Amritsar sectioofNH15fromKm 6.082 to Km 108.502 in the state of Punjab Under NHDP III B on
Design, Build, Finance, Operate and Transfer(DBFOT)Basis
Client
Concessionaire
Section
Type of material
: 58+360 L/S
Date of Sampling
: 09.02.13
: Campsite
Date of Testing
: 09.02.13
: 16 mm - 7 mm
Sample No
I.S.Sieve (mm)
Weight Retained
(gm)
26.5
Cumulative
Wt.Retained
(gm)
0
19.00
0.00
13.20
Cumulative %
Retained
Cumulative %
Passing
100.0
0.00
0.00
100.00
5120
5120
31.45
68.55
9.50
7201
12321
75.68
24.32
4.75
3856
16177
99.37
0.63
2.36
0.00
1.18
0.00
0.600
0.00
0.300
0.00
0.150
0.00
0.075
0.00
Sample No
26.5
100
19.00
0.00
100.00
13.20
5498
5498
37.05
62.95
9.50
5720
11218
75.59
24.41
4.75
3530
14748
99.38
0.62
Remarks
2.36
0.00
1.18
0.00
0.600
0.00
0.300
0.00
0.150
0.00
0.075
0.00
Construction Team
Independent Engineer
Supervision Team
Date
Date
Date
Concessionaire
Section
Type of material
: 58+360 L/S
Date of Sampling
: 09.02.13
: Campsite
Date of Testing
: 09.02.13
: 16 mm - 7 mm
Sample No
26.5
100
19.00
0.00
100.00
13.20
6085
6085
36.99
63.01
9.50
6405
12490
75.93
24.07
4.75
3875
16365
99.48
0.52
2.36
0.00
1.18
0.00
0.600
0.00
0.300
0.00
0.150
0.00
0.075
0.00
Construction Team
Independent Engineer
Supervision Team
Date
Date
Date
Concessionaire
Section
Type of material
: 58+360 L/S
Date of Sampling
: 09.02.13
: Camp site
Date of Testing
: 09.02.13
: 7 mm - 3 mm
Source of material
Sample No
I.S.Sieve (mm)
Weight Retained
(gm)
Cumulative
Wt.Retained
(gm)
Cumulative %
Retained
Cumulative %
Passing
26.5
100.0
19.00
100.00
13.20
100.00
9.50
0.00
100.00
4.75
4560
4560
26.79
73.21
2.36
10901
15461
90.84
9.16
1.18
720
16181
95.07
4.93
0.600
210
16391
96.30
3.70
0.300
160
16551
97.24
2.76
0.150
0.00
0.075
0.00
Sample No
26.5
100.00
19.00
100.00
13.20
100.00
9.50
0.00
100.00
4.75
4188
4188
27.25
72.75
2.36
9786
13974
90.94
9.06
1.18
698
14672
95.48
4.52
0.600
148
14820
96.45
3.55
0.300
134
14954
97.32
2.68
15366
0.150
0.00
0.075
0.00
Construction Team
Independent Engineer
Supervision Team
Date
Date
Date
Remarks
Concessionaire
Section
Type of material
: 58+360 L/S
Date of Sampling
: 09.02.13
: Camp site
Date of Testing
: 09.02.13
: 7 mm - 3 mm
Source of material
Sample No
I.S.Sieve (mm)
Weight Retained
(gm)
Cumulative
Wt.Retained
(gm)
Cumulative %
Retained
Cumulative %
Passing
26.5
100.00
19.00
100.00
13.20
100.00
9.50
0.00
100.00
4.75
4120
4120
27.03
72.97
2.36
9698
13818
90.65
9.35
1.18
705
14523
95.28
4.72
0.600
178
14701
96.44
3.56
0.300
132
14833
97.31
2.69
0.150
0.00
0.075
0.00
Construction Team
Independent Engineer
Supervision Team
Date
Date
Date
Remarks
