Professional Documents
Culture Documents
A BAS system will have a capital cost of USD 100 to 150 per
Constructi
on, 11%
Operating cost
Financing,
14%
Operation,
50%
Alteration
s, 25%
Capex -20%
Opex -80%
Landloard,
18%
Tenant, 20%
Mar 2010
Air-Conditioning
2%
1%
6%
16%
46%
Apr 2010
4%
16%
47%
Lifts
27%
2%
1%
May 2010
5%
2%
Air-Conditioning
28%
2%
Air-Conditioning
Fire & Water Supply
16%
Central UPS
Lifts
28%
2%
Case Study 1
1,700,000 kWh per month
(1,700,000kWh/111,483m2)x12=182 kWh/m2 per year
Case study 2
600,000 kWh per month
(600000kWh/40000m2) x 12 = 180 kWh/m2 per year