Professional Documents
Culture Documents
The Standard
Illustrations
The International Standard for
Quality Management Systems
Leland R. Beaumont
07748 U.S.A.
ISO Easy
P.O. Box 21
Middletown, NJ 07748 U.S.A.
Electronic mail address: info@isoeasy.org
www.isoeasy.org
Phone: (732)-671-7130
Fax: (801)-340-4690
All rights reserved. No part of this publication may be reproduced in any form, in an electronic
retrieval system or otherwise, without prior written permission from the publisher, except for the
inclusion of brief quotations in a review.
Copyright 1995-2002 by Leland R. Beaumont
Printed in the United States of America
Published March 17, 2002
Other books by this author, published by ISO Easy:
ISO 9001, The Standard Interpretation
ISO 9001, The Standard Companion
Establish, document, and implement a quality management system and continually improve its
effectiveness.
+
+
Supplier Requirements
Customer Requirements
Inputs
Outputs
Supplier
Process
Adjustments
+
+
Inputs
Control
Process
Customer
Measurements
Outputs
Quality Policy
+
+
Quality
Policy
Quality Manual
+
+
Records
+
Quality
Manual
+
+
Documented Procedures
+
Procedures
Planning,
Operation,
and Control
Documents
+
+
Records
Document
Control
Procedures
Procedure
+
External
Document
+
Obsolete
Document
Demonstrates
+
+
Conformance to requirements
Effective operation of the quality management system
+
+
+
+
Legible
Readily identifiable
Readily retrievable
+
+
+
+
Record
Control
Procedures
Identified
Stored
Protected
Retrievable
Defined retention time
ISO 9001
Records
Quality
Policy
5 Management Responsibility
Customer Satisfaction
Quality Objective
Late Shipments
Quality Objective
Quality
Policy
5.4 Planning
Quality
Manual
Supplier Requirements
Customer Requirements
Outputs
Inputs
Supplier
Procedures
Process
Customer
Planning,
Operation,
and Control
Documents
10
At planned intervals
To ensure its continuing suitability, adequacy, and effectiveness
To assess opportunities for improvement and the need for changes in the quality management
system; including the quality policy and quality objectives
Audit Results
Customer Feedback
Process performance
Product conformity
Preventive and corrective action status
Follow-up actions from previous reviews
Changes that could affect the quality
management system
Recommendations for improvement
11
6 Resource Management
6.3 Infrastructure
Determine, provide and maintain infrastructure, including:
+
+
+
12
People whose work affects product or service quality must be competent for that work, based on
education, training, skills, and experience.
Trainin
g
High Sc
3 Years
Course
Course
+
+
Identify required
competencies, including
training needs.
+
+
Comple
ted:
hool Dip
loma
experie
nce
123
432
Maintain records of
training, skills and
experience.
13
+
+
Plan and develop processes needed to create products and deliver service.
Plan these processes as part of the quality management system.
Determine:
Inputs
Procedures
Customer Satisfaction
Quality Objective
Quality objectives
Process Step
A
Inputs
Process Step
C
Process Step
B
Decision
Process Step
E
Process Step
F
Process Step
G
Process Step
D
Outputs
Acceptance Criteria
Records of Conformity
Records
14
Product
Requirements
Records
Product information
Inquiries, contracts, order handling, job order changes
Customer feedback and complaints
15
t
Projec
Plan
Product
Design
Information
Records
Requirements
for
Purchased
Products
Supplier
Selection
Records
4 5 6 7 8 9
Work
Instructions
Test Meter
Calibrated
Date:10/15/94
Certificate Number 12543
Expires: 10/15/95
Signature Leland R. Beraumont
Adjustments
Calibration
VOID
If Tampered
+
+
Inputs
Control
Process
Measurements
Outputs
Passed
18
+
+
Identify all special processes where deficiencies become apparent only after delivery or use.
Validate all of these special processes to demonstrate their ability to achieve planned results.
Establish how each process will be validated, using the following methods as applicable.
Work
Instructions
Process
Validation
Records
19
Pending
Test
Passed
Failed
27
Pounds
The customer
Regulatory requirements
Industry practice
Identify the Product from the time it is received and during all stages of production, delivery and installation.
Shift
Hospital
123
55872
Third
Jones
Smith
UPS
Doctors
124
55873
Second
Doe
Wesson
UPS
General
125
55874
Second
Doe
Smith
FedEx
Doctors
20
Customer
ABC
Intellectual
Property
Customer-provided software
Customer
+
+
Customer
Property
Damage
Records
Identify, verify, protect, and safeguard customer-supplied product for use in the final product.
Record and report to the customer any lost, damaged, or unsuitable product.
21
Control product
packaging.
22
Monitoring
and
Measurement
Requirements
Measurement equipment is
identified and calibrated
at prescribed intervals.
4 5 6 7 8 9
Calibration Log
Equipment type
Equipment identifier
Location
Frequency of checks
Check method
Acceptance criteria
Test Meter
Action to be taken
when out of calibration
Calibrated
Date:10/15/01
Certificate Number 12543
Expires: 10/15/02
Signature Leland R. Beaumont
Calibration
VOID
If Tampered
Of Calibration
Certificate Number 12543
Test Meter Serial Number 765
Traceable to NIST
Calibration performed 10/15/01
Meets Manufactures Specs.
Leland R. Beaumont
23
+
+
Quality
Manual
Quality
Policy
Customer
Satisfaction
Late Shipments
Quality Objective
Adjustments
Corrective
Action
Request
Inputs
Control
Process
Measurements
Outputs
24
Customer Satisfaction
Results
Satisfied
5
7
Quality
Manual
Quality
Policy
Customer Satisfaction
Quality Objective
Late Shipments
Quality Objective
Corrective
Action
Request
25
+
+
Determine if quality activities and related results comply with planned arrangements.
Determine the effectiveness of the quality management system.
+
+
+
Schedule audits on the basis of status and importance of the activity being audited.
Consider results of previous audits.
Define criteria, scope, frequency, and method.
Auditors:
+
+
+
+
Audit
Procedures
Recorded.
Brought to the attention of those having
responsibility for the area audited.
Corrective and preventive action is taken
promptly.
Follow-up ensures improvement.
Corrective
Action
Request
26
Monitoring
and
Measurement
Plans
+
+
Monitor
and
Measurement
Records
Test Res
u
lts
Approved
+
Passed
by:
I. M. Auth
orized
27
Nonconforming
Product
Control
Procedures
Test Status
b) Accept by concession.
Passed
Nonconforming
Product
Records
Failed
28
Customer Satisfaction
Results
Prod
u ct c
Product
Requirements
Adjustments
Inputs
onfo
rm
ance
act
ion
dat
a(
data
(7.2.
Measurements
Control
Process
8.2
.1
THINGS TO DO
1)
n
ctio
nt a
e
em
rov
Imp
Outputs
Monitor
and
Measurement
Records
u
Prod
nd s
ct tre
p
Su
r
plie
4
(8.2.
ta (
da
)
7.4
Supplier
Selection
Records
29
+
+
+
+
+
+
30
+
+
+
+
+
Top management reviews the effectiveness of the quality management system (5.6).
31