You are on page 1of 1
[ce] SPECIFICATION FOR: BEDD Q sasomneme A aay Engineering q DEMONSTRATION H2 PSA DOG.No. : A11226-PR-10 UNIT AT VR Date of Issue : Oct 12. 2012 Rev.No: 4 Job No. : A11226 Page : 28 of 47 5.13.1.2. The exchangers can be stacked considering the size of exchangers, equipment layout and approach for operaition and maintenance. Stack upto 3 shells when shell diameter is less than 1000 mm and individual shell isolation and bypasses are not provided. For other cases, limit stacking to 2 shells. 5.1.3.1.3. Vertical thermo syphon horizontal thermo syphon or kettle type re-bollers can be specified by unit designers, as found appropriate Considerations shall be given to + Process fluid degradation, + Fouling tendency of process fluid, + Process hold-up volumes within exckangers and constraints, if any, + Film boiling possibilities and tempera ure difference between hot and cold fluids, + Width of boiling range, + Vaporization rates and variations anticipated, + Equipment cost, + Equipment space and installation cor straints, if any, + To ensure effective natural circulator. Stabbed-in re-boilers shall be avoided as far as possible in order to facilitate equipment maintenence. General criteria for selection of TEMA type of exchangers shall be: fey

You might also like