEST CCS PROJECT

VFD

P-24801A /B
LEAN TEG PUMPS

MATERIAL:
INSULATION TYPE/THK:
TRIM:

CS

R/S

P-24801B

VFD

6.2 m^3/hr
5742 kPa
10.0 kW
CASING
INTERNALS
CS
CS
/
KP-248037-PAN
KP-248036-PAN

HIS
006

3"-KP-248011-PAN

RATED FLOW:
DIFF. PR.:
DRIVER:

PRS

HS
006A

E
01

CKD

3"
?
C-1

BY

HOA
?
C-2

3"

?
C-2

HS
005A

3"-KP-248010-PAN

DESCRIPTION

3/4" 3/4"

?
C-2

?
C-2
SP
003A

PP

3/4" 3/4"

PP

ISSUED
DATE

1"-KP-248042-PAN

PP

5115273
C-1
3/4"

PP

REV

5115273
C-1

2"-KP-248041-PAN

1"-KP-248040-PAN

XA
002

XL
002

VFD
LOCAL/
FAULT REMOTE

XA
001

XL
001

VFD
LOCAL/
FAULT REMOTE

SI
001

HIC
012

HS
007

PUMP DUTY
SELECTOR

SI
002
R

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT
UNIT 248 - DEHYDRATION
LEAN TEG PUMPS & FILTERS
SCALE: NONE
SHELL DWG NO.:

248.0000.000.041.004

REV.

FILE:\\F:\1025\DRAWINGS\CO2\248\248.004.pid MODEL DATE:7/7/2011 4:30:49 PM BY:ahm14887

RV
003

ET 10
38

2"-KP-248013-PAN

BLOCKED
DISCHARGE
1D2
SET@
7200 kPa-g

2"-KP-248012-PAN

5063244
C-1

D
5115273
C-1

248.004

FROM E-24803

?
C-1

2"

2"

ET 10
38

3"-KP-248009-PAB

3/4"

248.003

PAB
PAN

12378

?
C-1

LEAN TEG

ET 10
38

ET 10
38

S- 24802
TEG MAKE-UP PACKAGE

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "248" UNLESS OTHERWISE
STATED.
3 . POSITIVE DISPLACEMENT PUMP WITH ADJUSTABLE STROKE.
4 . GRADUATED GLASS COLUMN FOR CONTINUOUS TOTE TANK LEVEL AND INJECTION
PUMP CALIBRATION.

HOLDS:
NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

3/4"-VA-248007-PAB

?
?
1" HOSE

SP
005

?
?

1"-VA-248006-PAB

INSIDE OUTSIDE

SET@
530 kPa-g
RV
006
1000L
TOTE TANK
(REMOVABLE)
(BY SHELL)

3/4" 3/4"
2"x1"

2"

I
02

?
?

2"

?
?
SP
006

2"

C-1

C-1

INSIDE
N/A

OUTSIDE
ET 10

ET 10
38

MAKE-UP TEG
2"-KP-248022-PAB

12831

248.003

TO V-24803

PG
010

LI
011

2"

L
C-2

1" HOSE

PI
011

PT
011

C-1

C-2

1-1/2"x3/4"

2"x1"
6" FILL CAP

2"x1"

2" HOSE
3/4"

2"
1000 L
TOTE TANK
(OPERATING)
X2

LG
009

PP

C-2

2"

MAG

3/4" 3/4"

C-2
2" HOSE

2"

004

2"

D
D

ISSUED FOR ESTIMATE

I
002

HIS
008

P-24802

07/11/11

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

B
REV

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

CURB

SHELL CANADA
QUEST CCS PROJECT

A
R

P-24802
TEG MAKE-UP PUMP
RATED FLOW:
DIFF. PR.:
DRIVER:
MATERIAL:
INSULATION TYPE/THK:
TRIM:

620 L/hr
380 kPa
1.00 kW
CASING
CS
/

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT
UNIT 248 - DEHYDRATION
TEG MAKE-UP TANK & PUMP

INTERNALS
CS

SCALE: NONE
SHELL DWG NO.:

248.0000.000.041.005

REV.

