THE TOTAL LOAD IS THE SUMMATION OF THE DEAD LOADS AND OF THE
LIVE LOADS.
THE MEAN RADIUS (r) EQUALS THE OUTSIDE DIAMETER (O.D.) MINUS
THE WALL THICKNESS (t) DIVIDED BY TWO (2). r = (O.D. - t)/2
PIPE STIFFNESS FOR DB60 IS EQUAL TO 60 lb/in2 AND FOR DB120 IS
EQUAL TO 120 lb/in2 . 4 SCHEDULE 40 CONDUIT WILL HAVE A PIPE
STIFFNESS OF 346 lb/in2 (MINIMUM WALL THICKNESS).
HIGH LEVELS OF
HEIGHT OF
COVER
HEIGHT OF
COVER
1
E80
H (ft)
H20
H20
12.50
14
4.17
3.06
5.56
26.39
13.14
16
3.47
2.29
4.17
23.61
12.28
18
2.78
1.91
2.78
18.40
11.27
20
2.08
1.53
1.74
16.67
10.09
22
1.91
1.14
1.39
15.63
8.79
24
1.74
1.05
1.22
12.15
7.85
26
1.39
0.69
11.11
6.93
28
1.04
10
7.64
6.09
30
0.69
12
5.56
4.76
35
40
E80
H (ft)
26 INCH
ONCE THE DEAD LOAD AND LIVE LOAD ARE KNOWN THEY SHALL BE
ADDED TOGETHER TO OBTAIN THE TOTAL LOAD (TL = DL + LL). THE
TOTAL LOAD SHALL BE LESS THAN THE MAXIMUM LOAD.
1.
2.
3.
4.
5.
6.
LL = 2.08 lb/in2
7.
1.
2.
3.
4.
5.
6.
LL = 2.78 lb/in2