Concessionaire
Section
Type of material
: 58+360 L/S
Date of Sampling
: 09.02.13
: Camp site
Date of Testing
: 09.02.13
: 3 mm down
1410
Sample No
I.S.Sieve (mm)
Weight Retained
(gm)
Cumulative
Wt.Retained
(gm)
Cumulative %
Retained
Cumulative %
Passing
26.5
100.00
19.00
100.00
13.20
100.00
9.50
100.00
4.75
0.00
100.00
2.36
16
16
1.13
98.87
1.18
389
405
28.72
71.28
0.600
255
660
46.81
53.19
0.300
240
900
63.83
36.17
0.150
265
1165
82.62
17.38
0.075
150
1315
93.26
6.74
Sample No
I.S.Sieve (mm)
Weight Retained
(gm)
Cumulative
Wt.Retained
(gm)
Cumulative %
Retained
Cumulative %
Passing
26.5
0.00
100.00
19.00
0.00
100.00
13.20
0.00
100.00
9.50
0.00
100.00
4.75
0.00
100.00
2.36
26
26
1.79
98.21
1.18
374
400
27.47
72.53
0.600
292
692
47.53
52.47
0.300
230
922
63.32
36.68
0.150
289
1211
83.17
16.83
0.075
145
1356
93.13
6.87
Construction Team
Independent Engineer
Remarks
1456
Supervision Team
Remarks
Date
Date
Date
Client
Concessionaire
Section
: 58+360 L/S
Date of Sampling
: 09.02.13
: Camp site
Date of Testing
: 09.02.13
: 3 mm down
Sample No
I.S.Sieve (mm)
Weight Retained
(gm)
Cumulative
Wt.Retained
(gm)
Cumulative %
Retained
Cumulative %
Passing
26.5
100.00
19.00
100.00
13.20
100.00
9.50
100.00
4.75
0.00
100.00
2.36
22
22
1.75
98.25
1.18
320
342
27.23
72.77
0.600
244
586
46.66
53.34
0.300
210
796
63.38
36.62
0.150
235
1031
82.09
17.91
0.075
140
1171
93.23
6.77
Location
Type of material
1256
Construction Team
Independent Engineer
Supervision Team
Date
Date
Date
Remarks
Concessionaire
Section
Chainage
: 58+360 L/S
Date of Sampling
: 09.02.13
: Camp site
Date of Testing
: 09.02.13
Type of material
: filler
Source of material
Sample No
:1
200
Location
Weight Retained
(gm)
Cumulative
Wt.Retained
(gm)
Cumulative % Retained
Cumulative %
Passing
19.00
100.00
13.20
100.00
9.50
100.00
4.75
100.00
2.36
100.00
1.18
100.00
0.600
100.00
0.300
100.00
0.150
2.5
2.5
1.25
98.75
0.075
19.5
22.0
11.00
89.00
I.S.Sieve (mm)
Remarks
26.5
Pan
Sample No
I.S.Sieve (mm)
Weight Retained
(gm)
Cumulative
Wt.Retained
(gm)
Cumulative % Retained
Cumulative %
Passing
19.00
100.00
13.20
100.00
9.50
100.00
4.75
100.00
2.36
100.00
1.18
100.00
0.600
100.00
0.300
100.00
0.150
2.8
2.8
1.40
98.60
0.075
20.2
23.0
11.50
88.50
200
26.5
Pan
Construction Team
Independent Engineer
Supervision Team
Remarks
Date
Date
Date
Client
Concessionaire
Section
Chainage
: 58+360 L/S
Date of Sampling
: 09.02.13
: Camp site
Date of Testing
: 09.02.13
Type of material
: filler
Source of material
Sample No
:3
Location
200
Weight Retained
(gm)
Cumulative
Wt.Retained
(gm)
Cumulative % Retained
Cumulative %
Passing
19.00
100.00
