Peter Mrau
Dr. Michael Schttler
Siemens Power Generation (PG), Germany
Page 1 of 12
Abstract
Reducing water consumption and avoiding effluents is a general goal nowadays. On one hand
the water consumption affects the project profitability due to additional initial and life cycle
costs like expenses for the demineralised water supply and for waste water disposal.
On the other hand avoiding high water consumption and avoiding waste water disposal is an
important contribution to environmental protection and finally can help to ease the permitting
phase of a project.
This paper presents an example how Siemens Reference Power Plants are designed to
achieve the target of low water consumption and low waste water disposal.
Page 2 of 12
Market Environment
The energy demand worldwide is steadily growing. Not only the world population is
increasing but also the energy consumption per head rises continuously mainly caused by the
industrial development. Power production always has an impact on the environment.
Beside the flue gas, further emissions - liquid or gaseous - are leaving the power production
process. One noteworthy emission is the water loss of the water/steam cycle.
Considerable amounts of water have to be discharged. This water contains partially chemical
impurities. The discharge of these streams means an impact on the environment and often
also spending for the effluent treatment. Furthermore the water needs to be replaced which
again means additional expenditures and consequently additional waste water from the water
treatment plant. An important aspect taking into account that exceeding the natural available
water resources also means to influence the environment in a negative way.
This paper describes a system which helps to protect the environment by reducing water
consumption and waste water emissions and at the same time contributing to the economical
success of a project.
Page 3 of 12
2.1
A considerable amount of water is removed from the water/steam cycle for several reasons
and needs to be replaced by demineralised water.
HRSG drum blowdown: In the HRSG drums the water/vapour mixture coming from the
evaporator section is separated in the water liquid and vapour phase. The steam phase
leaves the drum as saturated steam and is nearly free of contaminations.
The water phase flows back into the evaporation section of the HRSG and contains all the
impurities which are fed into the drum by the feedwater flow. To limit the concentration
of impurities a certain amount of water is continuously extracted from the HRSG drums
as blowdown during normal operation. This blowdown is routed to the HRSG
atmospheric flash tank whereas the flashed steam is blown into the atmosphere via a
silencer, the water phase is dumped.
Superheater blowdown: During shutdown and start-up the superheater sections are also
drained. This stream is free of contamination and routed to the HRSG flash tank as well.
This means although this stream is suitable for rerouting it to the water/steam cycle from
a chemical point of view it can not be used anymore.
Steam line drains: During start-up the steam pipes and adjacent components like e.g.
valves needs to be warmed up by steam. The thereby emerging condensate and steam is
routed to the atmospheric clean drains flash tank. Although the steam line drains are not
contaminated the stream is not re-used. Analogue to the HRSG flash tank the water which
is fed to the clean drain flash tank is either lost to atmosphere or to the cooling water line.
Sampling: To control the chemical conditions in the water/steam cycle the sampling
system is fed from several points in the cycle like drum, superheater, condensate or
Page 4 of 12
feedwater system. The sampling streams are partially contaminated after the measurement
and routed to the sewer.
Condenser evacuation: To remove non-condensable gases in the water/steam cycle and
to achieve and maintain the condenser vacuum the evacuation pumps are continuously in
operation. Beside the non-condensable gases certain amounts of steam are extracted by
the evacuation pumps as well.
Leakages: Despite the application of high quality systems, components and maintenance
a certain amount of losses caused by leakages can not be prevented.
HP
IP
LP
Steam
Turbine
HRSG
Atmosphere
Atmosphere
Condenser
Clean
Drains
Flash
Tank
HRSG
Flash
Tank
Cooling Water
Cooling Water
Clean stream
Contaminated stream
The following chapters describe the components and systems which are handled by the Zero
Discharge Concept. This concept is designed to route all possible streams which leave the
water/steam cycle back into the system. The Zero Discharge Concept comprises the
following reduction steps:
1. Advanced Cascading Blowdown
2. Minimized Effluents
3. Treatment of Contaminations
Page 5 of 12
2.2
An easy way to reduce effluents caused by drum blowdown is to route the blowdown stream
to the next pressure stage. This means HP blowdown flows to the IP drum and the IP
blowdown is fed into the LP drum. The disadvantage of this system is that all impurities are
also carried over from drum to drum. This system is called cascading blowdown.
The concept of the Advanced Cascading Blowdown system provided by Siemens PG hereby
shows a significant advantage. The blowdowns of the HP and the IP drum is firstly routed to
a separate flash pipe. Whereas the flashed clean steam is routed to the LP drum and just the
contaminated condensate flows to the HRSG flash tank and will then be discharged.
Beside the savings of water a noteworthy amount of energy can be recovered. The power
output of a 400MW combined cycle power plant can be increased by about 130kW.
HP
IP
LP
Steam
Turbine
HRSG
Atmosphere
Atmosphere
Condenser
Clean
Drains
Flash
Tank
HRSG
Flash
Tank
Cooling Water
Cooling Water
Clean stream
Contaminated stream
2.3
A big step forward in reducing water consumption and water effluents can be achieved by the
Minimized Effluents System. The goal is to route all streams back to the water/steam cycle
which are free of contamination. The contaminated streams are flashed to recover at least the
clean portion.
Page 6 of 12
Therefore the clean steam phases of the flash tanks are rerouted back to the condenser. This
can be done either directly for the steam line drains flash tank or indirectly for the HRSG
flash tank.