FILE:\\F:\1025\DRAWINGS\CO2\248\248.005.pid MODEL DATE:7/7/2011 12:09:35 PM BY:ahm14887

CURB

R/S

C-1

3/4"

C-1
3/4"

HS
008A

11 Jul 2011

2"
3/4"

3/4"

2"
2"

HOA
E

C-2

LT
011

1-1/2"x3/4"

LG
011

248.005

1"-VA-248008-PAB

2"

3/4"

S-24802

C-2

2"x1"

6" FILL CAP

E-44014
WASH WATER MAKE-UP COOLER

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY"440' UNLESS OTHERWISE
STATED.
3 . ELECTRIC TRACE (ET10) E-44014.
4 . OPEN PATH (NO BLOCK VALVES) REQUIRED FROM E-44014 (FV-440076) TO V-44119
TO MEET SAD LINE SPECIFICATION REQUIREMENTS.

RATED DUTY:
SURFACE AREA:
TEMA TYPE:

0.7 MW (TOTAL)
31.8 m^2
BEU
4
SHELL
TUBE
4025 kPa-g / FV
DESIGN PRESS: 3100 kPa-g /
150 C / 150 C
DESIGN TEMP: 58 C /
CS + 0.38 mm CA
MATERIAL: CS + 3 mm CA
3
/
/ 3
INSULATION TYPE/THK:
TRIM: PROCESS SIDE: WB-440012-SAD
COOLING WATER SIDE: CWS-440077-SAD

D
441

FC
076

HH

E
453

FYE
076

FO
FT
076
2"x1-1/2"

ET 10
38

1-1/2"

2"x1-1/2"

?
?

?
?

FROM HEADER

D
3/4"

5115277
?

3/4"

1"
?
?

1-1/2"

1-1/2"

5115277
?

2"x1-1/2"

5115277
?

440.021

2"

2"-WB-440010-SAG

3/4"

BFW FOR WASH WATER

FV
076

FC

2"x1-1/2"

?
?

COOLING WATER RETURN

TW
010

1"
CSC 5062543
?

6"-CWR-441045-UAB

ET 10
38

3"

COOLING WATER RETURN

8"x3"

8"-CWR-440045-UAB

440.012

CSO
?
?

12722

FROM E-44129

1-1/2"

SAG SAD

441.031

TO HEADER

3/4"

TW
008

1-1/2"

V
5115277
?

C
RS

C
UAB
SAD

E-44014

SAD
UAB

RS

TI
009

TT
009
4
1-1/2"

?
?

WASH WATER
12113

441.030

TO V-44119

3"
3"

2"-WB-440011-SAD

5115277
?

3/4"

ET 10
38

ET 10
38

8"x3"

COOLING WATER SUPPLY


8"-CWS-440075-UAB

440.012

?
?

FROM HEADER

BACK FLUSH

COOLING WATER SUPPLY


6"-CWS-440076-UAB

12721

441.031

TO E-44129

ISSUED FOR ESTIMATE

11 Jul 2011

07/11/11

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRILIMINARY REVIEW

REV

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

SHELL CANADA
QUEST CCS PROJECT

A
R

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

SCALE: NONE
SHELL DWG NO.:

440.0000.000.041.048

REV.

440.048

UNIT 440 - HYDROGEN MANUFACTURING UNIT


WATER MAKE-UP COOLER

FILE:\\F:\1025\DRAWINGS\HMU\440\440.048.pid MODEL DATE:7/10/2011 10:26:02 PM BY:muk22296

12983

TO UC-246002

I
104

HH

3/4" 3/4"

PAC
HJE(0.4)
5

S-4

SP.

4"-P-441097-HJE(0.4)

050

16"-P-441096-HJE(0.4)

485.213

14"-P-441101-DAG

11

ET 10

10"

3/4"

FROM P-24602A/B/C

TO V-44119

12. TOP CONNECTION.

HOLDS:
NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
CONFIRM AVAILABILITY OF DCS AND SIS INTERLOCK SEQUENCE NUMBERS ADDED
FOR QUEST.