13.20
100.00
9.50
100.00
4.75
100.00
2.36
100.00
1.18
100.00
0.600
100.00
0.300
100.00
0.150
2.10
2.10
1.05
98.95
0.075
20.1
22.2
11.10
88.90
I.S.Sieve (mm)
26.5
Pan
Construction Team
Independent Engineer
Supervision Team
Date
Date
Date
Remarks
Client
Concessionaire
Section
Chainage
: 58+360 L/S
: 10/02/2013
Location
: Camp Site
: 10/02/2013
: Hot Mix Plant
40mm - 16mm
IS Sieve in mm
Sample1
Sample2
Sample3
Average
26.5
100.00
100.00
100.00
100.00
19.00
91.41
91.99
91.77
91.72
13.20
7.77
7.28
7.63
7.56
9.50
0.69
0.56
0.64
0.63
4.75
0.26
0.21
0.27
0.25
2.36
0.00
0.00
0.00
0.00
1.18
0.00
0.00
0.00
0.00
0.600
0.00
0.00
0.00
0.00
0.300
0.00
0.00
0.00
0.00
0.150
0.00
0.00
0.00
0.00
0.075
0.00
0.00
0.00
0.00
IS Sieve in mm
Sample1
Sample2
Sample3
Average
26.5
100.00
100.00
100.00
100.00
19.00
100.00
100.00
100.00
100.00
13.20
68.55
62.95
63.01
64.84
9.50
24.32
24.41
24.07
24.27
4.75
0.63
0.62
0.52
0.59
2.36
0.00
0.00
0.00
0.00
1.18
0.00
0.00
0.00
0.00
0.600
0.00
0.00
0.00
0.00
0.300
0.00
0.00
0.00
0.00
0.150
0.00
0.00
0.00
0.00
0.075
0.00
0.00
0.00
0.00
PAN
16mm - 7mm
PAN
7mm - 3mm
IS Sieve in mm
Sample1
Sample2
Sample3
Average
26.5
100.00
100.00
100.00
100.00
19.00
100.00
100.00
100.00
100.00
13.20
100.00
100.00
100.00
100.00
9.50
100.00
100.00
100.00
100.00
4.75
73.21
72.75
72.97
72.98
2.36
9.16
9.06
9.35
9.19
1.18
4.93
4.52
4.72
4.72
0.600
3.70
3.55
3.56
3.60
0.300
2.76
2.68
2.69
2.71
0.150
0.00
0.00
0.00
0.00
0.075
0.00
0.00
0.00
0.00
PAN
Construction Team
Independent Engineer
Date:
Date:
Supervision Team
Date:
Concessionaire
Section
: 58+360 L/S
: 10/02/2013
Location
: Camp Site
: 10/02/2013
: Hot Mix Plant
3mm Down
IS Sieve in mm
Sample1
Sample2
Sample3
Average
19.00
100.00
100.00
100.00
100.00
13.20
100.00
100.00
100.00
100.00
9.50
100.00
100.00
100.00
100.00
4.75
100.00
100.00
100.00
100.00
2.36
98.87
98.21
98.25
98.44
1.18
71.28
72.53
72.77
72.19
0.600
53.19
52.47
53.34
53.00
0.300
36.17
36.68
36.62
36.49
0.150
17.38
16.83
17.91
17.37
0.075
6.74
6.87
6.77
6.79
26.5
PAN
Filler
IS Sieve in mm
Sample1
Sample2
Sample3
Average
19.00
100.00
100.00
100.00
100.00
13.20
100.00
100.00
100.00
100.00
9.50
100.00
100.00
100.00
100.00
4.75
100.00
100.00
100.00
100.00
2.36
100.00
100.00
100.00
100.00
1.18
100.00
100.00
100.00
100.00
0.600
100.00
100.00
100.00
100.00
0.300
100.00
100.00
100.00
100.00
0.150
98.75
98.60
98.95
98.77
0.075
89.00
88.50
88.90
88.80
26.5
PAN
Construction Team
Independent Engineer
Supervision Team
Date:
Date:
Date:
Concessionaire
Section
: Gandyal
Date of Sampling
: 11.02.13
Type of Material
Date of Testing
: 11.02.13
Proposed Use
: B.C.
