QUALITY MANAGEMENT
® L&TSEAWOODS LTD. | rserantY™
Page Of of Of
QUALITY DEFICIENCY REPORT
‘ower 1 - level 2 - Wing Date: 24.02.2015
Location:
Department: MEP - FPS
‘Auditor(s): PARMANAND GUPTA | Signature: (¥ QDR No: MEP-112
Audited DocumentiWork:
‘ower 4 - level 2 - Wing C - #9/B
“| Non-conformance Observed:
Branch Pipes are not installed
Objective Evidence of Non Conformance: ATTACHED PHOTOGRAPHS:
Auditee Name: NAGARAJAN PILLAI NCR Categories (tick one)
Signature: Date: MAJOR
i MINOR
Root Causes of QD:
Negligence and improper supervision at site
Correction Proposed:
Install branch pipes.
Long Term Corre
e Action Proposed:
Crosscheck correct installation of pipes
Signature of Audites: Completion target date: =
ive action taken by audlifeg as par proposal; YES/NO
my comp) i te. We oe ensuye dunag raechancel clearoyel
Mechgnicos chee: ot ee. wll add yest ert
Signature of Auditee Actual closing date: s
Review ace action’ Oe ye
sea ee og UTE, Sem pe
Audi
Sainakire nee wot vepeat. Tis QDR ws
Date
Oe
C E: -
BeQUALITY MANAGEMENT
SYSTEM
L&TSEAWOODS LTD. _ [rijectavatiy Fan
Page 01 of Of