3.

Except in circumstances beyond the control of board,


there shall not be any necessity for the actual
expenditure in excess of the estimate cost. In case such
an excess has accrued. The Provisions contained in TNEB
manual Para 554 (3 7 5) will be followed and interested
collected.
4. The cost of work chargeable to applicant/ consumer
will be collected in full for works are undertaken.
5. If the cost of works executed the amount deposited by
the applicant/ consumer due to escalation of cost or due
to charge in scope of work depending on site conditions
and other on for seen reasons, I will remit the extra
amount either during the execution or there after.

6. The entire line, even if apportion there of has been


paid by the consumer, will be the property of the board
and the board will maintain if at its costs. The Board will
also have the right to use the service line for supply of
electricity to any other person.
7. The consumer applicant bound to comply with all
provisions of terms and conditions of supply prescribed
by the board from time to time and R & C order in force
and as amended from time to time.
8. The way leave to be provide a per TNEB Distribution
code article 27(6).
9. The proposed line to be routed either inside or outside
or the periphery of the consumers premises.
10. If there is any objection while a line is to be routed to
some other place I Will bears the expenses to clear the
encumbrances.
I agree to the above conditions.

Signature
applicant/consumer

of

Witness:
1.
2.