Tested by
: Jointly
Description
Trial No
(g)
353.00
354.00
353.00
(g)
48.50
50.00
50.50
(g)
304.50
304.00
302.50
(%)
13.74
14.12
14.31
(%)
Construction Team
Independent Engineer
14.06
Supervision Team
Date:
Date:
Date:
Concessionaire
Section
Location/Source
: Gandyal
Date of Sampling
: 11.02.13
Type of Material
Date of Testing
: 11.02.13
Proposed Use
: B.C.
Tested by
: Jointly
Description
Trial No
(g)
354.00
353.00
354.00
(g)
49.00
50.50
50.00
(g)
305.00
302.50
304.00
(%)
13.84
14.31
14.12
(%)
14.09
Construction Team
Independent Engineer
Date:
Date:
Supervision Team
Date:
Concessionaire
Section
Location/Source
: Gandyal
Date of Sampling
: 11.02.13
Type of Material
Date of Testing
: 11.02.13
Proposed Use
: B.C.
Tested by
: Jointly
Description
Trial No
(g)
354.00
354.00
354.00
(g)
48.00
49.00
49.50
(g)
306.00
305.00
304.50
(%)
13.56
13.84
13.98
(%)
13.79
Construction Team
Independent Engineer
Supervision Team
Date:
Date:
Date:
Concessionaire
Section
Location/Source : Gandyal
Date of Sampling
: 11.03.13
Date of Testing
: 11.03.13
Sample No.
Tested by
: Jointly
:1
IS SIEVE (mm)
Wt of Agg Passing
Through Thickness
Gauge (B) gms
Wt of Agg Retained on
Thickness Gauge (C)
gms
Passing
Retaining
40.0
31.5
31.5
25.0
25.0
20.0
20.0
16.0
16.0
12.5
1105
135
970
128
12.5
10.0
254
40
214
38
10
6.3
101
15
86
20
1460
190
1270
186
Total
Results
Sample No.
13.01
14.65
Conbined FI and EI
27.66 %
:2
IS SIEVE (mm)
Wt of Agg Passing
Through Thickness
Gauge (B) gms
Wt of Agg Retained on
Thickness Gauge (C)
gms
Passing
Retaining
40.0
31.5
31.5
25.0
25.0
20.0
20.0
16.0
16.0
12.5
1095
132
963
130
12.5
10.0
250
38
212
35
10
6.3
Total
98
16
82
22
1443
186
1257
187
Results
Flackiness Index =B/A x100
12.89
14.88
Conbined FI and EI
27.77 %
Construction Team
Independent Engineer
Supervision Team
Date:
Date:
Date:
Concessionaire
Section
Location/Source : Gandyal
Date of Sampling
: 11.03.13
Date of Testing
: 11.03.13
Sample No.
Tested by
: Jointly
:3
IS SIEVE (mm)
Wt of Agg Passing
Through Thickness
Gauge (B) gms
Wt of Agg Retained on
Thickness Gauge (C)
gms
Passing
Retaining
40.0
31.5
31.5
25.0
25.0
20.0
20.0
16.0
16.0
12.5
1120
140
980
135
12.5
10.0
258
42
216
36
10
6.3
104
17
87
18
1482
199
1283
189
Total
Results
Flackiness Index =B/A x100
13.43
14.73
Conbined FI and EI
28.16 %
Construction Team
Independent Engineer
Supervision Team
Date:
Date:
Date:
Concessionaire
Section
Location/Source : Gandyal
Type of Material
Date of Testing
: 13.02.13
Sample No.
