You are on page 1of 1

MI-VJEC CONSULTANT J/O

HANOI-HAIPHONG EXPRESSWAY PROJECT


Project Code: 268/06
MEINHARDT
INTERNATIONAL
168 Jalan Bukit Merah, #0901
Surbana One, Singapore
15016

Head Office: 18th Fl, VIT Tower, 519 Kim Ma, Ba Dinh, Hanoi
Telephone: +(84.4) 2220 8290 Fax: +(84.4) 2220 8293

Reference/Tham chiu: Ex-2/E/ 02.2/L . . .


23th, Aug, 2011

VJEC CO., Ltd


4th Fl, A1 Bldg, 55 Giai
Phong St.,
Hai Ba Trung Dist., Hanoi
City

Ngy 23 thng 8 nm

2011
To:

Namkwang Engineering & Construction Co., Ltd.


Tu Ho, Yen My, Hung Yen

Attention:

Mr. Hwang Sun Ki, Project Manager (Gim c D n)

CC:

Mr. Nguyn c Cng/ PMB Director (Gim c Ban qun l D n)

Subject:

Submission Calculation report Load resistance Capacity


for Bored Piles, Bridge B35, rev.1
trnh bo co tnh ton sc chu ti cc khoan nhi
cu B35 ,sa ln 1

V/v:
Ref.Letter

NK.EX2.PCT.0708 dated Aug 19, 2011.


NK.EX2.PCT.0708 ngy 19 thng 8 nm 2011.

Dear Sir
Tha Qu ng
After reviewing the Calculation report Load resistance capacity for Bored
Piles, Bridge B35. Rev. 1, the Engineer would like comment as follows :
Sau khi xem xt bo co tnh ton sc chu ti ca cc khoan nhi cu B35,
sa ln 1. TVGS c nhn xt nh sau :
Calculation report Load resistance capacity for Bored Pile, Bridge B35 to be
satisfactory. Contractor is requested to property Shop Drawings of Bored Pile
for items.
Bng tnh sc chu ti cc khoan nhi cu B35 t yu cu. ngh Nh
Thu trin khai bn v thi cng cc khoan nhi cho cc hng mc.
Yours sincerely,
Trn trng,

Nghim Xun Hng


Acting Resident Engineer, EX-2 /Quyn K s thng tr gi thu EX-2
Mobile : 0983668675
Email : hungnx@mivj.vn
Apply to:
- (1) Mr. Nguyn c Hip PMBs Site Representative
- (2) MI-VJEC Head Office
- (3) Filing: Package EX-2s site office