[ce] SPECIFICATION FOR: BEDD Q sasomneme
A aay Engineering
q DEMONSTRATION H2 PSA
DOG.No. : A11226-PR-10 UNIT AT VR Date of Issue : Oct 12. 2012
Rev.No: 4 Job No. : A11226 Page : 28 of 47
5.13.1.2. The exchangers can be stacked considering the size of exchangers,
equipment layout and approach for operaition and maintenance.
Stack upto 3 shells when shell diameter is less than 1000 mm and individual
shell isolation and bypasses are not provided. For other cases, limit stacking
to 2 shells.
5.1.3.1.3. Vertical thermo syphon horizontal thermo syphon or kettle type
re-bollers can be specified by unit designers, as found appropriate
Considerations shall be given to
+ Process fluid degradation,
+ Fouling tendency of process fluid,
+ Process hold-up volumes within exckangers and constraints, if any,
+ Film boiling possibilities and tempera ure difference between hot and cold
fluids,
+ Width of boiling range,
+ Vaporization rates and variations anticipated,
+ Equipment cost,
+ Equipment space and installation cor straints, if any,
+ To ensure effective natural circulator.
Stabbed-in re-boilers shall be avoided as far as possible in
order to facilitate equipment maintenence.
General criteria for selection of TEMA type of exchangers shall be:
fey