You are on page 1of 1
@ wesc A? ay Engineering SPECIFICATION FOR BEDD = cocina -ataeeno_| DEMONSTRATION HEPA | ou ofeue on 2 2 Rev.No: 4 Job No. : A11226 Page : 24 of 47 installed, shall be determined analogous to 5.1.2.1.7 (1) above, 4) The suction side design pressure shall be fixed analogous to 5.1.2.1.7(1) above, in case where: relieving device is installed. In the absence of pressure relieving device, the design pressure shall be determined in the same manner sitnilar to 5.1.2.1.7 (2). 5.1.2.18 For positive displacement compresscrs, mechanical design pressures shall be determined analogous to 5.1.2.1.6 and 5.1.2.1.7 (4) for the discharge and suction sides, respectively 5.1.2.1.9 For shell-and-tube heat exchangers, the low pressure (LP) side of exchanger, including upstream and downstream systems, shall be preferably specified with a design pressure at least equal to ten-th rleenth (10/13) of high pressure (HP) side design pressure, in order to avoid having to install a pressure relief device on the LP side. The ten-thirteenth criteria shall necessarily be adhered to when: 1) LP fluid is on the tube side. 2) Relief discharge cannot be conne:ted to flare header owing to nature of fluid 3) Relief discharge is two-phase anc cannot be connected conveniently to a low-pressure destination with “ree-draining piping, 4) Liquid relief cannot be connected to a closed blowdown system 5) The ten-thirteenth criteria calls for an increase by less than a factor cf 1.3 of the mechanical design pressure of the LP side as would be calculated from normal estimation procedures.

You might also like