14"-P-441102-DAE

1-1/2"
M

441.030

16"

FV
075

FO

14"-P-441103-DJE(0.4)

14"x10" FC 14"x10"

3/4"

LEAN AMINE

FT
075

12074

FYE
075

TT
030

H2 RAW GAS

V
6"

TI
030

E
451

18"x14"

36"
MW

18"

MIN
DAE DJE(0.4)

D
10"

CSC
DAG DAE

3"

PDT
064

3/4"

FC
075

246.002

FROM LX-246001

12072

12777

FREE DRAINING

SET POINT
12405

FREE DRAINING
CSO

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES AND CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "441" UNLESS OTHERWISE
STATED.
3 . BOTTOM OF COLUMN IS PACKED WITH 600 mm OF #2 RASCHIG RINGS.
4 . H2 RAW GAS BYPASS REQUIRED FOR SYSTEM PURGE AND PRESSURIZATION AT
START-UP.
5 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012.
6 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE.
7 . ELECTRIC TRACE TO HLL (ET 10).
8 . LOCALIZED DEGASSING OF CO2 MAY OCCUR AT RESTRICTIONS, BENDS, TEES,
ETC. RESULTING IN LOCALIZED TWO-PHASE FLOW AND VIBRATION.
9 . 316 SS HARDFACED TRIM MATERIAL IS REQUIRED FOR THIS CHECK VALVE.
10. INADVERTANT SIMULTANEOUS CLOSING OF BOTH HV-014 AND HV-015 PREVENTED
BY INTERLOCK I-102.
11. VALVES ARE FOR BATTERY LIMIT ISOLATION OF UNIT.

440.049
FL

6"-FL-441035-PAC

3/4" 3/4"

LEAN AMINE FLOW SIGNAL


246.011

6"x3"

ET 10 FREE DRAINING

3/4"
B

V
3/4"

CSC

RV
023

SIZE: 4270 mm ID x 23500 mm T/T


DESIGN PR. & TEMP: 3500 kPa-g @ 95 C / HV @ 150 C
MATERIAL(VESSEL/INTERNALS): CS + 3 mm 304L SS CLAD/ 316L SS
INSULATION TYPE/THK: H /
7
TRIM: P-441121-HJE(0.4) (TOP)
P-441120-DJE(0.4) (BTM)

FIRE
1-1/2H3
SET@
kPa-g

CSO

V-44118
AMINE ABSORBER 3

4"x1-1/2"

V-44118

3"

25

PDI
064

E
450
E
453

HZTE
015

I
104
I
103

HYE
015

ET 35
88

10

I
102

FO
20"-P-441095-HJE(0.4)

HIC
015

12"

20"x12"

20"-P-441095-HJE(0.4)

FO 20"x12"

HIC
014

BYPASS

H2 RAW GAS
441.030

12110

TO HMU 3 PSA

HV
015

E
453
E
450
1
24"
MW

2"

HHLL=4000 mm

7
24"
MW

NLL=2550 mm
LLL=1800 mm

2"

3"

LG
155

3/4"

3/4"

3"

3/4"

4500 mm

3/4"

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

ISSUED
DATE

DESCRIPTION

20"

D
3/4"

20"x12"

XV
020
10"

10"-P-441104-DJE(0.4)

12"x10"

4"

3/4"

FO
TT
031

8"

1-1/2"

10"x8"

FC

FC

LV
155

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

11

ET 10

10"x8"

SP
052

SHELL CANADA

10"-P-441104-DJE(0.4)

SP
053

QUEST CCS PROJECT

RICH AMINE
485.213

TO E-24602A/B
8

TWO PHASE FLOW


R

S-9

VACUUM TRUCK

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT
ISSUED FOR HAZOP

UNIT 441 - HYDROGEN MANUFACTURING UNIT TRAIN 3


AMINE ABSORBER 3
SCALE: NONE
SHELL DWG NO.:

CKD

12076

4"-P-441106-DJE(0.4)

BY

441.0000.000.041.029

REV.