:1
Tested by
: Jointly
Trail Number
Grade B
Grade C
Grade D
5000
5000
5000
3986
3914
3990
1014
1086
1010
20.28
21.72
20.20
Average
20.73
IS SIEVE (mm)
Passing
Retaining
B
40
25
25
20
20
12.5
2500
12.5
10
2500
10
6.3
2500
6.3
4.75
2500
4.75
2.36
5000
5000
5000
5000
4584+/- 25
3330 +/- 20
2500 +/- 15
11
Total
Tolerance Limit (Sphere
Weight) gms
No of Spheres
Construction Team
Independent Engineer
Supervision Team
Date
Date
Date
Client
Concessionaire
Section
Lab. Sample No
:1
Date of Sampling
: 13.02.13
Type of material
: PMB 40
Date of Testing
: 14.02.13
Location
Source of material
: Hincol
S.No
Description
Sample No 1 Sample No 2
Sample No
3
Weight of Pycnometer (W 1)
37.66
37.66
37.66
69.09
70.10
69.55
84.77
84.95
84.89
77.84
77.84
77.84
31.43
32.44
31.89
0.80
0.80
0.80
1.026
1.025
1.027
Construction Team
Independent Engineer
Supervision Team
Date
Date
Date
Average
1.026
25.144
25.952
25.512
24.50
25.33
24.84
Concessionaire
Section
:1
Location
Source of Material
Type of Material
: Filler
SL.No
DESCRIPTION OF TEST
Date of Sampling
Proposed use
TRIAL - 01
TRIAL - 02
37.66
37.66
54.36
55.20
89.38
90.05
77.84
77.84
0.80
0.80
2.589
2.633
2.589
2.633
Construction Team
Independent Engineer
Supervision Team
Date
Date
Date
of Pathankot to Amritsar
NHDP III B on Design,
uthority of India
on Team
: 13.02.13
: 14.02.13
: B.C.
Average
2.611
13.36
14.032
5.16
5.33
2.611
2.589147 2.632645
Client
Concessionaire
Section
Sample No
:1
Date of Sampling
: 14.02.13
Location
Date of Testing
: 14.02.13
Bitumen Grade
: PMB 40
Source of material
: Hincol
Observation No:
100
100
100
25
25
25
Penetration
46
46
47
Average Penetration
46
Construction Team
Independent Engineer
Supervision Team
Date
Date
Date
Client
Concessionaire
Section
Lab. Sample No
:1
Date of Sampling
: 14.02.13
Type of material
: PMB 40
Date of Testing
: 14.02.13
Location
Bitumen Grade
PMB 40
Apparatus Used
35
15
Description
Temperature at which sample
touches the bottom Plate
Ball No 1
Ball No 2
66.00
68.00
67.00
Remarks
Construction Team
Independent Engineer
Supervision Team
Date
Date
Date
Concessionaire
Section
DETERMINATION OF DUCTILITY
(TEST METHOD : IS - 1208)
Sample No
Date of Sampling
: 14.02.2013
Location
Date of Testing
: 14.02.2013
Bitumen Grade
: PMB 40
Source of material
: Hincol
Pouring Temperature, 0C
156
Test Temperature,0C
27
30
Test Property
Briquette Number
Average
1
96
95
Ductility Value(cm)
Construction Team
Independent Engineer
Supervision Team
Date
Date
Date
95.5
Client
Concessionaire
Section
Lab. Sample No
:1
Date of Sampling:
: 14.02.2013
Type of material
Date of Testing :
: 15.02.2013
location
Tested By
: Jointly
Total Wt of Aggregate
100 gms
Size of Aggregate
PMB 40
% of Bitumen used
5.0%
24 Hrs
Trial I
Trial II
Average
97
98
97.5
Stripping Value
Construction Team
Independent Engineer
Supervision Team
Date
Date
Date
Concessionaire
Section
:1
Date of Sampling
