You are on page 1of 1

ANALISA HARGA SATUAN (SNI)

NO

URAIAN PEKERJAAN

1
2
IV PEKERJAAN PLESTERAN
1 1 M2 PLESTERAN 1 PC : 2 PS (TEBAL 20 MM)
SNI 03-2837-2002(6.13)
BAHAN :
- Semen Type I

KOEFISIEN
3

14,2800

kg
3
m

- Pasir Pasang

0,0230

0,2500 org/hr
0,2000 org/hr
0,0200 org/hr
0,1250 org/hr
JUMLAH

HARGA
SATUAN
(Rp.)
4

JUMLAH HARGA
MATERIAL
UPAH
(Rp.)
(Rp.)
5
6

1.200

17.136

110.000

2.530

JUMLAH
HARGA
(Rp.)
7

UPAH :
Pekerja
Tukang Batu
Kepala Tukang
Mandor

35.000
50.000
65.000
70.000
19.666

8.750
10.000
1.300
8.750
28.800

1 M2 PLESTERAN 1 PC : 3 PS (TEBAL 20 MM)


SNI 03-2837-2002(6.14)
BAHAN :
- Semen Type I

10,8000

kg
m3

- Pasir Pasang

0,0260

0,2500 org/hr
0,2000 org/hr
0,0200 org/hr
0,1250 org/hr
JUMLAH

48.466

48.400

DIBULATKAN

1.200

12.960

110.000

2.860

UPAH :
Pekerja
Tukang Batu
Kepala Tukang
Mandor

35.000
50.000
65.000
70.000
15.820

8.750
10.000
1.300
8.750
28.800

1 M2 PLESTERAN 1 PC : 4 PS (TEBAL 20 MM)


SNI 03-2837-2002(6.15)
BAHAN :
- Semen Type I
- Pasir Pasang
UPAH :
- Pekerja
- Tukang Batu
- Kepala Tukang
- Mandor

8,6800
0,0280

kg
m3

0,2500 org/hr
0,2000 org/hr
0,0200 org/hr
0,1250 org/hr
JUMLAH

1.200
110.000

10.416
3.080

35.000
50.000
65.000
70.000
13.496

8.750
10.000
1.300
8.750
28.800

1 M2 PLESTER BETON 1 PC : 3 PS (TEBAL 15 MM)


SNI 03-2837-2002(6.30)
BAHAN :
- Semen Type I

6,4800

kg
3
m

- Pasir Pasang

0,0190

0,2000 org/hr
0,1500 org/hr
0,0150 org/hr
0,0100 org/hr
JUMLAH

42.296

42.200

DIBULATKAN
4

44.620

44.600

DIBULATKAN

1.200

7.776

110.000

2.090

UPAH :
Pekerja
Tukang Batu
Kepala Tukang
Mandor

35.000
50.000
65.000
70.000
9.866
DIBULATKAN

7.000
7.500
975
700
16.175

26.041

26.000