441.029

2"-P-441105-DJE(0.4)

3/4"

12723

1"-SCL-441XXX-SAB

04/20/11

TI
031

A/S

4"

440.018
SCL

XYE
020

s
XZTE
020

1"-SL-441XXX-SAB

XZI
020

450

3"

ISSUED FOR PHA III

LLLL=300 mm
SO

N/A
ET 10

06/13/11

REV

2"

12724

LI
155B

LT
155B

3
3"-SL-440XXX-SAB

LC
155

2"x3/4"
440.018
SL

LHS
155

MAG

2"

3"

SWING
ELBOW
3/4"

LI
155A

LT
155A

HLL=3300 mm

2"

14

DP

HJE(0.4)
ULB

SWING
ELBOW

FILE:\\F:\1025\DRAWINGS\HMU\441\441.029.pid MODEL DATE:6/14/2011 1:17:42 PM BY:bes29451

2"

2"

3"

3/4"

13014

2"

2"

3"

3/4"

V
2"-GI-440072-ULB
START-UP

LL
3/4"

440.046
GI

GWR

LTE
154

3/4"

CSC

PP

MIN

HH

3/4" 3/4"

MIN

E
450

24"

3/4"

E
451

24"x20"

3/4"

20"x16" FC 20"x16"
MIN
HV
014

FROM HMU 3

051

3/4"

441.016

12

2"

12077

ET 35
20"-P-441094-HJE(0.4)
88

3/4"

H2 RAW GAS

SP.
16"

3"

3"

FO

HZTE
014

3/4"

I
102

3/4"

10

HYE
014

1
FI
074B

V-44119
ABSORBER 3 WASH WATER VESSEL
SIZE:
DESIGN PR. & TEMP:
MATERIAL(VESSEL/INTERNALS):
INSULATION TYPE/THK:
TRIM:

2100 mm ID x 11100 mm T/T FV


3500 kPa-g @ 60 C / HV @ 150 C
CS + 3 mm 304L SS CLAD / 316L SS
H/
5
P-441126-HJE(0.4)

FC SIGNAL

FX
074B

441.016

FROM HMU 3

ET 35
88

20"-P-441095-HJE(0.4)

443.003

TO HMU 3 PSA SKID

HOLDS:

BYPASS

PC
067

AI
016

3/4"

6" 10"x6"
FC
TSO

10"-FL-441036-PAC

FREE DRAINING

440.049
FL

PI
065

PT
065

XV
019

20"x16"

INST
PIPING

FLOW

AP
016A

TT
032

FT
074

20"-P-441098-HJE(0.4)
1-1/2"

H2 RAW GAS

ET 35
88

FC

12111

441.016

TO HMU 3 PSA

DETAIL "B"

2"

3/4"

3/4"

3/4"

AP
016B

FO
16"

12912

AP
016C

A/S
XZTE
019

440.049
FL

3/4" 3/4"

INST
PIPING

XYE
019

3/4" 3/4"

FREE DRAINING

AE
016

E
453

3"

16"

CSC

3"

3"

CO2 RICH

INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.


SCOPE FOR SIGNAL TRANSFER TO PSA PLC TO BE DETERMINED.
INTERLOCK I-101 ACTIONS, IF ANY, TO BE CONFIRMED.
CONFIRM AVAILABILITY OF DCS AND SIS INTERLOCK SEQUENCE NUMBERS
ADDED FOR QUEST.

DETAIL "B"

E
450

PT
067

TI
032

AIT
016

CO2 LEAN

12775

PAC

HJE(0.4)

ET 38
88
6"-P-441099-HJE(0.4)

ET 10

FREE DRAINING

I
101
HOLD

PV
067

CO2

3/4" 3/4"

441.029

12864

FX
074A

3/4" 3/4"

12110

SET POINT

FHS
074

f(x)