: 13.02.2013
Location
Date of Testing
: 14.02.2013
Source of Material
: Gandyal
Proposed use
: B.C. ( Grading- I )
Type of Material
Size of Agg
: 16 mm - 7 mm
Trial No
Determination
Average
1
4060
4062
4067
2550
2548
2554
4042
4045
4050
W3/( W1-W2 )
2.677
2.672
2.677
2.675
W3/( W3-W2 )
2.709
2.702
2.707
2.706
( W1-W3 ) X 100/W3
0.45
0.42
0.42
0.43
Construction Team
Independent Engineer
Supervision Team
Date
Date
Date
Concessionaire
Section
:2
Date of Sampling
: 13.02.2013
Location
Date of Testing
: 14.02.2013
Source of Material
: Gandyal
Proposed use
: B.C. ( Grading- I)
Type of Material
Size of Agg
: 7 mm - 3 mm
Trial No
Determination
Average
1
500
500
500
1834
1835
1834
1520
1520
1520
496
496
497
(C gm)
D/A -(B-C)
2.667
2.681
2.672
2.673
D/D -(B-C)
2.725
2.740
2.716
2.727
100 (A - D)/D
0.81
0.81
0.60
0.74
Construction Team
Independent Engineer
Supervision Team
Date
Date
Date
Concessionaire
Section
:3
Date of Sampling
Location
Date of Testing
Source of Material
: Gandyal
Proposed use
Type of Material
Size of Agg
Trial No
Determination
1
500
500
500
1835
1834
1835
1520
1520
1520
492
493
492
(C gm)
D/A -(B-C)
2.659
2.651
2.659
D/D -(B-C)
2.780
2.754
2.780
100 (A - D)/D
1.63
1.42
1.63
Construction Team
Independent Engineer
Supervision Team
Date
Date
Date
nkot to Amritsar
Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to Amrits
on Design, Build, Finance, sectioofNH15fromKm 6.082 to Km 108.502 in the state of Punjab Under NHDP III B on Design, Bu
Finance, Operate and Transfer(DBFOT)Basis
Client
t. Ltd
Concessionaire
Section
Sample No.
:1
Date of Sampling
: 14.02.2013
Location
Date of Testing
: B.C. ( Grading- I )
Source of Material
: Gandyal
Proposed use
: 3 mm down
Type of Material
Size of Agg
rvision Team
Trial No
Average
Determination
1
4056
4060
4064
2549
2550
2559
4042
4045
4050
W3/( W1-W2 )
2.682
2.679
2.691
2.656
W3/( W3-W2 )
2.707
2.706
2.716
2.771
( W1-W3 ) X 100/W3
0.35
0.37
0.35
1.56
Construction Team
Independent Engineer
Supervision Team
Date
Date
Date
e of Pathankot to Amritsar
NHDP III B on Design, Build,
uthority of India
o 108+502
EST
:13.02.13
:14.02.13
: B.C. ( Grading- I )
: 40 mm - 16 mm
Average
2.684
2.710
0.35
Team
Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to Amritsar sectioofNH15fromKm 6.082 to Km 108.502 in the state of
Punjab Under NHDP III B on Design, Build, Finance, Operate and Transfer(DBFOT)Basis
Client
Concessionaire
Section
1,025
: 2.693
Sl No
Mould
Height
(mm)
Bitumen
% (Pb)
1
2
4.50
Wt in Air
Wt in
Water
SSD Wt
in Air
Volume
(cc)
Bulk
Density
(g/cc)
Gmb
1244.5
724.5
1246.0
521.5
1245.0
724.0
1245.5
1249.0
723.0
1250.0
2
3
2
3
2.386
190
1.00
1596
3.2
521.5
2.387
180
1.00
1512
3.0
527.0
2.370
200
1.00
1680
3.3
1.00
1596.00
3.2
2
3
2
3
62.16
2.391
205
1.00
1722
3.2
1246.5
727.0
1248.0
521.0
2.393
215
1.00
1806
3.5
1247.0
728.5
1248.0
519.5
2.400
200
1.00
1680
3.4
1.00
