You are on page 1of 8
HYDROSTATIC TEST REPORT M&P Ref, No. + 81247350 Customer + M/S. RELIANCE INDUSTRIES UNITED Project: JAMNAGAR 3 Os & Us Site + ROGC COOLING TOWER PO No. + 1E/9/P0-104/PUMP/2014-15 Dated: 08.09.2014 We certify that the following Casings & Covers, which contain fuld under pressure are Hydrostatic Tested to confirm the leak and soundness of Castings Components, duration 30 minutes, No Leakage / Drop in Pressure Observed. ie Tost Pressure in | BE pump ttodet/ ray No. Purnp Se. Wo. Kofem? ot PN ISO No, 7 PUMP 81247350/300/1 15.00 MP-CYC731-P-009 A/B 81247350/300/2 im x | PRESSURE GAUGE DETAILS: Pressure Gauge No. 1735 Gouge Range 0 70 42.00 Kokam | Caltoration Due Date zzz y | Above inspected casings & covers are found satisfactory In hydro test, accepted, iy, py ns QUALITY ASSURANCE DYNAMIC BALANCIN: PORT DATE: 10.04.2015 MAP Reference No. : 81247350 Customer 1 M/S. RELIANCE INDUSTRIES LIMITED. Project: JAMNAGAR 3 Os & Us Site + ROGC COOLING TOWER PONo. — + 16/9/P0-104/PUMP/2014-15 Dated: 08,09,2014 We certify that the following Impeller with particulars given here under are dynamically balanced as per ISO 1940 Grade 2.5 & found satisfactory in balancing, Accepted. on Pormssibie 7 sk, Operating Residual Unbalance fd Purp Modet Pump Sr. Noy Bocce | Unbalanee a nen PN ISO No. 7 PUMP es on MP-CYC731-P-009_ | 81247350/300/1 ~ 4.4, a 0.29 @ 176° NB, — C| 81247350/309/2 at 0.3 @ 353° TE: ORT. DATE: 10.04.2015 MB&P Ref. No, + 81247550 Customer 5 (M/S. RELIANCE INDUSTRIES LIMITED Project: JAMNAGAR 3 Os & Us Site 1 LDPE COOLING TOWER PO No. — + 1E/9/PO-104/PUMP/2014-15 Dated: 08.09.2014 We certify that the following Casings & Covers, which contain fuid under pressure are Hydrostatic Tested to confirm the leak and soundness of Castinys Components, duration 30 minutes, No Leakage / Drop in Pressure Observed. PRESSURE GAUGE DETAILS: Sr a Pump Model/Tag No. 7 PN- B PUMP Test Pressure in Pump Sr. No. Kagem? Fit 0/ 2B0/4 45.00 81247350/280/2 Pressure Gauge No. 1735 Gauge Range Calibration Due Date 0 70 42.00 Kgfem? 22.12.2015 Above Inspected casings & covers are found satisfactory in hydiro test, accepted. cea at \e2) aN 4 QUALITY ASSURANCE, DYNAMIC BALANCING REPORT DATE: 10.04.2015 —~ MB&P Reference No. : 81247350 Customer + M/S. RELIANCE INDUSTRIES UMITED Projact 1 JAMNAGAR 3 Os & Us Site + LOPE COOLING TOWER PONo. + It/9/P0-104/PUMP/2014-158 Dated: 08.09.2014 We certify that the following Impeller with particulars given here under are dynamically balanced as per ISO 1940 Grade 2.5 & found satisfactory in balancing, Accepted. - F i Pormlssibe ; m.wo.] rump node ruse, | S| die n | dane Ornate 81247350/280/1 MP-C¥C734-P-009 147350/: | 0.06 @ 134° “ Ais | at2a73s0/2a0/2"{ 7930 ssi 0.03. @ 71° — © = z £ HYDROSTATIC TEST REPORT DATE: 10.04.2015 MBP Ref. No, : 81247350 Customer + M/S. RELIANCE INDUSTRIES LIMITED Project + JAMNAGAR 3 Os & Us Site 2 FIRE WATER PO No. IE/9/PO-L04/PUMP/2014-15 Dated: 08.09.2014 We certify that the following Casings & Covers, which contain fluid under pressure are Hydrostatic Tested to confirm the leak and soundness of Castings Components, duration 30 minutes, No Leakage / Drop in Pressure Observed, Test Pressure in Pump Model/tag No. Pump Sr. No. Ky/em? PN « & PUMP 5: a PN = B PU 81247350/280/3 | 15.00 MP-CYC7EY--009 A78 81247350/280/8 - | | PRESSURE GAUGE DETAILS:~ | Pressure Gauge No. 4735 Gauge Range 0 To 42.00 Kolem? / Above _Inspected casings & covers are found satisfactory in hydro test, accepted. _ovrnont quarry assuRANCE DYNAMIC BALAN DATE: 10.04.2015 MBP Reference No. : 81247350 Customer + 1/5. RELIANCE INDUSTRIES LIMITED Project; JAMNAGAR 3 Os & Us C ra Site + FIRE WATER PONo. + 1£/9/P0-104/PUMP/2014- Dated: 08.09.2014 We certify that the following Impeller with particulars given here under are dynamically balanced as per ISO 1940 Grade 2.5 & found satisfactory in balancing, Accepted aisaibte : ump Model runpse.no. | ©2¢aa| matanonin | Rr Unbatnce ma. rt pwe pump © Mi _ i 81247350/280/3 0.01 @ 17° MP-CYC?14-P-009 1B | gr aa7aso/2aq/4 | 2930 ae 0.06 @ 224° HYDROSTATIC TEST REPORT DATE: 10.04.2018 MBP Ref, No. + 81247350 Customer + M/S. RELIANCE INDUSTRIES LIMITED Project: JAMNAGAR 3 Os & Us Site 1 MEG ASU COOLING TOWER PONo. — : 1E/9/PO-104/PUMP/2014-15 Dated: 08.09.2014 We certify that the following Casings & Covers, which contain fluid under pressure are Hydrostatic Tested to confirm the leak and soundness of Castings Components, duration 30 minutes, No Leakage / Drop in Pressure Observed. rs Tost Pressure in Br pump Modet/Tag No. Pump Sr. No. 7 Kg/om? PN ISO No. 7 PUMP 81247350/340/1 15.00 O14 MP-CYC735-P-009 A/B 81247350/310/2 PRESSURE GAUGE DETAILS: re Gauge No. | Gauge Range 0 To 42.00 Kgjem? | Calibration Due Date 22.12.2015 Above Inspected casings & covers are found satisfactory in hydro test, accepted. QUALITY ASSURANCE M&P Reference No. : 81247350 Customer: M/S. RELIANCE INDUSTRIES LIMITED Project: JAMNAGAR 3 Os & Us Site i MEG ASU COOLING TOWER PONo. — : 1E/9/PO-104/PUMP/2014-15 Dated; 08.09.2014 © DATE: 11.04.2015 We corlify that the following Impeller with particulars given here under are dynamically balanced as per 1S0 1940 Gyade 2.5 & found satisfactory in balancing, Soa Accepted, Ss mlssibte sR. Operating Residual Undolance ne Puma stool Pump Sr, Wo poet | Urbane in rps 11150 No. 7 PUMP. : ian E 81247350/310/1,| : 0.24 @ 331° OL | MPCVEISSP-009 MB | exza7s50/310/2| 793° = 0.27 @ 267° ehh. Patll | WMPPPL, Qa,

You might also like