H2 RAW GAS

12714

FROM FC-377

FI
074A

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "441" UNLESS OTHERWISE
STATED.
3 . CALCULATE AMOUNT OF CO2 REMOVED FROM RAW H2 GAS.
4 . H2 RAW GAS BYPASS REQUIRED FOR SYSTEM PURGE AND PRESSURIZATION AT
START-UP.
5 . ELECTRIC TRACE TO HLL (ET 10).
6 . EITHER LTE-441156 OR LTE-441159 SHALL BE SELECTABLE AS THE INPUT TO
SAFETY INTERLOCKS E-452 AND E-453. A DEVIATION ALARM TO MONITOR THE
TWO INSTRUMENTS SHALL BE PROVIDED AT THE DCS.
7 . HAND SWITCH TO SEND FLOW SETPOINT FROM FC-377 TO PSA WHEN QUEST IS
ISOLATED.
8 . TWO CHECK VALVES IN SERIES, ONE IN THE HORIZONTAL AND ONE IN THE
VERTICAL POSITION, SEPARATED BY AT LEAST 500 mm.

24"
MW

440.048

3"

3"x2"

2"-WB-440011-SAD

MIN

FROM E-44014

24"
MW

V-44119
9

SAD HJE(0.4)

HJE(0.4) PJE(0.4)

7
6"

24"
MW

6"x4"

ET 10

4"-P-441113-PJE(0.4)

CIRCULATING WATER
441.031

FROM E-44129

3"

E
452

3/4"

3/4"

2"

DP

HH
6

LL

2"

LTE
159

2"

LG
157

24"
MW

HLL=2380 mm

2"

2"
NLL=1070 mm
5

3"

3"

LLL=910 mm

3"

DP

LI
157A

06/13/11

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

LI
157B

LC SIGNAL

LHS
157A

12416

441.031

REV

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

TO LC-157

3/4"

2"

3"

LT
157A
LT
157B

3/4"

2"

HHLL=2550 mm

3"

MAG

L
E
453

3"

3/4"

3"

2"

3/4"

LI
159

2"

3/4"

3"

3/4"

LI
156

3/4"

FREE DRAINING

FROM V-44118

3"

18"

3/4"

441.029

18"x16"

16"-P-441096-HJE(0.4)

3/4"

12074

PP

3/4"

H2 RAW GAS

GWR

3/4" 3/4"

LTE
156

12415

LLLL=300 mm

SO

SHELL CANADA

7860 mm

8"
8"x6"

ET 10

6"-P-441107-PJE(0.4)

CIRCULATING WATER
12414

QUEST CCS PROJECT

441.031

3"

TO P-44108A/B

D
R

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT
ISSUED FOR HAZOP

UNIT 441 - HYDROGEN MANUFACTURING UNIT TRAIN 3


ABSORBER 3 WASH WATER VESSEL
SCALE: NONE
SHELL DWG NO.:

441.0000.000.041.030

REV.

441.030

12113

FILE:\\F:\1025\DRAWINGS\HMU\441\441.030.pid MODEL DATE:6/14/2011 2:17:59 PM BY:bes29451

WASH WATER

PDI
066

PDT
066

E-44129
ABSORBER 3 CIRCULATING WATER COOLER
0.3 MW
49.3 m^2
BEU
SHELL
3800 kPa-g / HV
60 C / 150 C
CS + 3 mm 304L SS CLAD
/
6
P-441122-PJE(0.4)

RATED DUTY:
SURFACE AREA:
TEMA TYPE:
DESIGN PRESS:
DESIGN TEMP:
MATERIAL:
INSULATION TYPE/THK:
TRIM:

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "441" UNLESS OTHERWISE
STATED.
3 . FOR PIPING DETAILS OF SAMPLE STATION SEE DRAWING 200.0000.000.041.012.
4 . CV OF CONTROL VALVE TO BE MINIMUM.
5 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE.
6 . ELECTRIC TRACE (ET 10).
7 . AUTO-START STAND-BY PUMP ON RUN FAILURE OF PRIMARY PUMP.
8 . VALVES ARE FOR BATTERY LIMIT ISOLATION OF UNIT.