1736.00
3.4
2.511
4.62
15.29
69.79
1260.5
736.0
1261.0
525.0
2.401
210
1.00
1764
3.6
1245.0
729.0
1246.0
517.0
2.408
215
1.00
1806
4.0
1264.0
738.0
1265.0
527.0
2.398
210
1.00
1764
3.3
1.00
1778.00
3.6
2.504
4.03
15.23
73.52
1258.5
734.5
1260.0
525.5
2.395
215
1.00
1806
4.0
1257.0
735.5
1257.5
522.0
2.408
210
1.00
1764
3.9
1259.0
734.0
1259.5
525.5
2.396
195
1.00
1638
3.8
1.00
1736.00
3.9
2.494
3.97
15.73
74.77
1256.5
730.5
1257.0
526.5
2.387
200
1.00
1680
4.1
1255.5
730.0
1256.0
526.0
2.387
205
1.00
1722
4.3
1253.5
731.5
1254.5
523.0
2.397
185
1.00
1554
4.0
1652.00
4.1
Average
Construction Team
15.56
522.5
2.400
5.50
5.89
VFB (%)
1250.5
Average
1
2.530
Air Voids
VMA (%)
(%)
728.0
2.403
5.25
Gmm
1249.5
Average
1
: 2.733
Flow (mm)
2.395
5.00
Effect Sp.Gr(Gse)
Correct
Stability
(KN)
Average
1
: 09.05.2012
Correction
factor
2.381
4.75
: 2.772
Date
Proving
Ring
Reading
Average
1
8.4 Kg/Div
2.390
Independent Engineer
2.478
3.91
16.45
76.20
Supervision Team
Date
Date
Date
1025
2,511
2,478
Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to Amritsar sectioofNH15fromKm 6.082 to
Km 108.502 in the state of Punjab Under NHDP III B on Design, Build, Finance, Operate and Transfer(DBFOT)Basis
Client
Concessionaire
Section
Type of Mix
: BC-II MIX
Date of Sampling
: 07.05.12
Location
: 58+360 L/S
Date of Testing
: 07.05.12
4.50%
Bitumen Content
4.75%
5.00%
5.25%
5.50%
839
761
762.5
752.5
760
752.5
760
752.5
760
752.5
2016
2009
2017
2012
2018
2014
2026
2019
2029
2022
3935
3885
3930
3890
3930.5
3890
3932
3892
3932
3889
3424
3132
3175
3132
3175
3132
3175
3132
3175
3132
1.767
2.521
2.512
2.511
2.503
2.505
2.487
2.500
2.479
2.477
Average
2.144
2.511
2.504
2.494
REMARKS :
Construction Team
Independent Engineer
Supervision Team
Date
Date
Date
2.478
RFI No.
: LAB ( 83 CAMP )
4.5% - 5.5 %
BC-II
Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to Amritsar sectioofN
to Km 108.502 in the state of Punjab Under NHDP III B on Design, Build, Finance, Operate and Transfer(
Client
Concessionaire
Section
1,025
1,025
1,025
1,025
Binder Content
4.50
4.75
5.00
5.25
95.50
95.25
95.00
94.75
MARSHALL DENSITY
2,381
2,395
2,403
2,400
LAB GMM
2,530
2,511
2,504
2,494
2,530
2,511
2,504
2,494
Gsb
2,693
2,693
2,693
2,693
Gse
2,718
2,707
2,710
2,709
Pba
0.35
0.19
0.23
0.21
Pbe
4.17
4.56
4.78
5.05
VMA
15.56
15.29
15.23
15.56
Air Voids
5.89
4.62
4.03
3.77
VFB
62.16
69.79
73.52
75.78
Stability
1512.00
1680.00
1792.00
1596.00
Flow
2.30
2.60
3.60
3.20
Marshall Qotient
657.39
646.15
497.78
498.75
NOTE:Gsb = 2.693
Gsa = 2.772
Gse = 2.733
Construction Team
Independent Engineer
Supervision Team
Date
Date
Date
thority of India
1,025
1,025
5.25
5.50
94.75
94.50
2,400
2,390
2,494
2,478
2,530
00
2,494
2,478
2,511
00.0
2,693
2,693
2,504
00.0
2,709
2,701
2,494
00.0
0.21
0.10
2,478
00.0
gsb
5.05
5.40
15.56
16.13
3.77
3.55
75.78
77.99
1596.00
1512.00
3.20
4.80
498.75
315.00
