NOTES:
Original Costs and Contract Value in 2011
were without Maintenance yard buildings.
Year End 2013 results declared with
maintenance yard buildings as Provisional
sum buildings added to the Contract.
Job Description
Job Nos.
Original
CTC
A
Savings
Savings
Revised Revised Cost DEC
Cost
CTC DEC- CTC - SEP 13 vs SEP Original vs
2013
2014
14
SEP 2014
B
D = C -B
E=C-A
(46,809)
(1,046,809)
MNE-413A
HVAC
MNE-413B
41,401,859
32,972,52 30,153,62
0
0
(2,818,900) (11,248,239)
Electrical
MNE-413C
60,270,040
54,967,61 52,976,69
8
3
(1,990,925) (7,293,347)
Plumbing
MNE-413D 11,901,014
10,832,31 10,619,71
3
1
(212,602)
Prelims
MNE-413E
21,521,15 33,713,19
3
3
12,192,040 15,722,052
17,991,141
(1,281,303)
Increased
by (RO)
Arbitration cost
2,000,000
3,000,000
6,500,000
1,080,000
COST ANALYSIS
Revised Cost
132.416
Material
77.966
Direct Labour
19.501
Indirect labour
17.920
3.255
Design
4.907
Provisions
4.953
Others
3.911
HVAC
Electrical
Plumbing
Prelims
Direct Labour
5.892
6.251
2.592
4.764
Indirect Labour
0.541
0.560
0.220
16.598
Total
6.433
6.811
2.812
21.362
19.499
17.919
37.418
Original
HVAC
Electrical
Plumbing
Prelims *
Revised
1.080
0.003
Casual Labour
0.538
3.000
0.141
14.678
19.498
Indirect Labour
0.541
0.560
0.220
16.598
17.919
COST AS ON END
NOVEMBER 2014
Discipline
Revised Budget
for Direct
Labour (A)
Balance for
Direct Labour
(C )
Subcontract
Labour (B)
Already
Spent (D)
Indirect
labour (T&C)
- ( E)
Total Available
Balance (C - D
+E)
HVAC
5,892,917
1,497,188
4,395,729
2,762,929
539,600
2,172,400
Electrical
6,251,105
892,439
5,358,666
5,433,418
558,781
484,029
Plumbing
2,592,673
2,592,673
2,042,402
220,124
770,395
Prelims
4,764,631
4,764,631
3,772,557
992,074
4,418,898
2,500,000
6,918,898
5,000,000
Discipline
Revised Budget
for Indirect
Labour (A)
Subcontract
Labour (B)
6
Balance for
Indirect Labour
(C )
Already
Spent (D)
Indirect
labour (T&C)
- ( E)
Total Available
Balance (C - D