Professional Documents
Culture Documents
Gas Processing and Liquefaction: (CH4533) Individual Assignment (10%)
Gas Processing and Liquefaction: (CH4533) Individual Assignment (10%)
Part B (30%)
The first Gas-to-Liquid (GTL) plant to be operated worldwide was set up in Bintulu, Sarawak
with production capacity of 14,700 barrels per day. Due to the many benefits of the GTL
products, four other GTL plants have also started operation globally. Carry out a two page
literature study on GTL technology. In your report, you are required to address the following
aspects:
Process description of GTL (chemical reaction, processing and the main unit operations)
Final products and targeted market
List of References