Bitumenious mix
2,693
2,693
2,693
2,693
2,693
gate
ggregate
e in %
Supervision Team
Date
23.32
b
gse
2,718
7,319
0.025
0.003415
0.34
2,707
7,289
0.014
0.001920
0.19
2,710
7,298
0.017
0.002329
0.23
2,709
7,295
0.016
0.002193
0.22
2,701
7,273
0.008
0.001099
0.11
Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to Amritsar sectioofNH15fromKm 6.082 to
Km 108.502 in the state of Punjab Under NHDP III B on Design, Build, Finance, Operate and Transfer(DBFOT)Basis
Client
Concessionaire
Section
Date of Sampling:
: 13.02.2013
Date of Testing :
: 13.02.2013
location
Tested By
: Jointly
Total wt.(gms)
unfractured
material wt.(gms)
% of fractured
material
Specified limit
Remarks
10
500
482
18
3.6
<10 %
Satisfactory
20
500
483
17
3.4
<10 %
Satisfactory
40
Construction Team
Independent Engineer
Supervision Team
Date
Date
Date
Concessionaire
Section
Type of material
: 58+360 L/S
Date of Sampling
: 09.02.13
: Campsite
Date of Testing
: 09.02.13
: 40 mm - 16 mm
Sample No
I.S.Sieve (mm)
Weight Retained
(gm)
26.5
Cumulative
Wt.Retained
(gm)
0
19.00
1985
13.20
Cumulative %
Retained
Cumulative %
Passing
100.0
1985
8.59
91.41
19320
21305
92.23
7.77
9.50
1635
22940
99.31
0.69
4.75
101
23041
99.74
0.26
2.36
0.00
1.18
0.00
0.600
0.00
0.300
0.00
0.150
0.00
0.075
0.00
Sample No
26.5
100
19.00
1850
1850
8.01
91.99
13.20
16369
18219
92.72
7.28
9.50
1320
19539
99.44
0.56
4.75
70
19609
99.79
0.21
Remarks
2.36
0.00
1.18
0.00
0.600
0.00
0.300
0.00
0.150
0.00
0.075
0.00
Construction Team
Independent Engineer
Supervision Team
Date
Date
Date
Concessionaire
Section
Type of material
: 58+360 L/S
Date of Sampling
: 09.02.13
: Campsite
Date of Testing
: 09.02.13
: 40 mm - 16 mm
Sample No
26.5
100
19.00
1901
1901
8.23
91.77
13.20
18770
18770
92.37
7.63
9.50
1420
20190
99.36
0.64
4.75
75
20265
99.73
0.27
2.36
0.00
1.18
0.00
0.600
0.00
0.300
0.00
0.150
0.00
0.075
0.00
Construction Team
Independent Engineer
Supervision Team
Date
Date
Date
Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to Amritsar section of
NH15 from Km 6.082 to Km 108.502 in the state of Punjab Under NHDP III B on Design, Build, Finance, Operate
and Transfer(DBFOT)Basis
Client
Concessionaire
Section
VISCOSITY OF EMULSION
(TEST METHOD : IS-3117)
Source
Date of Sampling
Type of material
Date of Testing
location
Tested By
Water Temp.
Emulsion Temp.
Trial I
3
Trial II
Viscosity Value
Remarks:
Construction Team
Independent Engineer
Supervision Team
Average
Date
Date
Date
Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to Amritsar section of NH15
from Km 6.082 to Km 108.502 in the state of Punjab Under NHDP III B on Design, Build, Finance, Operate and
Transfer(DBFOT)Basis
Client
Concessionaire
Section
Source
Date of Sampling
Type of material
Date of Testing
location
Tested By
Trail No
Discription
Construction Team
Independent Engineer
Supervision Team
Remarks
Date
Date
Date
of NH15
nd
arks