HP
IP
LP
Steam
Turbine
HRSG
HRSG Flash
Tank No2
Condensate
Storage Tank
Condenser
Clean
Drains
Flash
Tank
HRSG
Flash
Tank
Cooling Water
Clean stream
Contaminated stream
Page 7 of 12
condensate is routed directly to the condenser if demanded. The storage tank is needed to
compensate extraordinary high amount of condensate which can not immediately be
routed to the condenser (e.g. start-up, plant outage).
2.4
The final step in recovering the effluents is to avoid the discharge of condensate arising in the
water phase of the HRSG flash tank No1. The discharge stream is therefore pumped to a
blowdown storage tank for collecting and compensating purposes. From there the
contaminated stream is pumped to a condensate polishing plant. The clean condensate finally
is routed back to the water/steam cycle via the condenser.
Only if extraordinary high amount of condensate is collected in the blowdown storage tank
the condensate is routed to the raw water tank to avoid overflow of the blowdown storage
tank. But this could only happen if the condensate polishing plant is not available or the
make-up demand of the condenser is very low.
Further contaminated streams of the water/steam cycle like the major part of sampling
streams are routed to the condensate polishing plant as well and can therefore be recovered.
HP
IP
LP
Steam
Turbine
HRSG
HRSG Flash
Tank No2
Condensate
Storage Tank
HRSG
Flash
Tank
Raw
Water
Tank
Blowdown
Storage
Tank
Condenser
Clean
Drains
Flash
Tank
Condensate
Polishing Plant
Clean stream
Contaminated stream
Figure 4: Complete Zero Discharge system comprising all three reduction steps
Page 8 of 12
2.5
Result
Target of the Zero Discharge System is to collect the streams which leave the water/steam
cycle and route them back to the water/steam cycle wherever possible. As shown in Figure 4
this procedure can be applied to the HRSG drum blowdown, superheater drains and steam
line drains. This already saves more than 75% water.
Hugh amount of water needs to be replaced in the water/steam cycle due to extractions which
are routed to the sampling system. Not all of the streams can be treated in the condensate
polishing plant depending on quantity and quality of contamination. However, the recovery
of the treatable part of the sampling system saves more than 15% water.
The remaining water which can not be saved comprises the non-treatable sampling streams,
the condenser evacuation steam and leakages from the water/steam cycle.
As a final result the Zero Discharge System enables a reduction of effluents and accordingly
a reduction of make-up water for the water/steam cycle of more than 90% compared to a
conventional drain system in a combined cycle power plant with drum type HRSG.
Taking into account all the positive influences of the before mentioned systems finally the
question arises which is the best way to go. The answer depends on the project boundary
conditions. Influencing factors are:
Page 9 of 12
Not all of the combinations arising of the above mentioned questions can be examined within
this paper. Nevertheless some general rules can be given.
An easy and inexpensive way to reduce the make-up water consumption of the
water/steam cycle for a drum type HRSG is the application of the Advanced
Cascading Blowdown system which saves more than 15% of water.
This is also valid for the complete Zero Discharge Concept which enables a reduction
of water consumption of more than 90%.
Page 10 of 12
The most favourable and economical application of the Zero Discharge Concept is given in
arid regions in combination with an air cooled condenser.
The air cooled condenser does not require make-up water for a cooling tower system. The
water demand of the power plant is therefore limited to the supply of the water/steam cycle.
Only the potable water supply has to be provided additionally which is normally below 5% of
the overall water consumption.
The Zero Discharge System ensures enormous water savings and enables a continuous
operation of the plant without the threat of power reduction or plant outages due to water
restrictions. Furthermore this system helps to reduce the life cycle costs which arise from the
continuous expenditures for the raw water supply, the subsequent treatment in the
demineralised water plant and charges for the disposal of effluents.
A further cost advantage is given by a size reduction of the demineralised water tank and the
raw water tank. Interruptions of the raw water supply need to be compensated by installing
huge tanks for the storage of water. Since these tanks are sized to ensure a save supply of the
water/steam cycle for a certain amount of time, a reduction of water consumption allows a
reduction in tank size. Of course, the water storage capacity must not fall below a certain
limit since the activities during commissioning phase of the plant need to be ensured.
3.1
About 40% of the system costs for the Zero Discharge Concept have to be spent for the
condensate polishing plant necessary for the treatment of the contaminated effluents. This is
where the BENSON type HRSG comes into play. A condensate polishing plant is mandatory
and available for this type of HRSG anyway. The effluents of the water/steam cycle can be
fed into the polishing plant as well without having the necessity for a separate treatment
plant. This improves the overall economical situation significantly.
Not to forget that the high capacity of the condensate polishing plant available for the
BENSON type HRSG allows for an optimization of the Zero Discharge Concept. The second
HRSG flash tank and the storage tank are not necessary any more since the strict separation
of contaminated and clean streams do not have to be applied. The capacity of the polishing
Page 11 of 12
plant is suitable to clean the higher mass flow the absolute number of contaminations
remains the same.
HP
IP
LP
Steam
Turbine
HRSG
Condensate
Storage Tank
Condenser
Clean
Drains
Flash
Tank
HRSG
Flash
Tank
Clean stream
Contaminated stream
Raw
Water
Tank
Condensate
Polishing Plant
Conclusion
The Zero Discharge System helps to reduce unfavorable impacts on the environment. Water
savings with the consequential reduction of water supply and water discharge can be
achieved by this system: The Zero Discharge system saves more than 90% waste water
compared to a conventional water/steam cycle.
Beside the environmental aspect the Zero Discharge Concept enhance the project profitability
by life cycle cost reduction. Certainly, the economical benefit of the Zero Discharge system
depends on the project boundary conditions. Protecting the environment and improving the
economical situation of a project is not a contradiction.
Page 12 of 12