TUBE
2950 kPa-g /
58 C /
SUPER DUPLEX 2507 + 0.38 mm CA
/
6
CWR-441XXX-PJE(0.4)

D
HOLDS:

LC
157

441.030

LHS
157B

LV
157A

FROM LHS-157A

2"x1"

1"

3/4"

FC

2"x1"

3/4"

FC

SP
054
3/4"

FO

XZTE
018

ET 10
50

6"-P-441107-PJE(0.4)
FC

6"x4"

1-1/2"

3/4"

6"x4"

I
103

TO V-44119

6"x4"

1-1/2"

4"x3"

6"x4"

4"x3"

440.048

RS

UAB
PJE(0.4)

E-44129
PJE(0.4)
UAB

ET 10
50

4"-P-441113-PJE(0.4)

6"-CWS-440076-UAB

COOLING WATER SUPPLY


440.048

12721

FROM HEADER

4"

D
BACK FLUSH

SEL

ET 10
50

HS

SI

3/4"

D
PP

TO
GRADE
PP

SP
055

3/4"

P-44108A

XL
017

VFD
FAULT
LOCAL/
REMOTE

SI

06/13/11

ISSUED FOR PHA III

04/20/11

ISSUED FOR ESTIMATE

03/01/11

ISSUED FOR PHA II

01/10/11

ISSUED FOR CLIENT REVIEW

12/02/10

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW

3/4"

REV

ISSUED
DATE

DESCRIPTION

BY

CKD

PRS

CS

MC

PDP

APE

PEM CLIENT
APP

D
PP

TO
GRADE
PP

SP
055

3/4"

3/4
"
D

3/4"

3/4"
3/4"

D
D

VFD

MIN.

VFD

E
452

XA
017

HOA

3/4"

D
D

P-44108B

3/4
"
D

SHELL CANADA
QUEST CCS PROJECT

A
R

P-44108A /B 7
ABSORBER 3 CIRCULATING WATER WASH PUMPS
RATED FLOW:
DIFF. PR.:
DRIVER:
MATERIAL:
INSULATION TYPE/THK:
TRIM:

ISSUED FOR HAZOP

56.5 m^3/hr
233 kPa
5.6 kW
CASING
INTERNALS
316 SS
316 SS
/
6
P-441123-PJE(0.4)

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT

UNIT 441 - HYDROGEN MANUFACTURING UNIT TRAIN 3


ABSORBER 3 WASH WATER COOLER
SCALE: NONE
SHELL DWG NO.:

441.0000.000.041.031

REV.

FILE:\\F:\1025\DRAWINGS\HMU\441\441.031.pid MODEL DATE:6/14/2011 1:17:46 PM BY:bes29451

LOCAL/
REMOTE

3/4"

HS
017A

MIN.

XL
016

I
100

4"-P-441111-PJE(0.4)

VFD
FAULT

R/S

3/4"

E
452

XA
016

HIS
017

ET 10
50

3/4"

HOA

6"-P-441109-PJE(0.4)

HS
016A

ET

I
100

ET 10
50

R/S

ET 10

HIS
016

4"-P-441110-PJE(0.4)

12415

ET 10
38

6"-P-441108-PJE(0.4)

441.030

4"-P-441113-PJE(0.4)

12722

CSO

FT
077

3/4"

CIRCULATING WATER

LL

COOLING WATER RETURN

RS

TG
033

6"-CWR-441045-UAB

TO HEADER

4"-P-441XXX-PJE(0.4)

FC
077

ET 10
50

4"-P-441112-PJE(0.4)

NC

FROM V-44119

1-1/2"

441.031

441.030

XV
018

TG
034

ET 10

12414

TW
035

3/4"

CIRCULATING WATER

PT
070

S-8

A/S

441.013
TO V-44111

PI
070

3/4"

PURGE WATER

2"x1"

3/4" 3/4"

XYE
018

2"x1" 1"

2"-P-441115-PJE(0.4)

XZI
018

2"-P-441116-PJE(0.4)
3/4"

LV
157B

E
452

ET 10
38

ET

12416

INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.


CONFIRM AVAILABILITY OF DCS AND SIS INTERLOCK SEQUENCE NUMBERS
ADDED FOR QUEST.

2"

LC SIGNAL

You might also like