You are on page 1of 1
eB SPECIFICATION FOR BEDD | ocne.:atvacense | OENONSTRATION HZ PSA on arene: on 70 Rev.No: 4 Job No. : 11226 Page : 31 of 47 AM any cosineering [tube | CS/Low | High Alioy | Non ferrous Metallurgy | Alloy Steel | (above SCr, % | (Admiralty | Alloys {upto end | Moand.up | brass, Cu-Ni, |__(Incoloy, including 5Cr, | through etc.) Titanium, ete.) % Me) austenitic | ____ |Stainiess steo!) | Tube diameter | 25/20 25/20 257/20 25/20 | 25 mm (OD) _ Tube zero | 2016 | 206 | tasos | 20 Thickness (min) __ | | Tube thickness) 23/29 23i23 | 23/23 [| — = for IBR Service | Preferred tube OD will be: 20mm for fouling factor < 0.0004 hr-m2.°Cikcal, 25mm for fouling factor > 0.0004 hr-m2-°Cikcal. 5.1.3.3. METALLURGY 5.1.1.3.1 Lube oll cooler for lube oil / seal oil consoles shall be preferably SS 302. 5.1.3.4. FOULING FACTORS. 5.1.3.4.1. FOULING FATORS FOR PROCESS STREAMS Fouling factors for process streams are decided by licensor / designer based fon past experisnce and good design practices. However, specific requirements of Owner are addressed in individual unit design basis document. 5.1.3.4.2, FOULING FACOTRS FOR UTILITY STREAMS

You might also like